Special/Order Compliance
|
6/12/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Pre-Inspection
|
9/19/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
10/25/2019
|
Conditional Approval
|
RICKEY JACKSON
|
|
Deputy Reinf. Concrete
|
10/28/2019
|
Conditional Approval
|
ROBERT COLE
|
|
Footing/Foundation/Slab
|
10/28/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Pre-Inspection
|
10/28/2019
|
Partial Inspection
|
ROBERT COLE
|
|
Deputy Reinf. Concrete
|
10/29/2019
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
10/30/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
10/30/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
10/31/2019
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
11/1/2019
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/4/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
11/5/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
11/5/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
11/7/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
11/8/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
11/13/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
11/13/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/14/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
11/14/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
11/15/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
11/19/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
11/19/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
11/22/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
11/25/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/27/2019
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
12/2/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
12/2/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Reinforced Masonry Frame
|
12/2/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
12/5/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
12/5/2019
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
12/6/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
12/6/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
12/17/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
12/17/2019
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
12/18/2019
|
Approved
|
DANNY RODRIGUEZ
|
|
Excavation/Setback/Form/Re-Bar
|
12/18/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
12/18/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
12/18/2019
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
12/18/2019
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
12/19/2019
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Reinf. Concrete
|
12/20/2019
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
1/6/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
1/6/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
1/6/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
1/6/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Deputy Reinf. Concrete
|
1/9/2020
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/22/2020
|
Partial Approval
|
JAMES STEPHENS
|
|
Deputy Steel/Welding
|
2/4/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Wood Construction
|
2/11/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/11/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/20/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Steel/Welding
|
2/21/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Deputy Steel/Welding
|
2/24/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/26/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Deputy Steel/Welding
|
2/27/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/2/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Deputy Wood Construction
|
3/3/2020
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Deputy Drilled-In Anchors
|
3/6/2020
|
Conditional Approval
|
JAMES STEPHENS
|
|
Deputy Drilled-In Anchors
|
3/9/2020
|
Conditional Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/12/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/20/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/23/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/31/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/1/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wall Anchors
|
4/15/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/20/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Drywall Nailing
|
4/22/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
4/27/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
4/28/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/5/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
5/5/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/5/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/6/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/6/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/7/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/7/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
5/7/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/7/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/8/2020
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/8/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/12/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/12/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/13/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/13/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
5/14/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/14/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
5/14/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/14/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/18/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/18/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
5/21/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/21/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2020
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
5/22/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/26/2020
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Insulation
|
5/26/2020
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/27/2020
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Drywall Nailing
|
5/28/2020
|
Partial Approval
|
ROBERT COLE
|
|
Drywall Nailing
|
5/29/2020
|
Partial Approval
|
JOE VELASQUEZ
|
|
Insulation
|
5/29/2020
|
Not Ready for Inspection
|
JOE VELASQUEZ
|
|
Drywall Nailing
|
6/2/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/2/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/2/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
6/3/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/4/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/4/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/5/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
6/5/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/5/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Structural Steel Frame
|
6/5/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
6/5/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
6/5/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/8/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/8/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/8/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/9/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/9/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/10/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/10/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/11/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Structural Steel Frame
|
6/11/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/12/2020
|
Partial Approval
|
JOHN KITCKO
|
|
Insulation
|
6/12/2020
|
Partial Approval
|
JOHN KITCKO
|
|
Drywall Nailing
|
6/15/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
6/15/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/16/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/16/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/16/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/17/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/17/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/17/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/18/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/18/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
6/18/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/19/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
6/19/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/22/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/22/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/22/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/23/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/23/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/24/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/24/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/26/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
6/26/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
6/29/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/1/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/2/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
7/7/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/7/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/7/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
7/7/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
7/7/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/10/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/10/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
7/10/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/14/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/14/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
7/14/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/16/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
7/16/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/16/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/16/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
7/16/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/17/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/17/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Interior/Exterior Lathing
|
7/17/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/20/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
7/20/2020
|
Approved
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/20/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
7/20/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/21/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/21/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/22/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/22/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/23/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/23/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
7/23/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
7/23/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/24/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
7/24/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
7/27/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/27/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
7/27/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
7/27/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
7/27/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/28/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Interior/Exterior Lathing
|
7/28/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
7/28/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/29/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/29/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
7/31/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
7/31/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/3/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/4/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Interior/Exterior Lathing
|
8/4/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
8/4/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/5/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/7/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Interior/Exterior Lathing
|
8/7/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/10/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Light Gage Steel Frame
|
8/12/2020
|
Partial Approval
|
JEFFREY DURAN
|
|
Drywall Nailing
|
8/13/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/14/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Insulation
|
8/14/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/19/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Interior/Exterior Lathing
|
8/19/2020
|
Approved
|
HAMID PISHEHVAR
|
|
Drywall Nailing
|
8/24/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Interior/Exterior Lathing
|
8/24/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/25/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
8/31/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Drywall Nailing
|
9/2/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Interior/Exterior Lathing
|
9/8/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
9/16/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
10/2/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
10/27/2020
|
Corrections Issued
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
10/28/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
T-Bar Ceiling
|
11/5/2020
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
11/6/2020
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
11/9/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
11/12/2020
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Special/Order Compliance
|
1/7/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Final
|
1/21/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
1/21/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Final
|
1/21/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Rough
|
1/21/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
1/21/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
1/21/2021
|
SGSOV Not Ready
|
DANNY RODRIGUEZ
|
|
SUSMP-Std. Urban Storm Water
|
1/21/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Smoke Detectors
|
1/21/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
1/21/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
1/21/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Final
|
1/25/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
1/25/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Green Building Final
|
1/25/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
1/25/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
1/25/2021
|
SGSOV Not Ready
|
DANNY RODRIGUEZ
|
|
SUSMP-Std. Urban Storm Water
|
1/25/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Smoke Detectors
|
1/25/2021
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
1/25/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
1/25/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Final
|
1/26/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
1/26/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Masonry Wall/Backfill
|
1/26/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
1/26/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
1/26/2021
|
SGSOV Not Ready
|
DANNY RODRIGUEZ
|
|
SUSMP-Std. Urban Storm Water
|
1/26/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Smoke Detectors
|
1/26/2021
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
1/26/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
1/26/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Final
|
2/2/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Footing/Foundation/Slab
|
2/2/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
2/2/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
2/2/2021
|
SGSOV Not Ready
|
DANNY RODRIGUEZ
|
|
SUSMP-Std. Urban Storm Water
|
2/2/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Smoke Detectors
|
2/2/2021
|
Partial Approval
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
2/2/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
2/2/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Final
|
2/10/2021
|
Partial Inspection
|
DANNY RODRIGUEZ
|
|
Reinforced Concrete Frame
|
2/10/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
SGSOV-Seismic Gas S/O Valve
|
2/10/2021
|
SGSOV Approved
|
DANNY RODRIGUEZ
|
|
SUSMP-Std. Urban Storm Water
|
2/10/2021
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
|
Smoke Detectors
|
2/10/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
Verify Sprinkler Sign Off
|
2/10/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
Wood Frame
|
2/10/2021
|
Approved
|
DANNY RODRIGUEZ
|
|
Final
|
2/23/2021
|
OK to Issue CofO
|
DANNY RODRIGUEZ
|
|
SUSMP-Std. Urban Storm Water
|
2/23/2021
|
Approved
|
DANNY RODRIGUEZ
|