732 S SPRING ST 90014

Certificate Information: 732 S SPRING ST 90014

Application / Permit
15010-10000-02877
Plan Check / Job No.
B15LA11334
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 24 STORY MIXED USE BUILDING (2 LEVELS OF SUBTERRANEAN PARKING, 3 LEVELS ABOVE GROUND PARKING). LEASING OFFICE, RETAIL ON GROUND LEVEL WITH 20 STORIES OF RESIDENTIAL
Permit Issued
Issued on 6/15/2016
Issuing Office
Metro
Current Status
CofO Issued on 5/17/2019
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/13/2015 APPLICANT
Assigned to Plan Check Engineer 9/10/2015 LARRY LEE
Corrections Issued 9/14/2015 LARRY LEE
Quality Review Completed 9/14/2015 BILL STUTSMAN
Building Plans Picked Up 9/14/2015 APPLICANT
Applicant returned to address corrections 3/30/2016 LARRY LEE
Applicant returned to address corrections 4/27/2016 LARRY LEE
Applicant returned to address corrections 5/10/2016 LARRY LEE
Applicant returned to address corrections 6/2/2016 LARRY LEE
Plan Check Approved 6/15/2016 LARRY LEE
Plan Check Approved 6/15/2016 LARRY LEE
Issued 6/15/2016 LADBS
TCO Issued (Expire Date: 04-29-2019) 10/31/2018 HAMID PISHEHVAR
CofO in Progress 5/17/2019 WINSTON DUNNING
Permit Finaled 5/17/2019 WINSTON DUNNING
CofO Issued 5/17/2019 WINSTON DUNNING
Permit Finaled 5/17/2019 WINSTON DUNNING

Permit Application Clearance Information

Address approval Cleared 9/28/2015 ARMENIA HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 9/28/2015 ARMENIA HERNANDEZ
Hydrant and Access approval Cleared 10/1/2015 JOHN CONNEALLY
CPC Cleared 10/7/2015 CASSANDRA ZWEEP
CPC Cleared 10/7/2015 CASSANDRA ZWEEP
Work Adjacent to Public Way Cleared 4/15/2016 TERRY PHAN
Sewer availability Cleared 4/20/2016 ADRIAN HERNANDEZ
"D" conditions Cleared 5/9/2016 BRIDGETTE WOOTEN
Building over 3-story or 36-ft Cleared 5/10/2016 CALOSHA APPROVED
DAS Clearance Cleared 5/10/2016 WAI LAU
Excavation more than 5-ft deep Cleared 5/10/2016 CALOSHA APPROVED
Green Code Cleared 5/12/2016 MARCUS LEVIAS
Internal circulation Cleared 5/13/2016 TAIMOUR TANAVOLI
Low Impact Development Cleared 5/23/2016 AMMAR ELTAWIL
Stormwater Pollution Mitigatn Cleared 5/23/2016 AMMAR ELTAWIL
Highway dedication Cleared 5/25/2016 CARLOS CUEVA
Permit Cleared 5/25/2016 CARLOS CUEVA
Roof/Waste drainage to street Cleared 5/25/2016 CARLOS CUEVA
Miscellaneous Cleared 5/31/2016 BRIDGETTE WOOTEN
Opn space landscape/Water mgmt Cleared 6/7/2016 BRIDGETTE WOOTEN
Prkng lot landscape/Water mgmt Cleared 6/7/2016 BRIDGETTE WOOTEN
Site Plan review Cleared 6/7/2016 BRIDGETTE WOOTEN
Project located in CRA area Cleared 6/8/2016 JIM URQUHART
Fire Marshall Fire Life Safety Cleared 6/14/2016 ANDREW KO

Contact Information

Architect Mc, Larand Carl Frayser; Lic. No.: C4847 1900 MAIN STREET 8TH FLOOR      IRVINE, CA 92614
Contractor Holland Construction Inc; Lic. No.: 944880-B 1111 MAIN STREET STE 500      VANCOUVER, WA 98660
Engineer O'Keeffe, Michael John; Lic. No.: S4879 1661 W 5TH AVE      VANCOUVER, BC, V6J1N5

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Reinforced Concrete Frame 10/26/2016 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 10/26/2016 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 11/2/2016 Partial Approval WINSTON DUNNING
Green Building Rough 11/4/2016 Not Ready for Inspection JONATHAN QUACH
Reinforced Concrete Frame 11/4/2016 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 11/4/2016 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 11/8/2016 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 11/8/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 11/16/2016 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 11/16/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/17/2016 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 11/17/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/18/2016 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 11/18/2016 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 11/18/2016 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 11/18/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 11/21/2016 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 11/21/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/22/2016 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 11/22/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/23/2016 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 11/23/2016 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/28/2016 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 12/2/2016 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 12/2/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 12/5/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/6/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/7/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/8/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/9/2016 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 12/9/2016 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 12/9/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 12/12/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/13/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/14/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/15/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/16/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/19/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/20/2016 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 12/20/2016 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 12/20/2016 Partial Inspection WINSTON DUNNING
Deputy Other (see comments) 12/21/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/21/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/22/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/23/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/27/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/28/2016 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 1/3/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 1/3/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 1/4/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/4/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/5/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/6/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/9/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/9/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/10/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/11/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/13/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 1/13/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 1/13/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 1/17/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/18/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/19/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/20/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/20/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 1/20/2017 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 1/20/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 1/23/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/23/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 1/23/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 1/24/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/24/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/25/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/25/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/26/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/26/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/27/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/27/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/30/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/30/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/31/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/31/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 1/31/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 1/31/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 2/1/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 2/2/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/2/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/2/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/3/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/3/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 2/3/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 2/3/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 2/6/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/7/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/8/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/9/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/9/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/10/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/13/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/13/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/14/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 2/14/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 2/14/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 2/15/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/21/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/22/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/22/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 2/22/2017 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/23/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/23/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/24/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/24/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 2/24/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 2/24/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 2/27/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 2/27/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/28/2017 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 2/28/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/1/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 3/1/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/2/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 3/2/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/3/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 3/3/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/6/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 3/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/7/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 3/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/8/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 3/8/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 3/8/2017 Partial Inspection WINSTON DUNNING
Reinforced Masonry Frame 3/8/2017 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 3/8/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 3/9/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 3/9/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/10/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 3/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/13/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/14/2017 Conditional Approval WINSTON DUNNING
Green Building Rough 3/14/2017 Not Ready for Inspection DONALD CRICHLOW
Reinforced Concrete Frame 3/14/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 3/14/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 3/15/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/17/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/20/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/21/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 3/21/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 3/21/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 3/22/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/23/2017 Conditional Approval WINSTON DUNNING
Masonry Wall/Backfill 3/23/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 3/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/24/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/28/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/28/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 3/29/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 3/29/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/29/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 3/30/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/30/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 3/31/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/31/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/3/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/3/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 4/3/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 4/3/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 4/4/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/4/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/5/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/6/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/7/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/10/2017 Conditional Approval WINSTON DUNNING
Masonry Wall/Backfill 4/11/2017 Partial Approval WINSTON DUNNING
Deputy Drilled-In Anchors 4/14/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/14/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/14/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 4/14/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 4/14/2017 Partial Inspection WINSTON DUNNING
Deputy Drilled-In Anchors 4/17/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/17/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/17/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 4/18/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/18/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 4/19/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/19/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 4/20/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/20/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/20/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 4/21/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/21/2017 Conditional Approval WINSTON DUNNING
Drywall Nailing 4/21/2017 Partial Approval WINSTON DUNNING
Deputy Drilled-In Anchors 4/24/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/24/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/24/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 4/25/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/25/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/25/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 4/26/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/27/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/27/2017 Approved WINSTON DUNNING
Green Building Rough 4/27/2017 Not Ready for Inspection RICHARD DOCKUS
Green Building Rough 4/27/2017 Off-Hour Fees Due
Reinforced Concrete Frame 4/27/2017 Off-Hour Fees Due
Reinforced Concrete Frame 4/27/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 4/27/2017 Off-Hour Fees Due
Verify Sprinkler Sign Off 4/27/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 4/28/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/28/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/2/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/2/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/3/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/3/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/4/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/4/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/5/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/8/2017 Conditional Approval WINSTON DUNNING
Masonry Wall/Backfill 5/8/2017 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 5/8/2017 Partial Approval WINSTON DUNNING
Reinforced Masonry Frame 5/8/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 5/8/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 5/9/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/9/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/10/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/11/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/11/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/12/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/12/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/15/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/15/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/16/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/16/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/17/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/17/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 5/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/18/2017 Conditional Approval WINSTON DUNNING
Masonry Wall/Backfill 5/18/2017 Partial Inspection WINSTON DUNNING
Reinforced Masonry Frame 5/18/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/19/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/22/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/22/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 5/22/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 5/22/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 5/23/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/23/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 5/24/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/24/2017 Conditional Approval WINSTON DUNNING
Masonry Wall/Backfill 5/25/2017 Partial Inspection WINSTON DUNNING
Reinforced Masonry Frame 5/25/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 5/31/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/31/2017 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/1/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/1/2017 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/2/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/2/2017 Conditional Approval ERNESTO CORRAL
Reinforced Concrete Frame 6/2/2017 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 6/2/2017 Not Ready for Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/5/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/6/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/7/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/8/2017 Conditional Approval WINSTON DUNNING
Masonry Wall/Backfill 6/8/2017 Partial Inspection WINSTON DUNNING
Reinforced Masonry Frame 6/8/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/9/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/9/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/12/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/12/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/13/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/13/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/14/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/14/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 6/14/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 6/14/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 6/15/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/15/2017 Conditional Approval WINSTON DUNNING
Reinforced Masonry Frame 6/15/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/16/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/16/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/19/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 6/26/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 6/26/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 6/27/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/27/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/28/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/28/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/29/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/29/2017 Conditional Approval WINSTON DUNNING
Light Gage Steel Frame 6/29/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 6/30/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/30/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/3/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/3/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/5/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/6/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 7/6/2017 Conditional Approval WINSTON DUNNING
Verify Sprinkler Sign Off 7/6/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 7/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/7/2017 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 7/7/2017 Partial Approval WINSTON DUNNING
Reinforced Masonry Frame 7/7/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/10/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/11/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/11/2017 Conditional Approval WINSTON DUNNING
Light Gage Steel Frame 7/11/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/12/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/12/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/14/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/14/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/17/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/17/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/18/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/19/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 7/19/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 7/19/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 7/20/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/20/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/21/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/24/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/24/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/25/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/25/2017 Conditional Approval WINSTON DUNNING
Special/Order Compliance 7/25/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/26/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/26/2017 Conditional Approval WINSTON DUNNING
Light Gage Steel Frame 7/26/2017 Partial Approval WINSTON DUNNING
Masonry Wall/Backfill 7/26/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/27/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/27/2017 Conditional Approval WINSTON DUNNING
Masonry Wall/Backfill 7/27/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/28/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/28/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 7/31/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/31/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 7/31/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 7/31/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 8/1/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/1/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/2/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/2/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/3/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/3/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/4/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/4/2017 Conditional Approval WINSTON DUNNING
Insulation 8/4/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/7/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/8/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/9/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/9/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/10/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 8/10/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 8/10/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 8/11/2017 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/11/2017 Conditional Approval WINSTON DUNNING
Light Gage Steel Frame 8/11/2017 Partial Approval WINSTON DUNNING
Masonry Wall/Backfill 8/11/2017 Partial Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/14/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/14/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/17/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/17/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/17/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/18/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/18/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/21/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/21/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/22/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/22/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/22/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 8/22/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 8/22/2017 Partial Inspection WINSTON DUNNING
Deputy Drilled-In Anchors 8/23/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/23/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/23/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/25/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/25/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/28/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/28/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/29/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/29/2017 Conditional Approval NICK DANERI
Green Building Rough 8/29/2017 Partial Approval RICHARD DOCKUS
Insulation 8/29/2017 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 8/30/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/30/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/31/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/31/2017 Conditional Approval WINSTON DUNNING
Insulation 8/31/2017 Partial Inspection WINSTON DUNNING
Masonry Wall/Backfill 8/31/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 9/1/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/1/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 9/1/2017 Conditional Approval WINSTON DUNNING
Verify Sprinkler Sign Off 9/1/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 9/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/5/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/6/2017 Conditional Approval WINSTON DUNNING
Light Gage Steel Frame 9/6/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/8/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/8/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/11/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/11/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/11/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/12/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/12/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/12/2017 Conditional Approval WINSTON DUNNING
Light Gage Steel Frame 9/12/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/13/2017 Approved WINSTON DUNNING
Deputy Pre-Stress Concrete 9/13/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/13/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/14/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/14/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/14/2017 Conditional Approval WINSTON DUNNING
Green Building Rough 9/14/2017 Partial Approval RICHARD DOCKUS
Reinforced Concrete Frame 9/14/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 9/14/2017 Partial Inspection WINSTON DUNNING
Deputy Drilled-In Anchors 9/15/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/15/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/15/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/18/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/18/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/19/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/19/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/20/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/20/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/20/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/21/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/21/2017 Conditional Approval WINSTON DUNNING
Drywall Nailing 9/21/2017 Partial Approval WINSTON DUNNING
Green Building Rough 9/22/2017 Partial Approval RICHARD DOCKUS
Deputy Pre-Stress Concrete 9/26/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/26/2017 Conditional Approval WINSTON DUNNING
Green Building Rough 9/26/2017 Not Ready for Inspection RICHARD DOCKUS
Reinforced Concrete Frame 9/26/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 9/26/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 9/27/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/27/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/28/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/28/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 9/29/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/29/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 10/2/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/2/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/2/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 10/3/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/3/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/3/2017 Conditional Approval WINSTON DUNNING
Green Building Rough 10/3/2017 Partial Approval RICHARD DOCKUS
Light Gage Steel Frame 10/3/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 10/4/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/4/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/4/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 10/5/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/5/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 10/6/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/6/2017 Conditional Approval WINSTON DUNNING
Drywall Nailing 10/6/2017 Partial Approval WINSTON DUNNING
Green Building Rough 10/6/2017 Not Ready for Inspection RICHARD DOCKUS
Light Gage Steel Frame 10/6/2017 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 10/6/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 10/6/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 10/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/10/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/11/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/11/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/12/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/12/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/13/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/13/2017 Conditional Approval WINSTON DUNNING
Green Building Rough 10/13/2017 Partial Approval RICHARD DOCKUS
Deputy Pre-Stress Concrete 10/16/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/16/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 10/17/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/17/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/18/2017 Conditional Approval WINSTON DUNNING
Drywall Nailing 10/18/2017 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 10/18/2017 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 10/18/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 10/18/2017 Partial Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 10/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/19/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 10/20/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/20/2017 Conditional Approval WINSTON DUNNING
Green Building Rough 10/20/2017 Partial Approval RICHARD DOCKUS
Deputy Pre-Stress Concrete 10/23/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/23/2017 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 10/30/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 10/30/2017 Partial Inspection WINSTON DUNNING
Drywall Nailing 11/1/2017 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 11/1/2017 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/2/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 11/3/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 11/3/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/3/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 11/6/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 11/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/6/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 11/7/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 11/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/7/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 11/8/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 11/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/8/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 11/9/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 11/9/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/9/2017 Conditional Approval WINSTON DUNNING
Green Building Rough 11/9/2017 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 11/9/2017 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 11/9/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Masonry 11/13/2017 Conditional Approval WINSTON DUNNING
Drywall Nailing 11/16/2017 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 11/16/2017 Partial Approval WINSTON DUNNING
Drywall Nailing 11/22/2017 Partial Approval WINSTON DUNNING
Green Building Rough 11/22/2017 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 11/22/2017 Partial Approval WINSTON DUNNING
Deputy Drilled-In Anchors 11/29/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/29/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 11/29/2017 Conditional Approval WINSTON DUNNING
Green Building Rough 11/29/2017 Partial Inspection WINSTON DUNNING
Deputy Drilled-In Anchors 11/30/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/30/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 11/30/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/1/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/1/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/1/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/4/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/4/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/4/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/5/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/6/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/7/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/8/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/11/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/12/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/12/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/12/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/13/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/13/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/13/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/14/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/14/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/14/2017 Conditional Approval WINSTON DUNNING
Green Building Rough 12/14/2017 Partial Inspection WINSTON DUNNING
Drywall Nailing 12/15/2017 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 12/15/2017 Partial Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/18/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/19/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/20/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/20/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/20/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/21/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/22/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/22/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 12/22/2017 Conditional Approval WINSTON DUNNING
Drywall Nailing 12/28/2017 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 12/28/2017 Partial Approval WINSTON DUNNING
Deputy Drilled-In Anchors 12/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/2/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/2/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 1/2/2018 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 1/3/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/3/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 1/3/2018 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 1/4/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/4/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 1/4/2018 Conditional Approval WINSTON DUNNING
Green Building Rough 1/4/2018 Partial Inspection WINSTON DUNNING
Deputy Drilled-In Anchors 1/5/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/5/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 1/5/2018 Conditional Approval WINSTON DUNNING
Drywall Nailing 1/5/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 1/5/2018 Partial Approval WINSTON DUNNING
Green Building Rough 1/8/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 1/8/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 1/8/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 1/11/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 1/11/2018 Partial Approval WINSTON DUNNING
Green Building Rough 1/16/2018 Partial Inspection WINSTON DUNNING
Masonry Wall/Backfill 1/24/2018 Partial Approval WINSTON DUNNING
Interior/Exterior Lathing 1/26/2018 Partial Approval WINSTON DUNNING
Green Building Rough 1/29/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 1/29/2018 Partial Inspection WINSTON DUNNING
Structural Steel Frame 1/29/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 2/6/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 2/6/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 2/21/2018 Partial Approval WINSTON DUNNING
Green Building Rough 2/21/2018 Partial Inspection WINSTON DUNNING
Light Gage Steel Frame 2/21/2018 Partial Approval WINSTON DUNNING
Green Building Rough 3/1/2018 Conditional Approval NICK DANERI
Reinforced Concrete Frame 3/1/2018 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 3/1/2018 Not Ready for Inspection NICK DANERI
Drywall Nailing 3/8/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 3/8/2018 Partial Approval WINSTON DUNNING
Green Building Rough 3/12/2018 Partial Approval JAMES POWERS
Drywall Nailing 3/19/2018 Partial Approval WINSTON DUNNING
Green Building Rough 3/19/2018 Partial Inspection WINSTON DUNNING
Light Gage Steel Frame 3/19/2018 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 3/19/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 3/19/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 3/22/2018 Partial Approval NICK DANERI
Drywall Nailing 4/2/2018 Partial Approval NICK DANERI
Light Gage Steel Frame 4/2/2018 Partial Approval NICK DANERI
Masonry Wall/Backfill 4/3/2018 Partial Approval WINSTON DUNNING
Green Building Rough 4/5/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 4/9/2018 Partial Approval WINSTON DUNNING
Green Building Rough 4/16/2018 Partial Inspection WINSTON DUNNING
Light Gage Steel Frame 4/17/2018 Conditional Approval WINSTON DUNNING
Drywall Nailing 4/20/2018 Partial Approval WINSTON DUNNING
Green Building Rough 4/20/2018 Partial Inspection WINSTON DUNNING
Light Gage Steel Frame 4/20/2018 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 4/20/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 4/20/2018 Partial Inspection WINSTON DUNNING
Light Gage Steel Frame 5/2/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 5/10/2018 Partial Inspection WINSTON DUNNING
Interior/Exterior Lathing 5/18/2018 Partial Approval WINSTON DUNNING
Green Building Rough 5/24/2018 Partial Inspection WINSTON DUNNING
Insulation 5/24/2018 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 5/24/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 5/24/2018 Partial Inspection WINSTON DUNNING
Insulation 5/31/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 5/31/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 6/13/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 6/21/2018 Partial Approval WINSTON DUNNING
Interior/Exterior Lathing 7/18/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 7/18/2018 Partial Approval WINSTON DUNNING
T-Bar Ceiling 7/18/2018 Partial Approval WINSTON DUNNING
Interior/Exterior Lathing 8/1/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 8/10/2018 Partial Approval WINSTON DUNNING
Interior/Exterior Lathing 8/10/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 8/10/2018 Partial Approval WINSTON DUNNING
T-Bar Ceiling 8/10/2018 Partial Approval WINSTON DUNNING
Final 8/21/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 8/21/2018 Partial Inspection WINSTON DUNNING
Green Building Final 8/21/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 8/21/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 8/21/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 8/21/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 8/21/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 8/21/2018 Partial Inspection WINSTON DUNNING
Final 9/6/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 9/6/2018 Approved WINSTON DUNNING
Green Building Final 9/6/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 9/6/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 9/6/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 9/6/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 9/6/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 9/6/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 9/19/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 9/25/2018 Partial Inspection WINSTON DUNNING
Final 9/26/2018 Partial Inspection WINSTON DUNNING
Green Building Final 9/26/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 9/26/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 9/26/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 9/26/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 9/26/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 9/26/2018 Partial Inspection WINSTON DUNNING
Final 9/27/2018 Partial Inspection WINSTON DUNNING
Green Building Final 9/27/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 9/27/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 9/27/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 9/27/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 9/27/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 9/27/2018 Partial Inspection WINSTON DUNNING
Final 9/28/2018 Partial Inspection WINSTON DUNNING
Green Building Final 9/28/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 9/28/2018 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 9/28/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 9/28/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 9/28/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 9/28/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 10/10/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 10/10/2018 Partial Inspection WINSTON DUNNING
Final 10/11/2018 Partial Inspection WINSTON DUNNING
Green Building Final 10/11/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 10/11/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 10/11/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 10/11/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 10/11/2018 Partial Inspection WINSTON DUNNING
Final 10/12/2018 Partial Inspection WINSTON DUNNING
Final 10/15/2018 Partial Inspection WINSTON DUNNING
Green Building Final 10/15/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 10/15/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 10/15/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 10/15/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 10/15/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 10/15/2018 Partial Inspection WINSTON DUNNING
Final 10/16/2018 Partial Inspection WINSTON DUNNING
Green Building Final 10/16/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 10/16/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 10/16/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 10/16/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 10/16/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 10/16/2018 Partial Inspection WINSTON DUNNING
Final 10/18/2018 Partial Inspection WINSTON DUNNING
Interior/Exterior Lathing 10/18/2018 Partial Inspection WINSTON DUNNING
Final 10/24/2018 Partial Inspection WINSTON DUNNING
Green Building Final 10/24/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 10/24/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 10/24/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 10/24/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 10/24/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 10/24/2018 Partial Inspection WINSTON DUNNING
Final 10/25/2018 Partial Inspection WINSTON DUNNING
Green Building Final 10/25/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 10/25/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 10/25/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 10/25/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 10/25/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 10/25/2018 Partial Inspection WINSTON DUNNING
Final 11/29/2018 Partial Inspection WINSTON DUNNING
Green Building Final 11/29/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 11/29/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 11/29/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 11/29/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 11/29/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 11/29/2018 Partial Inspection WINSTON DUNNING
Final 11/30/2018 Partial Inspection WINSTON DUNNING
Green Building Final 11/30/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 11/30/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 11/30/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 11/30/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 11/30/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 11/30/2018 Partial Inspection WINSTON DUNNING
Final 12/17/2018 Partial Inspection WINSTON DUNNING
Green Building Final 12/17/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 12/17/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 12/17/2018 Partial Inspection WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 12/17/2018 SGSOV Not Ready WINSTON DUNNING
Smoke Detectors 12/17/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 12/17/2018 Partial Inspection WINSTON DUNNING
Special/Order Compliance 4/10/2019 Partial Inspection WINSTON DUNNING
Final 5/17/2019 Conditional Approval WINSTON DUNNING
Green Building Final 5/17/2019 Approved WINSTON DUNNING
Green Building Rough 5/17/2019 Approved WINSTON DUNNING
Reinforced Concrete Frame 5/17/2019 Approved WINSTON DUNNING
SGSOV-Seismic Gas S/O Valve 5/17/2019 SGSOV Approved WINSTON DUNNING
Smoke Detectors 5/17/2019 Approved WINSTON DUNNING
Verify Sprinkler Sign Off 5/17/2019 Approved WINSTON DUNNING