115 W PARK CIR 90067
Certificate Information: 115 W PARK CIR 90067
- Application / Permit
- 15010-10010-02801
- Plan Check / Job No.
- B19LA15478
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (35) Condo-Multi Family
- Work Description
- SUPPLEMENTAL TO PERMIT #15010-10000-02801 DEFERRED SUBMITTAL FOR SOUTH TOWER INTERIOR NON BEARING METAL STUDS WALLS.
- Permit Issued
- Issued on 9/12/2019
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 1/26/2022
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 8/1/2019 | APPLICANT |
| Assigned to Plan Check Engineer | 8/15/2019 | GARO TELMI |
| Corrections Issued | 8/16/2019 | GARO TELMI |
| Quality Review Completed | 8/22/2019 | CHAD DOI |
| Building Plans Picked Up | 8/23/2019 | APPLICANT |
| Plan Check Approved | 9/9/2019 | GARO TELMI |
| Issued | 9/12/2019 | LADBS |
| Permit Finaled | 1/25/2022 | DERRICK SPENCER |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Architect | Keys, Reginald Douglas; Lic. No.: C28841 | 1026 N LAUREL AVENUE WEST HOLLYWOOD, CA 90046 |
| Contractor | Webcor Construction L P; Lic. No.: 1037217-A | 1751 HARBOR BAY PARKWAY SUITE 200 ALAMEDA, CA 94502 |
| Engineer | Faghihi, Mahmoud; Lic. No.: S5789 | 888 S FIGUEROA STREET 18TH FLOOR LOS ANGELES, CA 90017 |
| Engineer | Waggoner,, Michael Alan; Lic. No.: S3738 | 10641 BENT TREE RD SANTA ANA, CA 92705 |
Inspector Information
| DERRICK SPENCER, (310) 914-3919 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Light Gage Steel Frame | 1/29/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 2/25/2020 | Approved | DERRICK SPENCER |
| Light Gage Steel Frame | 2/26/2020 | Not Ready for Inspection | DERRICK SPENCER |
| Light Gage Steel Frame | 6/25/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 7/7/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 8/4/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/4/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/6/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/6/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/7/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/7/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/10/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 8/10/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/11/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/11/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/12/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 8/13/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/14/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/17/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 8/18/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/18/2020 | Not Ready for Inspection | DERRICK SPENCER |
| Light Gage Steel Frame | 8/19/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/20/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/20/2020 | Partial Approval | DERRICK SPENCER |
| Pre-Inspection | 8/20/2020 | Approved | DERRICK SPENCER |
| Drywall Nailing | 8/21/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 8/21/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/21/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/24/2020 | Approved | DERRICK SPENCER |
| Insulation | 8/24/2020 | Not Ready for Inspection | DERRICK SPENCER |
| Light Gage Steel Frame | 8/24/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/25/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/26/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 8/26/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/26/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/27/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/27/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/28/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 8/28/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 8/31/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 8/31/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/1/2020 | Partial Approval | DERRICK SPENCER |
| Pre-Inspection | 9/1/2020 | Approved | DERRICK SPENCER |
| Drywall Nailing | 9/2/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 9/2/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/2/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 9/3/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/3/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 9/4/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 9/4/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/8/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 9/9/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/9/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 9/10/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/10/2020 | Partial Approval | DERRICK SPENCER |
| Pre-Inspection | 9/10/2020 | Approved | DERRICK SPENCER |
| Drywall Nailing | 9/11/2020 | Conditional Approval | DERRICK SPENCER |
| Insulation | 9/11/2020 | Conditional Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/11/2020 | Conditional Approval | DERRICK SPENCER |
| Drywall Nailing | 9/14/2020 | Partial Approval | JONATHAN ALLEN |
| Light Gage Steel Frame | 9/14/2020 | Partial Approval | JONATHAN ALLEN |
| Insulation | 9/15/2020 | Partial Approval | PAUL DAVIDSON |
| Light Gage Steel Frame | 9/15/2020 | Partial Approval | PAUL DAVIDSON |
| Drywall Nailing | 9/16/2020 | Not Ready for Inspection | PAUL DAVIDSON |
| Light Gage Steel Frame | 9/16/2020 | Partial Approval | PAUL DAVIDSON |
| Light Gage Steel Frame | 9/18/2020 | Not Ready for Inspection | PAUL DAVIDSON |
| Drywall Nailing | 9/21/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 9/21/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/21/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 9/22/2020 | Partial Approval | DERRICK SPENCER |
| Final | 9/22/2020 | Not Ready for Inspection | DERRICK SPENCER |
| Insulation | 9/22/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 9/23/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 9/23/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/23/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 9/24/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 9/24/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/24/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 9/25/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/25/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 9/28/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 9/28/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 9/29/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/29/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 9/30/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 9/30/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/1/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 10/1/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 10/2/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 10/2/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 10/5/2020 | Approved | DERRICK SPENCER |
| Light Gage Steel Frame | 10/5/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 10/6/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/6/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 10/7/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/7/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 10/7/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/8/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 10/8/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 10/9/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/9/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 10/9/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 10/13/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/14/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 10/14/2020 | Partial Inspection | DERRICK SPENCER |
| Drywall Nailing | 10/15/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/15/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/20/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 10/20/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/22/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 10/22/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 10/23/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 10/23/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 10/30/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 11/4/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 11/4/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 11/4/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 11/6/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 11/20/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 11/20/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 11/23/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 11/23/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 11/23/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 11/24/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 11/24/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 11/24/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 11/25/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 11/30/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 11/30/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 12/1/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 12/1/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 12/7/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 12/10/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 12/10/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 12/14/2020 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 12/16/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 12/16/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 12/16/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 12/17/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 12/23/2020 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 12/23/2020 | Partial Approval | DERRICK SPENCER |
| Insulation | 1/8/2021 | Approved | DERRICK SPENCER |
| Insulation | 1/14/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 1/14/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 1/19/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 1/19/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 1/25/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 1/25/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 1/28/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 1/28/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 2/1/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 2/1/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 2/5/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 2/9/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 2/11/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 2/16/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 2/16/2021 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 2/17/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 2/17/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 2/17/2021 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 2/18/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 2/18/2021 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 2/23/2021 | Partial Inspection | DERRICK SPENCER |
| Insulation | 2/26/2021 | Approved | DERRICK SPENCER |
| Light Gage Steel Frame | 2/26/2021 | Approved | DERRICK SPENCER |
| Light Gage Steel Frame | 3/3/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 3/5/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 3/5/2021 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 3/10/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 3/10/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 3/10/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 3/12/2021 | Partial Approval | PAUL DAVIDSON |
| Insulation | 3/17/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 3/17/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 3/19/2021 | Partial Approval | DERRICK SPENCER |
| Structural Steel Frame | 3/22/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 3/24/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 3/25/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 3/31/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 3/31/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 4/12/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 4/12/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 4/14/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 4/14/2021 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 4/16/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 4/16/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 4/20/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 4/20/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 4/21/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 4/21/2021 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 4/27/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 4/27/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 4/28/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 5/4/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 5/5/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 5/10/2021 | Partial Approval | SORIN CIRSTOIU |
| Light Gage Steel Frame | 5/17/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 5/19/2021 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 5/24/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 5/24/2021 | Partial Approval | DERRICK SPENCER |
| Drywall Nailing | 5/25/2021 | Partial Approval | DERRICK SPENCER |
| Insulation | 5/25/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 5/27/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 6/10/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 6/15/2021 | Approved | DERRICK SPENCER |
| Light Gage Steel Frame | 6/23/2021 | Approved | DERRICK SPENCER |
| Light Gage Steel Frame | 6/24/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 6/25/2021 | Approved | DERRICK SPENCER |
| Light Gage Steel Frame | 7/13/2021 | Partial Approval | DERRICK SPENCER |
| Light Gage Steel Frame | 7/16/2021 | Approved | DERRICK SPENCER |
| Insulation | 7/20/2021 | Approved | DERRICK SPENCER |
| Light Gage Steel Frame | 7/20/2021 | Approved | DERRICK SPENCER |
| Light Gage Steel Frame | 10/14/2021 | Approved | DERRICK SPENCER |
| Interior/Exterior Lathing | 10/15/2021 | Approved | DERRICK SPENCER |
| Final | 1/25/2022 | Permit Finaled | DERRICK SPENCER |
| Smoke Detectors | 1/25/2022 | Approved | DERRICK SPENCER |