801 S BERENDO ST 90005

Certificate Information: 801 S BERENDO ST 90005

Application / Permit
15010-10000-03362
Plan Check / Job No.
B15LA13214
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New construction 7-story mixed-use building with 2 subterranean parking levels. Ground floor retail with 6-story 98 total apartments. ( 9 units of very low income units).
Permit Issued
Issued on 8/30/2017
Issuing Office
Metro
Current Status
CofO Issued on 9/27/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/21/2015 APPLICANT
Assigned to Plan Check Engineer 10/8/2015 LARRY LEE
Corrections Issued 10/14/2015 LARRY LEE
Quality Review Completed 10/22/2015 BILL STUTSMAN
Building Plans Picked Up 10/27/2015 APPLICANT
Applicant returned to address corrections 12/1/2015 LARRY LEE
Plan Check Approved 6/20/2017 LARRY LEE
Issued 8/30/2017 LADBS
Permit Closed-Status Void 9/26/2018 WINSTON DUNNING
Re-Activate Permit 9/27/2018 WINSTON DUNNING
TCO Issued (Expire Date: 11-21-2021) 5/25/2021 DAVID TSAU
CofO in Progress 9/27/2021 ERNESTO CORRAL
Permit Finaled 9/27/2021 ERNESTO CORRAL
CofO Issued 9/27/2021 ERNESTO CORRAL
Permit Finaled 9/27/2021 ERNESTO CORRAL

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/12/2016 ADRIAN HERNANDEZ
Address approval Cleared 5/16/2016 JAMES MORALEZ
Hydrant and Access approval Cleared 5/16/2016 JOHN CONNEALLY
Highway dedication Cleared 7/14/2016 ADRIAN SANCHEZ
Project located in CRA area Cleared 8/17/2016 JIM URQUHART
Housing density bonus Cleared 3/28/2017 NICHOLAS KAWAZOE
Internal circulation Cleared 3/28/2017 COLLINS ALLAN
Sewer availability Cleared 5/17/2017 AVALYN KAMACHI
DAS Clearance Cleared 5/31/2017 LARRY LEE
Fire Marshall Fire Life Safety Cleared 6/1/2017 MENOA AGHAJANI
Green Code Cleared 6/5/2017 DAVID MATSON
CPC Cleared 6/9/2017 ERIC CLAROS
Frnt yard landscape/Water mgmt Cleared 6/9/2017 ERIC CLAROS
Miscellaneous Cleared 6/9/2017 ERIC CLAROS
Opn space landscape/Water mgmt Cleared 6/9/2017 ERIC CLAROS
Site Plan review Cleared 6/9/2017 ERIC CLAROS
ZA Case Cleared 6/9/2017 ERIC CLAROS
ZA Case Cleared 6/9/2017 ERIC CLAROS
ZA Case Cleared 6/9/2017 ERIC CLAROS
ZA Case Cleared 6/9/2017 ERIC CLAROS
ZA Case Cleared 6/9/2017 ERIC CLAROS
ZA Case Cleared 6/9/2017 ERIC CLAROS
Low Impact Development Cleared 6/16/2017 MICHAEL SCADUTO
Methane Ordinance Cleared 6/16/2017 DAVE MYERS
Permit Cleared 6/16/2017 LINDA MARGARET
Roof/Waste drainage to street Cleared 6/16/2017 LINDA MARGARET
Stormwater Pollution Mitigatn Cleared 6/16/2017 MICHAEL SCADUTO
Building over 3-story or 36-ft Cleared 6/20/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/20/2017 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 6/20/2017 DAVID PEREZ
ZA Case Cleared 6/20/2017 ERIC CLAROS

Contact Information

Contractor Philmont Management Inc; Lic. No.: 808686-B 3450 WILSHIRE BLVD 850      LOS ANGELES, CA 90010
Engineer Conaway, Johnny Ray; Lic. No.: C19689 PO BOX 155      OAK VIEW, CA 93022
Engineer Hassan, Mohamed Ali; Lic. No.: S5285 3621 HARBOR BLVD STE 125      SANTA ANA, CA 92704

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/18/2017 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 1/8/2018 Partial Inspection WINSTON DUNNING
METHANE-Barrier 1/8/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 1/8/2018 Partial Inspection WINSTON DUNNING
METHANE-Barrier 1/24/2018 Partial Inspection WINSTON DUNNING
Deputy Methane Barrier 2/1/2018 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 2/8/2018 Partial Inspection WINSTON DUNNING
METHANE-Barrier 2/8/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 2/8/2018 Partial Inspection WINSTON DUNNING
Deputy Methane Barrier 2/9/2018 Conditional Approval WINSTON DUNNING
METHANE-Subgrade 2/13/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 2/26/2018 Partial Inspection LESLIE TRUJILLO
METHANE-Barrier 2/26/2018 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 2/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/27/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/27/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 2/27/2018 Partial Inspection LESLIE TRUJILLO
METHANE-Rough 2/27/2018 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/27/2018 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 2/27/2018 Partial Inspection LESLIE TRUJILLO
Footing/Foundation/Slab 3/2/2018 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 3/2/2018 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 3/2/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 3/5/2018 Partial Inspection LESLIE TRUJILLO
METHANE-Rough 3/5/2018 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 3/5/2018 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 3/5/2018 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 3/6/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 3/13/2018 Partial Inspection WINSTON DUNNING
METHANE-Rough 3/13/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 3/13/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 3/13/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 3/20/2018 Not Ready for Inspection LESLIE TRUJILLO
METHANE-Rough 3/20/2018 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/20/2018 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 3/20/2018 Not Ready for Inspection LESLIE TRUJILLO
Green Building Rough 3/28/2018 Not Ready for Inspection LESLIE TRUJILLO
METHANE-Rough 3/28/2018 Approved LESLIE TRUJILLO
Reinforced Concrete Frame 3/28/2018 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 3/28/2018 Not Ready for Inspection LESLIE TRUJILLO
METHANE-Barrier 4/3/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 4/6/2018 No Access for Inspection WINSTON DUNNING
Reinforced Concrete Frame 4/6/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 4/6/2018 Partial Inspection WINSTON DUNNING
Deputy Shotcrete 4/9/2018 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 4/10/2018 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 4/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 4/12/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 4/12/2018 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 4/12/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 4/12/2018 Partial Inspection WINSTON DUNNING
Deputy Shotcrete 4/13/2018 Partial Approval JAMES POWERS
METHANE-Barrier 4/16/2018 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 4/30/2018 Partial Inspection ERNESTO CORRAL
METHANE-Barrier 4/30/2018 Partial Inspection ERNESTO CORRAL
METHANE-Subgrade 4/30/2018 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 5/9/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 5/9/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 5/9/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 5/10/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 5/16/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 5/16/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 5/16/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 5/23/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 5/23/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 5/23/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 5/23/2018 Partial Inspection WINSTON DUNNING
Deputy Shotcrete 5/25/2018 Conditional Approval WINSTON DUNNING
METHANE-Barrier 5/29/2018 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 6/5/2018 Partial Inspection WINSTON DUNNING
METHANE-Barrier 6/5/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 6/5/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 6/11/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 6/11/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 6/11/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 6/19/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 6/19/2018 Conditional Approval WINSTON DUNNING
Verify Sprinkler Sign Off 6/19/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 6/20/2018 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 6/21/2018 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 6/22/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 6/22/2018 Partial Approval WINSTON DUNNING
Green Building Rough 6/22/2018 Partial Inspection WINSTON DUNNING
METHANE-Barrier 6/22/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 6/22/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 6/22/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 6/22/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 6/29/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 6/29/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 6/29/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 7/9/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 7/9/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 7/9/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 7/18/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/19/2018 Approved WINSTON DUNNING
Deputy Reinf. Concrete 7/19/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 7/19/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 7/19/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 7/19/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 7/20/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/30/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/31/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 8/1/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 8/1/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 8/1/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 8/9/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/10/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/13/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/14/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 8/14/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 8/14/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 8/14/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 8/15/2018 Conditional Approval WINSTON DUNNING
Pre-Inspection 8/15/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 9/12/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 9/12/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 9/12/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 9/21/2018 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 9/21/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 9/21/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 9/26/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 9/26/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 9/26/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 9/28/2018 Partial Inspection WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 11/8/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 11/8/2018 Conditional Approval WINSTON DUNNING
METHANE-Barrier 11/8/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/8/2018 Partial Inspection WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 11/9/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 11/9/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 11/9/2018 Partial Inspection WINSTON DUNNING
METHANE-Barrier 11/9/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/9/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 11/9/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 11/9/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 11/13/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 11/26/2018 Partial Inspection WINSTON DUNNING
Deputy Drilled-In Anchors 11/28/2018 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 11/28/2018 Conditional Approval WINSTON DUNNING
Wood Frame 12/12/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 12/18/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 12/18/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 12/21/2018 Partial Approval WINSTON DUNNING
Green Building Rough 1/14/2019 Not Ready for Inspection LESLIE TRUJILLO
Reinforced Masonry Frame 1/14/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 1/14/2019 Not Ready for Inspection LESLIE TRUJILLO
Wood Frame 1/30/2019 Partial Inspection LESLIE TRUJILLO
Wood Frame 2/1/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 2/4/2019 Partial Inspection LESLIE TRUJILLO
Reinforced Masonry Frame 2/4/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 2/4/2019 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 2/12/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 2/20/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 2/21/2019 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 2/25/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 2/25/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 3/5/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/5/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 3/5/2019 Not Ready for Inspection LESLIE TRUJILLO
Drywall Nailing 3/6/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 3/7/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/15/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 3/15/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 3/19/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/27/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 4/10/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 4/10/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 4/12/2019 Partial Approval NICK DANERI
Drywall Nailing 4/25/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 4/25/2019 Partial Inspection LESLIE TRUJILLO
Masonry Wall/Backfill 4/25/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/25/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 4/25/2019 Partial Inspection LESLIE TRUJILLO
METHANE-Barrier 5/7/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 5/15/2019 Approved KATY RAMIREZ
Wood Frame 5/15/2019 Partial Approval TED RIES
Deputy Wood Construction 5/16/2019 Conditional Approval ERNESTO CORRAL
Drywall Nailing 5/23/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/23/2019 Partial Inspection LESLIE TRUJILLO
Wood Frame 6/6/2019 Not Ready for Inspection LESLIE TRUJILLO
Wood Frame 6/7/2019 Partial Inspection LESLIE TRUJILLO
Deputy Wood Construction 6/10/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 6/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 6/13/2019 Conditional Approval LESLIE TRUJILLO
Insulation 6/18/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 6/20/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 6/21/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 6/25/2019 Corrections Issued LESLIE TRUJILLO
Deputy Wood Construction 6/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 7/2/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 7/8/2019 Corrections Issued LESLIE TRUJILLO
Deputy Wood Construction 7/9/2019 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 7/11/2019 Conditional Approval LESLIE TRUJILLO
Insulation 7/12/2019 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 7/12/2019 Approved LESLIE TRUJILLO
Wood Frame 7/12/2019 Partial Inspection LESLIE TRUJILLO
Deputy Wood Construction 7/16/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 7/17/2019 Partial Inspection LESLIE TRUJILLO
Wood Frame 7/19/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 7/23/2019 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 7/24/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 7/24/2019 Partial Approval LESLIE TRUJILLO
Insulation 7/26/2019 Corrections Issued LESLIE TRUJILLO
Deputy Wood Construction 7/30/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 7/31/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/5/2019 Partial Approval LESLIE TRUJILLO
Insulation 8/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 8/12/2019 Conditional Approval LESLIE TRUJILLO
Wood Frame 8/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 8/14/2019 Conditional Approval LESLIE TRUJILLO
Insulation 8/15/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 8/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 8/22/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/27/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/5/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 9/5/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 9/10/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/10/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 9/16/2019 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 9/16/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 9/24/2019 Partial Approval LESLIE TRUJILLO
Insulation 9/24/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 10/11/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 10/16/2019 Conditional Approval DANIEL MC AULIFFE
Wood Frame 10/16/2019 Partial Approval DANIEL MC AULIFFE
Insulation 10/24/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 10/24/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 10/28/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 11/7/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/13/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/13/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 11/13/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/22/2019 Partial Inspection LESLIE TRUJILLO
Insulation 11/26/2019 Partial Approval DANIEL MC AULIFFE
Insulation 11/27/2019 Partial Approval DAVID BURKHEAD
Insulation 12/2/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 12/2/2019 Partial Inspection ERNESTO CORRAL
Wood Frame 12/6/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/9/2019 Partial Approval LESLIE TRUJILLO
Insulation 12/9/2019 Partial Inspection LESLIE TRUJILLO
Insulation 12/10/2019 Partial Approval LESLIE TRUJILLO
Insulation 12/12/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/12/2019 Partial Approval LESLIE TRUJILLO
Wood Frame 12/17/2019 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 12/18/2019 Partial Approval LESLIE TRUJILLO
Insulation 12/18/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 12/23/2019 Not Ready for Inspection LESLIE TRUJILLO
Drywall Nailing 1/2/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/8/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/10/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/14/2020 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 1/14/2020 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 1/15/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/17/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/17/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/23/2020 Partial Approval LESLIE TRUJILLO
Insulation 1/23/2020 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 1/29/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 1/31/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/6/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 2/6/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/6/2020 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 2/11/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 2/11/2020 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 2/14/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/18/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 2/19/2020 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 2/19/2020 Approved RAFAEL ESPINOZA
Drywall Nailing 3/2/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 3/12/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 5/12/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 5/12/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 5/18/2020 Not Ready for Inspection RAFAEL ESPINOZA
Insulation 5/18/2020 Partial Inspection RAFAEL ESPINOZA
Insulation 5/21/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/21/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 5/22/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 5/27/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/4/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/12/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 6/22/2020 Partial Approval RAFAEL ESPINOZA
METHANE-Barrier 6/22/2020 Approved RAFAEL ESPINOZA
Drywall Nailing 6/24/2020 Partial Approval RAFAEL ESPINOZA
Green Building Rough 6/24/2020 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 6/24/2020 Partial Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 6/24/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 6/24/2020 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 7/8/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/13/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/13/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/13/2020 Not Ready for Inspection RAFAEL ESPINOZA
Masonry Wall/Backfill 7/20/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 7/28/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 7/28/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/6/2020 Partial Inspection NICK DANERI
Drywall Nailing 8/12/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/12/2020 Partial Approval RAFAEL ESPINOZA
Grading Pre-Inspection 8/24/2020 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 8/31/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 8/31/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 9/2/2020 Partial Approval RAFAEL ESPINOZA
Insulation 9/2/2020 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 9/14/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 9/17/2020 Partial Approval RAFAEL ESPINOZA
SUSMP-Std. Urban Storm Water 9/17/2020 Approved RAFAEL ESPINOZA
Drywall Nailing 9/22/2020 Not Ready for Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 9/22/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 9/29/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 9/29/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 9/29/2020 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 10/14/2020 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 10/27/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Masonry Frame 11/10/2020 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 11/10/2020 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Masonry 11/12/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 11/17/2020 Conditional Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 11/20/2020 Partial Approval RUSSELL BONVOULOIR
Insulation 12/1/2020 Partial Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/3/2020 Conditional Approval RAFAEL ESPINOZA
Wood Frame 12/3/2020 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 12/4/2020 Conditional Approval RAFAEL ESPINOZA
Insulation 12/8/2020 Partial Approval NICK DANERI
Interior/Exterior Lathing 12/8/2020 Partial Approval NICK DANERI
Drywall Nailing 12/10/2020 Approved RAFAEL ESPINOZA
Interior/Exterior Lathing 12/10/2020 Approved RAFAEL ESPINOZA
Light Gage Steel Frame 12/10/2020 Corrections Issued RAFAEL ESPINOZA
Drywall Nailing 12/17/2020 Partial Approval RAFAEL ESPINOZA
Green Building Final 12/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 12/17/2020 Partial Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 12/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 12/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 12/17/2020 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 12/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 12/17/2020 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 12/22/2020 Partial Approval RAFAEL ESPINOZA
Insulation 12/23/2020 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 1/6/2021 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 1/8/2021 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 1/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 1/13/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 2/2/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/2/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 2/4/2021 Partial Approval RAFAEL ESPINOZA
Final 2/8/2021 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 2/8/2021 Approved RAFAEL ESPINOZA
Green Building Final 2/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 2/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 2/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 2/8/2021 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 2/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 2/8/2021 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 2/11/2021 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Drilled-In Anchors 3/1/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 3/10/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/10/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 3/12/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/12/2021 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 3/16/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 3/18/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 3/19/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 3/23/2021 Partial Inspection RAFAEL ESPINOZA
Footing/Foundation/Slab 4/1/2021 Approved RAFAEL ESPINOZA
Pre-Inspection 4/5/2021 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 4/6/2021 Not Ready for Inspection RAFAEL ESPINOZA
Drywall Nailing 4/7/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 4/8/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 4/9/2021 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 4/12/2021 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 4/13/2021 Approved DAVID BURKHEAD
Pre-Inspection 4/14/2021 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 4/15/2021 Approved DAVID BURKHEAD
Pre-Inspection 4/16/2021 Partial Inspection DAVID BURKHEAD
Pre-Inspection 4/19/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 4/20/2021 Not Ready for Inspection RAFAEL ESPINOZA
Pre-Inspection 4/22/2021 Partial Inspection RAFAEL ESPINOZA
Pre-Inspection 4/23/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 4/26/2021 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 4/26/2021 Approved RAFAEL ESPINOZA
Reinforced Concrete Frame 4/26/2021 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 4/26/2021 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 4/26/2021 SGSOV Approved RAFAEL ESPINOZA
Smoke Detectors 4/26/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 4/26/2021 Approved RAFAEL ESPINOZA
Final 8/23/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 8/23/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 9/10/2021 Not Ready for Inspection RAFAEL ESPINOZA
Smoke Detectors 9/10/2021 Approved RAFAEL ESPINOZA
Final 9/27/2021 OK to Issue CofO ERNESTO CORRAL