3057 W PICO BLVD 90006

Certificate Information: 3057 W PICO BLVD 90006

Application / Permit
15010-10000-03721
Plan Check / Job No.
B15LA14669
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
PROPOSED 6 STORY MIXED USE BLDG- 51 UNIT APARTMENT, RETAIL AND PARKING. 2 LEVELS OF TYPE IA BASEMENT, 1 STORY TYPE IA GARAGE/RETAIL AND 5 STORIES OF TYPE IIIA APARTMENT.
Permit Issued
Issued on 6/6/2018
Issuing Office
Metro
Current Status
CofO Issued on 4/9/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/30/2015 APPLICANT
Assigned to Plan Check Engineer 11/24/2015 JOHN VASQUEZ
Corrections Issued 12/3/2015 JOHN VASQUEZ
Quality Review Completed 12/4/2015 JOHN VASQUEZ
Building Plans Picked Up 12/7/2015 APPLICANT
Disabled Access Plans Picked Up 12/7/2015 APPLICANT
Applicant returned to address corrections 11/8/2017 JOHN VASQUEZ
Applicant returned to address corrections 11/17/2017 JOHN VASQUEZ
Applicant returned to address corrections 1/26/2018 JOHN VASQUEZ
Applicant returned to address corrections 3/22/2018 JOHN VASQUEZ
Applicant returned to address corrections 4/6/2018 JOHN VASQUEZ
Applicant returned to address corrections 4/16/2018 JOHN VASQUEZ
Plan Check Approved 4/30/2018 JOHN VASQUEZ
Issued 6/6/2018 LADBS
TCO Issued (Expire Date: 11-30-2022) 6/3/2022 ERNESTO CORRAL
TCO Issued (Expire Date: 05-30-2023) 12/1/2022 TED RIES
TCO Issued (Expire Date: 11-26-2023) 5/30/2023 TED RIES
TCO Issued (Expire Date: 04-28-2024) 10/31/2023 TED RIES
TCO Issued (Expire Date: 09-17-2024) 3/21/2024 RAFAEL ESPINOZA
TCO Issued (Expire Date: 03-08-2025) 9/9/2024 ERNESTO CORRAL
TCO Issued (Expire Date: 08-19-2025) 2/20/2025 ERNESTO CORRAL
CofO in Progress 4/9/2025 RAFAEL ESPINOZA
Permit Finaled 4/9/2025 ERNESTO CORRAL
CofO Issued 4/9/2025 ERNESTO CORRAL
Permit Finaled 4/9/2025 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 10/26/2016 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 10/26/2016 LEE GUILBEAUX
Highway dedication Cleared 10/2/2017 LEE GUILBEAUX
Frnt yard landscape/Water mgmt Cleared 10/26/2017 ANNA VIDAL
Opn space landscape/Water mgmt Cleared 10/26/2017 ANNA VIDAL
Driveway location Cleared 11/16/2017 MOHAMMAD HASAN
Internal circulation Cleared 11/16/2017 MOHAMMAD HASAN
Low Impact Development Cleared 11/29/2017 MARTIN FRAGOSO
Stormwater Pollution Mitigatn Cleared 11/29/2017 MARTIN FRAGOSO
Encroachment in public way Cleared 12/18/2017 JAMES KHO
Sewer availability Cleared 12/18/2017 ADRIAN SANCHEZ
Hydrant and Access approval Cleared 1/11/2018 JOHN CONNEALLY
Site Plan review Cleared 3/20/2018 STEVEN WECHSLER
Fire Marshall Fire Life Safety Cleared 4/5/2018 OSCAR SALGADO JR
Permit Cleared 4/5/2018 SOPHEA EK
Roof/Waste drainage to street Cleared 4/5/2018 STEVE MELGAR
Supplemental Onsite WTS Cleared 4/5/2018 RYAN HUDSON
Work Adjacent to Public Way Cleared 4/5/2018 HOK CHI CHIU
Building over 3-story or 36-ft Cleared 4/6/2018 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/6/2018 CALOSHA APPROVED
CPC Cleared 4/19/2018 STEVEN WECHSLER
DAS Clearance Cleared 4/19/2018 EDDIE GARIN

Contact Information

Architect Friedman, John Benjamin; Lic. No.: C9167 23427 BLYTHE STREET      WEST HILLS, CA 91304
Contractor Ketter Construction Inc; Lic. No.: 958623-B 14541 DELANO STREET      VAN NUYS, CA 91411
Engineer Askarian, Soroosh Namaghi; Lic. No.: C83413 22287 MULHOLLAND HWY 163      CALABASAS, CA 91302
Engineer Yeh, Kuo-Tay Paul; Lic. No.: S2872 12277 EASTBOURNE ROAD      SAN DIEGO, CA 92128

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/22/2018 Approved LESLIE TRUJILLO
Deputy Reinf. Concrete 10/12/2018 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 12/6/2018 No Access for Inspection LESLIE TRUJILLO
Pre-Inspection 12/17/2018 Partial Inspection LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/15/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 2/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/13/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 2/21/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/22/2019 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 2/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 2/28/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 2/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/1/2019 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 3/1/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 3/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/4/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 3/5/2019 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 3/6/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/8/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 3/8/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/12/2019 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 3/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 3/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/14/2019 Conditional Approval NICK DANERI
Deputy Shotcrete 3/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/20/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 3/20/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 3/20/2019 Approved LESLIE TRUJILLO
Deputy Reinf. Masonry 3/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/28/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 3/28/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/1/2019 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 4/2/2019 Partial Approval DAVID TSAU
Deputy Reinf. Concrete 4/3/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/3/2019 Off-Hour Fees Due
Special/Order Compliance 4/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/10/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/7/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/7/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/31/2019 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 6/4/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/5/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/5/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/13/2019 Conditional Approval LESLIE TRUJILLO
Special/Order Compliance 6/13/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/14/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 6/19/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/24/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/26/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 7/18/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/22/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/24/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 8/13/2019 Partial Approval LESLIE TRUJILLO
Insulation 8/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 8/26/2019 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 8/26/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 8/28/2019 Partial Approval JAMES POWERS
Deputy Shotcrete 8/29/2019 Partial Approval JAMES POWERS
Pre-Inspection 8/29/2019 Off-Hour Fees Due
Deputy Wood Construction 9/3/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 9/3/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/5/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 9/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/11/2019 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 9/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/23/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 9/25/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/26/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 10/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 10/29/2019 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 10/29/2019 Partial Approval JAMES POWERS
Wood Frame 10/31/2019 Partial Approval JAMES POWERS
Insulation 11/1/2019 Partial Approval JAMES POWERS
Deputy Wood Construction 11/4/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/8/2019 Not Ready for Inspection LESLIE TRUJILLO
Special/Order Compliance 11/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/12/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 11/14/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/18/2019 Corrections Issued LESLIE TRUJILLO
Deputy Wood Construction 11/20/2019 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 12/5/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 12/11/2019 Partial Approval LESLIE TRUJILLO
Insulation 12/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 12/16/2019 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/18/2019 Conditional Approval LESLIE TRUJILLO
Insulation 12/20/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/30/2019 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 12/30/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/7/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/7/2020 Not Ready for Inspection LESLIE TRUJILLO
Deputy Wood Construction 1/8/2020 Conditional Approval LESLIE TRUJILLO
Insulation 1/13/2020 Partial Approval DAVID BURKHEAD
Insulation 1/15/2020 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 1/22/2020 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/22/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/28/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 1/31/2020 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 2/5/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 2/5/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 2/24/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 2/27/2020 Conditional Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/2/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/2/2020 Partial Approval RAFAEL ESPINOZA
Insulation 3/5/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 3/5/2020 Partial Approval RAFAEL ESPINOZA
Insulation 3/10/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/16/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 3/19/2020 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 3/19/2020 Partial Inspection RAFAEL ESPINOZA
Insulation 3/27/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 3/27/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 4/13/2020 Corrections Issued RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 4/14/2020 Partial Approval RAFAEL ESPINOZA
Insulation 5/12/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 5/12/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/14/2020 Partial Approval RAFAEL ESPINOZA
Insulation 5/14/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/21/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 5/27/2020 Partial Approval RAFAEL ESPINOZA
Insulation 5/27/2020 Partial Approval RAFAEL ESPINOZA
Deputy Wood Construction 6/4/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 6/8/2020 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 6/15/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 6/22/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 6/22/2020 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 6/25/2020 Partial Approval RAFAEL ESPINOZA
Deputy Shotcrete 6/30/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 7/20/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/27/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 8/7/2020 Not Ready for Inspection NICK DANERI
Wood Frame 8/7/2020 Partial Approval NICK DANERI
Wood Frame 8/10/2020 Partial Approval RAFAEL ESPINOZA
Insulation 8/13/2020 Partial Approval RAFAEL ESPINOZA
Insulation 8/17/2020 Partial Approval NICK DANERI
Wood Frame 8/20/2020 Partial Approval RAFAEL ESPINOZA
Insulation 8/24/2020 Partial Approval RAFAEL ESPINOZA
Wood Frame 8/28/2020 Partial Approval RAFAEL ESPINOZA
Insulation 9/2/2020 Partial Approval RAFAEL ESPINOZA
Insulation 9/9/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 9/11/2020 Partial Approval RAFAEL ESPINOZA
Insulation 9/16/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/16/2020 Partial Approval RAFAEL ESPINOZA
Insulation 10/8/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 10/8/2020 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 2/17/2021 Partial Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/24/2021 Conditional Approval NICK DANERI
Light Gage Steel Frame 4/15/2021 Partial Inspection DANIEL COLLINS
Wood Frame 4/15/2021 Partial Approval DANIEL COLLINS
Final 6/3/2021 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 6/3/2021 Approved RAFAEL ESPINOZA
Green Building Final 6/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Rough 6/3/2021 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 6/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 6/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 6/3/2021 SGSOV Not Ready RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 6/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 6/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 7/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 7/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 7/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 7/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 7/7/2021 SGSOV Not Ready RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 7/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 7/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/7/2021 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 7/12/2021 Approved RAFAEL ESPINOZA
Final 12/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 12/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 12/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 12/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 12/2/2021 SGSOV Not Ready RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 12/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 12/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 12/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 4/20/2022 Corrections Issued RAFAEL ESPINOZA
Green Building Final 4/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 4/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 4/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 4/20/2022 SGSOV Approved RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 4/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 4/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/20/2022 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 4/26/2022 Partial Inspection RUSSELL BONVOULOIR
Special/Order Compliance 4/27/2022 Corrections Issued RAFAEL ESPINOZA
Special/Order Compliance 5/2/2022 Partial Inspection RAFAEL ESPINOZA
Final 5/11/2022 Partial Inspection RAFAEL ESPINOZA
Green Building Final 5/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 5/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 5/11/2022 Approved RAFAEL ESPINOZA
Smoke Detectors 5/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/11/2022 Not Ready for Inspection RAFAEL ESPINOZA
Special/Order Compliance 5/20/2022 Partial Inspection RAFAEL ESPINOZA
Green Building Final 5/25/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 5/25/2022 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 5/25/2022 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 5/25/2022 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 5/25/2022 Approved RAFAEL ESPINOZA
Pre-Inspection 5/26/2022 Approved RAFAEL ESPINOZA
Special/Order Compliance 11/9/2022 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 5/3/2023 Partial Inspection RAFAEL ESPINOZA
Special/Order Compliance 11/1/2023 Approved RAFAEL ESPINOZA
Special/Order Compliance 8/20/2024 Conditional Approval NICK DANERI
Special/Order Compliance 2/11/2025 Conditional Approval NICK DANERI
Final 4/9/2025 OK to Issue CofO RAFAEL ESPINOZA
Green Building Final 4/9/2025 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 4/9/2025 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 4/9/2025 Approved RAFAEL ESPINOZA
Smoke Detectors 4/9/2025 Approved RAFAEL ESPINOZA