8555 W COLGATE AVE 1-10 90048

Certificate Information: 8555 W COLGATE AVE 1-10 90048

Application / Permit
15010-10000-02873
Plan Check / Job No.
B15LA11310
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
(N) 5-STORY TYPE IIIA (10 UNITS) APARTMENT OVER 1 LEVELS TYPE IA BASEMENT GARAGE| PROVIDE 11% OF (8) TOTAL "BASE" UNITS (VERY LOW INCOME) PURSUANT TO LAMC 12.22 A25 PROCEDURE PER DIR 2014-4923-DB
Permit Issued
Issued on 1/31/2018
Issuing Office
Metro
Current Status
CofO Issued on 12/14/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/14/2015 APPLICANT
Disabled Access Plans Picked Up 9/10/2015 APPLICANT
Assigned to Plan Check Engineer 9/24/2015 CHIU TAM
Green Plans Picked Up 10/7/2015 APPLICANT
Corrections Issued 10/23/2015 CHIU TAM
Quality Review Completed 11/6/2015 JOHN VASQUEZ
Building Plans Picked Up 11/9/2015 APPLICANT
Applicant returned to address corrections 12/17/2015 CHIU TAM
Applicant returned to address corrections 12/29/2015 CHIU TAM
Applicant returned to address corrections 1/13/2016 CHIU TAM
Applicant returned to address corrections 1/26/2016 CHIU TAM
Applicant returned to address corrections 2/8/2016 CHIU TAM
Applicant returned to address corrections 2/17/2016 CHIU TAM
Applicant returned to address corrections 2/26/2016 CHIU TAM
Applicant returned to address corrections 3/1/2016 CHIU TAM
Applicant returned to address corrections 3/10/2016 CHIU TAM
Applicant returned to address corrections 6/8/2016 CHIU TAM
Applicant returned to address corrections 7/19/2016 CHIU TAM
Applicant returned to address corrections 9/30/2016 CHIU TAM
Applicant returned to address corrections 12/28/2016 SALVADOR QUINTANILLA
Plan Check Approved 12/15/2017 SALVADOR QUINTANILLA
Issued 1/31/2018 LADBS
TCO Issued (Expire Date: 01-10-2022) 7/14/2021 ERNESTO CORRAL
CofO in Progress 11/17/2021 EDWIN GREGORYONA
CofO Issued 12/14/2021 ERNESTO CORRAL
Permit Finaled 12/14/2021 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 12/10/2015 ARNULFO NUNO
Highway dedication Cleared 12/10/2015 ARNULFO NUNO
Permit Cleared 12/10/2015 ARNULFO NUNO
Eng Process Fee Ord 176,300 Cleared 12/15/2015 ADRIAN SANCHEZ
Sewer availability Cleared 12/15/2015 ADRIAN SANCHEZ
Green Code Cleared 12/17/2015 JOHN KLARIN
Hydrant and Access approval Cleared 2/17/2016 ROBERT DUFF
Internal circulation Cleared 5/10/2016 COLLINS ALLAN
Low Impact Development Cleared 5/10/2016 IDA MEISAMI-FARD
Roof/Waste drainage to street Cleared 5/10/2016 RAVIL MANAPOV
Stormwater Pollution Mitigatn Cleared 5/10/2016 IDA MEISAMI-FARD
Disturb/Remove Protected Trees Cleared 5/25/2016 TROY CALLEROS
Construction near power lines Cleared 6/20/2016 LUCIO FERRER
Construction within easement Cleared 6/20/2016 LUCIO FERRER
DAS Clearance Cleared 7/8/2016 WAI LAU
Fire Marshall Fire Life Safety Cleared 1/13/2017 PEJMAN NOORI
Work Adjacent to Public Way Cleared 8/4/2017 WARREN LIU
DCP conditions approval Cleared 10/18/2017 NICHOLAS KAWAZOE
Housing density bonus Cleared 10/18/2017 NICHOLAS KAWAZOE
Frnt yard landscape/Water mgmt Cleared 11/15/2017 AIDA KARAPETIAN
Miscellaneous Cleared 11/15/2017 AIDA KARAPETIAN
Opn space landscape/Water mgmt Cleared 11/15/2017 AIDA KARAPETIAN
Building over 3-story or 36-ft Cleared 11/30/2017 CALOSHA APPROVED
Miscellaneous Cleared 11/30/2017 AIDA KARAPETIAN

Contact Information

Contractor Owner-Builder       ,
Engineer Berkoz, Ertunga; Lic. No.: S2504 4665 ELLENITA AVE      TARZANA, CA 91356

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 8/7/2018 Partial Inspection LARRY ARNICK
Deputy Reinf. Concrete 10/3/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/3/2018 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 10/10/2018 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/8/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/13/2018 Approved GREGORY POMISH
Footing/Foundation/Slab 11/14/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Barrier 11/14/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 11/14/2018 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 11/15/2018 Approved LARRY ARNICK
Deputy Reinf. Concrete 11/16/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/26/2018 Approved GREGORY POMISH
Deputy Reinf. Masonry 11/27/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 11/27/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 11/27/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 11/28/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 11/28/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/29/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 11/29/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 11/30/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 11/30/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 12/3/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 12/4/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/4/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 12/5/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 12/6/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 12/7/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/7/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 12/10/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/10/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 12/10/2018 Partial Approval LARRY ARNICK
METHANE-Barrier 12/10/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Subgrade 12/10/2018 Not Ready for Inspection LARRY ARNICK
Deputy Shotcrete 12/11/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/11/2018 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 12/11/2018 Off-Hour Fees Due
METHANE-Barrier 12/11/2018 Off-Hour Fees Due
METHANE-Subgrade 12/11/2018 Off-Hour Fees Due
Deputy Reinf. Masonry 12/12/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/12/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 12/13/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/13/2018 Conditional Approval LARRY ARNICK
Green Building Rough 12/13/2018 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 12/13/2018 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 12/13/2018 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 12/13/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 12/14/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/14/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/14/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 12/17/2018 Approved GREGORY POMISH
Deputy Reinf. Masonry 12/18/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/18/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 12/19/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 12/20/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 12/21/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/26/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 12/27/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/27/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 1/24/2019 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 1/25/2019 Not Ready for Inspection GREGORY POMISH
Excavation/Setback/Form/Re-Bar 1/28/2019 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 1/29/2019 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 1/30/2019 Conditional Approval LARRY ARNICK
Deputy Wood Construction 4/9/2019 Conditional Approval LARRY ARNICK
Green Building Rough 4/9/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 4/9/2019 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 4/9/2019 Not Ready for Inspection LARRY ARNICK
Wood Frame 4/9/2019 Partial Approval LARRY ARNICK
Deputy Wood Construction 5/3/2019 Partial Approval JAMES POWERS
Deputy Wood Construction 5/13/2019 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/20/2019 Partial Approval LARRY ARNICK
Green Building Rough 6/20/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 6/20/2019 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 6/20/2019 Not Ready for Inspection LARRY ARNICK
Wood Frame 6/20/2019 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/3/2019 Not Ready for Inspection LARRY ARNICK
Deputy Wood Construction 7/9/2019 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/9/2019 Approved LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/27/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/9/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/18/2019 Approved LARRY ARNICK
Pre-Inspection 9/26/2019 Partial Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/30/2019 Partial Approval LARRY ARNICK
Drywall Nailing 10/4/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/4/2019 Not Ready for Inspection LARRY ARNICK
Green Building Rough 10/4/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 10/4/2019 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 10/4/2019 Not Ready for Inspection LARRY ARNICK
Wood Frame 10/4/2019 Not Ready for Inspection LARRY ARNICK
Green Building Rough 10/9/2019 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 10/9/2019 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 10/9/2019 Not Ready for Inspection LARRY ARNICK
Wood Frame 10/9/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/22/2019 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/30/2019 Corrections Issued JOEY BUCHANAN
Floor/Roof Diaphrgm/Shear Wall 10/31/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/1/2019 Partial Approval LARRY ARNICK
Drywall Nailing 11/6/2019 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/6/2019 Approved LARRY ARNICK
Green Building Rough 11/6/2019 Approved LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/13/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/15/2019 Partial Approval LARRY ARNICK
Insulation 11/15/2019 Partial Approval LARRY ARNICK
Insulation 11/19/2019 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/27/2019 Approved LARRY ARNICK
Drywall Nailing 12/10/2019 Partial Approval DANIEL COLLINS
Drywall Nailing 12/23/2019 Partial Approval JAMES POWERS
Green Building Final 12/27/2019 Not Ready for Inspection LARRY ARNICK
Insulation 12/27/2019 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 1/8/2020 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 1/10/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 1/10/2020 Partial Inspection LARRY ARNICK
Light Gage Steel Frame 1/13/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 1/13/2020 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 1/14/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 1/14/2020 Partial Inspection LARRY ARNICK
Drywall Nailing 1/17/2020 Partial Approval LARRY ARNICK
Pre-Inspection 1/22/2020 Partial Approval LARRY ARNICK
Pre-Inspection 1/28/2020 Partial Inspection LARRY ARNICK
Pre-Inspection 2/26/2020 Not Ready for Inspection JONATHAN QUACH
Pre-Inspection 2/27/2020 Partial Inspection LARRY ARNICK
Pre-Inspection 3/18/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 3/20/2020 Partial Inspection LARRY ARNICK
Deputy Reinf. Masonry 5/4/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/5/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/6/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/12/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/14/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 5/15/2020 Conditional Approval LARRY ARNICK
METHANE-Rough 5/18/2020 Approved LARRY ARNICK
Reinforced Masonry Frame 5/18/2020 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 5/18/2020 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 7/21/2020 Not Ready for Inspection LARRY ARNICK
Pre-Inspection 7/21/2020 Partial Inspection LARRY ARNICK
Green Building Final 4/30/2021 Approved EDWIN GREGORYONA
Verify Rec and Parks Fee Memo 6/3/2021 Partial Inspection EDWIN GREGORYONA
Verify Rec and Parks Fee Memo 11/10/2021 Approved EDWIN GREGORYONA
Drywall Nailing 11/17/2021 Approved EDWIN GREGORYONA
Final 11/17/2021 OK to Issue CofO EDWIN GREGORYONA
Footing/Foundation/Slab 11/17/2021 Approved EDWIN GREGORYONA
METHANE-Barrier 11/17/2021 Approved EDWIN GREGORYONA
METHANE-Subgrade 11/17/2021 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 11/17/2021 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 11/17/2021 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 11/17/2021 SGSOV Approved EDWIN GREGORYONA
SUSMP-Std. Urban Storm Water 11/17/2021 Approved EDWIN GREGORYONA
Smoke Detectors 11/17/2021 Approved EDWIN GREGORYONA
Structural Steel Frame 11/17/2021 Approved EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/17/2021 Approved EDWIN GREGORYONA
Wood Frame 11/17/2021 Approved EDWIN GREGORYONA