7101 W MACAPA DR 90068

Certificate Information: 7101 W MACAPA DR 90068

Application / Permit
15010-20000-04094
Plan Check / Job No.
B15VN15168
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Recreation Room
Work Description
NEW REC ROOM WITH ATT DECK AND BATHROOM WHICH SHOWER IS ACCEESSABLE FROM OUTSIDE. DECK ABOVE REC ROOM. CONSTRUCTION ON PILES.
Permit Issued
Issued on 10/25/2016
Issuing Office
Metro
Current Status
CofO Issued on 4/15/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/10/2015 APPLICANT
Assigned to Plan Check Engineer 12/17/2015 RODNEY SAMIIAN
Corrections Issued 1/5/2016 RODNEY SAMIIAN
Quality Review Completed 1/5/2016 STEVEN KIM
Building Plans Picked Up 1/8/2016 APPLICANT
Green Plans Picked Up 1/20/2016 APPLICANT
Applicant returned to address corrections 3/15/2016 RODNEY SAMIIAN
Plan Check Approved 9/20/2016 RODNEY SAMIIAN
Issued 10/25/2016 LADBS
CofO in Progress 4/10/2024 BRIAN SULLIVAN
Permit Finaled 4/15/2024 RONALD MYRICK
CofO Issued 4/15/2024 RONALD MYRICK
Permit Finaled 4/15/2024 RONALD MYRICK

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 1/8/2016 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 1/8/2016 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 1/8/2016 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 1/8/2016 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 1/8/2016 LEE GUILBEAUX
Hydrant and Access approval Cleared 1/8/2016 JOHN DALLAS
Sewer availability Cleared 1/8/2016 LEE GUILBEAUX
Public Works-Highway Ded. Cleared 1/8/2016 LEE GUILBEAUX
Low Impact Development Cleared 8/9/2016 MICHAEL SCADUTO
Roof/Waste drainage to street Cleared 8/16/2016 IRENE CHIA
Miscellaneous Cleared 9/13/2016 NORALI MARTINEZ
Specific Plan Cleared 9/13/2016 NORALI MARTINEZ
Green Code Cleared 9/20/2016 ROLLIN GETTLE III

Contact Information

Contractor Glynn Designbuild Inc; Lic. No.: 841188-B 20944 WAVEVIEW DRIVE      TOPANGA, CA 90290
Engineer Irvine, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD      PASADENA, CA 91107
Engineer Resnick, Bruce Daniel; Lic. No.: S3293 1927 PONTIUS AVE      LOS ANGELES, CA 90025

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 12/30/2016 Not Ready for Inspection BRIAN SULLIVAN
Piling/Pier/Caisson 1/3/2017 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 3/13/2017 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 4/24/2017 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 4/24/2017 Partial Approval BRIAN SULLIVAN
Deputy Shotcrete 4/27/2017 Conditional Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 5/12/2017 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 5/12/2017 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 5/18/2017 Partial Approval BRIAN SULLIVAN
Deputy Steel/Welding 6/19/2017 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 6/20/2017 Conditional Approval BRIAN SULLIVAN
Deputy Steel/Welding 6/21/2017 Conditional Approval BRIAN SULLIVAN
Structural Steel Frame 6/27/2017 Not Ready for Inspection LUIS BARRALES
Structural Steel Frame 6/30/2017 Partial Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 7/17/2017 Partial Approval BRIAN SULLIVAN
Gas Test 9/28/2017 Not Ready for Inspection BRIAN SULLIVAN
Sewer 9/28/2017 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 10/11/2017 Not Ready for Inspection BRIAN SULLIVAN
Sewer 10/11/2017 Not Ready for Inspection BRIAN SULLIVAN
Underground Mechanical 10/11/2017 Corrections Issued BRIAN SULLIVAN
PLUMBING-Rough 10/17/2017 Partial Inspection BRIAN SULLIVAN
Underground Mechanical 10/17/2017 Partial Inspection BRIAN SULLIVAN
ELECTRICAL-Rough 10/24/2017 Partial Approval BRIAN SULLIVAN
Sewer 10/24/2017 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 1/24/2018 Conditional Approval BRIAN SULLIVAN
PLUMBING-Rough 1/24/2018 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 1/29/2018 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 2/14/2018 Not Ready for Inspection BRIAN SULLIVAN
Shower Pan 2/16/2018 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 2/22/2018 Approved BRIAN SULLIVAN
Green Building Rough 2/22/2018 Approved BRIAN SULLIVAN
HVAC-Rough 2/22/2018 Approved BRIAN SULLIVAN
Verify Sprinkler Sign Off 2/22/2018 Approved BRIAN SULLIVAN
Drywall Nailing 3/2/2018 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 3/2/2018 Partial Approval BRIAN SULLIVAN
Interior/Exterior Lathing 3/28/2018 Approved BRIAN SULLIVAN
PLUMBING-Final 3/30/2018 Partial Approval BRIAN SULLIVAN
Final 3/12/2021 Corrections Issued BRIAN SULLIVAN
Footing/Foundation/Slab 3/12/2021 Approved BRIAN SULLIVAN
Green Building Final 3/12/2021 Not Ready for Inspection BRIAN SULLIVAN
Reinforced Concrete Frame 3/12/2021 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 3/12/2021 SGSOV Not Ready BRIAN SULLIVAN
Service/Power Release 3/12/2021 Not Ready for Inspection BRIAN SULLIVAN
Smoke Detectors 3/12/2021 Not Ready for Inspection BRIAN SULLIVAN
Final 3/28/2024 Corrections Issued BRIAN SULLIVAN
Green Building Final 3/28/2024 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 3/28/2024 SGSOV Approved BRIAN SULLIVAN
Service/Power Release 3/28/2024 Approved BRIAN SULLIVAN
Smoke Detectors 3/28/2024 Approved BRIAN SULLIVAN
Final 4/10/2024 OK to Issue CofO BRIAN SULLIVAN