427 W 5TH ST 1-347 90013

Certificate Information: 427 W 5TH ST 1-347 90013

Application / Permit
15010-10000-02769
Plan Check / Job No.
B15LA10654
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
NEW 24 STORY 347 UNIT HIGHRISE APARTMENT BUILDING WITH GROUND FLOOR RESTAURANT (CORE &SHELL) AND SUBTERRANEAN PARKING GARAGE. (POOL UNDER SEPERATE PERMIT)
Permit Issued
Issued on 2/1/2017
Issuing Office
Metro
Current Status
CofO Corrected on 9/30/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/13/2015 APPLICANT
Assigned to Plan Check Engineer 9/10/2015 ARMEN JIVALAGIAN
Corrections Issued 10/2/2015 ARMEN JIVALAGIAN
Quality Review Completed 10/9/2015 BILL STUTSMAN
Building Plans Picked Up 10/14/2015 APPLICANT
Green Plans Picked Up 10/24/2015 APPLICANT
Applicant returned to address corrections 2/22/2016 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/17/2016 ARMEN JIVALAGIAN
Applicant returned to address corrections 3/24/2016 ARMEN JIVALAGIAN
Applicant returned to address corrections 4/7/2016 ARMEN JIVALAGIAN
Applicant returned to address corrections 7/28/2016 ARMEN JIVALAGIAN
Applicant returned to address corrections 8/25/2016 ARMEN JIVALAGIAN
Applicant returned to address corrections 9/1/2016 ARMEN JIVALAGIAN
Applicant returned to address corrections 11/21/2016 ARMEN JIVALAGIAN
Applicant returned to address corrections 12/19/2016 ARMEN JIVALAGIAN
Applicant returned to address corrections 12/20/2016 ARMEN JIVALAGIAN
Plan Check Approved 2/1/2017 ARMEN JIVALAGIAN
Issued 2/1/2017 LADBS
TCO Issued (Expire Date: 05-23-2020) 11/25/2019 DAVID TSAU
TCO Issued (Expire Date: 11-17-2020) 5/21/2020 DAVID TSAU
CofO in Progress 9/21/2020 NICK DANERI
CofO Issued-Status Void 9/25/2020 ERNESTO CORRAL
Permit Finaled-Status Void 9/25/2020 ERNESTO CORRAL
Re-Activate Permit 9/30/2020 ERNESTO CORRAL
Permit Finaled 9/30/2020 ERNESTO CORRAL
CofO Corrected 9/30/2020 ERNESTO CORRAL
Permit Finaled 9/30/2020 ERNESTO CORRAL

Permit Application Clearance Information

Internal circulation Cleared 10/29/2015 TAIMOUR TANAVOLI
Address approval Cleared 1/12/2016 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 1/12/2016 ADRIAN SANCHEZ
Construction near power lines Cleared 2/11/2016 LUCIO FERRER
Driveway location Cleared 5/3/2016 TAIMOUR TANAVOLI
Internal circulation Cleared 5/3/2016 TAIMOUR TANAVOLI
Miscellaneous Cleared 5/26/2016 DAVE MYERS
Bicycle Parking Cleared 9/27/2016 JAMES KHO
Highway dedication Cleared 9/29/2016 JAMES KHO
Permit Cleared 9/29/2016 JACOB BIGLER
Metro Rail approval Cleared 9/30/2016 ARMEN JIVALAGIAN
Hydrant and Access approval Cleared 10/5/2016 JOHN CONNEALLY
Project located in CRA area Cleared 10/12/2016 JIM URQUHART
Project located in CRA area Cleared 10/12/2016 JIM URQUHART
Methane Ordinance Cleared 10/13/2016 DAVE MYERS
Sewer availability Cleared 10/18/2016 PAMELA TENEZA
Low Impact Development Cleared 12/6/2016 SAM NAVID
Food Service Establishment Cleared 12/16/2016 KENNETH BROWNE
Building over 3-story or 36-ft Cleared 12/23/2016 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 12/23/2016 CALOSHA APPROVED
DAS Clearance Cleared 1/3/2017 SHINE LIN
Fire Marshall Fire Life Safety Cleared 1/3/2017 ANDREW KO
Encroachment in public way Cleared 1/11/2017 ARMENIA AGUILAR
Green Code Cleared 1/13/2017 RUSSELL KELLY
Work Adjacent to Public Way Cleared 1/19/2017 TERRY PHAN
"D" conditions Cleared 1/27/2017 KIT AWAKUNI
Certificate of Compliance Cleared 1/27/2017 KIT AWAKUNI
Grading in hillside Cleared 1/27/2017 KIT AWAKUNI
Miscellaneous Cleared 1/27/2017 KIT AWAKUNI
Miscellaneous Cleared 1/27/2017 KIT AWAKUNI
Miscellaneous Cleared 1/27/2017 KIT AWAKUNI
Miscellaneous Cleared 1/27/2017 KIT AWAKUNI
Miscellaneous Cleared 1/27/2017 KIT AWAKUNI
Miscellaneous Cleared 1/27/2017 KIT AWAKUNI
Miscellaneous Cleared 1/27/2017 KIT AWAKUNI
Opn space landscape/Water mgmt Cleared 1/27/2017 KIT AWAKUNI
Site Plan review Cleared 1/27/2017 KIT AWAKUNI
Tract Map conditions Cleared 1/27/2017 KIT AWAKUNI
Tract Map conditions Cleared 1/27/2017 KIT AWAKUNI
ZA Case Cleared 1/27/2017 KIT AWAKUNI
ZA Case Cleared 1/27/2017 KIT AWAKUNI
ZI Cleared 1/27/2017 KIT AWAKUNI
ZI Cleared 1/27/2017 KIT AWAKUNI
Roof/Waste drainage to street Cleared 1/31/2017 ARMENIA AGUILAR
Grading Pre-Inspection Cleared 2/1/2017 ARMEN JIVALAGIAN

Contact Information

Contractor Suffolk Construction Company Inc; Lic. No.: 751099-B 390 FREMONT STREET      SAN FRANCISCO, CA 94105
Engineer Conaway, Johnny Ray; Lic. No.: C19689 PO BOX 155      OAK VIEW, CA 93022
Engineer Youssef, Nabih Fouad Guirg; Lic. No.: S2026 550 S HOPE ST SUITE 1700      LOS ANGELES, CA 90017

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 3/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 3/31/2017 Conditional Approval BARRY SILLS
Deputy Grading 4/3/2017 Conditional Approval ERNESTO CORRAL
Deputy Grading 4/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 4/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 5/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 5/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 5/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 5/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 5/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 5/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Grading 5/25/2017 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/30/2017 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 6/1/2017 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/28/2017 Partial Inspection ERNESTO CORRAL
Deputy Methane Barrier 7/3/2017 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 7/5/2017 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/6/2017 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 7/6/2017 Not Ready for Inspection LESLIE TRUJILLO
Footing/Foundation/Slab 7/7/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/10/2017 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 7/18/2017 Partial Inspection LESLIE TRUJILLO
Deputy Methane Barrier 7/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/21/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/25/2017 Partial Inspection LESLIE TRUJILLO
Deputy Methane Barrier 7/26/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/7/2017 Partial Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 8/11/2017 Partial Inspection LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/18/2017 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 8/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/22/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/23/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/24/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/24/2017 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 8/25/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/25/2017 Partial Approval JAMES POWERS
Footing/Foundation/Slab 8/26/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/29/2017 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 8/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/11/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/11/2017 Partial Inspection LESLIE TRUJILLO
Deputy Shotcrete 9/12/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/12/2017 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 9/13/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/13/2017 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 9/14/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/14/2017 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 9/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/27/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/27/2017 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 9/28/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/28/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/2/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/2/2017 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/3/2017 Not Ready for Inspection LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/4/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/10/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/10/2017 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/10/2017 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 10/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/11/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/11/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/17/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/17/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/23/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 10/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/24/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/24/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 10/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/1/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/1/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/6/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/6/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/7/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/7/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/8/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 11/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 11/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/13/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 11/13/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/15/2017 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 11/16/2017 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 11/16/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/17/2017 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 11/17/2017 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 11/17/2017 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 11/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/20/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/20/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/21/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/21/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/30/2017 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/30/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/1/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/1/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/6/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/6/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/8/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/8/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/11/2017 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 12/11/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/12/2017 Corrections Issued LESLIE TRUJILLO
Deputy Reinf. Masonry 12/12/2017 Corrections Issued LESLIE TRUJILLO
Deputy Reinf. Concrete 12/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/14/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/14/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/22/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/22/2017 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/26/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/29/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/3/2018 Not Ready for Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 1/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/4/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/4/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/10/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 1/11/2018 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/12/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/12/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/17/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/23/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/23/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 1/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/24/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/2/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/2/2018 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/7/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/7/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/12/2018 Conditional Approval LESLIE TRUJILLO
Green Building Rough 2/12/2018 Not Ready for Inspection ERNESTO CORRAL
Reinforced Concrete Frame 2/12/2018 Partial Inspection ERNESTO CORRAL
Verify Sprinkler Sign Off 2/12/2018 Not Ready for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 2/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 2/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/14/2018 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/14/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/15/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 2/15/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/15/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/16/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 2/16/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/16/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 2/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/20/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 2/20/2018 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 2/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 2/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/28/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 2/28/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/28/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/28/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 3/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/1/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/1/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/7/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/7/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/12/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/12/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/13/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 3/13/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/15/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/15/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/20/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/20/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/23/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/27/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/27/2018 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/30/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/3/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/3/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/5/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/6/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/10/2018 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 4/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/11/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/11/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 4/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 4/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 4/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/16/2018 Approved LESLIE TRUJILLO
Deputy Reinf. Concrete 4/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/16/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/16/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/19/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/19/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 4/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 4/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 4/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 4/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 4/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 4/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 4/24/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 4/24/2018 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/27/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/27/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 4/27/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 4/27/2018 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 4/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/3/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/3/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/4/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 5/4/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/4/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/4/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/4/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 5/7/2018 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 5/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/8/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 5/8/2018 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 5/8/2018 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/10/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 5/10/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/10/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/10/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/10/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 5/10/2018 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 5/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 5/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 5/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/15/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/15/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/18/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/18/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/23/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/23/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/23/2018 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/30/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 5/30/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/30/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/4/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/4/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/4/2018 Conditional Approval ERNESTO CORRAL
Insulation 6/4/2018 Partial Inspection ERNESTO CORRAL
Reinforced Concrete Frame 6/4/2018 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 6/5/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 6/5/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/5/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 6/6/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/6/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 6/7/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/7/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/7/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/7/2018 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 6/7/2018 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 6/8/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/8/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/8/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/12/2018 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/12/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/12/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/12/2018 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 6/13/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 6/13/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/13/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 6/14/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/14/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 6/15/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 6/15/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/15/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/15/2018 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 6/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/20/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/20/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/20/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/25/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/25/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/25/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/28/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/28/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/29/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/30/2018 Not Ready for Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/2/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/3/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/3/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/6/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/6/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/9/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/9/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/10/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/13/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/13/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/17/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/17/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/18/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/18/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/23/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/23/2018 Partial Approval LESLIE TRUJILLO
Insulation 7/23/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/23/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/24/2018 Approved LESLIE TRUJILLO
Deputy Reinf. Concrete 7/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/2/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/3/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/3/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/4/2018 Off-Hour Fees Due
Deputy Drilled-In Anchors 8/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/6/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/6/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/8/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 8/8/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/10/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/16/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/16/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/17/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/24/2018 Conditional Approval LESLIE TRUJILLO
Insulation 8/24/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/24/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/27/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/28/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/30/2018 Conditional Approval LESLIE TRUJILLO
Insulation 8/31/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/31/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/4/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 9/5/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 9/6/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 9/7/2018 Conditional Approval LESLIE TRUJILLO
Insulation 9/7/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/7/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/11/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/11/2018 Partial Inspection LESLIE TRUJILLO
Interior/Exterior Lathing 9/11/2018 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 9/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/17/2018 Conditional Approval LESLIE TRUJILLO
Insulation 9/17/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/19/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 9/19/2018 Not Ready for Inspection LESLIE TRUJILLO
Deputy Steel/Welding 9/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 9/24/2018 Conditional Approval ERNESTO CORRAL
Drywall Nailing 9/24/2018 Not Ready for Inspection ERNESTO CORRAL
Insulation 9/24/2018 Not Ready for Inspection ERNESTO CORRAL
Light Gage Steel Frame 9/24/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 9/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/25/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/25/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/27/2018 Conditional Approval ERNESTO CORRAL
Insulation 9/27/2018 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 9/28/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/1/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/10/2018 Conditional Approval LESLIE TRUJILLO
Insulation 10/10/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/12/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/15/2018 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 10/15/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/22/2018 Conditional Approval LESLIE TRUJILLO
Interior/Exterior Lathing 10/23/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/23/2018 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 10/29/2018 Partial Approval LESLIE TRUJILLO
Structural Steel Frame 10/29/2018 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 10/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/31/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/31/2018 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 11/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/5/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/5/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/6/2018 Conditional Approval LESLIE TRUJILLO
Interior/Exterior Lathing 11/6/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/9/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/9/2018 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 11/13/2018 Partial Approval LESLIE TRUJILLO
Structural Steel Frame 11/14/2018 Approved LESLIE TRUJILLO
Deputy Fireproofing 11/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 11/16/2018 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 11/16/2018 Partial Inspection ERNESTO CORRAL
Interior/Exterior Lathing 11/19/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/19/2018 Partial Approval LESLIE TRUJILLO
Structural Steel Frame 11/19/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/21/2018 Conditional Approval LESLIE TRUJILLO
Interior/Exterior Lathing 11/26/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/28/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/28/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/30/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/3/2018 Conditional Approval LESLIE TRUJILLO
Interior/Exterior Lathing 12/3/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/4/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/4/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/6/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/6/2018 Partial Inspection LESLIE TRUJILLO
Deputy Steel/Welding 12/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/10/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/13/2018 Conditional Approval LESLIE TRUJILLO
Structural Steel Frame 12/13/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/18/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/18/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/19/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/21/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/8/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/9/2019 Conditional Approval LESLIE TRUJILLO
Structural Steel Frame 1/9/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Steel/Welding 1/10/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/15/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/23/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/23/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/28/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/29/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/7/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/8/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/12/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/15/2019 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 2/22/2019 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 2/28/2019 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 3/6/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/18/2019 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 3/19/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/20/2019 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 3/21/2019 Partial Approval LESLIE TRUJILLO
Insulation 3/22/2019 Partial Approval LESLIE TRUJILLO
Insulation 3/26/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/27/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/28/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/29/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/4/2019 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 4/10/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/10/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/24/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/25/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/26/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 5/6/2019 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 5/9/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 5/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/18/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/27/2019 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 6/28/2019 Partial Approval LESLIE TRUJILLO
T-Bar Ceiling 6/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/16/2019 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 7/26/2019 Partial Inspection LESLIE TRUJILLO
Special/Order Compliance 8/2/2019 Approved LESLIE TRUJILLO
Special/Order Compliance 8/16/2019 Partial Approval LESLIE TRUJILLO
Final 9/12/2019 Not Ready for Inspection LESLIE TRUJILLO
Green Building Final 9/12/2019 Not Ready for Inspection LESLIE TRUJILLO
Green Building Rough 9/12/2019 Approved LESLIE TRUJILLO
Insulation 9/12/2019 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/12/2019 Approved LESLIE TRUJILLO
SGSOV-Seismic Gas S/O Valve 9/12/2019 SGSOV Not Ready LESLIE TRUJILLO
Smoke Detectors 9/12/2019 Not Ready for Inspection LESLIE TRUJILLO
Verify Sprinkler Sign Off 9/12/2019 Approved LESLIE TRUJILLO
Final 9/18/2019 Not Ready for Inspection LESLIE TRUJILLO
Footing/Foundation/Slab 9/18/2019 Approved LESLIE TRUJILLO
Green Building Final 9/18/2019 Not Ready for Inspection LESLIE TRUJILLO
Pre-Inspection 9/18/2019 Partial Approval LESLIE TRUJILLO
SGSOV-Seismic Gas S/O Valve 9/18/2019 SGSOV Not Ready LESLIE TRUJILLO
Smoke Detectors 9/18/2019 Approved LESLIE TRUJILLO
Pre-Inspection 9/20/2019 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 9/25/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 9/27/2019 Partial Inspection LESLIE TRUJILLO
Final 10/18/2019 Partial Inspection JEFF BYTHEWAY
Green Building Final 10/18/2019 Not Ready for Inspection JEFF BYTHEWAY
SGSOV-Seismic Gas S/O Valve 10/18/2019 SGSOV Not Ready JEFF BYTHEWAY
Pre-Inspection 11/4/2019 Partial Inspection LESLIE TRUJILLO
Final 11/19/2019 Partial Inspection LESLIE TRUJILLO
Green Building Final 11/19/2019 Partial Approval LESLIE TRUJILLO
SGSOV-Seismic Gas S/O Valve 11/19/2019 SGSOV Approved LESLIE TRUJILLO
Special/Order Compliance 11/25/2019 Approved ERNESTO CORRAL
Special/Order Compliance 4/28/2020 Partial Inspection LESLIE TRUJILLO
Special/Order Compliance 5/11/2020 Partial Approval NICK DANERI
Final 9/3/2020 Partial Inspection NICK DANERI
Green Building Final 9/3/2020 Not Ready for Inspection NICK DANERI
Final 9/4/2020 Conditional Approval NICK DANERI
Green Building Final 9/4/2020 Approved NICK DANERI