Excavation/Setback/Form/Re-Bar
|
10/16/2018
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Excavation/Setback/Form/Re-Bar
|
4/16/2020
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
SWPPP-Const. Storm Water
|
4/16/2020
|
Completed
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
10/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
10/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
10/27/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
11/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
11/24/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
12/2/2020
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
12/2/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
12/3/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/7/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/8/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/9/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/10/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
12/10/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/11/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
12/14/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
12/15/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
12/15/2020
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
12/15/2020
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
12/16/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
12/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
12/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
12/17/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
12/17/2020
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
12/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
12/18/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
12/22/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
12/22/2020
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
12/23/2020
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
1/4/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/8/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/11/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
1/11/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/12/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/25/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/26/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/26/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
1/27/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/28/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
1/29/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/4/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
2/9/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
2/12/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
2/12/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Piling/Pier/Caisson
|
2/12/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
2/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
2/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Shotcrete
|
2/17/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
2/17/2021
|
Off-Hour Fees Due
|
|
|
Deputy Reinf. Concrete
|
3/3/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/4/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/5/2021
|
Not Ready for Inspection
|
RONALD PACHECO
|
|
Pre-Inspection
|
3/9/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/12/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/17/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/19/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
3/19/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
3/22/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
3/23/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/25/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
3/25/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
3/25/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
3/30/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
3/31/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
3/31/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/14/2021
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/23/2021
|
Conditional Approval
|
MARK FERRARI
|
|
Reinforced Concrete Frame
|
4/23/2021
|
Corrections Issued
|
MARK FERRARI
|
|
Reinforced Concrete Frame
|
4/26/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/27/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
5/6/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
5/14/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/14/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
5/17/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
5/17/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
5/17/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
5/18/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/19/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
5/20/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
5/21/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
5/21/2021
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/25/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
5/25/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
6/4/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/7/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
6/7/2021
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
6/8/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/8/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
6/15/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wall Anchors
|
6/15/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
6/16/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
6/17/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
6/22/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/23/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
7/8/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
7/9/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
7/12/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
7/13/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/13/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/13/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/14/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
7/14/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/19/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Deputy Reinf. Masonry
|
7/21/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Masonry Wall/Backfill
|
7/21/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
|
Masonry Wall/Backfill
|
7/22/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Reinf. Masonry
|
7/23/2021
|
Conditional Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
8/3/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/4/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/5/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
8/5/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/5/2021
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
8/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/11/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Wood Construction
|
8/23/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/24/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
9/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/10/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/24/2021
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Wood Construction
|
9/29/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/6/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
10/6/2021
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/21/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
10/28/2021
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
10/28/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
11/2/2021
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
11/4/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
11/4/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
11/12/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
11/19/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
11/24/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
11/30/2021
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
11/30/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
12/6/2021
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
1/5/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
1/31/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
2/9/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
2/14/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
2/18/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
2/25/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
3/4/2022
|
Approved
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/7/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/7/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
3/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
3/10/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
3/11/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Masonry
|
3/11/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
3/11/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
3/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
3/15/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
3/15/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
3/16/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
3/16/2022
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/16/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
3/16/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Masonry Frame
|
3/16/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
3/23/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
3/30/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
4/5/2022
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
4/7/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
4/11/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
4/14/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Insulation
|
4/14/2022
|
Approved
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
4/25/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/11/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
1/12/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
1/13/2023
|
Approved
|
GREGORY POMISH
|
|
Final
|
9/26/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
9/26/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
9/26/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
9/26/2023
|
SGSOV Not Ready
|
RAFAEL ESPINOZA
|
|
Smoke Detectors
|
9/26/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
9/26/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
9/26/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Final
|
10/11/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Final
|
10/11/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
10/11/2023
|
Approved
|
RAFAEL ESPINOZA
|
|
SGSOV-Seismic Gas S/O Valve
|
10/11/2023
|
SGSOV Approved
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
10/11/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
4/2/2024
|
Partial Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
7/11/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
8/1/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
9/24/2024
|
Approved
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
10/28/2024
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
11/18/2024
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Final
|
3/11/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
3/11/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
3/19/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
3/27/2025
|
Approved
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
7/25/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Final
|
7/25/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
9/10/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
9/16/2025
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Special/Order Compliance
|
3/3/2026
|
Partial Approval
|
RONALD JIMENEZ
|