Excavation/Setback/Form/Re-Bar
|
7/23/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
7/23/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
7/30/2018
|
Partial Inspection
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/17/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
8/17/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
8/17/2018
|
Approved
|
JEFFREY DURAN
|
|
Pre-Inspection
|
8/20/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/29/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
8/29/2018
|
OK to Expire Permit
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
8/29/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
8/29/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/5/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/6/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
9/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
9/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/7/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/13/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/13/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
9/13/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
9/13/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/17/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/18/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
9/18/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Wood Frame
|
9/18/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy EIFS
|
10/11/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/11/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
10/11/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Pre-Inspection
|
10/11/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Structural Steel Frame
|
10/11/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
10/11/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/19/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/23/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/24/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/25/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/30/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
10/31/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/2/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/14/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/15/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
11/15/2018
|
Corrections Issued
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/20/2018
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
11/21/2018
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
11/26/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/26/2018
|
Corrections Issued
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
11/26/2018
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
11/26/2018
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/27/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/28/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/29/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
11/29/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
11/29/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/4/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
12/4/2018
|
Corrections Issued
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/6/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/12/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/13/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/14/2018
|
Approved
|
JEFFREY DURAN
|
|
Pre-Inspection
|
12/14/2018
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/18/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/26/2018
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
12/26/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
12/26/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
12/27/2018
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
12/27/2018
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/3/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/9/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
1/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
1/22/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/28/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
1/28/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/29/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
1/29/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
1/30/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/30/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
2/12/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
2/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
2/12/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
2/19/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
2/20/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
2/25/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
2/26/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
2/26/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
2/26/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Structural Steel Frame
|
2/26/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
2/26/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
2/28/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Masonry Wall/Backfill
|
3/4/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
3/5/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
3/6/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Reinforced Concrete Frame
|
3/8/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Excavation/Setback/Form/Re-Bar
|
3/11/2019
|
Not Ready for Inspection
|
JOHN KITCKO
|
|
Deputy Steel/Welding
|
3/13/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
3/14/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
3/15/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
3/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
3/20/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
3/27/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Steel/Welding
|
3/28/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Excavation/Setback/Form/Re-Bar
|
3/29/2019
|
Partial Approval
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
3/29/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Excavation/Setback/Form/Re-Bar
|
4/4/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
4/4/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
4/8/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Drilled-In Anchors
|
4/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
4/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
4/10/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
4/10/2019
|
Approved
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/10/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
4/11/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
4/11/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
4/16/2019
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
4/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
4/19/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
4/19/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
4/22/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/22/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
4/22/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
4/23/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/23/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
4/23/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
4/23/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
4/24/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/24/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
4/24/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
4/25/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/25/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
4/25/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
4/26/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/26/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
4/26/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
4/26/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Excavation/Setback/Form/Re-Bar
|
4/26/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
4/26/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/29/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
4/30/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
4/30/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/1/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/2/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
5/2/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/3/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
5/3/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
5/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
5/10/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Grading
|
5/14/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
5/14/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
5/14/2019
|
Corrections Issued
|
JEFFREY DURAN
|
|
Deputy Grading
|
5/15/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Grading
|
5/16/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Grading
|
5/17/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
5/22/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
5/29/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/4/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/5/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
6/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
6/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
6/5/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/6/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/7/2019
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
6/10/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
6/10/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/11/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
6/11/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
6/12/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/12/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
6/12/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
6/12/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/13/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
6/13/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/14/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
6/14/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Drilled-In Anchors
|
6/17/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
6/17/2019
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
6/18/2019
|
Conditional Approval
|
ANDREW DORSO
|
|
Deputy Drilled-In Anchors
|
6/21/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
6/21/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Pre-Inspection
|
6/21/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Deputy Drilled-In Anchors
|
6/24/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
6/24/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
6/25/2019
|
Approved
|
JEFFREY DURAN
|
|
Pre-Inspection
|
6/25/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/1/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/2/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/2/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
7/2/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
7/2/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/5/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/5/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/8/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/8/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/9/2019
|
Approved
|
JEFFREY DURAN
|
|
Insulation
|
7/9/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
7/9/2019
|
Corrections Issued
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/10/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
7/11/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Shotcrete
|
7/11/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
7/12/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Shotcrete
|
7/12/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
7/15/2019
|
Approved
|
JEFFREY DURAN
|
|
Insulation
|
7/15/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/16/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/17/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/18/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
7/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Insulation
|
7/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/19/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Shotcrete
|
7/19/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Insulation
|
7/19/2019
|
Not Ready for Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
7/22/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/22/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
7/23/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Reinf. Masonry
|
7/23/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Shotcrete
|
7/23/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Deputy Pre-Stress Concrete
|
7/24/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
7/24/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Shotcrete
|
7/24/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
7/25/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/25/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
7/26/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/26/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/29/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
7/31/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
7/31/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/1/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/1/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/2/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/2/2019
|
Approved
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/2/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
8/2/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/5/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/5/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Insulation
|
8/6/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
8/7/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
8/8/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Masonry
|
8/9/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/13/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/13/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
8/14/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/14/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/15/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Masonry
|
8/16/2019
|
Approved
|
MILLARD ARDOIN
|
|
Deputy Shotcrete
|
8/16/2019
|
Approved
|
MILLARD ARDOIN
|
|
Wall Anchors
|
8/16/2019
|
Partial Approval
|
MILLARD ARDOIN
|
|
Deputy Reinf. Masonry
|
8/19/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/19/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/20/2019
|
Approved
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
8/26/2019
|
Approved
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
9/3/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/9/2019
|
Not Ready for Inspection
|
MILLARD ARDOIN
|
|
Green Building Rough
|
9/9/2019
|
Not Ready for Inspection
|
MILLARD ARDOIN
|
|
Deputy Reinf. Concrete
|
9/17/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
9/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
9/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
9/18/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Light Gage Steel Frame
|
9/24/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
9/26/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
11/4/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
11/4/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
T-Bar Ceiling
|
11/13/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
11/21/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
11/22/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
11/25/2019
|
Partial Inspection
|
DANIEL VARNUM
|
|
Special/Order Compliance
|
11/25/2019
|
Partial Inspection
|
DANIEL VARNUM
|
|
T-Bar Ceiling
|
11/26/2019
|
Partial Approval
|
MILLARD ARDOIN
|
|
Special/Order Compliance
|
12/2/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
12/3/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
T-Bar Ceiling
|
12/3/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
T-Bar Ceiling
|
12/4/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
12/9/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
T-Bar Ceiling
|
12/9/2019
|
Approved
|
JEFFREY DURAN
|
|
Masonry Wall/Backfill
|
12/10/2019
|
Partial Inspection
|
JEFFREY DURAN
|
|
Green Building Rough
|
12/11/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
12/11/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
12/11/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
12/23/2019
|
Partial Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
12/23/2019
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Deputy Shotcrete
|
12/24/2019
|
Conditional Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
1/3/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Pre-Inspection
|
1/10/2020
|
Partial Inspection
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/14/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/15/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/16/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/17/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Pre-Stress Concrete
|
1/22/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Steel/Welding
|
1/23/2020
|
Conditional Approval
|
JAMES STEPHENS
|
|
Footing/Foundation/Slab
|
1/27/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
1/30/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
2/10/2020
|
Partial Inspection
|
JEFFREY FULTON
|
|
T-Bar Ceiling
|
2/10/2020
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
2/27/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
3/17/2020
|
Partial Inspection
|
JEFFREY DURAN
|
|
Drywall Nailing
|
3/24/2020
|
Approved
|
JEFFREY DURAN
|
|
Final
|
3/24/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Footing/Foundation/Slab
|
3/24/2020
|
Approved
|
JEFFREY DURAN
|
|
Green Building Final
|
3/24/2020
|
Approved
|
JEFFREY DURAN
|
|
Green Building Rough
|
3/24/2020
|
Approved
|
JEFFREY DURAN
|
|
Reinforced Masonry Frame
|
3/24/2020
|
Approved
|
JEFFREY DURAN
|
|
SGSOV-Seismic Gas S/O Valve
|
3/24/2020
|
SGSOV Approved
|
JEFFREY DURAN
|
|
Smoke Detectors
|
3/24/2020
|
Approved
|
JEFFREY DURAN
|
|
Structural Steel Frame
|
3/24/2020
|
Approved
|
JEFFREY DURAN
|
|
Verify Sprinkler Sign Off
|
3/24/2020
|
Approved
|
JEFFREY DURAN
|
|
Final
|
3/27/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Final
|
4/2/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
4/2/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Final
|
4/13/2020
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
4/13/2020
|
Partial Approval
|
ROBERT DAVIS
|
|
Final
|
4/15/2020
|
Not Ready for Inspection
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
4/16/2020
|
Conditional Approval
|
JEFFREY DURAN
|
|
Final
|
4/20/2020
|
Not Ready for Inspection
|
HAMID PISHEHVAR
|
|
Final
|
4/24/2020
|
OK for TCO
|
JEFFREY DURAN
|
|
Special/Order Compliance
|
9/25/2020
|
Approved
|
HAMID PISHEHVAR
|