220 N BRISTOL AVE 90049

Certificate Information: 220 N BRISTOL AVE 90049

Application / Permit
15010-10000-03062
Plan Check / Job No.
B15LA12098
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2-STORY SINGLE FAMILY DWELLING W/BASEMENT.
Permit Issued
Issued on 2/3/2016
Issuing Office
Metro
Current Status
CofO Issued on 1/27/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/27/2015 APPLICANT
Assigned to Plan Check Engineer 9/17/2015 MANUEL GARCIA
Corrections Issued 9/29/2015 MANUEL GARCIA
Quality Review Completed 10/9/2015 GARO TELMI
Building Plans Picked Up 10/9/2015 APPLICANT
Green Plans Picked Up 10/13/2015 APPLICANT
Applicant returned to address corrections 11/18/2015 MANUEL GARCIA
Plan Check Approved 2/3/2016 MANUEL GARCIA
Issued 2/3/2016 LADBS
CofO in Progress 12/17/2020 MICHAEL PELHAM
Permit Finaled 1/27/2021 VINCENT COTTON
CofO Issued 1/27/2021 VINCENT COTTON
Permit Finaled 1/27/2021 VINCENT COTTON

Permit Application Clearance Information

CPC Cleared 10/13/2015 VINCENT QUITORIANO
ZA Case Cleared 10/13/2015 VINCENT QUITORIANO
Address approval Cleared 10/15/2015 ADRIAN HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 10/15/2015 JAMES KHO
Sewer availability Cleared 10/15/2015 JAMES KHO
Hydrant and Access approval Cleared 10/20/2015 ROBERT DUFF
ZA Case Cleared 10/22/2015 ERIC CLAROS
ZA Case Cleared 10/22/2015 ERIC CLAROS
ZA Case Cleared 10/22/2015 ERIC CLAROS
Green Code Cleared 11/25/2015 RICHARD DOCKUS
Low Impact Development Cleared 1/22/2016 MICHAEL SCADUTO
Roof/Waste drainage to street Cleared 1/22/2016 ADRIAN SANCHEZ
Excavation more than 5-ft deep Cleared 2/3/2016 CALOSHA APPROVED

Contact Information

Architect Al-Sayed, Marwan; Lic. No.: C33865 8748 HOLLOWAY DRIVE      WEST HOLLYWOOD, CA 90069
Contractor Valle/Reinis Builders Inc; Lic. No.: 839178-B 10537 TENNESSEE AVENUE      LOS ANGELES, CA 90064
Engineer Baad, Katherine Firestone; Lic. No.: C64669 5232 ZAKON RD      TORRANCE, CA 90505
Engineer Daugherty, Daniel Thomas; Lic. No.: C76588 31129 VIA COLINAS STE 707      WESTLAKE VILLAGE, CA 91362
Engineer Nelson, Chris Donald; Lic. No.: L6385 31238 VIA COLINAS STE C      WESTLAKE VILLAGE, CA 91362

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 2/11/2016 Not Ready for Inspection DAVID LEE
Pre-Inspection 2/11/2016 Partial Approval DAVID LEE
PLUMBING-Rough 6/2/2016 Partial Approval JOHN LUMB
Underground Mechanical 6/8/2016 Partial Approval JOHN LUMB
ELECTRICAL-Rough 6/9/2016 Partial Approval JOHN LUMB
ELECTRICAL-Rough 6/14/2016 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 6/29/2016 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 7/7/2016 Partial Approval VINCENT SCIPIONI
Underground Mechanical 7/13/2016 Partial Inspection VINCENT SCIPIONI
Footing/Foundation/Slab 7/27/2016 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 7/28/2016 Partial Approval VINCENT SCIPIONI
Reinforced Masonry Frame 8/4/2016 Partial Approval VINCENT SCIPIONI
Reinforced Masonry Frame 8/10/2016 Partial Approval VINCENT SCIPIONI
Masonry Wall/Backfill 8/17/2016 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 8/17/2016 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 8/18/2016 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 8/29/2016 Partial Approval VINCENT SCIPIONI
Green Building Rough 9/1/2016 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 9/1/2016 Partial Inspection VINCENT SCIPIONI
Verify Sprinkler Sign Off 9/1/2016 Partial Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 9/14/2016 Partial Approval VINCENT SCIPIONI
Reinforced Masonry Frame 9/14/2016 Partial Inspection VINCENT SCIPIONI
Green Building Rough 9/16/2016 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 9/16/2016 Partial Approval VINCENT SCIPIONI
Verify Sprinkler Sign Off 9/16/2016 Not Ready for Inspection VINCENT SCIPIONI
Deputy Reinf. Concrete 9/19/2016 No Access for Inspection VINCENT SCIPIONI
Green Building Rough 10/7/2016 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 10/7/2016 Partial Approval VINCENT SCIPIONI
Verify Sprinkler Sign Off 10/7/2016 Not Ready for Inspection VINCENT SCIPIONI
Footing/Foundation/Slab 11/1/2016 Partial Approval VINCENT SCIPIONI
Sewer 11/8/2016 Partial Approval VINCENT SCIPIONI
Underground Mechanical 11/9/2016 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 11/15/2016 Partial Approval VINCENT SCIPIONI
Underground Mechanical 11/15/2016 Partial Approval VINCENT SCIPIONI
Underground Mechanical 11/16/2016 Partial Inspection VINCENT SCIPIONI
Underground Mechanical 12/8/2016 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 12/9/2016 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 12/13/2016 Partial Approval VINCENT SCIPIONI
Underground Mechanical 12/21/2016 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 12/22/2016 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 1/18/2017 Partial Approval VINCENT SCIPIONI
Underground Mechanical 1/18/2017 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 2/2/2017 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 3/17/2017 Partial Approval DAVID KOSKI
Footing/Foundation/Slab 3/24/2017 Partial Inspection VINCENT SCIPIONI
Footing/Foundation/Slab 3/31/2017 Partial Approval VINCENT SCIPIONI
Underground Mechanical 3/31/2017 Partial Approval VINCENT SCIPIONI
Drywall Nailing 4/21/2017 Not Ready for Inspection VINCENT SCIPIONI
Green Building Rough 4/21/2017 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 4/24/2017 Partial Approval VINCENT SCIPIONI
Verify Sprinkler Sign Off 4/24/2017 No Access for Inspection VINCENT SCIPIONI
Reinforced Masonry Frame 4/28/2017 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 5/4/2017 Partial Approval VINCENT SCIPIONI
Reinforced Masonry Frame 5/15/2017 Partial Approval DAVID KOSKI
Green Building Rough 5/23/2017 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 5/23/2017 Partial Approval VINCENT SCIPIONI
Verify Sprinkler Sign Off 5/23/2017 Not Ready for Inspection VINCENT SCIPIONI
Green Building Rough 5/25/2017 Not Ready for Inspection DANIEL ORRANTE
Reinforced Concrete Frame 5/25/2017 Not Ready for Inspection DANIEL ORRANTE
Verify Sprinkler Sign Off 5/25/2017 Not Ready for Inspection DANIEL ORRANTE
Deputy Shotcrete 5/26/2017 Conditional Approval VINCENT SCIPIONI
Deputy Reinf. Concrete 6/6/2017 Approved DANIEL ORRANTE
Reinforced Concrete Frame 6/7/2017 Partial Approval VINCENT SCIPIONI
Green Building Rough 6/9/2017 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 6/9/2017 Partial Approval VINCENT SCIPIONI
Verify Sprinkler Sign Off 6/9/2017 Not Ready for Inspection VINCENT SCIPIONI
Green Building Rough 6/28/2017 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 6/28/2017 Partial Approval VINCENT SCIPIONI
Verify Sprinkler Sign Off 6/28/2017 Not Ready for Inspection VINCENT SCIPIONI
Deputy Reinf. Concrete 7/14/2017 Conditional Approval VINCENT SCIPIONI
Green Building Rough 7/24/2017 Not Ready for Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 7/24/2017 Partial Approval VINCENT SCIPIONI
Verify Sprinkler Sign Off 7/24/2017 Not Ready for Inspection VINCENT SCIPIONI
Green Building Rough 7/26/2017 Approved VINCENT SCIPIONI
Reinforced Concrete Frame 7/26/2017 Partial Inspection VINCENT SCIPIONI
Verify Sprinkler Sign Off 7/26/2017 Approved VINCENT SCIPIONI
Reinforced Concrete Frame 8/3/2017 Partial Approval VINCENT SCIPIONI
Deputy Reinf. Concrete 9/7/2017 Conditional Approval VINCENT SCIPIONI
Reinforced Concrete Frame 9/7/2017 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 9/19/2017 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 9/22/2017 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 9/29/2017 Not Ready for Inspection JOHN LUMB
Piling/Pier/Caisson 10/11/2017 Order to Comply Issued VINCENT SCIPIONI
Deputy Reinf. Concrete 10/12/2017 Conditional Approval VINCENT SCIPIONI
Reinforced Concrete Frame 10/24/2017 Partial Inspection VINCENT SCIPIONI
Reinforced Concrete Frame 10/26/2017 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 11/3/2017 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 11/13/2017 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 12/1/2017 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 12/21/2017 Partial Approval JOHN LUMB
Reinforced Concrete Frame 12/28/2017 Partial Approval VINCENT SCIPIONI
Piling/Pier/Caisson 1/3/2018 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 1/18/2018 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 2/1/2018 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 2/5/2018 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 2/6/2018 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 2/13/2018 Partial Approval JOHN LUMB
Reinforced Concrete Frame 2/20/2018 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 3/5/2018 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 3/15/2018 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 3/23/2018 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 4/20/2018 Partial Approval VINCENT SCIPIONI
Reinforced Concrete Frame 5/17/2018 Partial Approval VINCENT SCIPIONI
Underground Mechanical 5/29/2018 Partial Approval VINCENT SCIPIONI
Footing/Foundation/Slab 7/25/2018 Partial Approval VINCENT SCIPIONI
Light Gage Steel Frame 8/15/2018 Partial Approval KENNETH NAGLE
Footing/Foundation/Slab 9/6/2018 Partial Approval KENNETH NAGLE
Reinforced Concrete Frame 10/10/2018 Partial Approval KENNETH NAGLE
PLUMBING-Rough 10/25/2018 Partial Approval MICHAEL PELHAM
HVAC-Rough 11/2/2018 Partial Approval RICHARD STEINBACH
Reinforced Concrete Frame 12/11/2018 Partial Approval KENNETH NAGLE
Footing/Foundation/Slab 12/13/2018 Not Ready for Inspection KENNETH NAGLE
Reinforced Concrete Frame 12/14/2018 Partial Approval KENNETH NAGLE
ELECTRICAL-Rough 1/11/2019 Partial Approval DANIEL ORRANTE
BUILDING-Rough-Frame 1/15/2019 Partial Inspection KENNETH NAGLE
Insulation 1/15/2019 Partial Inspection KENNETH NAGLE
PLUMBING-Rough 1/15/2019 Partial Approval KENNETH NAGLE
Shower Pan 1/22/2019 Partial Approval KENNETH NAGLE
ELECTRICAL-Rough 1/25/2019 Partial Approval KENNETH NAGLE
HVAC-Rough 1/25/2019 Partial Approval KENNETH NAGLE
PLUMBING-Rough 1/25/2019 Partial Approval KENNETH NAGLE
Interior/Exterior Lathing 1/28/2019 Partial Approval KENNETH NAGLE
Underground Mechanical 1/31/2019 Not Ready for Inspection KENNETH NAGLE
Shower Pan 2/1/2019 Partial Approval RICHARD STEINBACH
Light Gage Steel Frame 2/7/2019 Partial Inspection KENNETH NAGLE
Shower Pan 2/11/2019 Partial Approval KENNETH NAGLE
Rough-Elec/Plmb/HVAC 2/13/2019 Not Ready for Inspection KENNETH NAGLE
Shower Pan 2/21/2019 Partial Approval KENNETH NAGLE
ELECTRICAL-Rough 2/25/2019 Partial Approval ANDREW NAVE
PLUMBING-Rough 2/25/2019 Partial Approval ANDREW NAVE
BUILDING-Rough-Frame 2/27/2019 Not Ready for Inspection KENNETH NAGLE
HVAC-Rough 2/27/2019 Partial Inspection KENNETH NAGLE
Reinforced Concrete Frame 2/27/2019 Not Ready for Inspection KENNETH NAGLE
Interior/Exterior Lathing 3/5/2019 Partial Approval KENNETH NAGLE
BUILDING-Rough-Frame 3/14/2019 Not Ready for Inspection MICHAEL TEMPLE
HVAC-Rough 3/14/2019 Not Ready for Inspection MICHAEL TEMPLE
Reinforced Concrete Frame 3/14/2019 Not Ready for Inspection MICHAEL TEMPLE
BUILDING-Rough-Frame 3/15/2019 Partial Approval MICHAEL TEMPLE
HVAC-Rough 3/15/2019 Partial Approval MICHAEL TEMPLE
Reinforced Concrete Frame 3/15/2019 Partial Approval MICHAEL TEMPLE
Drywall Nailing 3/21/2019 Partial Approval KENNETH NAGLE
HVAC-Rough 3/21/2019 Partial Approval KENNETH NAGLE
Interior/Exterior Lathing 3/21/2019 Partial Approval KENNETH NAGLE
Wood Frame 3/21/2019 Partial Approval KENNETH NAGLE
Underground Mechanical 3/27/2019 Partial Approval KENNETH NAGLE
Drywall Nailing 4/1/2019 Partial Approval MICHAEL TEMPLE
Interior/Exterior Lathing 5/8/2019 Partial Approval RICHARD STEINBACH
Reinforced Concrete Frame 5/9/2019 Partial Approval RICHARD STEINBACH
ELECTRICAL-Rough 5/21/2019 Partial Approval RICHARD STEINBACH
BUILDING-Rough-Frame 5/23/2019 Partial Approval MICHAEL TEMPLE
HVAC-Rough 5/23/2019 Partial Approval MICHAEL TEMPLE
Gas Test 5/28/2019 Partial Approval RICHARD STEINBACH
Interior/Exterior Lathing 5/28/2019 Partial Approval RICHARD STEINBACH
Underground Mechanical 5/28/2019 Partial Approval RICHARD STEINBACH
Footing/Foundation/Slab 6/12/2019 Partial Approval RICHARD STEINBACH
ELECTRICAL-Rough 6/21/2019 Partial Approval RICHARD STEINBACH
HVAC-Rough 6/21/2019 Partial Approval RICHARD STEINBACH
ELECTRICAL-Rough 7/19/2019 Partial Approval TIM CHRISTENSEN
HVAC-Rough 7/19/2019 Partial Approval TIM CHRISTENSEN
PLUMBING-Rough 7/19/2019 Partial Approval TIM CHRISTENSEN
ELECTRICAL-Rough 8/14/2019 Partial Approval TIM CHRISTENSEN
PLUMBING-Rough 8/14/2019 Partial Approval TIM CHRISTENSEN
HVAC-Rough 8/27/2019 Partial Approval TIM CHRISTENSEN
PLUMBING-Rough 8/27/2019 Partial Approval TIM CHRISTENSEN
Drywall Nailing 9/4/2019 Partial Approval TIM CHRISTENSEN
ELECTRICAL-Rough 9/11/2019 Partial Approval TIM CHRISTENSEN
HVAC-Rough 9/11/2019 Corrections Issued TIM CHRISTENSEN
ELECTRICAL-Rough 9/30/2019 Partial Inspection TIM CHRISTENSEN
ELECTRICAL-Rough 10/2/2019 Conditional Approval TIM CHRISTENSEN
Pre-Inspection 10/2/2019 Partial Inspection ANTHONY MCDOWALL
Drywall Nailing 10/3/2019 Partial Approval TIM CHRISTENSEN
BUILDING-Rough-Frame 10/25/2019 Partial Approval MICHAEL TEMPLE
ELECTRICAL-Rough 11/8/2019 Partial Approval TIM CHRISTENSEN
Drywall Nailing 12/23/2019 Not Ready for Inspection TIM CHRISTENSEN
BUILDING-Rough-Frame 12/26/2019 Corrections Issued TIM CHRISTENSEN
Green Building Rough 12/26/2019 Approved TIM CHRISTENSEN
BUILDING-Rough-Frame 1/8/2020 Approved TIM CHRISTENSEN
Drywall Nailing 1/8/2020 Approved TIM CHRISTENSEN
ELECTRICAL-Rough 1/8/2020 Approved TIM CHRISTENSEN
Green Building Rough 1/8/2020 Approved TIM CHRISTENSEN
HVAC-Rough 1/8/2020 Approved TIM CHRISTENSEN
Insulation 1/8/2020 Conditional Approval TIM CHRISTENSEN
Interior/Exterior Lathing 1/8/2020 Approved TIM CHRISTENSEN
PLUMBING-Rough 1/8/2020 Approved TIM CHRISTENSEN
Special/Order Compliance 1/30/2020 Corrections Issued MICHAEL TEMPLE
ELECTRICAL-Final 7/6/2020 Not Ready for Inspection TIM CHRISTENSEN
HVAC-Final 7/6/2020 Partial Inspection TIM CHRISTENSEN
PLUMBING-Final 7/6/2020 Partial Approval TIM CHRISTENSEN
HVAC-Final 7/7/2020 Corrections Issued TIM CHRISTENSEN
ELECTRICAL-Final 7/8/2020 Partial Inspection ANTHONY MCDOWALL
PLUMBING-Final 7/8/2020 Corrections Issued TIM CHRISTENSEN
Final 7/17/2020 Not Ready for Inspection TIM CHRISTENSEN
Footing/Foundation/Slab 7/17/2020 Approved TIM CHRISTENSEN
Green Building Final 7/17/2020 Not Ready for Inspection TIM CHRISTENSEN
Reinforced Concrete Frame 7/17/2020 Approved TIM CHRISTENSEN
SGSOV-Seismic Gas S/O Valve 7/17/2020 SGSOV Not Ready TIM CHRISTENSEN
Service/Power Release 7/17/2020 Not Ready for Inspection TIM CHRISTENSEN
Smoke Detectors 7/17/2020 Not Ready for Inspection TIM CHRISTENSEN
Structural Steel Frame 7/17/2020 Approved TIM CHRISTENSEN
PLUMBING-Final 7/20/2020 Approved TIM CHRISTENSEN
HVAC-Final 7/28/2020 Approved TIM CHRISTENSEN
ELECTRICAL-Final 7/30/2020 Corrections Issued ANTHONY MCDOWALL
Special/Order Compliance 7/30/2020 Corrections Issued TIM CHRISTENSEN
Service/Power Release 8/10/2020 Approved TIM CHRISTENSEN
ELECTRICAL-Final 9/23/2020 Corrections Issued TIM CHRISTENSEN
Special/Order Compliance 9/23/2020 Partial Approval ANTHONY MCDOWALL
ELECTRICAL-Final 9/30/2020 Approved TIM CHRISTENSEN
Service/Power Release 9/30/2020 Approved TIM CHRISTENSEN
Special/Order Compliance 9/30/2020 Approved ANTHONY MCDOWALL
Final 10/29/2020 Conditional Approval TIM CHRISTENSEN
Green Building Final 10/29/2020 Approved TIM CHRISTENSEN
SGSOV-Seismic Gas S/O Valve 10/29/2020 SGSOV Approved TIM CHRISTENSEN
Smoke Detectors 10/29/2020 Approved TIM CHRISTENSEN
Final 12/1/2020 Corrections Issued OGANES TARAKHCHYAN
Final 12/16/2020 Conditional Approval MICHAEL PELHAM