9189 N DE GARMO AVE 91352

Certificate Information: 9189 N DE GARMO AVE 91352

Application / Permit
15010-10000-02927
Plan Check / Job No.
B15LA11593
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(22) Warehouse
Work Description
CONSTRUCT A NEW ONE STORY METAL WAREHOUSE STRUCTURE TO ENCLOSE AN EXISTING MATERIAL RECOVERY FACILITY AND TRANSFER STATION OPERATION
Permit Issued
Issued on 8/22/2018
Issuing Office
Metro
Current Status
Issued on 8/22/2018
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/24/2015 APPLICANT
Assigned to Plan Check Engineer 9/17/2015 LARRY LEE
Corrections Issued 9/29/2015 LARRY LEE
Quality Review Completed 10/5/2015 BILL STUTSMAN
Applicant returned to address corrections 10/21/2015 LARRY LEE
Applicant returned to address corrections 4/14/2016 LARRY LEE
Applicant returned to address corrections 2/23/2018 LARRY LEE
Applicant returned to address corrections 7/20/2018 LARRY LEE
Applicant returned to address corrections 8/6/2018 LARRY LEE
Plan Check Approved 8/21/2018 LARRY LEE
Issued 8/22/2018 LADBS

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 1/8/2016 LEE GUILBEAUX
Highway dedication Cleared 1/8/2016 LEE GUILBEAUX
Address approval Cleared 1/20/2016 HOWARD COOPER
Sewer availability Cleared 1/29/2016 ARMEN DERMENJIAN
Hydrant and Access approval Cleared 2/4/2016 JOHN DALLAS
Building over 3-story or 36-ft Cleared 3/17/2016 CALOSHA APPROVED
Permit Cleared 3/21/2016 ARMEN DERMENJIAN
Miscellaneous Cleared 4/6/2016 BOB DUENAS
Miscellaneous Cleared 4/18/2016 BOB DUENAS
DAS Clearance Cleared 2/7/2017 LARRY LEE
Green Code Cleared 3/1/2017 LARRY LEE
CPC Cleared 7/30/2018 ANNA VIDAL
Prkng lot landscape/Water mgmt Cleared 7/30/2018 ANNA VIDAL
Site Plan review Cleared 7/30/2018 ANNA VIDAL
ZI Cleared 7/30/2018 ANNA VIDAL
Low Impact Development Cleared 8/2/2018 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 8/2/2018 STEVE MELGAR
Stormwater Pollution Mitigatn Cleared 8/2/2018 AMMAR ELTAWIL

Contact Information

Architect Sander, Whitney Fairbanks; Lic. No.: C20158 2434 LINCOLN BLVD.      VENICE, CA 90291
Contractor Facility Builders & Erectors Inc; Lic. No.: 670072-B 3940 E MIRALOMA AVENUE      ANAHEIM, CA 92806
Engineer Aguilar, Humberto; Lic. No.: C75014 464 N PALM ST      WOODLAKE, CA 93286
Engineer Babayan, Raffi Samuel; Lic. No.: C72168 1140 N COLUMBUS AVE 112      GLENDALE, CA 91202
Engineer Costa, Orlando Sarmiento; Lic. No.: S2285 1543 WEST GARVEY AVENUE      WEST COVINA, CA 91790
Engineer Sepich, John Edward; Lic. No.: C37509 4007 MCCULLOUGH AVE 469      SAN ANTONIO, TX 78212

Inspector Information

ANDREW DORSO, (818) 374-7520 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 10/31/2018 Partial Inspection ANDREW DORSO
Pre-Inspection 11/16/2018 Partial Inspection ANDREW DORSO
Piling/Pier/Caisson 11/26/2018 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 12/7/2018 Partial Inspection ANDREW DORSO
Piling/Pier/Caisson 12/10/2018 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/11/2018 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/11/2018 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/12/2018 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/12/2018 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/13/2018 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/13/2018 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/14/2018 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/14/2018 Partial Inspection ANDREW DORSO
Piling/Pier/Caisson 12/17/2018 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/18/2018 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/18/2018 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/19/2018 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/19/2018 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/20/2018 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/20/2018 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/21/2018 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/21/2018 Partial Inspection ANDREW DORSO
Deputy Drilled-In Anchors 12/26/2018 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/26/2018 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 12/26/2018 Not Ready for Inspection ANDREW DORSO
METHANE-Barrier 12/26/2018 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 12/26/2018 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 12/26/2018 Not Ready for Inspection ANDREW DORSO
Excavation/Setback/Form/Re-Bar 12/27/2018 Partial Approval ROBERT DAVIS
Piling/Pier/Caisson 12/27/2018 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 12/28/2018 Conditional Approval ROBERT DAVIS
Piling/Pier/Caisson 12/28/2018 Partial Approval ROBERT DAVIS
Piling/Pier/Caisson 1/3/2019 Not Ready for Inspection ROBERT DAVIS
Deputy Reinf. Concrete 1/4/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 1/4/2019 Partial Inspection ANDREW DORSO
Footing/Foundation/Slab 1/7/2019 Partial Inspection ANDREW DORSO
METHANE-Barrier 1/7/2019 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 1/7/2019 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 1/7/2019 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/8/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 1/8/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/9/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 1/9/2019 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/10/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 1/10/2019 Partial Approval ANDREW DORSO
Piling/Pier/Caisson 1/11/2019 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 1/12/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/15/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 1/16/2019 No Access for Inspection ANDREW DORSO
Piling/Pier/Caisson 1/22/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/23/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 1/23/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/24/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 1/24/2019 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 1/25/2019 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 1/25/2019 Partial Inspection ANDREW DORSO
Footing/Foundation/Slab 1/28/2019 Partial Inspection ANDREW DORSO
METHANE-Barrier 1/28/2019 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/29/2019 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 1/29/2019 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 1/29/2019 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 1/29/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/30/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 1/30/2019 Partial Inspection ANDREW DORSO
Piling/Pier/Caisson 2/1/2019 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 2/6/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 2/7/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 2/11/2019 Partial Inspection ANDREW DORSO
Piling/Pier/Caisson 2/19/2019 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 3/1/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 3/4/2019 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 3/6/2019 Partial Inspection ANDREW DORSO
METHANE-Barrier 3/6/2019 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 3/6/2019 Not Ready for Inspection ANDREW DORSO
Deputy Other (see comments) 3/7/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 3/8/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 3/21/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 5/9/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 5/31/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/4/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/6/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/7/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/13/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/14/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/17/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/18/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/19/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/24/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/25/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/26/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/27/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/28/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/1/2019 Approved DANNY RODRIGUEZ
Structural Steel Frame 7/1/2019 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Steel/Welding 7/2/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 7/3/2019 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 7/5/2019 Approved ROBERT DAVIS
Deputy Steel/Welding 7/12/2019 Conditional Approval ANDREW DORSO
Structural Steel Frame 7/12/2019 Partial Inspection ANDREW DORSO
Deputy Steel/Welding 7/15/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/16/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/17/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/18/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/23/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/24/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/25/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/26/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/29/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/30/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 7/31/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 8/1/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 8/2/2019 Conditional Approval ANDREW DORSO
Reinforced Masonry Frame 8/15/2019 Not Ready for Inspection ANDREW DORSO
Deputy Drilled-In Anchors 8/16/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Masonry 8/16/2019 Conditional Approval ANDREW DORSO
Reinforced Masonry Frame 8/19/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Masonry 8/20/2019 Conditional Approval ANDREW DORSO
Reinforced Masonry Frame 8/21/2019 Partial Inspection ANDREW DORSO
Deputy Steel/Welding 8/26/2019 Conditional Approval JAMES STEPHENS
Deputy Steel/Welding 9/4/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 9/9/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 9/12/2019 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 9/23/2019 Conditional Approval ANDREW DORSO
Green Building Rough 9/30/2019 Not Ready for Inspection ANDREW DORSO
METHANE-Rough 9/30/2019 Not Ready for Inspection ANDREW DORSO
Reinforced Concrete Frame 9/30/2019 Partial Inspection ANDREW DORSO
Deputy Fireproofing 10/18/2019 Conditional Approval ANDREW DORSO
Deputy Fireproofing 10/22/2019 Conditional Approval ANDREW DORSO
Deputy Fireproofing 10/23/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 10/28/2019 Partial Inspection ANDREW DORSO
Deputy Fireproofing 10/30/2019 Conditional Approval ANDREW DORSO
Deputy Fireproofing 10/31/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/5/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/6/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/12/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/13/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/14/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 11/14/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 11/15/2019 Conditional Approval ANDREW DORSO
Deputy Fireproofing 11/18/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/20/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/21/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/22/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 11/22/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 11/25/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/26/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/27/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/5/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/5/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/6/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/9/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/10/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/11/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/11/2019 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/12/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/13/2019 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 12/13/2019 Partial Inspection ANDREW DORSO
METHANE-Barrier 12/13/2019 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 12/13/2019 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 12/13/2019 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/16/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/17/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/18/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/19/2019 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 12/19/2019 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 12/20/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/23/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/24/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/26/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/27/2019 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 12/31/2019 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 1/2/2020 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 1/3/2020 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 1/6/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 1/6/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 1/6/2020 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 1/6/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/7/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/8/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/9/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/10/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/13/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/14/2020 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 1/14/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/15/2020 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 1/15/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 1/15/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 1/15/2020 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 1/15/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/16/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/17/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/21/2020 Conditional Approval JAMES STEPHENS
Deputy Reinf. Concrete 1/22/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/23/2020 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 1/23/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 1/23/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 1/23/2020 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 1/23/2020 Not Ready for Inspection ANDREW DORSO
Deputy Drilled-In Anchors 1/24/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/24/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/28/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/29/2020 Conditional Approval ANDREW DORSO
Reinforced Masonry Frame 1/29/2020 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/30/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 1/31/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 2/4/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Masonry 2/4/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 2/5/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 2/6/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 2/7/2020 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 2/10/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 2/10/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 2/10/2020 Not Ready for Inspection ANDREW DORSO
Piling/Pier/Caisson 2/10/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 2/11/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 2/12/2020 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 2/13/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 2/14/2020 Conditional Approval GARY EWELL
Deputy Reinf. Concrete 2/18/2020 Conditional Approval ANDREW DORSO
Deputy Drilled-In Anchors 2/21/2020 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 2/21/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 2/21/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 2/21/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 2/24/2020 Conditional Approval ANDREW DORSO
Deputy Methane Barrier 3/3/2020 Conditional Approval ANDREW DORSO
Deputy Drilled-In Anchors 3/4/2020 Conditional Approval ANDREW DORSO
Deputy Methane Barrier 3/4/2020 Conditional Approval ANDREW DORSO
Deputy Methane Barrier 3/5/2020 Conditional Approval ANDREW DORSO
Deputy Methane Barrier 3/6/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 3/12/2020 Conditional Approval ANDREW DORSO
Deputy Methane Barrier 3/13/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 3/13/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 3/19/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 3/25/2020 Conditional Approval ANDREW DORSO
Green Building Rough 3/25/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Rough 3/25/2020 Not Ready for Inspection ANDREW DORSO
Reinforced Concrete Frame 3/25/2020 Partial Inspection ANDREW DORSO
Deputy Drilled-In Anchors 3/26/2020 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 3/26/2020 Conditional Approval ANDREW DORSO
Deputy Methane Barrier 4/1/2020 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 4/1/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 4/1/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 4/1/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 4/3/2020 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 4/6/2020 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 4/13/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 4/14/2020 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 4/14/2020 Partial Inspection ANDREW DORSO
Deputy Drilled-In Anchors 4/16/2020 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 4/16/2020 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 4/22/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 4/22/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 4/22/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 6/8/2020 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 6/8/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 6/8/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 6/8/2020 Not Ready for Inspection ANDREW DORSO
Deputy Methane Barrier 6/11/2020 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 6/11/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 6/11/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 6/11/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 6/15/2020 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 6/16/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 6/16/2020 Partial Inspection ANDREW DORSO
METHANE-Subgrade 6/16/2020 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 6/17/2020 Conditional Approval ANDREW DORSO
Deputy Steel/Welding 6/17/2020 Conditional Approval ANDREW DORSO
Masonry Wall/Backfill 6/19/2020 Corrections Issued VAHE KELEDJIAN
Masonry Wall/Backfill 6/23/2020 Partial Inspection ANDREW DORSO
Footing/Foundation/Slab 6/30/2020 Partial Inspection ANDREW DORSO
Masonry Wall/Backfill 6/30/2020 Partial Inspection ANDREW DORSO
Masonry Wall/Backfill 7/7/2020 Partial Inspection ANDREW DORSO
Masonry Wall/Backfill 7/10/2020 Partial Inspection ANDREW DORSO
Green Building Rough 8/11/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Rough 8/11/2020 Not Ready for Inspection ANDREW DORSO
Reinforced Concrete Frame 8/11/2020 Partial Inspection ANDREW DORSO
Light Gage Steel Frame 9/28/2020 Partial Inspection ANDREW DORSO
Insulation 9/30/2020 Not Ready for Inspection ANDREW DORSO
Insulation 10/2/2020 Partial Inspection ANDREW DORSO
Light Gage Steel Frame 10/2/2020 Partial Inspection ANDREW DORSO
Drywall Nailing 10/13/2020 Partial Inspection ANDREW DORSO
Piling/Pier/Caisson 10/21/2020 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 10/22/2020 Conditional Approval ANDREW DORSO
Special/Order Compliance 10/26/2020 Partial Inspection JEFFREY DURAN
Deputy Reinf. Concrete 10/27/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 10/28/2020 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 10/28/2020 Partial Inspection ANDREW DORSO
Special/Order Compliance 10/28/2020 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 10/29/2020 Approved HAMID PISHEHVAR
Deputy Reinf. Concrete 10/30/2020 Conditional Approval JEFFREY DURAN
Deputy Reinf. Concrete 11/2/2020 Conditional Approval ANDREW DORSO
METHANE-Barrier 11/4/2020 Corrections Issued ANDREW DORSO
Piling/Pier/Caisson 11/4/2020 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 11/5/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/6/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/10/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/12/2020 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 11/12/2020 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 11/13/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/17/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/18/2020 Conditional Approval ANDREW DORSO
Deputy Reinf. Concrete 11/19/2020 Conditional Approval ANDREW DORSO
Piling/Pier/Caisson 11/19/2020 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 11/20/2020 Conditional Approval ANDREW DORSO
Footing/Foundation/Slab 11/23/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Barrier 11/23/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 11/23/2020 Not Ready for Inspection ANDREW DORSO
Footing/Foundation/Slab 11/24/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 11/24/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 11/24/2020 Not Ready for Inspection ANDREW DORSO
Deputy Reinf. Concrete 11/25/2020 Conditional Approval DANIEL VARNUM
Footing/Foundation/Slab 12/10/2020 Partial Inspection ANDREW DORSO
METHANE-Barrier 12/10/2020 Not Ready for Inspection ANDREW DORSO
METHANE-Subgrade 12/10/2020 Not Ready for Inspection ANDREW DORSO
Special/Order Compliance 12/18/2020 Partial Inspection ANDREW DORSO
Masonry Wall/Backfill 1/7/2021 Partial Inspection ANDREW DORSO
Masonry Wall/Backfill 1/11/2021 Partial Inspection ANDREW DORSO
Deputy Reinf. Concrete 1/25/2021 Approved HAMID PISHEHVAR
Footing/Foundation/Slab 1/25/2021 Partial Approval HAMID PISHEHVAR
METHANE-Barrier 1/25/2021 Partial Approval HAMID PISHEHVAR
METHANE-Subgrade 1/25/2021 Partial Approval HAMID PISHEHVAR
Deputy Reinf. Concrete 1/26/2021 Approved HAMID PISHEHVAR
Masonry Wall/Backfill 2/12/2021 Not Ready for Inspection ROBERT DAVIS
Pre-Inspection 2/17/2021 Partial Inspection ANDREW DORSO
Reinforced Masonry Frame 2/17/2021 Partial Inspection ANDREW DORSO
Masonry Wall/Backfill 3/18/2021 Partial Inspection ANDREW DORSO
Masonry Wall/Backfill 3/23/2021 Approved ANDREW DORSO
Grading Pre-Inspection 4/26/2021 Partial Inspection ANDREW DORSO
METHANE-Rough 4/26/2021 Partial Inspection ANDREW DORSO
METHANE-Subgrade 4/26/2021 Partial Inspection ANDREW DORSO
Deputy Methane Barrier 4/27/2021 Conditional Approval ANDREW DORSO
METHANE-Final 4/27/2021 Not Ready for Inspection ANDREW DORSO
Deputy Steel/Welding 5/11/2021 Conditional Approval ANDREW DORSO
Floor/Roof Diaphrgm/Shear Wall 5/25/2021 Partial Inspection ANDREW DORSO
Special/Order Compliance 7/29/2021 Partial Inspection ANDREW DORSO
Special/Order Compliance 1/5/2022 Corrections Issued ANDREW DORSO
Final 1/19/2022 Not Ready for Inspection ANDREW DORSO
Footing/Foundation/Slab 1/19/2022 Approved ANDREW DORSO
Green Building Final 1/19/2022 Approved ANDREW DORSO
Green Building Rough 1/19/2022 Approved ANDREW DORSO
METHANE-Barrier 1/19/2022 Approved ANDREW DORSO
METHANE-Final 1/19/2022 Approved ANDREW DORSO
METHANE-Rough 1/19/2022 Approved ANDREW DORSO
METHANE-Subgrade 1/19/2022 Approved ANDREW DORSO
Reinforced Concrete Frame 1/19/2022 Approved ANDREW DORSO
SGSOV-Seismic Gas S/O Valve 1/19/2022 SGSOV Approved ANDREW DORSO
Smoke Detectors 1/19/2022 Not Ready for Inspection ANDREW DORSO