728 N SWEETZER AVE Unit 101-408 90069

Certificate Information: 728 N SWEETZER AVE Unit 101-408 90069

Application / Permit
15010-10000-03347
Plan Check / Job No.
B15LA13130
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 4 story Type VA apartment with 49 units over 2 story Type IA subterranean parking.
Permit Issued
Issued on 2/22/2018
Issuing Office
Metro
Current Status
CofO Corrected on 1/4/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/21/2015 APPLICANT
Assigned to Plan Check Engineer 10/8/2015 LARRY LEE
Corrections Issued 10/14/2015 LARRY LEE
Quality Review Completed 10/22/2015 BILL STUTSMAN
Building Plans Picked Up 10/26/2015 APPLICANT
Applicant returned to address corrections 2/2/2016 LARRY LEE
Applicant returned to address corrections 5/15/2017 LARRY LEE
Plan Check Approved 1/30/2018 LARRY LEE
No Progress 1/30/2018 LARRY LEE
Plan Check Approved 1/30/2018 LARRY LEE
Issued 2/22/2018 LADBS
CofO in Progress 12/22/2021 EDWIN GREGORYONA
CofO in Progress 12/22/2021 EDWIN GREGORYONA
CofO Issued-Status Void 12/28/2021 ERNESTO CORRAL
Permit Finaled-Status Void 12/28/2021 ERNESTO CORRAL
Re-Activate Permit 1/4/2022 ERNESTO CORRAL
CofO Corrected 1/4/2022 ERNESTO CORRAL
Permit Finaled 1/4/2022 ERNESTO CORRAL

Permit Application Clearance Information

Hydrant and Access approval Cleared 9/7/2016 ROBERT DUFF
DAS Clearance Cleared 9/14/2016 LARRY LEE
Green Code Cleared 9/14/2016 ALDO UBAU
CPC Cleared 10/5/2016 CASSANDRA ZWEEP
CPC Cleared 10/5/2016 CASSANDRA ZWEEP
Address approval Cleared 10/21/2016 ALFREDO JARA
Eng Process Fee Ord 176,300 Cleared 10/21/2016 ALFREDO JARA
Permit Cleared 11/10/2016 ADRIAN SANCHEZ
Sewer availability Cleared 11/15/2016 RAVIL MANAPOV
Fire Marshall Fire Life Safety Cleared 11/18/2016 MENOA AGHAJANI
"Q" conditions Cleared 12/13/2016 NICOLE SANCHEZ
ZI Cleared 12/13/2016 NICOLE SANCHEZ
Highway dedication Cleared 12/21/2016 JAMES MORALEZ
Building over 3-story or 36-ft Cleared 4/12/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/12/2017 CALOSHA APPROVED
Frnt yard landscape/Water mgmt Cleared 4/13/2017 DANALYNN DOMINGUEZ
Miscellaneous Cleared 4/13/2017 DANALYNN DOMINGUEZ
Opn space landscape/Water mgmt Cleared 4/13/2017 DANALYNN DOMINGUEZ
Work Adjacent to Public Way Cleared 5/15/2017 DAVID PEREZ
Low Impact Development Cleared 11/6/2017 MARTIN FRAGOSO
Stormwater Pollution Mitigatn Cleared 11/6/2017 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 1/11/2018 FATIMA GUERRA

Contact Information

Architect Hannouche, Samir; Lic. No.: C28484 20250 ACACIA 130      NEWPORT BEACH, CA 92660
Contractor Etco Homes Inc; Lic. No.: 879789-B 8447 WILSHIRE BLVD 400      BEVERLY HILLS, CA 902113209
Engineer Eosakul, Dissakorn; Lic. No.: S5226 8363 EDGE WOOD ST      CHINO, CA 91708
Engineer Lamb, Russell Craig; Lic. No.: GE2207 14 HUGHES STE B 101      IRVINE, CA 92618

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 3/9/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/5/2018 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/5/2018 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 5/14/2018 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 5/17/2018 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 5/17/2018 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 5/29/2018 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 7/24/2018 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 7/26/2018 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 7/27/2018 Partial Approval GREGORY POMISH
Deputy Shotcrete 7/31/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/2/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/3/2018 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/6/2018 Partial Approval GREGORY POMISH
Deputy Shotcrete 8/7/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/24/2018 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 8/30/2018 Not Ready for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 9/4/2018 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 9/17/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/18/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/19/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/20/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/21/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/21/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/24/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/25/2018 Conditional Approval GREGORY POMISH
Green Building Rough 9/25/2018 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 9/25/2018 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 9/25/2018 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 9/26/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/27/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/2/2018 Conditional Approval GREGORY POMISH
Green Building Rough 10/10/2018 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 10/10/2018 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 10/10/2018 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 10/23/2018 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 11/15/2018 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 11/15/2018 Partial Approval GREGORY POMISH
Green Building Rough 11/15/2018 Not Ready for Inspection GREGORY POMISH
Masonry Wall/Backfill 11/15/2018 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 11/15/2018 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 11/15/2018 Not Ready for Inspection GREGORY POMISH
Verify Sprinkler Sign Off 11/15/2018 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/19/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/21/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/21/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/30/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/10/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/11/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/13/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/14/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/17/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/18/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/19/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/20/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/21/2018 Approved GREGORY POMISH
Deputy Reinf. Masonry 12/21/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/24/2018 Approved GREGORY POMISH
Deputy Reinf. Masonry 12/26/2018 Approved GREGORY POMISH
Deputy Reinf. Masonry 12/27/2018 Approved GREGORY POMISH
Deputy Reinf. Masonry 12/28/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/31/2018 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/2/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/3/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/4/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/4/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/7/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/7/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/8/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/8/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/9/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/9/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/10/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/10/2019 Approved GREGORY POMISH
Excavation/Setback/Form/Re-Bar 1/10/2019 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 1/11/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/11/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/14/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/14/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/15/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/15/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/16/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/16/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/17/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/17/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/22/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/22/2019 Approved GREGORY POMISH
Excavation/Setback/Form/Re-Bar 1/22/2019 Partial Approval GREGORY POMISH
Deputy Shotcrete 1/23/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/25/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/25/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/28/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/28/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/29/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/29/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/29/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 1/30/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/30/2019 Approved GREGORY POMISH
Excavation/Setback/Form/Re-Bar 1/30/2019 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 1/31/2019 Approved GREGORY POMISH
Deputy Shotcrete 1/31/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 2/1/2019 Approved GREGORY POMISH
Deputy Shotcrete 2/1/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/4/2019 Approved GREGORY POMISH
Deputy Shotcrete 2/6/2019 Approved GREGORY POMISH
Deputy Other (see comments) 2/7/2019 Approved GREGORY POMISH
Deputy Shotcrete 2/7/2019 Approved GREGORY POMISH
Masonry Wall/Backfill 2/7/2019 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/12/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 2/15/2019 Approved GREGORY POMISH
Deputy Shotcrete 2/19/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 2/20/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 2/25/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 2/26/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 2/27/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 2/28/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 3/1/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 3/4/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 3/5/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 3/6/2019 Approved GREGORY POMISH
Deputy Reinf. Masonry 3/7/2019 Approved GREGORY POMISH
Reinforced Masonry Frame 3/7/2019 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 3/8/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/12/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/20/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/22/2019 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 3/26/2019 Not Ready for Inspection GREGORY POMISH
Deputy Other (see comments) 3/27/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/27/2019 Approved GREGORY POMISH
Deputy Other (see comments) 3/28/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/28/2019 Approved GREGORY POMISH
Deputy Other (see comments) 3/29/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/29/2019 Approved GREGORY POMISH
Deputy Other (see comments) 4/1/2019 No Access for Inspection LARRY ARNICK
Deputy Reinf. Concrete 4/1/2019 Conditional Approval LARRY ARNICK
Deputy Other (see comments) 4/2/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/2/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/9/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/10/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/11/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/12/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/15/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/16/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/17/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/22/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/23/2019 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/29/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/30/2019 Approved TED RIES
Deputy Reinf. Concrete 4/30/2019 Approved TED RIES
Deputy Drilled-In Anchors 5/1/2019 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 5/1/2019 Approved HAMID PISHEHVAR
Deputy Drilled-In Anchors 5/2/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/2/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 5/3/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/3/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/6/2019 Conditional Approval LARRY ARNICK
Green Building Rough 5/6/2019 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 5/6/2019 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 5/6/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 5/7/2019 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/7/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/8/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/9/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/10/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/20/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/21/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/5/2019 Conditional Approval LARRY ARNICK
Deputy Shotcrete 6/6/2019 Conditional Approval LARRY ARNICK
Deputy Wood Construction 7/10/2019 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/15/2019 Conditional Approval LARRY ARNICK
Deputy Pre-Stress Concrete 7/16/2019 Conditional Approval LARRY ARNICK
Deputy Wood Construction 7/18/2019 Approved DANIEL MC AULIFFE
Deputy Reinf. Masonry 7/25/2019 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/30/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/4/2019 Partial Approval LARRY ARNICK
Green Building Rough 9/4/2019 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 9/4/2019 Not Ready for Inspection LARRY ARNICK
Wood Frame 9/4/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/16/2019 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/17/2019 Partial Approval LARRY ARNICK
Deputy Wood Construction 11/5/2019 Conditional Approval LARRY ARNICK
Deputy Wood Construction 12/16/2019 Conditional Approval LARRY ARNICK
Deputy Wood Construction 1/13/2020 Conditional Approval LARRY ARNICK
Insulation 1/17/2020 Partial Approval LARRY ARNICK
Deputy Wood Construction 1/23/2020 Conditional Approval LARRY ARNICK
Deputy Wood Construction 2/12/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 2/26/2020 Conditional Approval JONATHAN QUACH
Deputy Fireproofing 3/5/2020 Conditional Approval LARRY ARNICK
Drywall Nailing 6/30/2020 Partial Approval LARRY ARNICK
Insulation 6/30/2020 Partial Approval LARRY ARNICK
Final 7/13/2020 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 7/13/2020 Approved LARRY ARNICK
Green Building Final 7/13/2020 Not Ready for Inspection LARRY ARNICK
Green Building Rough 7/13/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 7/13/2020 Partial Inspection LARRY ARNICK
Reinforced Concrete Frame 7/13/2020 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 7/13/2020 SGSOV Not Ready LARRY ARNICK
Smoke Detectors 7/13/2020 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 7/13/2020 Not Ready for Inspection LARRY ARNICK
Wood Frame 7/13/2020 Not Ready for Inspection LARRY ARNICK
Green Building Rough 7/21/2020 Not Ready for Inspection LARRY ARNICK
Insulation 7/21/2020 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 7/21/2020 Not Ready for Inspection LARRY ARNICK
Wood Frame 7/21/2020 Partial Approval LARRY ARNICK
Drywall Nailing 8/27/2020 Partial Approval LARRY ARNICK
Insulation 8/27/2020 Partial Approval LARRY ARNICK
Insulation 8/31/2020 Not Ready for Inspection LARRY ARNICK
Insulation 9/1/2020 Partial Approval LARRY ARNICK
Insulation 9/2/2020 Partial Approval LARRY ARNICK
Drywall Nailing 9/8/2020 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 9/9/2020 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 9/10/2020 Partial Approval LARRY ARNICK
Insulation 9/14/2020 Not Ready for Inspection LARRY ARNICK
Green Building Rough 9/16/2020 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 9/16/2020 Not Ready for Inspection LARRY ARNICK
Wood Frame 9/16/2020 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 9/18/2020 Partial Approval JONATHAN QUACH
Green Building Rough 9/28/2020 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 9/28/2020 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 9/28/2020 Not Ready for Inspection LARRY ARNICK
Wood Frame 9/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 9/29/2020 Conditional Approval LARRY ARNICK
Insulation 9/30/2020 Approved LARRY ARNICK
Drywall Nailing 10/7/2020 Partial Approval LARRY ARNICK
T-Bar Ceiling 10/8/2020 Partial Approval LARRY ARNICK
Drywall Nailing 10/23/2020 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 10/23/2020 Partial Approval LARRY ARNICK
Drywall Nailing 10/29/2020 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 11/5/2020 Approved LARRY ARNICK
Drywall Nailing 11/6/2020 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 11/12/2020 Approved EDWIN GREGORYONA
Drywall Nailing 11/17/2020 Not Ready for Inspection JONATHAN QUACH
Drywall Nailing 11/20/2020 Partial Approval LANNY MERRICK
Drywall Nailing 11/23/2020 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/23/2020 Not Ready for Inspection EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/25/2020 Partial Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 12/1/2020 Partial Approval LANNY MERRICK
Excavation/Setback/Form/Re-Bar 12/9/2020 Not Ready for Inspection LANNY MERRICK
Excavation/Setback/Form/Re-Bar 12/31/2020 Partial Approval LARRY ARNICK
Light Gage Steel Frame 1/6/2021 Not Ready for Inspection LARRY ARNICK
Insulation 1/7/2021 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 1/7/2021 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 1/8/2021 Partial Inspection LARRY ARNICK
Drywall Nailing 1/12/2021 Partial Approval LARRY ARNICK
Insulation 1/12/2021 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 1/12/2021 Partial Approval LARRY ARNICK
Masonry Wall/Backfill 1/14/2021 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 1/20/2021 Partial Approval LARRY ARNICK
Special/Order Compliance 1/21/2021 Partial Approval LARRY ARNICK
Light Gage Steel Frame 2/22/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/2/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/10/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/18/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/19/2021 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 4/5/2021 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 4/16/2021 Partial Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 4/22/2021 Approved EDWIN GREGORYONA
Light Gage Steel Frame 4/23/2021 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 5/3/2021 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 5/7/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 5/10/2021 Approved EDWIN GREGORYONA
Light Gage Steel Frame 5/10/2021 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 5/10/2021 Approved EDWIN GREGORYONA
Wood Frame 5/10/2021 Partial Inspection EDWIN GREGORYONA
Light Gage Steel Frame 5/11/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/17/2021 Partial Inspection EDWIN GREGORYONA
Drywall Nailing 5/18/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/19/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/24/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/15/2021 Partial Approval EDWIN GREGORYONA
Final 7/8/2021 Not Ready for Inspection JONATHAN QUACH
Green Building Final 7/8/2021 Not Ready for Inspection JONATHAN QUACH
Reinforced Concrete Frame 7/8/2021 Not Ready for Inspection JONATHAN QUACH
SGSOV-Seismic Gas S/O Valve 7/8/2021 SGSOV Not Ready JONATHAN QUACH
Smoke Detectors 7/8/2021 Not Ready for Inspection JONATHAN QUACH
Wood Frame 7/8/2021 Not Ready for Inspection JONATHAN QUACH
Pre-Inspection 7/12/2021 Approved EDWIN GREGORYONA
Pre-Inspection 7/13/2021 Not Ready for Inspection EDWIN GREGORYONA
Pre-Inspection 7/14/2021 Partial Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 8/30/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 8/31/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 9/23/2021 Partial Approval EDWIN GREGORYONA
Masonry Wall/Backfill 9/23/2021 Approved EDWIN GREGORYONA
Final 10/13/2021 Partial Inspection EDWIN GREGORYONA
Green Building Final 10/13/2021 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 10/13/2021 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 10/13/2021 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 10/13/2021 Approved EDWIN GREGORYONA
Wood Frame 10/13/2021 Approved EDWIN GREGORYONA
Final 10/27/2021 Partial Inspection EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 10/27/2021 SGSOV Approved EDWIN GREGORYONA
Final 12/9/2021 Partial Inspection EDWIN GREGORYONA
Final 12/20/2021 Partial Inspection EDWIN GREGORYONA
Special/Order Compliance 12/21/2021 Approved EDWIN GREGORYONA
Final 12/22/2021 OK to Issue CofO EDWIN GREGORYONA