9189 N DE GARMO AVE 91352
Certificate Information: 9189 N DE GARMO AVE 91352
- Application / Permit
- 15010-10000-02927
- Plan Check / Job No.
- B15LA11593
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- Commercial
- Primary Use
- (22) Warehouse
- Work Description
- CONSTRUCT A NEW ONE STORY METAL WAREHOUSE STRUCTURE TO ENCLOSE AN EXISTING MATERIAL RECOVERY FACILITY AND TRANSFER STATION OPERATION
- Permit Issued
- Issued on 8/22/2018
- Issuing Office
- Metro
- Current Status
- Issued on 8/22/2018
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 8/24/2015 | APPLICANT |
| Assigned to Plan Check Engineer | 9/17/2015 | LARRY LEE |
| Corrections Issued | 9/29/2015 | LARRY LEE |
| Quality Review Completed | 10/5/2015 | BILL STUTSMAN |
| Applicant returned to address corrections | 10/21/2015 | LARRY LEE |
| Applicant returned to address corrections | 4/14/2016 | LARRY LEE |
| Applicant returned to address corrections | 2/23/2018 | LARRY LEE |
| Applicant returned to address corrections | 7/20/2018 | LARRY LEE |
| Applicant returned to address corrections | 8/6/2018 | LARRY LEE |
| Plan Check Approved | 8/21/2018 | LARRY LEE |
| Issued | 8/22/2018 | LADBS |
Permit Application Clearance Information
| Eng Process Fee Ord 176,300 | Cleared | 1/8/2016 | LEE GUILBEAUX |
| Highway dedication | Cleared | 1/8/2016 | LEE GUILBEAUX |
| Address approval | Cleared | 1/20/2016 | HOWARD COOPER |
| Sewer availability | Cleared | 1/29/2016 | ARMEN DERMENJIAN |
| Hydrant and Access approval | Cleared | 2/4/2016 | JOHN DALLAS |
| Building over 3-story or 36-ft | Cleared | 3/17/2016 | CALOSHA APPROVED |
| Permit | Cleared | 3/21/2016 | ARMEN DERMENJIAN |
| Miscellaneous | Cleared | 4/6/2016 | BOB DUENAS |
| Miscellaneous | Cleared | 4/18/2016 | BOB DUENAS |
| DAS Clearance | Cleared | 2/7/2017 | LARRY LEE |
| Green Code | Cleared | 3/1/2017 | LARRY LEE |
| CPC | Cleared | 7/30/2018 | ANNA VIDAL |
| Prkng lot landscape/Water mgmt | Cleared | 7/30/2018 | ANNA VIDAL |
| Site Plan review | Cleared | 7/30/2018 | ANNA VIDAL |
| ZI | Cleared | 7/30/2018 | ANNA VIDAL |
| Low Impact Development | Cleared | 8/2/2018 | AMMAR ELTAWIL |
| Roof/Waste drainage to street | Cleared | 8/2/2018 | STEVE MELGAR |
| Stormwater Pollution Mitigatn | Cleared | 8/2/2018 | AMMAR ELTAWIL |
Contact Information
| Architect | Sander, Whitney Fairbanks; Lic. No.: C20158 | 2434 LINCOLN BLVD. VENICE, CA 90291 |
| Contractor | Facility Builders & Erectors Inc; Lic. No.: 670072-B | 3940 E MIRALOMA AVENUE ANAHEIM, CA 92806 |
| Engineer | Aguilar, Humberto; Lic. No.: C75014 | 464 N PALM ST WOODLAKE, CA 93286 |
| Engineer | Babayan, Raffi Samuel; Lic. No.: C72168 | 1140 N COLUMBUS AVE 112 GLENDALE, CA 91202 |
| Engineer | Costa, Orlando Sarmiento; Lic. No.: S2285 | 1543 WEST GARVEY AVENUE WEST COVINA, CA 91790 |
| Engineer | Sepich, John Edward; Lic. No.: C37509 | 4007 MCCULLOUGH AVE 469 SAN ANTONIO, TX 78212 |
Inspector Information
| ANDREW DORSO, (818) 374-7520 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 10/31/2018 | Partial Inspection | ANDREW DORSO |
| Pre-Inspection | 11/16/2018 | Partial Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 11/26/2018 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 12/7/2018 | Partial Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 12/10/2018 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/11/2018 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/11/2018 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/12/2018 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/12/2018 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/13/2018 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/13/2018 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/14/2018 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/14/2018 | Partial Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 12/17/2018 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/18/2018 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/18/2018 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/19/2018 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/19/2018 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/20/2018 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/20/2018 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/21/2018 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/21/2018 | Partial Inspection | ANDREW DORSO |
| Deputy Drilled-In Anchors | 12/26/2018 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/26/2018 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 12/26/2018 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Barrier | 12/26/2018 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 12/26/2018 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 12/26/2018 | Not Ready for Inspection | ANDREW DORSO |
| Excavation/Setback/Form/Re-Bar | 12/27/2018 | Partial Approval | ROBERT DAVIS |
| Piling/Pier/Caisson | 12/27/2018 | Not Ready for Inspection | ROBERT DAVIS |
| Deputy Reinf. Concrete | 12/28/2018 | Conditional Approval | ROBERT DAVIS |
| Piling/Pier/Caisson | 12/28/2018 | Partial Approval | ROBERT DAVIS |
| Piling/Pier/Caisson | 1/3/2019 | Not Ready for Inspection | ROBERT DAVIS |
| Deputy Reinf. Concrete | 1/4/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/4/2019 | Partial Inspection | ANDREW DORSO |
| Footing/Foundation/Slab | 1/7/2019 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 1/7/2019 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 1/7/2019 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 1/7/2019 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/8/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/8/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/9/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/9/2019 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/10/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/10/2019 | Partial Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/11/2019 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 1/12/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/15/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/16/2019 | No Access for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 1/22/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/23/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/23/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/24/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/24/2019 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 1/25/2019 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 1/25/2019 | Partial Inspection | ANDREW DORSO |
| Footing/Foundation/Slab | 1/28/2019 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 1/28/2019 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/29/2019 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 1/29/2019 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 1/29/2019 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 1/29/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/30/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/30/2019 | Partial Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 2/1/2019 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 2/6/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 2/7/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 2/11/2019 | Partial Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 2/19/2019 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 3/1/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 3/4/2019 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 3/6/2019 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 3/6/2019 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 3/6/2019 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Other (see comments) | 3/7/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 3/8/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 3/21/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 5/9/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 5/31/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/4/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/6/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/7/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/13/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/14/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/17/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/18/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/19/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/24/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/25/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/26/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/27/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/28/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/1/2019 | Approved | DANNY RODRIGUEZ |
| Structural Steel Frame | 7/1/2019 | Not Ready for Inspection | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 7/2/2019 | Conditional Approval | JAMES STEPHENS |
| Deputy Steel/Welding | 7/3/2019 | Conditional Approval | DANNY RODRIGUEZ |
| Deputy Steel/Welding | 7/5/2019 | Approved | ROBERT DAVIS |
| Deputy Steel/Welding | 7/12/2019 | Conditional Approval | ANDREW DORSO |
| Structural Steel Frame | 7/12/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Steel/Welding | 7/15/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/16/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/17/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/18/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/23/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/24/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/25/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/26/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/29/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/30/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 7/31/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 8/1/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 8/2/2019 | Conditional Approval | ANDREW DORSO |
| Reinforced Masonry Frame | 8/15/2019 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Drilled-In Anchors | 8/16/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Masonry | 8/16/2019 | Conditional Approval | ANDREW DORSO |
| Reinforced Masonry Frame | 8/19/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Masonry | 8/20/2019 | Conditional Approval | ANDREW DORSO |
| Reinforced Masonry Frame | 8/21/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Steel/Welding | 8/26/2019 | Conditional Approval | JAMES STEPHENS |
| Deputy Steel/Welding | 9/4/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 9/9/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 9/12/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 9/23/2019 | Conditional Approval | ANDREW DORSO |
| Green Building Rough | 9/30/2019 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Rough | 9/30/2019 | Not Ready for Inspection | ANDREW DORSO |
| Reinforced Concrete Frame | 9/30/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Fireproofing | 10/18/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Fireproofing | 10/22/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Fireproofing | 10/23/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 10/28/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Fireproofing | 10/30/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Fireproofing | 10/31/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/5/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/6/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/12/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/13/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/14/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 11/14/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/15/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Fireproofing | 11/18/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/20/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/21/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/22/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 11/22/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/25/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/26/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/27/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/5/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/5/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/6/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/9/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/10/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/11/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/11/2019 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/12/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/13/2019 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 12/13/2019 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 12/13/2019 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 12/13/2019 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 12/13/2019 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/16/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/17/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/18/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/19/2019 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 12/19/2019 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/20/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/23/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/24/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/26/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/27/2019 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 12/31/2019 | Conditional Approval | JAMES STEPHENS |
| Deputy Reinf. Concrete | 1/2/2020 | Conditional Approval | JAMES STEPHENS |
| Deputy Reinf. Concrete | 1/3/2020 | Conditional Approval | JEFFREY FULTON |
| Footing/Foundation/Slab | 1/6/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 1/6/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 1/6/2020 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 1/6/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/7/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/8/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/9/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/10/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/13/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/14/2020 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 1/14/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/15/2020 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 1/15/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 1/15/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 1/15/2020 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 1/15/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/16/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/17/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/21/2020 | Conditional Approval | JAMES STEPHENS |
| Deputy Reinf. Concrete | 1/22/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/23/2020 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 1/23/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 1/23/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 1/23/2020 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 1/23/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Drilled-In Anchors | 1/24/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/24/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/28/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/29/2020 | Conditional Approval | ANDREW DORSO |
| Reinforced Masonry Frame | 1/29/2020 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/30/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/31/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 2/4/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Masonry | 2/4/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 2/5/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 2/6/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 2/7/2020 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 2/10/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 2/10/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 2/10/2020 | Not Ready for Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 2/10/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 2/11/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 2/12/2020 | Conditional Approval | CAMERON CHABAN |
| Deputy Reinf. Concrete | 2/13/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 2/14/2020 | Conditional Approval | GARY EWELL |
| Deputy Reinf. Concrete | 2/18/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Drilled-In Anchors | 2/21/2020 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 2/21/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 2/21/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 2/21/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 2/24/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Methane Barrier | 3/3/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Drilled-In Anchors | 3/4/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Methane Barrier | 3/4/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Methane Barrier | 3/5/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Methane Barrier | 3/6/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 3/12/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Methane Barrier | 3/13/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 3/13/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 3/19/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 3/25/2020 | Conditional Approval | ANDREW DORSO |
| Green Building Rough | 3/25/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Rough | 3/25/2020 | Not Ready for Inspection | ANDREW DORSO |
| Reinforced Concrete Frame | 3/25/2020 | Partial Inspection | ANDREW DORSO |
| Deputy Drilled-In Anchors | 3/26/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 3/26/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Methane Barrier | 4/1/2020 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 4/1/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 4/1/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 4/1/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 4/3/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 4/6/2020 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 4/13/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 4/14/2020 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 4/14/2020 | Partial Inspection | ANDREW DORSO |
| Deputy Drilled-In Anchors | 4/16/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 4/16/2020 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 4/22/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 4/22/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 4/22/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 6/8/2020 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 6/8/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 6/8/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 6/8/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Methane Barrier | 6/11/2020 | Conditional Approval | JEFFREY DURAN |
| Footing/Foundation/Slab | 6/11/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 6/11/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 6/11/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 6/15/2020 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 6/16/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 6/16/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Subgrade | 6/16/2020 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 6/17/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Steel/Welding | 6/17/2020 | Conditional Approval | ANDREW DORSO |
| Masonry Wall/Backfill | 6/19/2020 | Corrections Issued | VAHE KELEDJIAN |
| Masonry Wall/Backfill | 6/23/2020 | Partial Inspection | ANDREW DORSO |
| Footing/Foundation/Slab | 6/30/2020 | Partial Inspection | ANDREW DORSO |
| Masonry Wall/Backfill | 6/30/2020 | Partial Inspection | ANDREW DORSO |
| Masonry Wall/Backfill | 7/7/2020 | Partial Inspection | ANDREW DORSO |
| Masonry Wall/Backfill | 7/10/2020 | Partial Inspection | ANDREW DORSO |
| Green Building Rough | 8/11/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Rough | 8/11/2020 | Not Ready for Inspection | ANDREW DORSO |
| Reinforced Concrete Frame | 8/11/2020 | Partial Inspection | ANDREW DORSO |
| Light Gage Steel Frame | 9/28/2020 | Partial Inspection | ANDREW DORSO |
| Insulation | 9/30/2020 | Not Ready for Inspection | ANDREW DORSO |
| Insulation | 10/2/2020 | Partial Inspection | ANDREW DORSO |
| Light Gage Steel Frame | 10/2/2020 | Partial Inspection | ANDREW DORSO |
| Drywall Nailing | 10/13/2020 | Partial Inspection | ANDREW DORSO |
| Piling/Pier/Caisson | 10/21/2020 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 10/22/2020 | Conditional Approval | ANDREW DORSO |
| Special/Order Compliance | 10/26/2020 | Partial Inspection | JEFFREY DURAN |
| Deputy Reinf. Concrete | 10/27/2020 | Approved | HAMID PISHEHVAR |
| Deputy Reinf. Concrete | 10/28/2020 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 10/28/2020 | Partial Inspection | ANDREW DORSO |
| Special/Order Compliance | 10/28/2020 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 10/29/2020 | Approved | HAMID PISHEHVAR |
| Deputy Reinf. Concrete | 10/30/2020 | Conditional Approval | JEFFREY DURAN |
| Deputy Reinf. Concrete | 11/2/2020 | Conditional Approval | ANDREW DORSO |
| METHANE-Barrier | 11/4/2020 | Corrections Issued | ANDREW DORSO |
| Piling/Pier/Caisson | 11/4/2020 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/5/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/6/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/10/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/12/2020 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 11/12/2020 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/13/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/17/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/18/2020 | Conditional Approval | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/19/2020 | Conditional Approval | ANDREW DORSO |
| Piling/Pier/Caisson | 11/19/2020 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/20/2020 | Conditional Approval | ANDREW DORSO |
| Footing/Foundation/Slab | 11/23/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Barrier | 11/23/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 11/23/2020 | Not Ready for Inspection | ANDREW DORSO |
| Footing/Foundation/Slab | 11/24/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 11/24/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 11/24/2020 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 11/25/2020 | Conditional Approval | DANIEL VARNUM |
| Footing/Foundation/Slab | 12/10/2020 | Partial Inspection | ANDREW DORSO |
| METHANE-Barrier | 12/10/2020 | Not Ready for Inspection | ANDREW DORSO |
| METHANE-Subgrade | 12/10/2020 | Not Ready for Inspection | ANDREW DORSO |
| Special/Order Compliance | 12/18/2020 | Partial Inspection | ANDREW DORSO |
| Masonry Wall/Backfill | 1/7/2021 | Partial Inspection | ANDREW DORSO |
| Masonry Wall/Backfill | 1/11/2021 | Partial Inspection | ANDREW DORSO |
| Deputy Reinf. Concrete | 1/25/2021 | Approved | HAMID PISHEHVAR |
| Footing/Foundation/Slab | 1/25/2021 | Partial Approval | HAMID PISHEHVAR |
| METHANE-Barrier | 1/25/2021 | Partial Approval | HAMID PISHEHVAR |
| METHANE-Subgrade | 1/25/2021 | Partial Approval | HAMID PISHEHVAR |
| Deputy Reinf. Concrete | 1/26/2021 | Approved | HAMID PISHEHVAR |
| Masonry Wall/Backfill | 2/12/2021 | Not Ready for Inspection | ROBERT DAVIS |
| Pre-Inspection | 2/17/2021 | Partial Inspection | ANDREW DORSO |
| Reinforced Masonry Frame | 2/17/2021 | Partial Inspection | ANDREW DORSO |
| Masonry Wall/Backfill | 3/18/2021 | Partial Inspection | ANDREW DORSO |
| Masonry Wall/Backfill | 3/23/2021 | Approved | ANDREW DORSO |
| Grading Pre-Inspection | 4/26/2021 | Partial Inspection | ANDREW DORSO |
| METHANE-Rough | 4/26/2021 | Partial Inspection | ANDREW DORSO |
| METHANE-Subgrade | 4/26/2021 | Partial Inspection | ANDREW DORSO |
| Deputy Methane Barrier | 4/27/2021 | Conditional Approval | ANDREW DORSO |
| METHANE-Final | 4/27/2021 | Not Ready for Inspection | ANDREW DORSO |
| Deputy Steel/Welding | 5/11/2021 | Conditional Approval | ANDREW DORSO |
| Floor/Roof Diaphrgm/Shear Wall | 5/25/2021 | Partial Inspection | ANDREW DORSO |
| Special/Order Compliance | 7/29/2021 | Partial Inspection | ANDREW DORSO |
| Special/Order Compliance | 1/5/2022 | Corrections Issued | ANDREW DORSO |
| Final | 1/19/2022 | Not Ready for Inspection | ANDREW DORSO |
| Footing/Foundation/Slab | 1/19/2022 | Approved | ANDREW DORSO |
| Green Building Final | 1/19/2022 | Approved | ANDREW DORSO |
| Green Building Rough | 1/19/2022 | Approved | ANDREW DORSO |
| METHANE-Barrier | 1/19/2022 | Approved | ANDREW DORSO |
| METHANE-Final | 1/19/2022 | Approved | ANDREW DORSO |
| METHANE-Rough | 1/19/2022 | Approved | ANDREW DORSO |
| METHANE-Subgrade | 1/19/2022 | Approved | ANDREW DORSO |
| Reinforced Concrete Frame | 1/19/2022 | Approved | ANDREW DORSO |
| SGSOV-Seismic Gas S/O Valve | 1/19/2022 | SGSOV Approved | ANDREW DORSO |
| Smoke Detectors | 1/19/2022 | Not Ready for Inspection | ANDREW DORSO |