1338 N GORDON ST 1-44 90028

Certificate Information: 1338 N GORDON ST 1-44 90028

Application / Permit
15010-10000-02290
Plan Check / Job No.
B15LA08738
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
CONSTRUCT 4-STORY , APARTMENT BUILDING, TYPE VA, OVER 2 LEVELS OF SUBTERRANEAN PARKING, TYPE IA. 44 TOTAL UNITS WITH 4 RESTICTED, VERY LOW INCOME UNITS.
Permit Issued
Issued on 9/20/2016
Issuing Office
Valley
Current Status
CofO Corrected on 10/17/2019
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/24/2015 APPLICANT
Assigned to Plan Check Engineer 7/24/2015 EUGENE BARBEAU
Green Plans Picked Up 7/31/2015 APPLICANT
Corrections Issued 8/13/2015 EUGENE BARBEAU
Quality Review Completed 8/17/2015 JOHN VASQUEZ
Building Plans Picked Up 8/21/2015 APPLICANT
Disabled Access Plans Picked Up 8/21/2015 APPLICANT
Applicant returned to address corrections 10/14/2015 EUGENE BARBEAU
Applicant returned to address corrections 10/21/2015 EUGENE BARBEAU
Applicant returned to address corrections 12/4/2015 EUGENE BARBEAU
Applicant returned to address corrections 1/14/2016 EUGENE BARBEAU
Applicant returned to address corrections 3/21/2016 EUGENE BARBEAU
Applicant returned to address corrections 4/8/2016 EUGENE BARBEAU
Applicant returned to address corrections 7/27/2016 EUGENE BARBEAU
Applicant returned to address corrections 8/25/2016 EUGENE BARBEAU
Plan Check Approved 8/25/2016 EUGENE BARBEAU
Issued 9/20/2016 LADBS
TCO Issued (Expire Date: 12-01-2019) 6/4/2019 DAVID TSAU
CofO in Progress 8/15/2019 WINSTON DUNNING
CofO Issued-Status Void 8/15/2019 WINSTON DUNNING
Permit Finaled-Status Void 8/15/2019 WINSTON DUNNING
Re-Activate Permit 10/17/2019 DAVID TSAU
CofO Corrected 10/17/2019 WINSTON DUNNING
Permit Finaled 10/17/2019 WINSTON DUNNING

Permit Application Clearance Information

Address approval Cleared 9/2/2015 JAMES MORALEZ
Green Code Cleared 12/1/2015 AREN PILAVJIAN
DAS Clearance Cleared 12/9/2015 EUGENE BARBEAU
Hydrant and Access approval Cleared 12/9/2015 ROBERT DUFF
Fire Marshall Fire Life Safety Cleared 12/16/2015 SUSIE ADAMIAN
Eng Process Fee Ord 176,300 Cleared 3/15/2016 ARNULFO NUNO
Highway dedication Cleared 3/15/2016 ARNULFO NUNO
Permit Cleared 3/15/2016 SEVAK ISAKHAYAN
ZI Cleared 3/15/2016 KIT AWAKUNI
"Q" conditions Cleared 4/5/2016 ERIC CLAROS
Building over 3-story or 36-ft Cleared 4/22/2016 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/22/2016 CALOSHA APPROVED
Frnt yard landscape/Water mgmt Cleared 4/22/2016 ERIC CLAROS
Opn space landscape/Water mgmt Cleared 4/22/2016 ERIC CLAROS
ZI Cleared 4/22/2016 ERIC CLAROS
Project located in CRA area Cleared 5/17/2016 JIM URQUHART
Housing density bonus Cleared 5/19/2016 ALFREDA MASTERS
Sewer availability Cleared 6/7/2016 SHANNON CAMPBELL
Low Impact Development Cleared 8/16/2016 IDA MEISAMI-FARD
Roof/Waste drainage to street Cleared 8/16/2016 JACOB BIGLER
Stormwater Pollution Mitigatn Cleared 8/16/2016 IDA MEISAMI-FARD
Work Adjacent to Public Way Cleared 8/18/2016 DAVID PEREZ

Contact Information

Architect Boivin, Alan; Lic. No.: C9528 21066 COLINA DRIVE      TOPANGA, CA 90290
Contractor Owner-Builder       ,
Contractor Verdugo Company; Lic. No.: 707327-B 4116 WEST MAGNOLIA BOULEVARD   #203    BURBANK, CA 91505
Engineer Aquino, Wilson Otoniel; Lic. No.: C77255 720 W MILFORD ST      GLENDALE, CA 91203
Engineer Dejban, Masoud; Lic. No.: S2521 17200 VENTURA BLVD STE 213A      ENCINO, CA 91316
Engineer Varela, Gregorio; Lic. No.: C81201 111 S OAK AVE #4      PASADENA, CA 91107

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Steel/Welding 9/23/2016 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/13/2016 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/14/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/18/2016 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 11/3/2016 Conditional Approval BARRY SILLS
Deputy Steel/Welding 11/4/2016 Conditional Approval BARRY SILLS
Deputy Reinf. Concrete 11/15/2016 Approved SAKO AGHAZARIAN
Excavation/Setback/Form/Re-Bar 11/15/2016 Partial Approval SAKO AGHAZARIAN
Excavation/Setback/Form/Re-Bar 12/12/2016 Partial Approval BARRY SILLS
Deputy Reinf. Masonry 12/16/2016 Conditional Approval BARRY SILLS
Deputy Reinf. Masonry 12/20/2016 Conditional Approval BARRY SILLS
Excavation/Setback/Form/Re-Bar 12/20/2016 Partial Approval BARRY SILLS
Masonry Wall/Backfill 12/20/2016 Partial Approval BARRY SILLS
Masonry Wall/Backfill 12/22/2016 Not Ready for Inspection BARRY SILLS
Deputy Reinf. Masonry 12/27/2016 Conditional Approval BARRY SILLS
Reinforced Masonry Frame 12/27/2016 Partial Approval BARRY SILLS
Deputy Shotcrete 1/19/2017 Conditional Approval TED RIES
Deputy Shotcrete 1/20/2017 Approved SAKO AGHAZARIAN
Deputy Shotcrete 1/25/2017 Conditional Approval BARRY SILLS
Deputy Shotcrete 1/26/2017 Conditional Approval BARRY SILLS
Deputy Shotcrete 1/27/2017 Conditional Approval DAVID BURKHEAD
Green Building Rough 1/27/2017 Not Ready for Inspection MICKEY YAMASHITA
Reinforced Concrete Frame 1/27/2017 Partial Approval BARRY SILLS
Verify Sprinkler Sign Off 1/27/2017 Not Ready for Inspection BARRY SILLS
Deputy Shotcrete 1/30/2017 Conditional Approval BARRY SILLS
Deputy Reinf. Concrete 1/31/2017 Conditional Approval BARRY SILLS
Deputy Shotcrete 1/31/2017 Conditional Approval BARRY SILLS
Reinforced Concrete Frame 1/31/2017 Partial Approval BARRY SILLS
Verify Sprinkler Sign Off 1/31/2017 Not Ready for Inspection BARRY SILLS
Deputy Shotcrete 2/1/2017 Conditional Approval BARRY SILLS
Footing/Foundation/Slab 2/1/2017 Partial Approval BARRY SILLS
Deputy Shotcrete 2/2/2017 Conditional Approval BARRY SILLS
Excavation/Setback/Form/Re-Bar 3/29/2017 Partial Approval BARRY SILLS
Deputy Reinf. Concrete 3/30/2017 Conditional Approval BARRY SILLS
Excavation/Setback/Form/Re-Bar 3/30/2017 Partial Approval BARRY SILLS
Deputy Reinf. Concrete 4/20/2017 Conditional Approval BARRY SILLS
Excavation/Setback/Form/Re-Bar 4/25/2017 Partial Approval BARRY SILLS
Deputy Reinf. Concrete 4/26/2017 Conditional Approval BARRY SILLS
Deputy Reinf. Concrete 4/28/2017 Conditional Approval BARRY SILLS
Excavation/Setback/Form/Re-Bar 5/1/2017 Partial Approval BARRY SILLS
Deputy Reinf. Masonry 5/4/2017 Conditional Approval TED RIES
Deputy Reinf. Masonry 5/5/2017 Conditional Approval BARRY SILLS
Masonry Wall/Backfill 5/5/2017 Partial Approval BARRY SILLS
Deputy Reinf. Masonry 5/8/2017 Conditional Approval BARRY SILLS
Deputy Reinf. Masonry 5/9/2017 Conditional Approval BARRY SILLS
Masonry Wall/Backfill 5/9/2017 Partial Approval BARRY SILLS
Footing/Foundation/Slab 5/18/2017 Partial Approval TED RIES
Excavation/Setback/Form/Re-Bar 6/1/2017 Partial Approval BARRY SILLS
Excavation/Setback/Form/Re-Bar 6/15/2017 Partial Approval BARRY SILLS
Deputy Reinf. Concrete 6/19/2017 Conditional Approval TED RIES
Deputy Reinf. Masonry 6/22/2017 Conditional Approval TED RIES
Masonry Wall/Backfill 6/22/2017 Partial Approval TED RIES
Deputy Reinf. Concrete 7/6/2017 Conditional Approval BARRY SILLS
Excavation/Setback/Form/Re-Bar 7/6/2017 Partial Approval BARRY SILLS
Deputy Reinf. Concrete 7/7/2017 Conditional Approval BARRY SILLS
Deputy Drilled-In Anchors 7/14/2017 Conditional Approval BARRY SILLS
Deputy Wood Construction 7/21/2017 Conditional Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 7/21/2017 Partial Approval TED RIES
Verify Sprinkler Sign Off 7/21/2017 Not Ready for Inspection TED RIES
Wood Frame 7/21/2017 Not Ready for Inspection TED RIES
Deputy Reinf. Concrete 7/26/2017 Conditional Approval TED RIES
Deputy Steel/Welding 7/26/2017 Conditional Approval TED RIES
Excavation/Setback/Form/Re-Bar 7/26/2017 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 8/18/2017 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 9/18/2017 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 10/12/2017 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 2/9/2018 Partial Approval TED RIES
Deputy Wood Construction 2/12/2018 Conditional Approval TED RIES
Drywall Nailing 2/16/2018 Partial Approval JEFF BYTHEWAY
Interior/Exterior Lathing 2/28/2018 Partial Approval TED RIES
Insulation 4/11/2018 Partial Approval TED RIES
Light Gage Steel Frame 4/11/2018 Partial Approval TED RIES
Interior/Exterior Lathing 4/12/2018 Partial Approval TED RIES
Insulation 4/17/2018 Partial Approval TED RIES
Light Gage Steel Frame 4/17/2018 Partial Approval TED RIES
Drywall Nailing 4/20/2018 Partial Approval TED RIES
Insulation 4/24/2018 Partial Approval TED RIES
Light Gage Steel Frame 4/24/2018 Partial Approval TED RIES
Drywall Nailing 4/27/2018 Approved TED RIES
Drywall Nailing 5/1/2018 Partial Approval TED RIES
Insulation 5/7/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/7/2018 Partial Approval GREGORY POMISH
Deputy Wood Construction 5/8/2018 Approved JEFF BYTHEWAY
Drywall Nailing 5/17/2018 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 6/12/2018 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 6/25/2018 Partial Approval TED RIES
Interior/Exterior Lathing 6/25/2018 Partial Inspection TED RIES
Excavation/Setback/Form/Re-Bar 7/10/2018 Partial Approval TED RIES
Masonry Wall/Backfill 7/18/2018 Not Ready for Inspection TED RIES
Drywall Nailing 7/20/2018 Partial Approval TED RIES
Masonry Wall/Backfill 7/20/2018 Partial Approval TED RIES
Interior/Exterior Lathing 7/31/2018 Approved TED RIES
Green Building Rough 9/14/2018 Approved TED RIES
Insulation 9/14/2018 Approved TED RIES
Verify Sprinkler Sign Off 9/14/2018 Approved TED RIES
Wood Frame 9/14/2018 Approved TED RIES
Drywall Nailing 9/25/2018 Partial Approval JEFF BYTHEWAY
Final 5/2/2019 Partial Inspection TED RIES
Footing/Foundation/Slab 5/2/2019 Approved TED RIES
Green Building Final 5/2/2019 Approved TED RIES
Reinforced Concrete Frame 5/2/2019 Approved TED RIES
SGSOV-Seismic Gas S/O Valve 5/2/2019 SGSOV Approved TED RIES
SUSMP-Std. Urban Storm Water 5/2/2019 Partial Inspection TED RIES
Smoke Detectors 5/2/2019 Approved TED RIES
Final 5/23/2019 Conditional Approval TED RIES
SUSMP-Std. Urban Storm Water 5/23/2019 Approved TED RIES