11005 W BELLAGIO PL 90077

Certificate Information: 11005 W BELLAGIO PL 90077

Application / Permit
15010-10000-04320
Plan Check / Job No.
B15LA16666
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2 STORY SINGLE FAMILY RESIDENCE with NFPA 13D FIRE SPRINKLERS
Permit Issued
Issued on 9/6/2016
Issuing Office
Metro
Current Status
CofO Issued on 4/26/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/25/2015 APPLICANT
Green Plans Picked Up 12/7/2015 APPLICANT
Assigned to Plan Check Engineer 12/17/2015 ERIC CABRERA
Corrections Issued 12/20/2015 ERIC CABRERA
Quality Review Completed 12/29/2015 GARO TELMI
Building Plans Picked Up 12/29/2015 APPLICANT
Applicant returned to address corrections 3/22/2016 ERIC CABRERA
Plan Check Approved 8/24/2016 ERIC CABRERA
Issued 9/6/2016 LADBS
CofO in Progress 4/19/2023 CARLOS MATAMOROS
Permit Finaled 4/26/2023 DANIEL ORRANTE
CofO Issued 4/26/2023 DANIEL ORRANTE
Permit Finaled 4/26/2023 DANIEL ORRANTE

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 1/4/2016 KARAN PATEL
BHO/Hillside ordinance Cleared 1/4/2016 KARAN PATEL
Highway dedication Cleared 1/4/2016 KARAN PATEL
Permit Cleared 1/4/2016 KARAN PATEL
Sewer availability Cleared 1/4/2016 KARAN PATEL
Work Adjacent to Public Way Cleared 1/4/2016 DAVID PEREZ
BHO/Hillside ordinance Cleared 1/8/2016 HUGO RICO
BHO/Hillside ordinance Cleared 1/8/2016 HUGO RICO
BHO/Hillside ordinance Cleared 1/8/2016 HUGO RICO
Highway dedication Cleared 1/8/2016 HUGO RICO
Miscellaneous Cleared 1/8/2016 HUGO RICO
Eng Process Fee Ord 176,300 Cleared 1/12/2016 ARNULFO NUNO
Miscellaneous Cleared 1/15/2016 VINCENT QUITORIANO
ZI Cleared 1/15/2016 VINCENT QUITORIANO
GPI Written Notices Cleared 3/22/2016 ERIC CABRERA
Grading Pre-Inspection Cleared 3/22/2016 ERIC CABRERA
Green Code Cleared 3/24/2016 DONALD CRICHLOW
Low Impact Development Cleared 4/12/2016 MARTIN FRAGOSO
Excavation more than 5-ft deep Cleared 4/19/2016 CALOSHA APPROVED
Hydrant and Access approval Cleared 4/26/2016 ROBERT DUFF
Roof/Waste drainage to street Cleared 6/24/2016 ADRIAN SANCHEZ
Construction within easement Cleared 9/1/2016 LUCIO FERRER
Permit Cleared 9/6/2016 NIRAV PATEL

Contact Information

Contractor Tyler Development Corporation; Lic. No.: 451882-B 1932 COTNER AVE      LOS ANGELES, CA 90025
Engineer Labib, Youhanna T; Lic. No.: S4549 209 E EL SEGUNDO BLVD      EL SEGUNDO, CA 90245
Engineer Peck, Christopher Mount; Lic. No.: C58162 25 SOUTH EL MOLINO AVE      PASADENA, CA 911012023
Geologist Hollingsworth, Robert Alan; Lic. No.: EG1265 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

EVAN COOPER, (310) 914-3861 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 4/14/2017 Partial Inspection THOMAS FINNILA
Footing/Foundation/Slab 4/17/2017 Partial Inspection THOMAS FINNILA
Deputy Reinf. Concrete 4/18/2017 Conditional Approval THOMAS FINNILA
Deputy Reinf. Concrete 4/19/2017 Conditional Approval THOMAS FINNILA
Piling/Pier/Caisson 4/19/2017 Partial Approval THOMAS FINNILA
Deputy Reinf. Concrete 4/20/2017 Conditional Approval THOMAS FINNILA
Deputy Reinf. Concrete 4/21/2017 Conditional Approval THOMAS FINNILA
Deputy Reinf. Concrete 5/23/2017 Conditional Approval DANIEL ORRANTE
Footing/Foundation/Slab 5/26/2017 Partial Approval THOMAS FINNILA
Deputy Shotcrete 6/12/2017 Conditional Approval THOMAS FINNILA
Reinforced Concrete Frame 6/13/2017 Conditional Approval THOMAS FINNILA
Deputy Shotcrete 6/14/2017 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 6/22/2017 Partial Approval THOMAS FINNILA
Reinforced Concrete Frame 6/22/2017 Partial Approval THOMAS FINNILA
Deputy Shotcrete 6/23/2017 Conditional Approval DANIEL ORRANTE
Footing/Foundation/Slab 7/14/2017 Partial Approval THOMAS FINNILA
Reinforced Concrete Frame 7/25/2017 Conditional Approval THOMAS FINNILA
PLUMBING-Rough 8/7/2017 Partial Inspection THOMAS FINNILA
Footing/Foundation/Slab 9/12/2017 Conditional Approval THOMAS FINNILA
Deputy Reinf. Concrete 9/14/2017 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 9/19/2017 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 9/25/2017 Conditional Approval THOMAS FINNILA
Deputy Reinf. Concrete 9/28/2017 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 10/4/2017 Partial Approval THOMAS FINNILA
Footing/Foundation/Slab 10/13/2017 Not Ready for Inspection THOMAS FINNILA
Footing/Foundation/Slab 10/23/2017 Partial Approval THOMAS FINNILA
Deputy Reinf. Concrete 10/26/2017 Conditional Approval THOMAS FINNILA
Deputy Reinf. Concrete 10/27/2017 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 11/7/2017 Conditional Approval THOMAS FINNILA
Deputy Reinf. Concrete 11/9/2017 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 11/16/2017 Partial Approval THOMAS FINNILA
Footing/Foundation/Slab 12/5/2017 Partial Approval DANIEL ORRANTE
Special/Order Compliance 12/23/2017 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 1/23/2018 Partial Inspection THOMAS FINNILA
Footing/Foundation/Slab 2/1/2018 Partial Inspection THOMAS FINNILA
Piling/Pier/Caisson 2/2/2018 Not Ready for Inspection THOMAS FINNILA
Excavation/Setback/Form/Re-Bar 2/5/2018 Partial Approval THOMAS FINNILA
Deputy Reinf. Concrete 2/7/2018 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 2/15/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 2/28/2018 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 3/1/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/3/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/4/2018 Approved MATT KELLERMAN
Deputy Reinf. Concrete 4/4/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/9/2018 No Access for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 4/10/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/11/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/24/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/24/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/2/2018 Partial Approval ANTHONY ANDERSON
Piling/Pier/Caisson 5/21/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 5/25/2018 Partial Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 5/29/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/31/2018 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 6/7/2018 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 6/11/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 7/13/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 7/17/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 7/17/2018 Not Ready for Inspection MICHAEL PELHAM
Footing/Foundation/Slab 7/23/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 7/24/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/7/2018 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 8/8/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 8/9/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Steel/Welding 9/11/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/12/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 9/13/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/13/2018 Conditional Approval JOEL LAUNCHBAUGH
Piling/Pier/Caisson 9/13/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/14/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/17/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/18/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/19/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/20/2018 Partial Approval JOHN LUMB
Deputy Steel/Welding 9/21/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/24/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/25/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/26/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 9/27/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 9/28/2018 Approved JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/1/2018 Partial Approval JOHN LUMB
Deputy Steel/Welding 10/2/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 10/4/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 10/5/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/9/2018 Approved JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/10/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 10/12/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/15/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/16/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/17/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/18/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/19/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/22/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/23/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/24/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/25/2018 Conditional Approval MATT KELLERMAN
Deputy Steel/Welding 10/26/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 10/29/2018 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 10/30/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 10/31/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 11/1/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 11/2/2018 Conditional Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 11/5/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Wood Construction 11/9/2018 Conditional Approval JOEL LAUNCHBAUGH
Floor/Roof Diaphrgm/Shear Wall 11/9/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 11/13/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 11/21/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 11/21/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Wood Construction 11/30/2018 Conditional Approval JOEL LAUNCHBAUGH
Floor/Roof Diaphrgm/Shear Wall 12/4/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Steel/Welding 12/13/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Wood Construction 1/8/2019 Conditional Approval JOEL LAUNCHBAUGH
Floor/Roof Diaphrgm/Shear Wall 1/8/2019 Partial Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 3/20/2019 Partial Approval ANTHONY MCDOWALL
HVAC-Rough 4/11/2019 Partial Approval ANTHONY MCDOWALL
BUILDING-Rough-Frame 5/6/2019 Not Ready for Inspection ROBERT SHELLY
Footing/Foundation/Slab 5/6/2019 Approved ROBERT SHELLY
Green Building Rough 5/6/2019 Not Ready for Inspection ROBERT SHELLY
Verify Sprinkler Sign Off 5/6/2019 Not Ready for Inspection ROBERT SHELLY
Deputy Reinf. Concrete 5/7/2019 Conditional Approval ANTHONY MCDOWALL
Pre-Inspection 6/14/2019 Partial Inspection ANTHONY MCDOWALL
HVAC-Rough 6/19/2019 Partial Approval ANTHONY MCDOWALL
PLUMBING-Rough 6/19/2019 Partial Approval ANTHONY MCDOWALL
ELECTRICAL-Rough 7/2/2019 Partial Approval ANTHONY MCDOWALL
Floor/Roof Diaphrgm/Shear Wall 7/2/2019 Not Ready for Inspection ANTHONY MCDOWALL
Pre-Inspection 7/22/2019 Partial Inspection ANTHONY MCDOWALL
PLUMBING-Rough 9/20/2019 Partial Approval MATT KELLERMAN
PLUMBING-Rough 9/27/2019 Approved ANTHONY MCDOWALL
ELECTRICAL-Rough 10/2/2019 Corrections Issued ANTHONY MCDOWALL
ELECTRICAL-Rough 10/8/2019 Partial Approval ANTHONY MCDOWALL
ELECTRICAL-Rough 10/17/2019 Corrections Issued ANTHONY MCDOWALL
HVAC-Rough 11/7/2019 Corrections Issued ANTHONY MCDOWALL
Special/Order Compliance 11/7/2019 Approved MATTHEW NUCKOLLS
ELECTRICAL-Rough 11/12/2019 Approved ANTHONY MCDOWALL
HVAC-Rough 11/12/2019 Approved ANTHONY MCDOWALL
BUILDING-Rough-Frame 11/15/2019 Approved ANTHONY MCDOWALL
Green Building Rough 11/15/2019 Approved ANTHONY MCDOWALL
Insulation 11/15/2019 Not Ready for Inspection ANTHONY MCDOWALL
Verify Sprinkler Sign Off 11/15/2019 Approved ANTHONY MCDOWALL
Insulation 12/4/2019 Approved ANTHONY MCDOWALL
Interior/Exterior Lathing 12/9/2019 Not Ready for Inspection ANTHONY MCDOWALL
Interior/Exterior Lathing 12/12/2019 Approved ANTHONY MCDOWALL
Drywall Nailing 1/13/2020 Partial Approval CARLOS MATAMOROS
Drywall Nailing 1/28/2020 Approved CARLOS MATAMOROS
Shower Pan 1/31/2020 Approved CARLOS MATAMOROS
Service/Power Release 6/22/2020 Not Required CARLOS MATAMOROS
Service/Power Release 3/11/2021 Not Ready for Inspection CHRISTOPHER WILSON
Service/Power Release 4/15/2021 Not Ready for Inspection CARLOS MATAMOROS
Service/Power Release 4/22/2021 Not Ready for Inspection CARLOS MATAMOROS
Service/Power Release 4/26/2021 Corrections Issued CARLOS MATAMOROS
Service/Power Release 8/4/2021 Approved CARLOS MATAMOROS
Special/Order Compliance 10/22/2021 Approved CARLOS MATAMOROS
ELECTRICAL-Final 6/1/2022 Not Ready for Inspection BRENDAN LOONEY
Pool/Spa Cover 6/1/2022 Not Ready for Inspection BRENDAN LOONEY
ELECTRICAL-Final 7/7/2022 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Final 8/1/2022 Conditional Approval PATRICK QUALEY
ELECTRICAL-Final 8/5/2022 Approved CARLOS MATAMOROS
HVAC-Final 8/5/2022 Approved CARLOS MATAMOROS
Gas Test 8/12/2022 Approved CHRISTOPHER WILSON
PLUMBING-Final 8/30/2022 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
PLUMBING-Final 8/31/2022 Conditional Approval CARLOS MATAMOROS
PLUMBING-Final 9/13/2022 Approved CARLOS MATAMOROS
Enclosure/Fence 10/25/2022 Approved CARLOS MATAMOROS
Final 3/31/2023 Not Ready for Inspection CARLOS MATAMOROS
Green Building Final 3/31/2023 Not Ready for Inspection CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 3/31/2023 SGSOV Not Ready CARLOS MATAMOROS
Smoke Detectors 3/31/2023 Approved CARLOS MATAMOROS
Final 4/6/2023 Partial Approval CARLOS MATAMOROS
Green Building Final 4/6/2023 Approved CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 4/6/2023 SGSOV Approved CARLOS MATAMOROS
Final 4/18/2023 OK to Issue CofO CARLOS MATAMOROS