Drywall Nailing
|
10/30/2023
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Pre-Inspection
|
10/30/2023
|
Approved
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
10/31/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
10/31/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/3/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
11/3/2023
|
Approved
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/9/2023
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Grading Pre-Inspection
|
11/13/2023
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Masonry Wall/Backfill
|
11/13/2023
|
Partial Inspection
|
RONALD JIMENEZ
|
|
Pre-Inspection
|
11/13/2023
|
Approved
|
RONALD JIMENEZ
|
|
Pre-Inspection
|
12/6/2023
|
Approved
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
12/11/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/11/2023
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/18/2023
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
1/9/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/10/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/16/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
1/17/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
1/17/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/18/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/18/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
1/18/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/18/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/18/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
1/19/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
1/19/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
1/30/2024
|
Approved
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
1/30/2024
|
No Access for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/30/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/30/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/31/2024
|
Approved
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/31/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/31/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/31/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Deputy Wood Construction
|
2/1/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
2/2/2024
|
Approved
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/2/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
2/9/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Insulation
|
2/12/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/12/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/12/2024
|
Partial Inspection
|
JEROME BLACKWOOD
|
|
Deputy Wood Construction
|
2/16/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/16/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/16/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
2/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Wood Construction
|
2/23/2024
|
Approved
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/23/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/23/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/27/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
3/5/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
3/5/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/26/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
3/26/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/28/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/2/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/8/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Drywall Nailing
|
4/19/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/19/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
4/26/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
4/26/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
5/3/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
5/3/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/7/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
5/7/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/10/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
5/10/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
5/15/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
5/15/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
5/20/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/3/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/5/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
6/11/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Pre-Inspection
|
6/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/21/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/24/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/24/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
7/5/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
T-Bar Ceiling
|
7/9/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/16/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/31/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
8/14/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
8/21/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
8/26/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/26/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
9/13/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
9/27/2024
|
Partial Approval
|
NICK DANERI
|
|
Pre-Inspection
|
9/27/2024
|
Partial Approval
|
NICK DANERI
|
|
Pre-Inspection
|
9/30/2024
|
Approved
|
DAVID BURKHEAD
|
|
Insulation
|
10/9/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/30/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
10/30/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/31/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
11/7/2024
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
11/12/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
11/15/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
12/5/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/23/2024
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
1/7/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
2/10/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/10/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
2/12/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
2/27/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
2/28/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/5/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Insulation
|
3/10/2025
|
Partial Approval
|
TIMOTHY POWELL
|
|
Pre-Inspection
|
3/12/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
3/17/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
3/24/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
3/25/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
4/1/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
4/9/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/11/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
4/11/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/15/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
4/15/2025
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
4/16/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
4/17/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
4/25/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/2/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
5/8/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
5/13/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/13/2025
|
Approved
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
5/16/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/22/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
5/27/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/27/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
5/29/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
5/29/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
6/3/2025
|
Partial Approval
|
LUIS CCAMACHO
|
|
Pre-Inspection
|
6/3/2025
|
Partial Inspection
|
LUIS CCAMACHO
|
|
Pre-Inspection
|
6/4/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Excavation/Setback/Form/Re-Bar
|
6/5/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
6/10/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/16/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
6/20/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
7/3/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
7/9/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/9/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/11/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/11/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
7/25/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
7/29/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Masonry Wall/Backfill
|
8/1/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/1/2025
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
8/8/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/15/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/22/2025
|
Not Ready for Inspection
|
PAUL BAZERKANIAN
|
|
Insulation
|
8/25/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
8/28/2025
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/4/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
9/9/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
9/18/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
9/24/2025
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Interior/Exterior Lathing
|
9/25/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Pre-Inspection
|
9/25/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
9/30/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Wall Anchors
|
9/30/2025
|
Corrections Issued
|
LARRY ARNICK
|
|
Wood Frame
|
10/3/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/8/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
10/14/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
10/14/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/17/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
10/30/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
10/31/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
11/6/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
11/10/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
11/13/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
11/19/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/19/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
11/24/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
11/24/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
12/2/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/2/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/3/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/3/2025
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
12/12/2025
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
12/22/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/2/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/7/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/8/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/9/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/12/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/13/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/22/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
1/22/2026
|
Partial Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
1/29/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/20/2026
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/23/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
2/27/2026
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/2/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
3/11/2026
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
3/27/2026
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
4/1/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
4/2/2026
|
Approved
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
4/2/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
4/6/2026
|
Corrections Issued
|
DAVID BURKHEAD
|