5411 N ETIWANDA AVE 91356

Certificate Information: 5411 N ETIWANDA AVE 91356

Application / Permit
15010-10000-03597
Plan Check / Job No.
B15LA14076
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(8) Garage - Public
Work Description
Proposed 4-tiered Parking Garage with 2 1/2 subterranean tiers
Permit Issued
Issued on 7/18/2018
Issuing Office
Metro
Current Status
CofO Issued on 2/25/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/14/2015 APPLICANT
Assigned to Plan Check Engineer 11/5/2015 ALLEN MANALANSAN
Corrections Issued 11/9/2015 ALLEN MANALANSAN
Quality Review Completed 11/20/2015 JOHN VASQUEZ
Building Plans Picked Up 11/20/2015 APPLICANT
Applicant returned to address corrections 12/21/2015 ALLEN MANALANSAN
Applicant returned to address corrections 3/24/2016 ALLEN MANALANSAN
Applicant returned to address corrections 4/4/2016 ALLEN MANALANSAN
Applicant returned to address corrections 4/12/2016 ALLEN MANALANSAN
Applicant returned to address corrections 4/14/2016 ALLEN MANALANSAN
Applicant returned to address corrections 10/5/2016 ALLEN MANALANSAN
Applicant returned to address corrections 10/26/2016 ALLEN MANALANSAN
Applicant returned to address corrections 11/1/2016 ALLEN MANALANSAN
Applicant returned to address corrections 11/22/2016 ALLEN MANALANSAN
Plan Check Approved 7/18/2018 ALLEN MANALANSAN
Issued 7/18/2018 LADBS
TCO Issued (Expire Date: 10-21-2020) 4/24/2020 RICKEY JACKSON
TCO Issued (Expire Date: 04-18-2021) 10/20/2020 JEFFREY DURAN
CofO in Progress 2/19/2021 JEFFREY DURAN
Permit Finaled 2/25/2021 RICKEY JACKSON
CofO Issued 2/25/2021 RICKEY JACKSON
Permit Finaled 2/25/2021 RICKEY JACKSON

Permit Application Clearance Information

Highway dedication Cleared 11/24/2015 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 1/6/2016 LEE GUILBEAUX
Permit Cleared 1/6/2016 LEE GUILBEAUX
Green Code Cleared 3/10/2016 MARCUS LEVIAS
Hydrant and Access approval Cleared 6/16/2016 JOHN DALLAS
Disturb/Remove Protected Trees Cleared 8/5/2016 ADRIAN SANCHEZ
Excavation more than 5-ft deep Cleared 11/1/2016 CALOSHA APPROVED
Address approval Cleared 11/29/2016 RAVIL MANAPOV
Low Impact Development Cleared 1/31/2017 MARTIN FRAGOSO
Stormwater Pollution Mitigatn Cleared 1/31/2017 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 2/14/2017 LEE GUILBEAUX
Address approval Cleared 4/4/2018 LEE GUILBEAUX
Building over 3-story or 36-ft Cleared 4/10/2018 CALOSHA APPROVED
Sewer availability Cleared 4/11/2018 LEE GUILBEAUX
DAS Clearance Cleared 4/17/2018 RICARDO TRES
Work Adjacent to Public Way Cleared 5/17/2018 CHIU TAM
Driveway location Cleared 6/1/2018 ALBERT ISAGULIAN
Internal circulation Cleared 6/1/2018 ALBERT ISAGULIAN
Specific Plan Cleared 6/1/2018 ALBERT ISAGULIAN
Comm Cor/Mini-Mall Cleared 7/13/2018 FIPE LEILUA
Comm Cor/Mini-Mall Cleared 7/13/2018 FIPE LEILUA
Comm Cor/Mini-Mall Cleared 7/13/2018 FIPE LEILUA
Frnt yard landscape/Water mgmt Cleared 7/13/2018 FIPE LEILUA
Miscellaneous Cleared 7/13/2018 FIPE LEILUA
Prkng lot landscape/Water mgmt Cleared 7/13/2018 FIPE LEILUA
Site Plan review Cleared 7/13/2018 FIPE LEILUA
Specific Plan Cleared 7/13/2018 FIPE LEILUA
Specific Plan Cleared 7/13/2018 FIPE LEILUA
ZA Case Cleared 7/13/2018 FIPE LEILUA
ZA Case Cleared 7/13/2018 FIPE LEILUA

Contact Information

Architect Williamson, Craig Robert; Lic. No.: C23466 8811 RESEARCH DRIVE SUITE 200      IRVINE, CA 92618
Contractor Millie And Severson General Contractors; Lic. No.: 99031-A P O BOX 3601      LOS ALAMITOS, CA 90720
Engineer Sivathasan, Kathiravetpilla; Lic. No.: GE2708 831 LA DOCENA LANE      CORONA, CA 92879
Engineer Waggoner, Michael Alan; Lic. No.: S3738 10641 BENT TREE RD      SANTA ANA, CA 92705

Inspector Information

ROBERT DAVIS, (818) 374-1125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 7/30/2018 Partial Inspection CAMERON CHABAN
Pre-Inspection 7/30/2018 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 1/4/2019 Approved JEFFREY DURAN
Footing/Foundation/Slab 1/4/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 1/9/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 1/10/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 1/11/2019 Conditional Approval JEFFREY DURAN
Special/Order Compliance 1/11/2019 Partial Inspection JEFFREY DURAN
Footing/Foundation/Slab 3/20/2019 Partial Approval JEFFREY DURAN
Green Building Rough 3/20/2019 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 3/20/2019 Corrections Issued JEFFREY DURAN
Verify Sprinkler Sign Off 3/20/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Reinf. Concrete 3/29/2019 Conditional Approval ROBERT COLE
Footing/Foundation/Slab 3/29/2019 Partial Approval ROBERT COLE
Green Building Rough 4/16/2019 Not Ready for Inspection CAMERON CHABAN
Reinforced Concrete Frame 4/16/2019 Conditional Approval CAMERON CHABAN
Verify Sprinkler Sign Off 4/16/2019 Not Ready for Inspection CAMERON CHABAN
Footing/Foundation/Slab 4/22/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 4/23/2019 Partial Approval JEFFREY DURAN
Deputy Grading 4/24/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 4/24/2019 Partial Approval JEFFREY DURAN
Deputy Grading 4/25/2019 Conditional Approval JEFFREY DURAN
Deputy Grading 4/26/2019 Conditional Approval JEFFREY DURAN
Deputy Fireproofing 4/29/2019 Conditional Approval JEFFREY DURAN
Deputy Fireproofing 4/30/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 4/30/2019 Approved JEFFREY DURAN
Reinforced Concrete Frame 4/30/2019 Partial Approval JEFFREY DURAN
Deputy Fireproofing 5/1/2019 Conditional Approval JEFFREY DURAN
Deputy Fireproofing 5/2/2019 Conditional Approval JEFFREY DURAN
Reinforced Concrete Frame 5/2/2019 Conditional Approval JEFFREY DURAN
Deputy Fireproofing 5/3/2019 Conditional Approval JEFFREY DURAN
Deputy Fireproofing 5/9/2019 Conditional Approval JEFFREY DURAN
Deputy Grading 5/9/2019 Conditional Approval JEFFREY DURAN
Deputy Fireproofing 5/10/2019 Conditional Approval JEFFREY DURAN
Deputy Grading 5/10/2019 Conditional Approval JEFFREY DURAN
Deputy Fireproofing 5/13/2019 Approved JEFFREY DURAN
Deputy Fireproofing 5/14/2019 Approved JEFFREY DURAN
Deputy Fireproofing 5/15/2019 Conditional Approval JEFFREY DURAN
Light Gage Steel Frame 5/15/2019 Partial Approval JEFFREY DURAN
Deputy Fireproofing 5/16/2019 Conditional Approval JEFFREY DURAN
Interior/Exterior Lathing 5/31/2019 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 6/4/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 6/6/2019 Partial Approval JEFFREY DURAN
Drywall Nailing 6/7/2019 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 6/11/2019 Partial Approval JEFFREY DURAN
Footing/Foundation/Slab 6/12/2019 Partial Approval JEFFREY DURAN
Interior/Exterior Lathing 6/12/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 6/13/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 6/14/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 6/18/2019 Partial Inspection ANDREW DORSO
Drywall Nailing 6/21/2019 Partial Approval ROBERT COLE
Interior/Exterior Lathing 6/21/2019 Not Ready for Inspection ROBERT COLE
Masonry Wall/Backfill 6/24/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 6/25/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 6/26/2019 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 6/27/2019 Conditional Approval JEFFREY DURAN
Drywall Nailing 6/27/2019 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 6/27/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 6/28/2019 Approved JEFFREY DURAN
Reinforced Concrete Frame 6/28/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 6/29/2019 Conditional Approval JEFFREY DURAN
Green Building Rough 7/1/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 7/1/2019 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 7/1/2019 Partial Inspection JEFFREY DURAN
Verify Sprinkler Sign Off 7/1/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 7/2/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 7/2/2019 Conditional Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 7/5/2019 Approved JEFFREY DURAN
Deputy Reinf. Concrete 7/5/2019 Approved JEFFREY DURAN
Reinforced Concrete Frame 7/5/2019 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 7/10/2019 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 7/11/2019 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/11/2019 Approved DANNY RODRIGUEZ
Light Gage Steel Frame 7/11/2019 Not Ready for Inspection DANNY RODRIGUEZ
Reinforced Concrete Frame 7/11/2019 Partial Approval DANNY RODRIGUEZ
Deputy Pre-Stress Concrete 7/12/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 7/12/2019 Conditional Approval JAMES STEPHENS
Deputy Pre-Stress Concrete 7/15/2019 Approved JEFFREY DURAN
Deputy Reinf. Concrete 7/15/2019 Approved JEFFREY DURAN
Floor/Roof Diaphrgm/Shear Wall 7/15/2019 Conditional Approval JEFFREY DURAN
Light Gage Steel Frame 7/15/2019 Not Ready for Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 7/16/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 7/16/2019 Conditional Approval JEFFREY DURAN
Interior/Exterior Lathing 7/18/2019 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 7/19/2019 Partial Approval ROBERT COLE
Drywall Nailing 7/22/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 7/23/2019 Partial Approval ROBERT COLE
Pre-Inspection 7/26/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 7/27/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 8/2/2019 Approved JEFFREY DURAN
Pre-Inspection 8/2/2019 Approved JEFFREY DURAN
Special/Order Compliance 8/2/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 8/5/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 8/7/2019 Approved JEFFREY DURAN
Deputy Pre-Stress Concrete 8/8/2019 Approved JEFFREY DURAN
Reinforced Concrete Frame 8/8/2019 Partial Inspection JEFFREY DURAN
Deputy Pre-Stress Concrete 8/9/2019 Approved JEFFREY DURAN
Green Building Rough 8/9/2019 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 8/9/2019 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 8/9/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 8/13/2019 Partial Inspection JEFFREY DURAN
Drywall Nailing 8/15/2019 Partial Approval JAMES STEPHENS
Light Gage Steel Frame 8/15/2019 Not Ready for Inspection JAMES STEPHENS
Pre-Inspection 8/16/2019 Partial Approval MILLARD ARDOIN
Pre-Inspection 8/19/2019 Partial Inspection JEFFREY DURAN
Deputy Reinf. Concrete 8/20/2019 Approved JEFFREY DURAN
Pre-Inspection 8/20/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 8/21/2019 Partial Approval ROBERT COLE
Pre-Inspection 8/26/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 8/29/2019 Approved JEFFREY DURAN
Deputy Reinf. Concrete 8/29/2019 Approved JEFFREY DURAN
Deputy Shotcrete 8/29/2019 Approved JEFFREY DURAN
Reinforced Concrete Frame 8/29/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 8/30/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 8/30/2019 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 8/30/2019 Conditional Approval JEFFREY DURAN
Drywall Nailing 8/30/2019 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 8/30/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 9/3/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 9/4/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 9/9/2019 Partial Approval MILLARD ARDOIN
Pre-Inspection 9/12/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 9/14/2019 No Result Entered RICKEY JACKSON
Reinforced Concrete Frame 9/16/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 9/17/2019 Off-Hour Fees Due
Reinforced Concrete Frame 9/19/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 9/24/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 9/25/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 9/27/2019 Approved JEFFREY DURAN
Pre-Inspection 9/27/2019 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 10/1/2019 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 10/7/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 10/8/2019 Conditional Approval JEFFREY DURAN
Reinforced Concrete Frame 10/9/2019 Conditional Approval JEFFREY DURAN
Reinforced Concrete Frame 10/16/2019 Partial Approval JEFFREY DURAN
Deputy Pre-Stress Concrete 10/18/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/18/2019 Conditional Approval JEFFREY DURAN
Deputy Shotcrete 10/18/2019 Approved JEFFREY DURAN
Reinforced Concrete Frame 10/18/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/21/2019 Approved JEFFREY DURAN
Deputy Shotcrete 10/21/2019 Approved JEFFREY DURAN
Reinforced Concrete Frame 10/21/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/23/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 10/24/2019 Approved JEFFREY DURAN
Green Building Rough 10/24/2019 Not Ready for Inspection JEFFREY DURAN
Reinforced Concrete Frame 10/24/2019 Partial Approval JEFFREY DURAN
Reinforced Masonry Frame 10/24/2019 Partial Approval JEFFREY DURAN
Verify Sprinkler Sign Off 10/24/2019 Not Ready for Inspection JEFFREY DURAN
Pre-Inspection 10/31/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 11/2/2019 Off-Hour Fees Due
Pre-Inspection 11/2/2019 Partial Approval JOHN KITCKO
Reinforced Concrete Frame 11/6/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 11/8/2019 Partial Approval JEFFREY DURAN
Wood Frame 11/8/2019 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 11/12/2019 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 11/14/2019 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 11/18/2019 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 11/18/2019 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/19/2019 Conditional Approval RICKEY JACKSON
Deputy Steel/Welding 11/20/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 11/21/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 11/26/2019 Partial Approval MILLARD ARDOIN
Deputy Steel/Welding 12/3/2019 Conditional Approval JEFFREY DURAN
Deputy Steel/Welding 12/5/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 12/5/2019 Partial Approval JEFFREY DURAN
Deputy Reinf. Concrete 12/6/2019 Approved JEFFREY DURAN
Deputy Steel/Welding 12/6/2019 Conditional Approval JEFFREY DURAN
Pre-Inspection 12/6/2019 Partial Approval JEFFREY DURAN
Pre-Inspection 12/7/2019 Off-Hour Fees Due
Deputy Steel/Welding 12/9/2019 Approved JEFFREY DURAN
Deputy Reinf. Masonry 12/10/2019 Approved JEFFREY DURAN
Reinforced Concrete Frame 12/13/2019 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 12/16/2019 Conditional Approval JAMES STEPHENS
Excavation/Setback/Form/Re-Bar 12/18/2019 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 12/23/2019 Partial Approval JEFFREY DURAN
Light Gage Steel Frame 1/10/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 1/10/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 1/14/2020 Conditional Approval JEFFREY DURAN
Drywall Nailing 1/17/2020 Partial Approval JEFFREY DURAN
Drywall Nailing 1/22/2020 Partial Approval JEFFREY DURAN
Reinforced Concrete Frame 2/5/2020 Partial Approval JEFFREY DURAN
Masonry Wall/Backfill 3/10/2020 Partial Inspection JEFFREY DURAN
Deputy Reinf. Masonry 3/11/2020 Approved JEFFREY DURAN
Masonry Wall/Backfill 3/11/2020 Partial Inspection JEFFREY DURAN
Pre-Inspection 3/12/2020 Partial Inspection JEFFREY DURAN
Masonry Wall/Backfill 3/13/2020 Partial Approval JEFFREY DURAN
Deputy Reinf. Masonry 3/17/2020 Approved JEFFREY DURAN
Masonry Wall/Backfill 3/17/2020 Partial Approval JEFFREY DURAN
Final 4/2/2020 Not Ready for Inspection JEFFREY DURAN
Footing/Foundation/Slab 4/2/2020 Approved JEFFREY DURAN
Green Building Final 4/2/2020 Not Ready for Inspection JEFFREY DURAN
Green Building Rough 4/2/2020 Approved JEFFREY DURAN
Reinforced Concrete Frame 4/2/2020 Approved JEFFREY DURAN
Reinforced Masonry Frame 4/2/2020 Approved JEFFREY DURAN
SGSOV-Seismic Gas S/O Valve 4/2/2020 SGSOV No Gas JEFFREY DURAN
Smoke Detectors 4/2/2020 Approved JEFFREY DURAN
Verify Sprinkler Sign Off 4/2/2020 Approved JEFFREY DURAN
Special/Order Compliance 4/6/2020 Partial Approval JEFFREY DURAN
Pre-Inspection 4/7/2020 Partial Inspection DANIEL VARNUM
Final 4/21/2020 OK for TCO JEFFREY DURAN
Final 4/24/2020 OK for TCO JEFFREY DURAN
Green Building Final 4/24/2020 Approved JEFFREY DURAN
Special/Order Compliance 9/25/2020 Approved HAMID PISHEHVAR