Grading Pre-Inspection
|
2/11/2016
|
Not Ready for Inspection
|
DAVID LEE
|
|
Pre-Inspection
|
2/11/2016
|
Partial Approval
|
DAVID LEE
|
|
PLUMBING-Rough
|
6/2/2016
|
Partial Approval
|
JOHN LUMB
|
|
Underground Mechanical
|
6/8/2016
|
Partial Approval
|
JOHN LUMB
|
|
ELECTRICAL-Rough
|
6/9/2016
|
Partial Approval
|
JOHN LUMB
|
|
ELECTRICAL-Rough
|
6/14/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
6/29/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
7/7/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Underground Mechanical
|
7/13/2016
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
7/27/2016
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
7/28/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Masonry Frame
|
8/4/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Masonry Frame
|
8/10/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Masonry Wall/Backfill
|
8/17/2016
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
8/17/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
8/18/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
8/29/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Green Building Rough
|
9/1/2016
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
9/1/2016
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Verify Sprinkler Sign Off
|
9/1/2016
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
9/14/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Masonry Frame
|
9/14/2016
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Green Building Rough
|
9/16/2016
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
9/16/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Verify Sprinkler Sign Off
|
9/16/2016
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
9/19/2016
|
No Access for Inspection
|
VINCENT SCIPIONI
|
|
Green Building Rough
|
10/7/2016
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
10/7/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Verify Sprinkler Sign Off
|
10/7/2016
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
11/1/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Sewer
|
11/8/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Underground Mechanical
|
11/9/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
11/15/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Underground Mechanical
|
11/15/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Underground Mechanical
|
11/16/2016
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Underground Mechanical
|
12/8/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
12/9/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
12/13/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Underground Mechanical
|
12/21/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
12/22/2016
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
1/18/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Underground Mechanical
|
1/18/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
2/2/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
3/17/2017
|
Partial Approval
|
DAVID KOSKI
|
|
Footing/Foundation/Slab
|
3/24/2017
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
3/31/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Underground Mechanical
|
3/31/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Drywall Nailing
|
4/21/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Green Building Rough
|
4/21/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
4/24/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Verify Sprinkler Sign Off
|
4/24/2017
|
No Access for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Masonry Frame
|
4/28/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
5/4/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Masonry Frame
|
5/15/2017
|
Partial Approval
|
DAVID KOSKI
|
|
Green Building Rough
|
5/23/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
5/23/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Verify Sprinkler Sign Off
|
5/23/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Green Building Rough
|
5/25/2017
|
Not Ready for Inspection
|
DANIEL ORRANTE
|
|
Reinforced Concrete Frame
|
5/25/2017
|
Not Ready for Inspection
|
DANIEL ORRANTE
|
|
Verify Sprinkler Sign Off
|
5/25/2017
|
Not Ready for Inspection
|
DANIEL ORRANTE
|
|
Deputy Shotcrete
|
5/26/2017
|
Conditional Approval
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
6/6/2017
|
Approved
|
DANIEL ORRANTE
|
|
Reinforced Concrete Frame
|
6/7/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Green Building Rough
|
6/9/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
6/9/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Verify Sprinkler Sign Off
|
6/9/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Green Building Rough
|
6/28/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
6/28/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Verify Sprinkler Sign Off
|
6/28/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
7/14/2017
|
Conditional Approval
|
VINCENT SCIPIONI
|
|
Green Building Rough
|
7/24/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
7/24/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Verify Sprinkler Sign Off
|
7/24/2017
|
Not Ready for Inspection
|
VINCENT SCIPIONI
|
|
Green Building Rough
|
7/26/2017
|
Approved
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
7/26/2017
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Verify Sprinkler Sign Off
|
7/26/2017
|
Approved
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
8/3/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
9/7/2017
|
Conditional Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
9/7/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
9/19/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
9/22/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
9/29/2017
|
Not Ready for Inspection
|
JOHN LUMB
|
|
Piling/Pier/Caisson
|
10/11/2017
|
Order to Comply Issued
|
VINCENT SCIPIONI
|
|
Deputy Reinf. Concrete
|
10/12/2017
|
Conditional Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
10/24/2017
|
Partial Inspection
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
10/26/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
11/3/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
11/13/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
12/1/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
12/21/2017
|
Partial Approval
|
JOHN LUMB
|
|
Reinforced Concrete Frame
|
12/28/2017
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Piling/Pier/Caisson
|
1/3/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
1/18/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
2/1/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
2/5/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
2/6/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
2/13/2018
|
Partial Approval
|
JOHN LUMB
|
|
Reinforced Concrete Frame
|
2/20/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
3/5/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
3/15/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
3/23/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
4/20/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Reinforced Concrete Frame
|
5/17/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Underground Mechanical
|
5/29/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Footing/Foundation/Slab
|
7/25/2018
|
Partial Approval
|
VINCENT SCIPIONI
|
|
Light Gage Steel Frame
|
8/15/2018
|
Partial Approval
|
KENNETH NAGLE
|
|
Footing/Foundation/Slab
|
9/6/2018
|
Partial Approval
|
KENNETH NAGLE
|
|
Reinforced Concrete Frame
|
10/10/2018
|
Partial Approval
|
KENNETH NAGLE
|
|
PLUMBING-Rough
|
10/25/2018
|
Partial Approval
|
MICHAEL PELHAM
|
|
HVAC-Rough
|
11/2/2018
|
Partial Approval
|
RICHARD STEINBACH
|
|
Reinforced Concrete Frame
|
12/11/2018
|
Partial Approval
|
KENNETH NAGLE
|
|
Footing/Foundation/Slab
|
12/13/2018
|
Not Ready for Inspection
|
KENNETH NAGLE
|
|
Reinforced Concrete Frame
|
12/14/2018
|
Partial Approval
|
KENNETH NAGLE
|
|
ELECTRICAL-Rough
|
1/11/2019
|
Partial Approval
|
DANIEL ORRANTE
|
|
BUILDING-Rough-Frame
|
1/15/2019
|
Partial Inspection
|
KENNETH NAGLE
|
|
Insulation
|
1/15/2019
|
Partial Inspection
|
KENNETH NAGLE
|
|
PLUMBING-Rough
|
1/15/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
Shower Pan
|
1/22/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
ELECTRICAL-Rough
|
1/25/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
HVAC-Rough
|
1/25/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
PLUMBING-Rough
|
1/25/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
Interior/Exterior Lathing
|
1/28/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
Underground Mechanical
|
1/31/2019
|
Not Ready for Inspection
|
KENNETH NAGLE
|
|
Shower Pan
|
2/1/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
Light Gage Steel Frame
|
2/7/2019
|
Partial Inspection
|
KENNETH NAGLE
|
|
Shower Pan
|
2/11/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
Rough-Elec/Plmb/HVAC
|
2/13/2019
|
Not Ready for Inspection
|
KENNETH NAGLE
|
|
Shower Pan
|
2/21/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
ELECTRICAL-Rough
|
2/25/2019
|
Partial Approval
|
ANDREW NAVE
|
|
PLUMBING-Rough
|
2/25/2019
|
Partial Approval
|
ANDREW NAVE
|
|
BUILDING-Rough-Frame
|
2/27/2019
|
Not Ready for Inspection
|
KENNETH NAGLE
|
|
HVAC-Rough
|
2/27/2019
|
Partial Inspection
|
KENNETH NAGLE
|
|
Reinforced Concrete Frame
|
2/27/2019
|
Not Ready for Inspection
|
KENNETH NAGLE
|
|
Interior/Exterior Lathing
|
3/5/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
BUILDING-Rough-Frame
|
3/14/2019
|
Not Ready for Inspection
|
MICHAEL TEMPLE
|
|
HVAC-Rough
|
3/14/2019
|
Not Ready for Inspection
|
MICHAEL TEMPLE
|
|
Reinforced Concrete Frame
|
3/14/2019
|
Not Ready for Inspection
|
MICHAEL TEMPLE
|
|
BUILDING-Rough-Frame
|
3/15/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
HVAC-Rough
|
3/15/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
Reinforced Concrete Frame
|
3/15/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
Drywall Nailing
|
3/21/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
HVAC-Rough
|
3/21/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
Interior/Exterior Lathing
|
3/21/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
Wood Frame
|
3/21/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
Underground Mechanical
|
3/27/2019
|
Partial Approval
|
KENNETH NAGLE
|
|
Drywall Nailing
|
4/1/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
Interior/Exterior Lathing
|
5/8/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
Reinforced Concrete Frame
|
5/9/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
ELECTRICAL-Rough
|
5/21/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
BUILDING-Rough-Frame
|
5/23/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
HVAC-Rough
|
5/23/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
Gas Test
|
5/28/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
Interior/Exterior Lathing
|
5/28/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
Underground Mechanical
|
5/28/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
Footing/Foundation/Slab
|
6/12/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
ELECTRICAL-Rough
|
6/21/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
HVAC-Rough
|
6/21/2019
|
Partial Approval
|
RICHARD STEINBACH
|
|
ELECTRICAL-Rough
|
7/19/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
HVAC-Rough
|
7/19/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
PLUMBING-Rough
|
7/19/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
ELECTRICAL-Rough
|
8/14/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
PLUMBING-Rough
|
8/14/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
HVAC-Rough
|
8/27/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
PLUMBING-Rough
|
8/27/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
Drywall Nailing
|
9/4/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
ELECTRICAL-Rough
|
9/11/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
HVAC-Rough
|
9/11/2019
|
Corrections Issued
|
TIM CHRISTENSEN
|
|
ELECTRICAL-Rough
|
9/30/2019
|
Partial Inspection
|
TIM CHRISTENSEN
|
|
ELECTRICAL-Rough
|
10/2/2019
|
Conditional Approval
|
TIM CHRISTENSEN
|
|
Pre-Inspection
|
10/2/2019
|
Partial Inspection
|
ANTHONY MCDOWALL
|
|
Drywall Nailing
|
10/3/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
BUILDING-Rough-Frame
|
10/25/2019
|
Partial Approval
|
MICHAEL TEMPLE
|
|
ELECTRICAL-Rough
|
11/8/2019
|
Partial Approval
|
TIM CHRISTENSEN
|
|
Drywall Nailing
|
12/23/2019
|
Not Ready for Inspection
|
TIM CHRISTENSEN
|
|
BUILDING-Rough-Frame
|
12/26/2019
|
Corrections Issued
|
TIM CHRISTENSEN
|
|
Green Building Rough
|
12/26/2019
|
Approved
|
TIM CHRISTENSEN
|
|
BUILDING-Rough-Frame
|
1/8/2020
|
Approved
|
TIM CHRISTENSEN
|
|
Drywall Nailing
|
1/8/2020
|
Approved
|
TIM CHRISTENSEN
|
|
ELECTRICAL-Rough
|
1/8/2020
|
Approved
|
TIM CHRISTENSEN
|
|
Green Building Rough
|
1/8/2020
|
Approved
|
TIM CHRISTENSEN
|
|
HVAC-Rough
|
1/8/2020
|
Approved
|
TIM CHRISTENSEN
|
|
Insulation
|
1/8/2020
|
Conditional Approval
|
TIM CHRISTENSEN
|
|
Interior/Exterior Lathing
|
1/8/2020
|
Approved
|
TIM CHRISTENSEN
|
|
PLUMBING-Rough
|
1/8/2020
|
Approved
|
TIM CHRISTENSEN
|
|
Special/Order Compliance
|
1/30/2020
|
Corrections Issued
|
MICHAEL TEMPLE
|
|
ELECTRICAL-Final
|
7/6/2020
|
Not Ready for Inspection
|
TIM CHRISTENSEN
|
|
HVAC-Final
|
7/6/2020
|
Partial Inspection
|
TIM CHRISTENSEN
|
|
PLUMBING-Final
|
7/6/2020
|
Partial Approval
|
TIM CHRISTENSEN
|
|
HVAC-Final
|
7/7/2020
|
Corrections Issued
|
TIM CHRISTENSEN
|
|
ELECTRICAL-Final
|
7/8/2020
|
Partial Inspection
|
ANTHONY MCDOWALL
|
|
PLUMBING-Final
|
7/8/2020
|
Corrections Issued
|
TIM CHRISTENSEN
|
|
Final
|
7/17/2020
|
Not Ready for Inspection
|
TIM CHRISTENSEN
|
|
Footing/Foundation/Slab
|
7/17/2020
|
Approved
|
TIM CHRISTENSEN
|
|
Green Building Final
|
7/17/2020
|
Not Ready for Inspection
|
TIM CHRISTENSEN
|
|
Reinforced Concrete Frame
|
7/17/2020
|
Approved
|
TIM CHRISTENSEN
|
|
SGSOV-Seismic Gas S/O Valve
|
7/17/2020
|
SGSOV Not Ready
|
TIM CHRISTENSEN
|
|
Service/Power Release
|
7/17/2020
|
Not Ready for Inspection
|
TIM CHRISTENSEN
|
|
Smoke Detectors
|
7/17/2020
|
Not Ready for Inspection
|
TIM CHRISTENSEN
|
|
Structural Steel Frame
|
7/17/2020
|
Approved
|
TIM CHRISTENSEN
|
|
PLUMBING-Final
|
7/20/2020
|
Approved
|
TIM CHRISTENSEN
|
|
HVAC-Final
|
7/28/2020
|
Approved
|
TIM CHRISTENSEN
|
|
ELECTRICAL-Final
|
7/30/2020
|
Corrections Issued
|
ANTHONY MCDOWALL
|
|
Special/Order Compliance
|
7/30/2020
|
Corrections Issued
|
TIM CHRISTENSEN
|
|
Service/Power Release
|
8/10/2020
|
Approved
|
TIM CHRISTENSEN
|
|
ELECTRICAL-Final
|
9/23/2020
|
Corrections Issued
|
TIM CHRISTENSEN
|
|
Special/Order Compliance
|
9/23/2020
|
Partial Approval
|
ANTHONY MCDOWALL
|
|
ELECTRICAL-Final
|
9/30/2020
|
Approved
|
TIM CHRISTENSEN
|
|
Service/Power Release
|
9/30/2020
|
Approved
|
TIM CHRISTENSEN
|
|
Special/Order Compliance
|
9/30/2020
|
Approved
|
ANTHONY MCDOWALL
|
|
Final
|
10/29/2020
|
Conditional Approval
|
TIM CHRISTENSEN
|
|
Green Building Final
|
10/29/2020
|
Approved
|
TIM CHRISTENSEN
|
|
SGSOV-Seismic Gas S/O Valve
|
10/29/2020
|
SGSOV Approved
|
TIM CHRISTENSEN
|
|
Smoke Detectors
|
10/29/2020
|
Approved
|
TIM CHRISTENSEN
|
|
Final
|
12/1/2020
|
Corrections Issued
|
OGANES TARAKHCHYAN
|
|
Final
|
12/16/2020
|
Conditional Approval
|
MICHAEL PELHAM
|