609 N DILLON ST 1-52 90026
Certificate Information: 609 N DILLON ST 1-52 90026
- Application / Permit
- 15010-10000-04188
- Plan Check / Job No.
- B15LA16153
- Group
- Building
- Type
- Bldg-New
- Sub-Type
- Commercial
- Primary Use
- (5) Apartment
- Work Description
- NEW 2 STORY TYPE V-A , 52 UNITS MIXED USE APARTMENT BUILDING ( 5 Extremely Low Income unit per 12.22.A.31, TOC Tier 1) OVER GROUND LEVEL TYPE I-A RETAIL OVER TWO LEVELS OF TYPE I-A SUBTERRANEAN PARKING ( TOTAL 3 STORY BUILDING).
- Permit Issued
- Issued on 7/22/2020
- Issuing Office
- Metro
- Current Status
- Issued on 7/22/2020
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
Submitted | 12/8/2015 | APPLICANT |
Assigned to Plan Check Engineer | 12/17/2015 | GARO TELMI |
Corrections Issued | 12/22/2015 | GARO TELMI |
Reviewed by Supervisor | 12/31/2015 | BILL STUTSMAN |
Building Plans Picked Up | 1/5/2016 | APPLICANT |
Applicant returned to address corrections | 6/28/2017 | GARO TELMI |
Applicant returned to address corrections | 7/11/2017 | GARO TELMI |
Applicant returned to address corrections | 7/20/2017 | GARO TELMI |
Applicant returned to address corrections | 8/17/2017 | GARO TELMI |
Applicant returned to address corrections | 1/5/2018 | GARO TELMI |
Applicant returned to address corrections | 7/25/2018 | GARO TELMI |
Applicant returned to address corrections | 9/14/2018 | GARO TELMI |
Applicant returned to address corrections | 11/15/2018 | GARO TELMI |
Applicant returned to address corrections | 5/7/2019 | GARO TELMI |
Applicant returned to address corrections | 2/19/2020 | GARO TELMI |
Applicant returned to address corrections | 3/5/2020 | GARO TELMI |
Applicant returned to address corrections | 5/27/2020 | GARO TELMI |
Applicant returned to address corrections | 6/15/2020 | GARO TELMI |
Plan Check Approved | 7/15/2020 | GARO TELMI |
Issued | 7/22/2020 | APPLICANT |
Permit Application Clearance Information
Comm Cor/Mini-Mall | Cleared | 6/28/2017 | DANALYNN DOMINGUEZ |
ZI | Cleared | 6/28/2017 | DANALYNN DOMINGUEZ |
Drainage to Storm Drain | Cleared | 6/29/2017 | ARMENIA AGUILAR |
Highway dedication | Cleared | 8/30/2017 | JAMES MORALEZ |
Construction near power lines | Cleared | 10/25/2017 | RIDWAN HARDY |
Address approval | Cleared | 7/17/2018 | STEVE MELGAR |
Encroachment in public way | Cleared | 7/17/2018 | KAREN LE |
Eng Process Fee Ord 176,300 | Cleared | 7/17/2018 | STEVE MELGAR |
Permit | Cleared | 7/17/2018 | STEVE MELGAR |
Comm Cor/Mini-Mall | Cleared | 7/19/2018 | SOPHIE GABEL-SCHEINBAU |
Frnt yard landscape/Water mgmt | Cleared | 7/19/2018 | SOPHIE GABEL-SCHEINBAU |
Miscellaneous | Cleared | 7/19/2018 | SOPHIE GABEL-SCHEINBAU |
Miscellaneous | Cleared | 7/19/2018 | SOPHIE GABEL-SCHEINBAU |
Site Plan review | Cleared | 7/19/2018 | SOPHIE GABEL-SCHEINBAU |
Opn space landscape/Water mgmt | Cleared | 7/25/2018 | DIANA JIMENEZ |
Highway dedication | Cleared | 8/7/2018 | MICHAEL CASTILLO |
Sewer availability | Cleared | 8/7/2018 | MICHAEL CASTILLO |
Driveway location | Cleared | 8/14/2018 | JOHNATHAN YU |
Internal circulation | Cleared | 8/14/2018 | JOHNATHAN YU |
Green Code | Cleared | 8/28/2018 | GARO TELMI |
Hydrant and Access approval | Cleared | 9/12/2018 | JOHN CONNEALLY |
Housing rent stabilization | Cleared | 9/25/2018 | STEVEN HOFSTAD |
Building over 3-story or 36-ft | Cleared | 10/17/2018 | CALOSHA APPROVED |
Excavation more than 5-ft deep | Cleared | 10/17/2018 | CALOSHA APPROVED |
Density Bonus 12.22.A.31 | Cleared | 10/22/2018 | MICHAEL ZIRBES |
GPI Written Notices | Cleared | 11/15/2018 | GARO TELMI |
Grading Pre-Inspection | Cleared | 11/15/2018 | GARO TELMI |
DAS Clearance | Cleared | 1/8/2019 | GARO TELMI |
Work Adjacent to Public Way | Cleared | 1/10/2019 | TERRY PHAN |
Low Impact Development | Cleared | 1/18/2019 | AMMAR ELTAWIL |
Roof/Waste drainage to street | Cleared | 1/28/2019 | KAREN LE |
Miscellaneous | Cleared | 1/31/2019 | DIANA JIMENEZ |
Fire Marshall Fire Life Safety | Cleared | 3/12/2019 | VIDAL GARCIA |
Methane Ordinance | Cleared | 3/12/2019 | WILLIAM JOHNS |
Miscellaneous | Cleared | 9/27/2019 | SOPHIE GABEL-SCHEINBAU |
Site Plan review | Cleared | 9/27/2019 | SOPHIE GABEL-SCHEINBAU |
Contact Information
Architect | O'Herlihy,, Lorcan Patrick; Lic. No.: C24245 | 4106 W JEFFERSON BLVD LOS ANGELES, CA 90016 |
Contractor | Owner-Builder | , |
Engineer | Anhorn,, Jerald Edward; Lic. No.: L7159 | 123 S LA SALLE REDLANDS, CA 92374 |
Engineer | Berliner,, Neal David; Lic. No.: GE2576 | 4913 MONUMENT ST SIMI VALLEY, CA 93063 |
Engineer | Funk,, David Lyle; Lic. No.: S5421 | 319 MAIN STREET EL SEGUNDO, CA 90245 |
Engineer | Knur,, Reinard Thomas; Lic. No.: GE2755 | 1435 MONCADO DR GLENDALE, CA 91207 |
Engineer | Ortiz,, David Arturo; Lic. No.: C56818 | 7248 BECKFORD AVE RESEDA, CA 91335 |
Engineer | Tofani,, Glenn David; Lic. No.: C44229 | 77 BUNSEN IRVINE, CA 92618 |
Engineer | Young,, Don Yuk-Man; Lic. No.: C35713 | 149 PASADENA AVE STE B SOUTH PASADENA, CA 91030 |
Inspector Information
DANIEL MC AULIFFE, (213) 482-7294 | Office Hours: 7:00-8:00 AM MON-FRI |
DAVID BURKHEAD, (213) 482-7294 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
Deputy Shotcrete | 3/9/2021 |
Inspection Request History
Deputy Steel/Welding | 7/29/2020 | Approved | DANIEL MC AULIFFE |
Deputy Steel/Welding | 7/29/2020 | Conditional Approval | DANIEL MC AULIFFE |
Piling/Pier/Caisson | 7/29/2020 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Grading | 7/31/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 8/3/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 8/4/2020 | Approved | DANIEL MC AULIFFE |
Pre-Inspection | 8/4/2020 | Partial Approval | DANIEL MC AULIFFE |
Deputy Grading | 8/5/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 8/6/2020 | Conditional Approval | DANIEL MC AULIFFE |
Pre-Inspection | 8/6/2020 | Partial Approval | DANIEL MC AULIFFE |
Deputy Grading | 8/7/2020 | Conditional Approval | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 8/13/2020 | Partial Approval | DANIEL MC AULIFFE |
Deputy Grading | 8/17/2020 | Conditional Approval | DAVID BURKHEAD |
Excavation/Setback/Form/Re-Bar | 8/17/2020 | Not Ready for Inspection | EDWIN GREGORYONA |
Pre-Inspection | 8/17/2020 | Not Ready for Inspection | EDWIN GREGORYONA |
Deputy Grading | 8/18/2020 | Conditional Approval | DAVID BURKHEAD |
Deputy Steel/Welding | 8/18/2020 | Partial Approval | EDWIN GREGORYONA |
Deputy Grading | 8/19/2020 | Conditional Approval | DAVID BURKHEAD |
Deputy Steel/Welding | 8/19/2020 | Conditional Approval | DAVID BURKHEAD |
Deputy Grading | 8/20/2020 | Partial Approval | EDWIN GREGORYONA |
Deputy Steel/Welding | 8/20/2020 | Partial Approval | EDWIN GREGORYONA |
Deputy Grading | 8/21/2020 | Conditional Approval | DAVID BURKHEAD |
Deputy Steel/Welding | 8/21/2020 | Conditional Approval | DAVID BURKHEAD |
Deputy Grading | 8/24/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Steel/Welding | 8/24/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 8/25/2020 | Approved | DANIEL MC AULIFFE |
Deputy Steel/Welding | 8/25/2020 | Approved | DANIEL MC AULIFFE |
Deputy Grading | 8/26/2020 | Approved | DANIEL MC AULIFFE |
Pre-Inspection | 8/26/2020 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Grading | 8/27/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 8/28/2020 | Approved | DANIEL MC AULIFFE |
Deputy Grading | 8/31/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 9/1/2020 | Approved | DANIEL MC AULIFFE |
Deputy Grading | 9/2/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 9/3/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 9/4/2020 | Approved | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 9/4/2020 | Partial Approval | DANIEL MC AULIFFE |
Pre-Inspection | 9/4/2020 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Grading | 9/8/2020 | Approved | DANIEL MC AULIFFE |
Deputy Grading | 9/9/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 9/16/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 9/17/2020 | Approved | DANIEL MC AULIFFE |
Piling/Pier/Caisson | 9/17/2020 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Grading | 9/21/2020 | Conditional Approval | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 9/21/2020 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Grading | 9/22/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 9/23/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 9/24/2020 | Approved | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 9/24/2020 | Partial Inspection | DANIEL MC AULIFFE |
Footing/Foundation/Slab | 9/24/2020 | Partial Inspection | DANIEL MC AULIFFE |
METHANE-Barrier | 9/24/2020 | Not Ready for Inspection | DANIEL MC AULIFFE |
METHANE-Subgrade | 9/24/2020 | Not Ready for Inspection | DANIEL MC AULIFFE |
Deputy Grading | 9/28/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 9/29/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 9/30/2020 | Approved | DANIEL MC AULIFFE |
Deputy Grading | 10/2/2020 | Conditional Approval | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 10/2/2020 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Grading | 10/8/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 10/9/2020 | Conditional Approval | DAVID BURKHEAD |
Deputy Grading | 10/13/2020 | Conditional Approval | DAVID BURKHEAD |
Deputy Grading | 10/15/2020 | Approved | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 10/15/2020 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Grading | 10/16/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 10/19/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 10/20/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 10/21/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 10/22/2020 | Conditional Approval | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 10/22/2020 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Grading | 10/23/2020 | Conditional Approval | DAVID BURKHEAD |
Deputy Grading | 10/26/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 10/27/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Grading | 10/28/2020 | Approved | DANIEL MC AULIFFE |
METHANE-Subgrade | 11/6/2020 | Partial Inspection | DANIEL MC AULIFFE |
METHANE-Barrier | 11/24/2020 | Partial Approval | DANIEL MC AULIFFE |
Deputy Methane Barrier | 12/1/2020 | Conditional Approval | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 12/8/2020 | Partial Approval | DANIEL MC AULIFFE |
Deputy Other (see comments) | 12/10/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Other (see comments) | 12/11/2020 | Approved | DANIEL MC AULIFFE |
Deputy Other (see comments) | 12/18/2020 | Conditional Approval | DAVID BURKHEAD |
Excavation/Setback/Form/Re-Bar | 12/21/2020 | Partial Approval | DANIEL MC AULIFFE |
Footing/Foundation/Slab | 12/21/2020 | Partial Approval | DANIEL MC AULIFFE |
METHANE-Barrier | 12/21/2020 | Approved | DANIEL MC AULIFFE |
METHANE-Subgrade | 12/21/2020 | Approved | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 12/22/2020 | Approved | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 12/23/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 12/28/2020 | Conditional Approval | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 12/28/2020 | Partial Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 12/30/2020 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 1/4/2021 | Approved | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 1/6/2021 | Approved | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 1/7/2021 | Approved | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 1/7/2021 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 1/8/2021 | Conditional Approval | DAVID BURKHEAD |
Deputy Shotcrete | 1/8/2021 | Conditional Approval | DAVID BURKHEAD |
Excavation/Setback/Form/Re-Bar | 1/11/2021 | Partial Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 1/12/2021 | Approved | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 1/19/2021 | Approved | DANIEL MC AULIFFE |
Deputy Reinf. Masonry | 1/25/2021 | Conditional Approval | DANIEL MC AULIFFE |
Reinforced Masonry Frame | 1/25/2021 | Partial Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 1/28/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 1/29/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/1/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/2/2021 | Approved | DANIEL MC AULIFFE |
Reinforced Masonry Frame | 2/2/2021 | Partial Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/3/2021 | Approved | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 2/3/2021 | Partial Approval | DANIEL MC AULIFFE |
Footing/Foundation/Slab | 2/3/2021 | Partial Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/4/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/8/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/9/2021 | Approved | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/10/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/11/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/12/2021 | Approved | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 2/12/2021 | Partial Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/16/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Shotcrete | 2/16/2021 | Conditional Approval | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 2/16/2021 | Partial Inspection | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/17/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/18/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/19/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/22/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/23/2021 | Approved | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 2/23/2021 | Partial Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/24/2021 | Conditional Approval | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 2/24/2021 | Not Ready for Inspection | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/25/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 2/26/2021 | Approved | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 2/26/2021 | Partial Approval | DANIEL MC AULIFFE |
Deputy Reinf. Concrete | 3/1/2021 | Conditional Approval | DANIEL MC AULIFFE |
Excavation/Setback/Form/Re-Bar | 3/1/2021 | Partial Approval | DANIEL MC AULIFFE |
Deputy Shotcrete | 3/2/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Shotcrete | 3/3/2021 | Conditional Approval | DANIEL MC AULIFFE |
Deputy Shotcrete | 3/4/2021 | Approved | DANIEL MC AULIFFE |
Deputy Shotcrete | 3/5/2021 | No Result Entered | DANIEL MC AULIFFE |