Excavation/Setback/Form/Re-Bar
|
7/30/2018
|
Partial Inspection
|
CAMERON CHABAN
|
|
Pre-Inspection
|
7/30/2018
|
Partial Inspection
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
1/4/2019
|
Approved
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
1/4/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/10/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/11/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
1/11/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
3/20/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
3/20/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
3/20/2019
|
Corrections Issued
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
3/20/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/29/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
3/29/2019
|
Partial Approval
|
ROBERT COLE
|
|
Green Building Rough
|
4/16/2019
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Reinforced Concrete Frame
|
4/16/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Verify Sprinkler Sign Off
|
4/16/2019
|
Not Ready for Inspection
|
CAMERON CHABAN
|
|
Footing/Foundation/Slab
|
4/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
4/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Grading
|
4/24/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
4/24/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Grading
|
4/25/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Grading
|
4/26/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
4/29/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
4/30/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/30/2019
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
4/30/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
5/1/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
5/2/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
5/2/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
5/3/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
5/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Grading
|
5/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
5/10/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Grading
|
5/10/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
5/13/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
5/14/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
5/15/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
5/15/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Fireproofing
|
5/16/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
5/31/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
6/4/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
6/6/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
6/7/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Pre-Inspection
|
6/11/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
6/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
6/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
6/13/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
6/14/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
6/18/2019
|
Partial Inspection
|
ANDREW DORSO
|
|
Drywall Nailing
|
6/21/2019
|
Partial Approval
|
ROBERT COLE
|
|
Interior/Exterior Lathing
|
6/21/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Masonry Wall/Backfill
|
6/24/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
6/25/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
6/26/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
6/27/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
6/27/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
6/27/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
6/28/2019
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
6/28/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
6/29/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
7/1/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
7/1/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
7/1/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
7/1/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
7/2/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/2/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
7/5/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/5/2019
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
7/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
7/10/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Pre-Stress Concrete
|
7/11/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
7/11/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/11/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
7/11/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Pre-Stress Concrete
|
7/12/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
7/12/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Pre-Stress Concrete
|
7/15/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/15/2019
|
Approved
|
JEFFREY DURAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
7/15/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
7/16/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/16/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Interior/Exterior Lathing
|
7/18/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
7/19/2019
|
Partial Approval
|
ROBERT COLE
|
|
Drywall Nailing
|
7/22/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
7/23/2019
|
Partial Approval
|
ROBERT COLE
|
|
Pre-Inspection
|
7/26/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
7/27/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
8/2/2019
|
Approved
|
JEFFREY DURAN
|
|
Pre-Inspection
|
8/2/2019
|
Approved
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
8/2/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
8/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
8/7/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
8/8/2019
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
8/8/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
8/9/2019
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
8/9/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
8/9/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
8/9/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
8/13/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/15/2019
|
Partial Approval
|
JAMES STEPHENS
|
|
Light Gage Steel Frame
|
8/15/2019
|
Not Ready for Inspection
|
JAMES STEPHENS
|
|
Pre-Inspection
|
8/16/2019
|
Partial Approval
|
MILLARD ARDOIN
|
|
Pre-Inspection
|
8/19/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/20/2019
|
Approved
|
JEFFREY DURAN
|
|
Pre-Inspection
|
8/20/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
8/21/2019
|
Partial Approval
|
ROBERT COLE
|
|
Pre-Inspection
|
8/26/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
8/29/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/29/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/29/2019
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
8/29/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
8/30/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/30/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/30/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/30/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
8/30/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
9/3/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
9/4/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
9/9/2019
|
Partial Approval
|
MILLARD ARDOIN
|
|
Pre-Inspection
|
9/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
9/14/2019
|
No Result Entered
|
RICKEY JACKSON
|
|
Reinforced Concrete Frame
|
9/16/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
9/17/2019
|
Off-Hour Fees Due
|
|
|
Reinforced Concrete Frame
|
9/19/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
9/24/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
9/25/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/27/2019
|
Approved
|
JEFFREY DURAN
|
|
Pre-Inspection
|
9/27/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
10/1/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
10/7/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
10/8/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
10/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
10/16/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
10/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
10/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
10/18/2019
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
10/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
10/21/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
10/21/2019
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
10/21/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
10/23/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
10/24/2019
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
10/24/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
10/24/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
10/24/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
10/24/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
10/31/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
11/2/2019
|
Off-Hour Fees Due
|
|
|
Pre-Inspection
|
11/2/2019
|
Partial Approval
|
JOHN KITCKO
|
|
Reinforced Concrete Frame
|
11/6/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
11/8/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Wood Frame
|
11/8/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
11/12/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
11/14/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
11/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
11/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/19/2019
|
Conditional Approval
|
RICKEY JACKSON
|
|
Deputy Steel/Welding
|
11/20/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
11/21/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
11/26/2019
|
Partial Approval
|
MILLARD ARDOIN
|
|
Deputy Steel/Welding
|
12/3/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/5/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
12/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/6/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/6/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
12/6/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
12/7/2019
|
Off-Hour Fees Due
|
|
|
Deputy Steel/Welding
|
12/9/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
12/10/2019
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
12/13/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
12/16/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Excavation/Setback/Form/Re-Bar
|
12/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
12/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
1/10/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
1/10/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
1/14/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
1/17/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
1/22/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
2/5/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
3/10/2020
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/11/2020
|
Approved
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
3/11/2020
|
Partial Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
3/12/2020
|
Partial Inspection
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
3/13/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
3/17/2020
|
Approved
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
3/17/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Final
|
4/2/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
4/2/2020
|
Approved
|
JEFFREY DURAN
|
|
Green Building Final
|
4/2/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Green Building Rough
|
4/2/2020
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
4/2/2020
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
4/2/2020
|
Approved
|
JEFFREY DURAN
|
|
SGSOV-Seismic Gas S/O Valve
|
4/2/2020
|
SGSOV No Gas
|
JEFFREY DURAN
|
|
Smoke Detectors
|
4/2/2020
|
Approved
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
4/2/2020
|
Approved
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
4/6/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
4/7/2020
|
Partial Inspection
|
DANIEL VARNUM
|
|
Final
|
4/21/2020
|
OK for TCO
|
JEFFREY DURAN
|
|
Final
|
4/24/2020
|
OK for TCO
|
JEFFREY DURAN
|
|
Green Building Final
|
4/24/2020
|
Approved
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
9/25/2020
|
Approved
|
HAMID PISHEHVAR
|