510 S OXFORD AVE 201-814PH 90020

Certificate Information: 510 S OXFORD AVE 201-814PH 90020

Application / Permit
15010-10000-03689
Plan Check / Job No.
B15LA14499
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
7 Story Apartment Building and 2-levels of subterranean Parking Garage
Permit Issued
Issued on 8/29/2018
Issuing Office
Metro
Current Status
Issued on 8/29/2018
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/30/2015 APPLICANT
Assigned to Plan Check Engineer 11/24/2015 ALLEN MANALANSAN
Corrections Issued 12/17/2015 ALLEN MANALANSAN
Quality Review Completed 12/29/2015 JOHN VASQUEZ
Building Plans Picked Up 1/4/2016 APPLICANT
Applicant returned to address corrections 11/21/2017 ALLEN MANALANSAN
Applicant returned to address corrections 12/11/2017 ALLEN MANALANSAN
Applicant returned to address corrections 4/16/2018 ALLEN MANALANSAN
Plan Check Approved 4/30/2018 ALLEN MANALANSAN
Issued 8/29/2018 LADBS
TCO Issued (Expire Date: 10-05-2026) 4/8/2026 ERNESTO CORRAL

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/29/2016 HOWARD COOPER
Highway dedication Cleared 3/30/2016 ADRIAN HERNANDEZ
Address approval Cleared 8/3/2017 NAZILA NOORIFAR
Hydrant and Access approval Cleared 11/27/2017 JOHN CONNEALLY
Project located in CRA area Cleared 12/5/2017 JIM URQUHART
Frnt yard landscape/Water mgmt Cleared 12/13/2017 DENNIS CHEW
Opn space landscape/Water mgmt Cleared 12/13/2017 DENNIS CHEW
Encroachment in public way Cleared 12/14/2017 FATIMA GUERRA
Permit Cleared 12/14/2017 ADRIAN SANCHEZ
ZI Cleared 12/15/2017 SEAN VEAL
Driveway location Cleared 12/20/2017 JOHNATHAN YU
Internal circulation Cleared 12/20/2017 JOHNATHAN YU
Building over 3-story or 36-ft Cleared 12/22/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 12/22/2017 CALOSHA APPROVED
Low Impact Development Cleared 1/18/2018 MITESH PATEL
Miscellaneous Cleared 1/18/2018 BRIDGETTE WOOTEN
Green Code Cleared 1/25/2018 DONALD CRICHLOW
DAS Clearance Cleared 1/26/2018 ALLEN MANALANSAN
Roof/Waste drainage to street Cleared 1/26/2018 STEVE MELGAR
Miscellaneous Cleared 2/8/2018 BRIDGETTE WOOTEN
Site Plan review Cleared 2/8/2018 BRIDGETTE WOOTEN
Tract Map conditions Cleared 2/8/2018 BRIDGETTE WOOTEN
Sewer availability Cleared 2/9/2018 STEVE MELGAR
Stormwater Pollution Mitigatn Cleared 2/14/2018 MITESH PATEL
Fire Marshall Fire Life Safety Cleared 3/6/2018 MENOA AGHAJANI
Work Adjacent to Public Way Cleared 4/30/2018 CHIU TAM

Contact Information

Architect , ; Lic. No.: C9167 23427 BLYTHE STREET      WEST HILLS, CA 91304
Contractor Nova Homes Inc Dba Inland Development; Lic. No.: 828225-B 1232 VILLAGE WAY STE A      SANTA ANA, CA 92705
Engineer Berkoz, Ertunga; Lic. No.: S2504 4665 ELLENITA AVE      TARZANA, CA 91356
Engineer Kumar, Krishna C V; Lic. No.: M22176 307 S SMITH AVE 33      CORONA, CA 92882
Engineer Smith, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065
Landscape Architect Lewis, Paul Adam; Lic. No.: LA3620 13351-D RIVERSIDE DR #445      SHERMAN OAKS, CA 91423

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 3/1/2019 Approved TED RIES
Deputy Reinf. Concrete 3/4/2019 Approved TED RIES
Deputy Reinf. Concrete 3/12/2019 Approved TED RIES
Deputy Steel/Welding 3/12/2019 Approved TED RIES
Deputy Reinf. Concrete 3/13/2019 Approved TED RIES
Deputy Steel/Welding 3/13/2019 Approved TED RIES
Deputy Reinf. Concrete 3/14/2019 Approved TED RIES
Deputy Steel/Welding 3/14/2019 Approved TED RIES
Deputy Reinf. Concrete 3/15/2019 Approved TED RIES
Deputy Steel/Welding 3/15/2019 Approved TED RIES
Deputy Reinf. Concrete 3/18/2019 Approved TED RIES
Deputy Steel/Welding 3/18/2019 Approved TED RIES
Deputy Grading 5/6/2019 Approved TED RIES
Deputy Grading 5/7/2019 Approved TED RIES
Deputy Grading 5/8/2019 Approved TED RIES
Deputy Grading 5/9/2019 Approved TED RIES
Deputy Grading 5/10/2019 Approved TED RIES
Deputy Grading 5/13/2019 Approved TED RIES
Deputy Grading 5/14/2019 Approved TED RIES
Deputy Grading 5/15/2019 Approved TED RIES
Deputy Grading 5/16/2019 Approved TED RIES
Deputy Grading 5/17/2019 Approved TED RIES
Deputy Grading 5/20/2019 Approved JEFF BYTHEWAY
Deputy Grading 5/21/2019 Approved TED RIES
Deputy Grading 5/22/2019 Approved TED RIES
Deputy Grading 5/23/2019 Approved TED RIES
Deputy Grading 5/24/2019 Approved TED RIES
Deputy Grading 5/28/2019 Approved TED RIES
Deputy Grading 5/29/2019 Approved TED RIES
Deputy Grading 5/30/2019 Approved TED RIES
Deputy Grading 5/31/2019 Approved TED RIES
Deputy Steel/Welding 6/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/31/2019 Conditional Approval DANIEL MC AULIFFE
Pre-Inspection 8/22/2019 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/26/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/4/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/9/2019 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/12/2019 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 9/18/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 9/20/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 9/23/2019 Approved DANIEL MC AULIFFE
Deputy Shotcrete 9/24/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 9/25/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 9/26/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/7/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/8/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/10/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/17/2019 Approved DANIEL MC AULIFFE
Deputy Shotcrete 10/21/2019 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 10/22/2019 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/23/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/24/2019 Approved JEFF BYTHEWAY
Pre-Inspection 10/24/2019 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 10/25/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 10/30/2019 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 11/1/2019 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/4/2019 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 11/4/2019 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/6/2019 Conditional Approval DANIEL COLLINS
Excavation/Setback/Form/Re-Bar 11/6/2019 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 11/6/2019 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 11/7/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/8/2019 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 11/8/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/12/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/15/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/19/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/22/2019 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/25/2019 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 12/4/2019 Partial Inspection DANIEL MC AULIFFE
Masonry Wall/Backfill 12/5/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 12/16/2019 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 12/17/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 1/10/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 1/21/2020 Not Ready for Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 1/22/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/23/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 1/23/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 2/6/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/13/2020 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/13/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/25/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 2/25/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/4/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/4/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/5/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/9/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/9/2020 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/12/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/17/2020 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 3/17/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/18/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/19/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/27/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 3/31/2020 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 3/31/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/1/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 4/15/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 4/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 4/20/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 4/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 4/22/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/22/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 4/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/24/2020 Approved DANIEL MC AULIFFE
Deputy Shotcrete 4/24/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 4/27/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/29/2020 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 4/29/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/4/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/5/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/5/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/5/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/7/2020 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 5/8/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/11/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/12/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 5/12/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/13/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/14/2020 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 5/14/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/15/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/15/2020 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 5/18/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 5/18/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/19/2020 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 5/19/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/20/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/21/2020 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 5/21/2020 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 5/21/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 5/21/2020 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 5/21/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 5/22/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 5/29/2020 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 6/2/2020 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 6/10/2020 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 6/15/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 6/16/2020 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 6/18/2020 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 6/26/2020 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/2/2020 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/6/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/8/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/15/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/16/2020 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 7/16/2020 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 7/16/2020 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/20/2020 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 7/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/21/2020 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/24/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/27/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/28/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 7/28/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/30/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/30/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 8/3/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/4/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 8/6/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 8/6/2020 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 8/7/2020 Partial Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 8/11/2020 Not Ready for Inspection DANIEL MC AULIFFE
Masonry Wall/Backfill 8/14/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 8/18/2020 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 8/18/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 8/19/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/20/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 8/21/2020 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 8/21/2020 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 8/26/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/27/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/28/2020 Approved DANIEL MC AULIFFE
Masonry Wall/Backfill 8/28/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/1/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/2/2020 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/3/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/9/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 9/11/2020 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 9/17/2020 Partial Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 9/22/2020 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 9/22/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/24/2020 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 9/24/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/28/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/29/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/8/2020 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 10/9/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/15/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/22/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/23/2020 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 10/28/2020 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/10/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/12/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/13/2020 Approved DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/13/2020 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 11/13/2020 Partial Inspection DANIEL MC AULIFFE
Pre-Inspection 11/18/2020 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/19/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/20/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/23/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/24/2020 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 11/25/2020 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/1/2020 Partial Approval DANIEL MC AULIFFE
Pre-Inspection 12/4/2020 Not Ready for Inspection DANIEL MC AULIFFE
Pre-Inspection 12/8/2020 Not Ready for Inspection DANIEL MC AULIFFE
Pre-Inspection 12/9/2020 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 12/14/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/16/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/17/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/18/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/21/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/22/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/28/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/29/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 12/29/2020 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/4/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/11/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 1/11/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/12/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/1/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/3/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 2/4/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/11/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/16/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Grading 2/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 2/18/2021 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 2/18/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 2/19/2021 Conditional Approval DANIEL MC AULIFFE
Wood Frame 2/19/2021 Not Ready for Inspection DANIEL MC AULIFFE
Pre-Inspection 2/22/2021 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 2/23/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/1/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 3/1/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/2/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/11/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/18/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/22/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/23/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/25/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/30/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/31/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/1/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/7/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/8/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/15/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/19/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/21/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/22/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 4/26/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 4/26/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/27/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/28/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 4/28/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/29/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/3/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/5/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/6/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/10/2021 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 5/10/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 5/11/2021 Approved DANIEL MC AULIFFE
Pre-Inspection 5/11/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/12/2021 Conditional Approval DANIEL MC AULIFFE
Pre-Inspection 5/12/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 5/13/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/14/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/17/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/18/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 5/18/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/20/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/24/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/25/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/26/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 5/27/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 5/27/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 5/28/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 5/28/2021 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 6/1/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/2/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 6/4/2021 Conditional Approval NICK DANERI
Footing/Foundation/Slab 6/9/2021 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/10/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/11/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 6/18/2021 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 6/22/2021 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 6/24/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 6/29/2021 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/2/2021 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 7/2/2021 Not Ready for Inspection RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 7/6/2021 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/14/2021 Partial Approval DANIEL MC AULIFFE
Wood Frame 7/20/2021 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 8/19/2021 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 8/23/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/2/2021 Conditional Approval DANIEL MC AULIFFE
Wood Frame 9/10/2021 Partial Inspection DANIEL MC AULIFFE
Wood Frame 9/15/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Wood Construction 9/21/2021 Approved DANIEL MC AULIFFE
Wood Frame 9/21/2021 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 9/23/2021 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 10/14/2021 Partial Approval RAFAEL ESPINOZA
Wood Frame 10/21/2021 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 10/25/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 10/26/2021 Conditional Approval DANIEL MC AULIFFE
Pre-Inspection 11/3/2021 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 11/9/2021 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/10/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 1/11/2022 Conditional Approval DANIEL MC AULIFFE
Wood Frame 1/31/2022 Partial Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 2/2/2022 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 3/1/2022 Partial Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 3/14/2022 Partial Approval DANIEL MC AULIFFE
Deputy Steel/Welding 3/25/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/4/2022 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 4/7/2022 Conditional Approval DANIEL MC AULIFFE
Floor/Roof Diaphrgm/Shear Wall 4/19/2022 Partial Approval DANIEL MC AULIFFE
Wood Frame 5/4/2022 Not Ready for Inspection EDWIN GREGORYONA
Light Gage Steel Frame 5/11/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/23/2022 Partial Approval TED RIES
Wood Frame 5/26/2022 Partial Approval TED RIES
Drywall Nailing 5/27/2022 Partial Approval TED RIES
Deputy Steel/Welding 6/10/2022 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 7/18/2022 Partial Approval TED RIES
Deputy Steel/Welding 8/24/2022 Conditional Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 9/8/2022 Not Ready for Inspection DAVID BURKHEAD
Wall Anchors 9/8/2022 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 9/8/2022 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 10/5/2022 Partial Approval TED RIES
Wood Frame 10/13/2022 Partial Approval TED RIES
Wood Frame 12/5/2022 Partial Approval TED RIES
Special/Order Compliance 12/7/2022 Approved TED RIES
Drywall Nailing 12/13/2022 Partial Approval TED RIES
Insulation 12/20/2022 Partial Approval TED RIES
Deputy Drilled-In Anchors 1/26/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 1/26/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 2/9/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 2/21/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Wood Construction 2/23/2024 Approved DAVID BURKHEAD
Deputy Wood Construction 3/5/2024 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/26/2024 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 6/5/2025 Conditional Approval DAVID BURKHEAD
Pre-Inspection 5/6/2026 Approved DAVID BURKHEAD
Pre-Inspection 5/26/2026 Approved DAVID BURKHEAD
Pre-Inspection 6/4/2026 Approved DAVID BURKHEAD