210 S OCEAN FRONT WALK 90291

Certificate Information: 210 S OCEAN FRONT WALK 90291

Application / Permit
15010-10000-01036
Plan Check / Job No.
B15LA03758
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(23) Miscellaneous Bldg/Structure
Work Description
PROPOSED 1-STORY, (10) STALL, TYPE VB RESTROOM BUILDING
Permit Issued
Issued on 3/13/2018
Issuing Office
Metro
Current Status
CofO Issued on 7/16/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/17/2015 APPLICANT
Disabled Access Plans Picked Up 3/25/2015 APPLICANT
Assigned to Plan Check Engineer 3/27/2015 JOHN VASQUEZ
Corrections Issued 4/3/2015 JOHN VASQUEZ
Green Plans Picked Up 4/7/2015 APPLICANT
Quality Review Completed 4/9/2015 CHARLES CHANG
Building Plans Picked Up 4/15/2015 APPLICANT
Applicant returned to address corrections 11/9/2015 JOHN VASQUEZ
Plan Check Approved 12/10/2015 JOHN VASQUEZ
Issued 3/13/2018 LADBS
CofO in Progress 7/13/2020 JEFF BYTHEWAY
No Progress 7/15/2020 HENRY BAGHDASSARIAN
CofO in Progress 7/16/2020 HENRY BAGHDASSARIAN
Permit Finaled 7/16/2020 HENRY BAGHDASSARIAN
CofO Issued 7/16/2020 HENRY BAGHDASSARIAN
Permit Finaled 7/16/2020 HENRY BAGHDASSARIAN

Permit Application Clearance Information

DAS Clearance Cleared 7/31/2015 SHINE LIN
Miscellaneous Cleared 8/27/2015 CASSANDRA ZWEEP
Address approval Cleared 8/28/2015 ADRIAN HERNANDEZ
City owned building/parcel Cleared 8/28/2015 HAROOT AVANESIAN
Highway dedication Cleared 8/28/2015 ADRIAN HERNANDEZ
Permit Cleared 8/28/2015 ADRIAN HERNANDEZ
Sewer availability Cleared 8/28/2015 ADRIAN HERNANDEZ
Specific Plan Cleared 9/2/2015 SOCORRO YUMUL
Abandoned oil well Cleared 9/24/2015 ROBERT DUFF
Abandoned oil well approval Cleared 9/24/2015 ROBERT DUFF
Eng Process Fee Ord 176,300 Cleared 9/24/2015 SHANNON CAMPBELL
Hydrant and Access approval Cleared 9/24/2015 ROBERT DUFF
Green Code Cleared 10/7/2015 RUSSELL KELLY
Low Impact Development Cleared 10/7/2015 IDA MEISAMI-FARD
Roof/Waste drainage to street Cleared 10/7/2015 ARNULFO NUNO
Specific Plan Cleared 10/7/2015 COLLINS ALLAN
Stormwater Pollution Mitigatn Cleared 10/7/2015 IDA MEISAMI-FARD
Flood clearance Cleared 10/8/2015 ROMANO GALASSI
Coastal Zone Cleared 11/9/2015 RALPH AVILA

Contact Information

Architect Lomelin, Jorge Robert; Lic. No.: C23333 1536 N PASS & COVINA RD      VALINDA, CA 91744
Contractor Owner-Builder       ,
Engineer Razepoor, Nasser; Lic. No.: S3594 3507 SEAGLEN DR      RANCHO PALOS VERDES, CA 90275

Inspector Information

PAUL DAVIDSON, (310) 914-3914 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/20/2018 Approved JASON BORUTA
Pre-Inspection 8/27/2019 Approved JASON BORUTA
Deputy Reinf. Concrete 10/31/2019 Conditional Approval JASON BORUTA
Deputy Reinf. Concrete 11/1/2019 Conditional Approval JASON BORUTA
Deputy Reinf. Concrete 1/9/2020 Conditional Approval JASON BORUTA
Deputy Reinf. Concrete 1/10/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 1/15/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 1/22/2020 Approved TED RIES
Deputy Reinf. Masonry 1/23/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 1/24/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 1/31/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/3/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/4/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/5/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/6/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/7/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/10/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/11/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/12/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/13/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/14/2020 Approved TED RIES
Deputy Reinf. Masonry 2/19/2020 Approved NICK LAROCCA
Deputy Reinf. Masonry 2/20/2020 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 2/21/2020 Approved JEFF BYTHEWAY
Reinforced Masonry Frame 2/26/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/19/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/20/2020 Approved JEFF BYTHEWAY
Green Building Rough 3/24/2020 Not Ready for Inspection JEFF BYTHEWAY
METHANE-Rough 3/24/2020 Partial Approval JEFF BYTHEWAY
Structural Steel Frame 3/24/2020 Partial Approval JEFF BYTHEWAY
Verify Sprinkler Sign Off 3/24/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/26/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/27/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 3/31/2020 Approved JEFF BYTHEWAY
Green Building Rough 3/31/2020 Approved JEFF BYTHEWAY
METHANE-Rough 3/31/2020 Approved JEFF BYTHEWAY
Structural Steel Frame 3/31/2020 Approved JEFF BYTHEWAY
Light Gage Steel Frame 4/3/2020 Approved JEFF BYTHEWAY
Deputy Steel/Welding 4/10/2020 Approved JEFF BYTHEWAY
Floor/Roof Diaphrgm/Shear Wall 4/20/2020 Partial Approval DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 4/21/2020 Approved DERRICK SPENCER
Footing/Foundation/Slab 6/1/2020 Approved JEFF BYTHEWAY
METHANE-Barrier 6/1/2020 Approved JEFF BYTHEWAY
METHANE-Subgrade 6/1/2020 Approved JEFF BYTHEWAY
SUSMP-Std. Urban Storm Water 6/1/2020 Approved JEFF BYTHEWAY
Smoke Detectors 6/1/2020 Approved JEFF BYTHEWAY
Wood Frame 6/1/2020 Approved JEFF BYTHEWAY
SGSOV-Seismic Gas S/O Valve 6/2/2020 SGSOV Not Ready JEFF BYTHEWAY
Final 6/4/2020 Not Ready for Inspection JEFF BYTHEWAY
Green Building Final 6/4/2020 Not Ready for Inspection JEFF BYTHEWAY
SGSOV-Seismic Gas S/O Valve 6/4/2020 SGSOV Not Ready JEFF BYTHEWAY
Final 7/2/2020 Conditional Approval JEFF BYTHEWAY
Green Building Final 7/2/2020 Approved JEFF BYTHEWAY
SGSOV-Seismic Gas S/O Valve 7/2/2020 SGSOV No Gas JEFF BYTHEWAY