Excavation/Setback/Form/Re-Bar
|
10/24/2017
|
Partial Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
10/24/2017
|
Approved
|
JEFFREY DURAN
|
|
Pre-Inspection
|
11/20/2017
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/29/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/30/2017
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
11/30/2017
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/1/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/4/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/5/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/5/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/5/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
12/5/2017
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/6/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/6/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
12/6/2017
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
12/6/2017
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
12/6/2017
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/7/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/7/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/7/2017
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/8/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/8/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/8/2017
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/11/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/11/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/11/2017
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/12/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/12/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/12/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/13/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/13/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2017
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/14/2017
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Shotcrete
|
12/14/2017
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
12/15/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/15/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/15/2017
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/18/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/18/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/18/2017
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/19/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/19/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/19/2017
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/20/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/20/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/20/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/21/2017
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/21/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/21/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/27/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/27/2017
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/28/2017
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/28/2017
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/29/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/29/2017
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/2/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/2/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/3/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/3/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/3/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/4/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/4/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/4/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/5/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
1/5/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
1/19/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/22/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/22/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/23/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/23/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/24/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/24/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/25/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/26/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/29/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/2/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
2/6/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/6/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/7/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/8/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/12/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/13/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
2/14/2018
|
Corrections Issued
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/14/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/15/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/20/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/20/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/21/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/21/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/22/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/23/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
2/26/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/26/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/27/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
2/27/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/27/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/28/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
2/28/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/28/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
2/28/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
2/28/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
2/28/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/1/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/1/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/2/2018
|
No Access for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/2/2018
|
No Access for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/5/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/5/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
3/5/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/6/2018
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
3/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/7/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/7/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
3/7/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/8/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/8/2018
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
3/8/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
3/8/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
3/8/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/9/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/9/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/12/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/12/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/13/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/13/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/15/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/16/2018
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
3/16/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
3/16/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
3/16/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/19/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/19/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/20/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/20/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/21/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/23/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/23/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
3/23/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/27/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
3/27/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
3/28/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
3/28/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Excavation/Setback/Form/Re-Bar
|
3/28/2018
|
Partial Approval
|
ROBERT COLE
|
|
Green Building Rough
|
3/28/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Reinforced Masonry Frame
|
3/28/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Verify Sprinkler Sign Off
|
3/28/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
3/29/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
3/29/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
3/29/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
3/29/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
3/30/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
3/30/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
4/2/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
4/2/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/3/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
4/3/2018
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
4/3/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
4/3/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
4/3/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/4/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
4/4/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/5/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
4/5/2018
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
4/5/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
4/5/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
4/5/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
4/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/9/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/9/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/10/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/10/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/11/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/16/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/17/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/18/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/19/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/19/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/20/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/23/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/23/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/24/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/25/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/26/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/27/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/30/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/30/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/4/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
5/4/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
5/7/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
5/8/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/9/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
5/9/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
5/9/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
5/9/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
5/10/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
5/11/2018
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
5/14/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
5/14/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
5/14/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
5/14/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
5/14/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
5/15/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
5/15/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
5/15/2018
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Masonry
|
5/16/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Steel/Welding
|
5/16/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Wood Construction
|
5/18/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Steel/Welding
|
5/22/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Steel/Welding
|
5/24/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/25/2018
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
5/31/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Wood Construction
|
5/31/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/31/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Special/Order Compliance
|
6/1/2018
|
Corrections Issued
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
6/4/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
6/4/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
6/7/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
6/11/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
6/11/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
6/14/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/14/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
6/14/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Masonry Wall/Backfill
|
6/14/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Structural Steel Frame
|
6/14/2018
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Masonry
|
6/18/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Steel/Welding
|
6/18/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
6/18/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
6/19/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
6/19/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Drywall Nailing
|
6/19/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Deputy Steel/Welding
|
6/20/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
6/21/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
6/21/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
6/21/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/21/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
6/28/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
6/29/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/29/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
7/5/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
7/9/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
7/11/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
7/17/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
7/20/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
7/24/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/24/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
7/24/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
7/26/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
7/31/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/3/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
8/7/2018
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Wood Construction
|
8/9/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
8/16/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/20/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
8/21/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
8/28/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
8/29/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
9/10/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
9/11/2018
|
Approved
|
JEFFREY DURAN
|
|
Wood Frame
|
9/11/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/12/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
9/12/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/13/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
9/13/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
9/17/2018
|
Approved
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/17/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Wood Frame
|
9/17/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
9/19/2018
|
Approved
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/19/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Wall Anchors
|
9/19/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
9/21/2018
|
Approved
|
JEFFREY DURAN
|
|
Insulation
|
9/21/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/24/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Wood Frame
|
9/24/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
9/25/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/26/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Wood Frame
|
9/26/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
9/27/2018
|
Approved
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/27/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/27/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Insulation
|
9/27/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
9/27/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
10/2/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/9/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
10/10/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
10/10/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
10/11/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
10/12/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/12/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
10/12/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
10/12/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
10/16/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Insulation
|
10/16/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
10/17/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
10/19/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
10/22/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/23/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Wood Frame
|
10/23/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
10/24/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/25/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
10/25/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Wood Frame
|
10/25/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/26/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
10/26/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/29/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
11/2/2018
|
Approved
|
JEFFREY DURAN
|
|
Insulation
|
11/2/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
11/5/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/7/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/8/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/9/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
11/9/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
11/13/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
11/14/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
11/14/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
11/14/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/15/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
11/15/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
11/16/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
11/16/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/20/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Insulation
|
11/20/2018
|
Partial Approval
|
ROBERT COLE
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/21/2018
|
Partial Inspection
|
ROBERT COLE
|
|
Drywall Nailing
|
11/26/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/27/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
11/28/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/28/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
11/28/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/29/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Insulation
|
11/29/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
12/3/2018
|
Approved
|
JEFFREY DURAN
|
|
Wood Frame
|
12/3/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
12/4/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
12/5/2018
|
Approved
|
JEFFREY DURAN
|
|
Drywall Nailing
|
12/5/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Wood Frame
|
12/5/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
12/6/2018
|
Corrections Issued
|
JEFFREY DURAN
|
|
Wood Frame
|
12/6/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
12/7/2018
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Drywall Nailing
|
12/12/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
12/12/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
12/13/2018
|
Approved
|
JEFFREY DURAN
|
|
Insulation
|
12/17/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
12/20/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
12/21/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
12/24/2018
|
Corrections Issued
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
4/17/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
4/30/2019
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Drilled-In Anchors
|
8/19/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
9/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
9/20/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
9/23/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
9/24/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
5/27/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Final
|
5/29/2020
|
OK to Issue CofO
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
5/29/2020
|
Approved
|
JEFFREY DURAN
|
|
Green Building Final
|
5/29/2020
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
5/29/2020
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
5/29/2020
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
5/29/2020
|
Approved
|
JEFFREY DURAN
|
|
SGSOV-Seismic Gas S/O Valve
|
5/29/2020
|
SGSOV Approved
|
JEFFREY DURAN
|
|
Smoke Detectors
|
5/29/2020
|
Approved
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
5/29/2020
|
Approved
|
JEFFREY DURAN
|