218 S OCCIDENTAL BLVD 90057

Certificate Information: 218 S OCCIDENTAL BLVD 90057

Application / Permit
15010-10000-02503
Plan Check / Job No.
B15LA09596
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
PDPP -6 STORY 47 UNITS APARTMENT WITH 5 LEVEL TYPE IIIA OVER TWO LEVEL TYPE IA ON GRADE & SUBTERRANEAN PARKING GARAGE <<AFFORDABLE HOUSING INCENTIVES INVOKED FOR BOTH DENSITY INCREASE & PARKING REDUCTION AS WELL AS OPEN SPACE REDUCTION>>
Permit Issued
Issued on 6/19/2017
Issuing Office
Metro
Current Status
CofO Issued on 12/1/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/24/2015 APPLICANT
Assigned to Plan Check Engineer 8/13/2015 DEAN LEE
Corrections Issued 8/20/2015 DEAN LEE
Quality Review Completed 9/9/2015 BILL STUTSMAN
Disabled Access Plans Picked Up 9/10/2015 APPLICANT
Applicant returned to address corrections 10/13/2015 DEAN LEE
Building Plans Picked Up 2/12/2016 APPLICANT
Applicant returned to address corrections 4/27/2016 DEAN LEE
Plan Check Approved 5/9/2017 DEAN LEE
Issued 6/19/2017 LADBS
CofO in Progress 12/1/2023 GREGORY POMISH
Permit Finaled 12/1/2023 ERNESTO CORRAL
CofO Issued 12/1/2023 ERNESTO CORRAL
Permit Finaled 12/1/2023 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 9/2/2015 NATALIE MOORE
Highway dedication Cleared 9/2/2015 NATALIE MOORE
Permit Cleared 9/2/2015 NATALIE MOORE
Encroachment in public way Cleared 9/30/2015 ARMENIA HERNANDEZ
Certificate of Compliance Cleared 10/7/2015 CASSANDRA ZWEEP
Driveway location Cleared 10/7/2015 COLLINS ALLAN
Internal circulation Cleared 10/7/2015 COLLINS ALLAN
Hydrant and Access approval Cleared 11/2/2015 JOHN CONNEALLY
Building over 3-story or 36-ft Cleared 12/3/2015 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 12/3/2015 CALOSHA APPROVED
Eng Process Fee Ord 176,300 Cleared 3/2/2016 ARNULFO NUNO
Sewer availability Cleared 3/2/2016 ARNULFO NUNO
Green Code Cleared 6/29/2016 DONALD CRICHLOW
Grading Pre-Inspection Cleared 7/1/2016 DEAN LEE
Fire Marshall Fire Life Safety Cleared 8/5/2016 PEJMAN NOORI
Low Impact Development Cleared 8/8/2016 RYAN HUDSON
Roof/Waste drainage to street Cleared 8/17/2016 RAVIL MANAPOV
DAS Clearance Cleared 11/29/2016 EDDIE GARIN
Housing density bonus Cleared 4/17/2017 NICHOLAS KAWAZOE
Opn space landscape/Water mgmt Cleared 4/20/2017 ULISES GONZALEZ
ZA Case Cleared 4/20/2017 ULISES GONZALEZ
Work Adjacent to Public Way Cleared 5/9/2017 WARREN LIU

Contact Information

Architect Shichishima, Kazushige; Lic. No.: C34034 3828 INGRAHAM STREET APT 224      LOS ANGELES, CA 90005
Contractor Go Green Remodeling Inc; Lic. No.: 966335-B 4221 WILSHIRE BLVD STE 312      LOS ANGELES, CA 90010
Engineer Babayan, Raffi Samuel; Lic. No.: C72168 1140 N COLUMBUS AVE 112      GLENDALE, CA 91202
Engineer Lee, David Chong; Lic. No.: S5881 13044 PACIFIC PROMENADE 217      PLAYA VISTA, CA 90094

Inspector Information

GREGORY POMISH, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI
NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/13/2017 Partial Inspection WINSTON DUNNING
Pre-Inspection 7/17/2017 Partial Inspection WINSTON DUNNING
Pre-Inspection 8/1/2017 Partial Inspection WINSTON DUNNING
Pre-Inspection 8/18/2017 Partial Inspection WINSTON DUNNING
Pre-Inspection 10/24/2017 Partial Inspection WINSTON DUNNING
Pre-Inspection 11/6/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 12/1/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 12/1/2017 Partial Inspection WINSTON DUNNING
Pre-Inspection 12/6/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 12/7/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 12/7/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 12/7/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 12/7/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 12/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/12/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/2/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 1/18/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 1/18/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 1/18/2018 Partial Inspection WINSTON DUNNING
Masonry Wall/Backfill 1/22/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 1/31/2018 Partial Inspection WINSTON DUNNING
METHANE-Barrier 1/31/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 1/31/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 2/21/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 2/21/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 2/21/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 3/14/2018 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 3/14/2018 Conditional Approval LESLIE TRUJILLO
METHANE-Subgrade 3/14/2018 Partial Approval LESLIE TRUJILLO
Pre-Inspection 3/19/2018 Partial Inspection WINSTON DUNNING
Deputy Shotcrete 3/21/2018 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 3/21/2018 Partial Approval WINSTON DUNNING
Deputy Methane Barrier 5/3/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 5/4/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 5/7/2018 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 5/8/2018 Conditional Approval WINSTON DUNNING
METHANE-Barrier 5/18/2018 Partial Inspection WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 6/1/2018 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 6/6/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 6/6/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 6/6/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 6/12/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 6/12/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 6/12/2018 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 6/29/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 6/29/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 6/29/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 8/8/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 8/8/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 8/8/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 8/8/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 8/17/2018 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 8/17/2018 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 8/28/2018 Partial Approval WINSTON DUNNING
Reinforced Concrete Frame 8/29/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 8/30/2018 Conditional Approval WINSTON DUNNING
Masonry Wall/Backfill 9/7/2018 Partial Approval WINSTON DUNNING
Green Building Rough 11/27/2018 Conditional Approval WINSTON DUNNING
METHANE-Rough 11/27/2018 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 11/27/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 11/27/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 11/28/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/7/2018 Conditional Approval WINSTON DUNNING
Special/Order Compliance 6/16/2020 Partial Inspection NICK DANERI
Special/Order Compliance 3/3/2021 Partial Inspection NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 3/15/2021 Partial Approval RAFAEL ESPINOZA
Floor/Roof Diaphrgm/Shear Wall 3/26/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 4/9/2021 Partial Approval NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/9/2021 Corrections Issued NICK DANERI
Floor/Roof Diaphrgm/Shear Wall 6/29/2021 Partial Approval KATY RAMIREZ
Insulation 7/13/2021 Partial Approval KATY RAMIREZ
Insulation 7/23/2021 Partial Approval EDWIN GREGORYONA
Green Building Rough 8/4/2021 Approved KATY RAMIREZ
METHANE-Rough 8/4/2021 Approved KATY RAMIREZ
Verify Sprinkler Sign Off 8/4/2021 Not Ready for Inspection KATY RAMIREZ
Wood Frame 8/4/2021 Partial Inspection KATY RAMIREZ
Wood Frame 8/5/2021 Partial Approval KATY RAMIREZ
Insulation 8/10/2021 Partial Approval KATY RAMIREZ
Verify Sprinkler Sign Off 8/10/2021 Not Ready for Inspection KATY RAMIREZ
Wood Frame 8/10/2021 Partial Approval KATY RAMIREZ
Insulation 8/13/2021 Partial Approval KATY RAMIREZ
Special/Order Compliance 8/24/2021 Partial Inspection KATY RAMIREZ
Drywall Nailing 9/3/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 9/15/2021 Partial Approval KATY RAMIREZ
Drywall Nailing 9/21/2021 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 9/27/2021 Partial Approval KATY RAMIREZ
Footing/Foundation/Slab 2/8/2022 Partial Approval KATY RAMIREZ
METHANE-Barrier 2/8/2022 Approved KATY RAMIREZ
METHANE-Subgrade 2/8/2022 Approved KATY RAMIREZ
Final 8/31/2022 Corrections Issued TED RIES
Footing/Foundation/Slab 8/31/2022 Not Ready for Inspection TED RIES
Green Building Final 8/31/2022 Not Ready for Inspection TED RIES
Reinforced Concrete Frame 8/31/2022 Approved TED RIES
Reinforced Masonry Frame 8/31/2022 Not Ready for Inspection TED RIES
SGSOV-Seismic Gas S/O Valve 8/31/2022 SGSOV Not Ready TED RIES
SUSMP-Std. Urban Storm Water 8/31/2022 Not Ready for Inspection TED RIES
Smoke Detectors 8/31/2022 Approved TED RIES
Verify Sprinkler Sign Off 8/31/2022 Approved TED RIES
Wood Frame 8/31/2022 Approved TED RIES
Pre-Inspection 3/7/2023 Partial Inspection GREGORY POMISH
Pre-Inspection 4/25/2023 Partial Inspection GREGORY POMISH
Final 7/6/2023 Not Ready for Inspection GREGORY POMISH
Footing/Foundation/Slab 7/6/2023 Approved GREGORY POMISH
Green Building Final 7/6/2023 Approved GREGORY POMISH
Reinforced Masonry Frame 7/6/2023 Approved GREGORY POMISH
SGSOV-Seismic Gas S/O Valve 7/6/2023 SGSOV Approved GREGORY POMISH
SUSMP-Std. Urban Storm Water 7/6/2023 Approved GREGORY POMISH
Final 7/10/2023 Partial Approval GREGORY POMISH