3400-3404 W SUNSET BLVD 1-35 90026

Certificate Information: 3400-3404 W SUNSET BLVD 1-35 90026

Application / Permit
15010-10000-02786
Plan Check / Job No.
B15LA10812
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW CONSTRUCTION A 35 UNITS APARTMENT FIVE STORIES BUILDING, WITH RESIDENTIAL AND COMMERCIAL USE AT PORTION OF THE GROUD LEVEL OF THE BUILDING. (5 stories over 2 levels of basement)
Permit Issued
Issued on 8/9/2017
Issuing Office
Metro
Current Status
CofO Issued on 11/18/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/25/2015 APPLICANT
Assigned to Plan Check Engineer 9/17/2015 LARRY LEE
Corrections Issued 9/29/2015 LARRY LEE
Quality Review Completed 10/9/2015 BILL STUTSMAN
Building Plans Picked Up 10/13/2015 APPLICANT
Applicant returned to address corrections 12/20/2016 LARRY LEE
Applicant returned to address corrections 2/23/2017 LARRY LEE
Applicant returned to address corrections 7/26/2017 LARRY LEE
Plan Check Approved 8/9/2017 LARRY LEE
Issued 8/9/2017 LADBS
TCO Issued (Expire Date: 05-31-2021) 12/2/2020 ERNESTO CORRAL
CofO in Progress 10/4/2021 DAVID BURKHEAD
CofO Issued 11/18/2021 ERNESTO CORRAL
Permit Finaled 11/18/2021 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 8/2/2016 JACOB BIGLER
Eng Process Fee Ord 176,300 Cleared 8/2/2016 JACOB BIGLER
Driveway location Cleared 8/19/2016 TAIMOUR TANAVOLI
Hydrant and Access approval Cleared 10/31/2016 JOHN CONNEALLY
"Q" conditions Cleared 12/9/2016 TREVOR MARTIN
Opn space landscape/Water mgmt Cleared 12/9/2016 TREVOR MARTIN
Prkng lot landscape/Water mgmt Cleared 12/9/2016 TREVOR MARTIN
Tract Map conditions Cleared 12/9/2016 TREVOR MARTIN
Tract Map conditions Cleared 12/9/2016 TREVOR MARTIN
ZA Case Cleared 12/9/2016 TREVOR MARTIN
Low Impact Development Cleared 12/12/2016 MARTIN FRAGOSO
Stormwater Pollution Mitigatn Cleared 12/12/2016 MARTIN FRAGOSO
Fire Marshall Fire Life Safety Cleared 12/15/2016 SUSIE ADAMIAN
DAS Clearance Cleared 12/19/2016 LARRY LEE
Bicycle Parking Cleared 12/20/2016 JAMES KHO
Building over 3-story or 36-ft Cleared 12/20/2016 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 12/20/2016 CALOSHA APPROVED
Green Code Cleared 12/23/2016 MICKEY YAMASHITA
Miscellaneous Cleared 1/12/2017 TREVOR MARTIN
Sewer availability Cleared 6/23/2017 ADRIAN SANCHEZ
Highway dedication Cleared 7/5/2017 SEVAK ISAKHAYAN
Permit Cleared 7/17/2017 LINDA MARGARET
Roof/Waste drainage to street Cleared 7/17/2017 LINDA MARGARET
Miscellaneous Cleared 7/24/2017 TREVOR MARTIN
ZA Case Cleared 7/26/2017 TREVOR MARTIN
Work Adjacent to Public Way Cleared 8/9/2017 DAVID PEREZ

Contact Information

Architect Watts, Jonathan Venning; Lic. No.: C21311 1657 BRYN MAWR AVENUE      SANTA MONICA, CA 90405
Contractor T N T Simmonds; Lic. No.: 888520-B 7916 WOODLEY AVE      VAN NUYS, CA 91406
Engineer , ; Lic. No.: GE3092       ,
Engineer Uhles, Scott Delane; Lic. No.: C72391 2909 ARIZONA AVE 5      SANTA MONICA, CA 90404

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Grading Pre-Inspection 8/14/2017 Approved SAKO AGHAZARIAN
Pre-Inspection 8/14/2017 Approved SAKO AGHAZARIAN
Excavation/Setback/Form/Re-Bar 1/5/2018 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 1/17/2018 Partial Approval JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 1/18/2018 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 1/23/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 1/23/2018 Not Ready for Inspection JEFF BYTHEWAY
Footing/Foundation/Slab 2/5/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/7/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/9/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 2/12/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/15/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 2/15/2018 Not Ready for Inspection JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 2/19/2018 Partial Approval JEFF BYTHEWAY
Footing/Foundation/Slab 2/19/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 2/20/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/22/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 2/22/2018 Partial Approval JEFF BYTHEWAY
Green Building Rough 2/22/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 2/22/2018 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 2/22/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 2/23/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 2/28/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 3/1/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 3/7/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 3/8/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/8/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/9/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/15/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/16/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/19/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/20/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 3/20/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/21/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/21/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 3/23/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/23/2018 Conditional Approval JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/26/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 3/28/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/29/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 3/29/2018 Conditional Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 3/30/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 3/30/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 3/30/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/2/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/2/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 4/2/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/3/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/3/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 4/3/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/4/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/4/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 4/4/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/10/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/11/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/11/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 4/12/2018 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 4/12/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/13/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/19/2018 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 4/20/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/25/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/26/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 4/26/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 4/27/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 4/27/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/30/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/3/2018 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 5/3/2018 Partial Approval TED RIES
Deputy Reinf. Concrete 5/4/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/8/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/8/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/9/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/22/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/22/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 5/23/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 5/25/2018 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 5/30/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 5/31/2018 Conditional Approval TED RIES
Deputy Shotcrete 6/1/2018 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 6/1/2018 Partial Inspection ERNESTO CORRAL
Deputy Shotcrete 6/4/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 6/5/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 6/6/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 6/8/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 6/8/2018 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 6/11/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/12/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 6/12/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 6/12/2018 Partial Approval JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 6/13/2018 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 6/14/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 6/15/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/6/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 7/13/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/18/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 7/18/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 7/19/2018 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 7/19/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 7/20/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 7/30/2018 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/2/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/2/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 8/3/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/3/2018 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 8/7/2018 Approved JEFF BYTHEWAY
Green Building Rough 8/7/2018 Not Ready for Inspection JEFF BYTHEWAY
Verify Sprinkler Sign Off 8/7/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Shotcrete 8/8/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/8/2018 Not Ready for Inspection JEFF BYTHEWAY
Reinforced Concrete Frame 8/8/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Shotcrete 8/9/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/9/2018 Partial Approval JEFF BYTHEWAY
Deputy Shotcrete 8/10/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/17/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/17/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Reinf. Concrete 8/20/2018 Approved JEFF BYTHEWAY
Excavation/Setback/Form/Re-Bar 8/20/2018 Partial Approval JEFF BYTHEWAY
Deputy Reinf. Concrete 8/21/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 8/21/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/28/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/29/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/30/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/31/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 9/5/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 9/11/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 9/13/2018 Approved TED RIES
Deputy Steel/Welding 9/14/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 9/21/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 9/27/2018 Approved TED RIES
Deputy Reinf. Masonry 9/27/2018 Approved TED RIES
Deputy Steel/Welding 9/27/2018 Approved TED RIES
Deputy Reinf. Concrete 9/28/2018 Approved TED RIES
Deputy Reinf. Masonry 9/28/2018 Approved TED RIES
Deputy Steel/Welding 9/28/2018 Approved TED RIES
Deputy Reinf. Masonry 10/1/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 10/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 10/4/2018 Approved TED RIES
Deputy Reinf. Masonry 10/5/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 10/9/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 10/12/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 10/16/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 10/17/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 10/18/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/19/2018 Approved JEFF BYTHEWAY
Masonry Wall/Backfill 10/24/2018 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 11/5/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 11/5/2018 Approved JEFF BYTHEWAY
Wood Frame 11/6/2018 Partial Inspection JEFF BYTHEWAY
Deputy Drilled-In Anchors 11/7/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 11/8/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 11/14/2018 Approved JEFF BYTHEWAY
Footing/Foundation/Slab 11/14/2018 Not Ready for Inspection JEFF BYTHEWAY
Deputy Drilled-In Anchors 11/15/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 11/26/2018 Approved JEFF BYTHEWAY
Wood Frame 12/3/2018 Partial Inspection JEFF BYTHEWAY
Deputy Wood Construction 12/14/2018 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 12/14/2018 Conditional Approval JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 1/11/2019 Off-Hour Fees Due
Floor/Roof Diaphrgm/Shear Wall 1/11/2019 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/12/2019 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 4/9/2019 Partial Approval JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 4/12/2019 Partial Approval JEFF BYTHEWAY
Wood Frame 4/23/2019 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 4/29/2019 Partial Approval JEFF BYTHEWAY
Wood Frame 5/3/2019 Not Ready for Inspection JEFF BYTHEWAY
Wood Frame 5/6/2019 Partial Approval TED RIES
Wood Frame 5/10/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 5/15/2019 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 5/15/2019 Partial Approval JEFF BYTHEWAY
Wood Frame 5/22/2019 Partial Approval TED RIES
Wood Frame 5/30/2019 No Access for Inspection TED RIES
Wood Frame 6/3/2019 Partial Approval TED RIES
Wood Frame 6/5/2019 Partial Approval TED RIES
Wood Frame 6/10/2019 Partial Approval TED RIES
Wood Frame 6/13/2019 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 6/18/2019 Partial Approval JEFF BYTHEWAY
Interior/Exterior Lathing 7/1/2019 Not Ready for Inspection JEFF BYTHEWAY
Interior/Exterior Lathing 7/3/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 7/9/2019 Partial Inspection JEFF BYTHEWAY
Drywall Nailing 7/15/2019 Partial Approval JEFF BYTHEWAY
Wood Frame 7/19/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 7/25/2019 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 7/29/2019 Not Ready for Inspection DANIEL MC AULIFFE
Interior/Exterior Lathing 7/30/2019 Partial Approval DANIEL MC AULIFFE
Insulation 8/1/2019 Partial Inspection ERNESTO CORRAL
Drywall Nailing 8/9/2019 Partial Approval DANIEL MC AULIFFE
Insulation 8/16/2019 Partial Approval JEFF BYTHEWAY
Interior/Exterior Lathing 8/16/2019 Partial Approval JEFF BYTHEWAY
Wood Frame 8/22/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 8/27/2019 Partial Approval JEFF BYTHEWAY
Insulation 9/9/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 9/16/2019 Partial Inspection JEFF BYTHEWAY
Drywall Nailing 9/18/2019 Partial Approval JEFF BYTHEWAY
Wood Frame 9/23/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 9/24/2019 Not Ready for Inspection JEFF BYTHEWAY
Drywall Nailing 9/25/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 9/26/2019 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Steel/Welding 10/1/2019 Approved JEFF BYTHEWAY
Wood Frame 10/2/2019 Approved JEFF BYTHEWAY
Drywall Nailing 10/7/2019 Corrections Issued JEFF BYTHEWAY
Drywall Nailing 10/10/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 10/17/2019 Partial Approval JEFF BYTHEWAY
Deputy Steel/Welding 10/23/2019 Conditional Approval DANIEL MC AULIFFE
Drywall Nailing 10/29/2019 Partial Approval JEFF BYTHEWAY
Drywall Nailing 11/7/2019 Partial Approval JEFF BYTHEWAY
Special/Order Compliance 11/7/2019 Approved DAVID BURKHEAD
Drywall Nailing 11/18/2019 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 11/21/2019 Partial Approval DAVID BURKHEAD
Drywall Nailing 11/25/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 11/25/2019 Partial Approval DAVID BURKHEAD
Drywall Nailing 12/16/2019 Partial Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 1/13/2020 Conditional Approval DANIEL MC AULIFFE
Light Gage Steel Frame 1/16/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 1/29/2020 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 2/7/2020 Partial Inspection DAVID BURKHEAD
Drywall Nailing 2/28/2020 Partial Approval DAVID BURKHEAD
Wood Frame 3/20/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 3/25/2020 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 3/25/2020 Partial Approval DAVID BURKHEAD
Drywall Nailing 4/16/2020 Corrections Issued DAVID BURKHEAD
Drywall Nailing 5/4/2020 Partial Approval DAVID BURKHEAD
Insulation 5/13/2020 Partial Inspection DAVID BURKHEAD
Final 6/12/2020 Corrections Issued DAVID BURKHEAD
Pre-Inspection 6/17/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 6/26/2020 Partial Approval DAVID BURKHEAD
Pre-Inspection 6/30/2020 Partial Inspection DAVID BURKHEAD
Pre-Inspection 7/1/2020 Partial Inspection DAVID BURKHEAD
Light Gage Steel Frame 7/17/2020 Corrections Issued DAVID BURKHEAD
Final 9/10/2020 Partial Inspection DAVID BURKHEAD
Footing/Foundation/Slab 9/10/2020 Approved DAVID BURKHEAD
Green Building Final 9/10/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 9/10/2020 Approved DAVID BURKHEAD
Reinforced Concrete Frame 9/10/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 9/10/2020 Not Ready for Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 9/10/2020 SGSOV Approved DAVID BURKHEAD
Smoke Detectors 9/10/2020 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/10/2020 Approved DAVID BURKHEAD
Drywall Nailing 9/15/2020 Partial Inspection DANIEL MC AULIFFE
Drywall Nailing 9/24/2020 Not Ready for Inspection DAVID BURKHEAD
Drywall Nailing 9/30/2020 Partial Approval DAVID BURKHEAD
Final 10/22/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 10/22/2020 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 10/22/2020 Approved DAVID BURKHEAD
Reinforced Masonry Frame 10/22/2020 Approved DAVID BURKHEAD
Smoke Detectors 10/22/2020 Approved DAVID BURKHEAD
Green Building Final 11/10/2020 Not Ready for Inspection DAVID BURKHEAD
Final 11/16/2020 Not Ready for Inspection DAVID BURKHEAD
Green Building Final 11/16/2020 Approved DAVID BURKHEAD
Final 11/19/2020 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 11/30/2020 Approved DAVID BURKHEAD
Pre-Inspection 12/8/2020 Partial Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/19/2021 Approved DAVID BURKHEAD
Special/Order Compliance 5/5/2021 Approved DAVID BURKHEAD
Final 9/13/2021 Partial Inspection DAVID BURKHEAD
Final 9/24/2021 OK to Issue CofO DAVID BURKHEAD
Pre-Inspection 11/16/2021 Approved DAVID BURKHEAD