Pre-Inspection
|
8/11/2017
|
Partial Inspection
|
GREGORY POMISH
|
Pre-Inspection
|
5/23/2018
|
Partial Inspection
|
GREGORY POMISH
|
Pre-Inspection
|
11/7/2019
|
Partial Inspection
|
LARRY ARNICK
|
Deputy Reinf. Concrete
|
1/31/2020
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Reinf. Concrete
|
2/3/2020
|
Conditional Approval
|
LARRY ARNICK
|
Green Building Rough
|
7/23/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
7/23/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
7/23/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
7/24/2020
|
Partial Approval
|
LARRY ARNICK
|
Green Building Rough
|
7/30/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
7/30/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
7/30/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
7/30/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
8/12/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
8/12/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
8/12/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
8/12/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
8/18/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
8/18/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
8/18/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
8/18/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
8/25/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
8/25/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
8/25/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
8/25/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
9/1/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
9/1/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
9/1/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
9/1/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
9/3/2020
|
Partial Approval
|
LARRY ARNICK
|
METHANE-Barrier
|
9/3/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Subgrade
|
9/3/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
9/8/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
9/8/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
9/8/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
9/8/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
9/14/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
9/14/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
9/14/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
9/14/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
9/22/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
9/22/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
9/22/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
9/22/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
9/28/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
9/28/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
9/28/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
9/28/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
9/30/2020
|
Partial Approval
|
LARRY ARNICK
|
Green Building Rough
|
10/2/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
10/2/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
10/2/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
10/2/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
10/5/2020
|
Partial Approval
|
LARRY ARNICK
|
METHANE-Barrier
|
10/5/2020
|
Conditional Approval
|
LARRY ARNICK
|
METHANE-Subgrade
|
10/5/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
10/8/2020
|
Partial Approval
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
10/14/2020
|
Partial Approval
|
NICK DANERI
|
Green Building Rough
|
10/14/2020
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Barrier
|
10/14/2020
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Rough
|
10/14/2020
|
Not Ready for Inspection
|
NICK DANERI
|
METHANE-Subgrade
|
10/14/2020
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
10/14/2020
|
Partial Approval
|
NICK DANERI
|
Verify Sprinkler Sign Off
|
10/14/2020
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Masonry Frame
|
10/16/2020
|
Partial Approval
|
DAVID BURKHEAD
|
Green Building Rough
|
10/28/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
10/28/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
10/28/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
10/28/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
11/5/2020
|
Partial Approval
|
LARRY ARNICK
|
METHANE-Barrier
|
11/5/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Subgrade
|
11/5/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
11/6/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
11/6/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Masonry Wall/Backfill
|
11/6/2020
|
Partial Approval
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
11/6/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
11/6/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
11/19/2020
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
METHANE-Rough
|
11/19/2020
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
11/19/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
Verify Sprinkler Sign Off
|
11/19/2020
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Footing/Foundation/Slab
|
11/20/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
METHANE-Barrier
|
11/20/2020
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
METHANE-Subgrade
|
11/20/2020
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Masonry Wall/Backfill
|
11/20/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
Green Building Rough
|
12/7/2020
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
METHANE-Rough
|
12/7/2020
|
Partial Inspection
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
12/7/2020
|
Partial Approval
|
EDWIN GREGORYONA
|
Verify Sprinkler Sign Off
|
12/7/2020
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Green Building Rough
|
12/10/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
12/10/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
12/10/2020
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
12/10/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
12/18/2020
|
Partial Approval
|
LARRY ARNICK
|
Green Building Rough
|
12/21/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
12/21/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
12/21/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
12/21/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
12/22/2020
|
Partial Approval
|
LARRY ARNICK
|
METHANE-Barrier
|
12/22/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Subgrade
|
12/22/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Masonry Frame
|
12/23/2020
|
Partial Approval
|
LARRY ARNICK
|
Green Building Rough
|
1/4/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
METHANE-Rough
|
1/4/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
Reinforced Concrete Frame
|
1/4/2021
|
Partial Approval
|
DAVID BURKHEAD
|
Verify Sprinkler Sign Off
|
1/4/2021
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
Footing/Foundation/Slab
|
1/5/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Barrier
|
1/5/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Subgrade
|
1/5/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
Green Building Rough
|
1/7/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
1/7/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
1/7/2021
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
1/7/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
1/13/2021
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
1/14/2021
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
1/15/2021
|
Conditional Approval
|
LARRY ARNICK
|
Green Building Rough
|
1/15/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
1/15/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
1/15/2021
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
1/15/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
1/19/2021
|
Conditional Approval
|
LARRY ARNICK
|
Deputy Drilled-In Anchors
|
1/20/2021
|
Conditional Approval
|
LARRY ARNICK
|
Green Building Rough
|
1/28/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Rough
|
1/28/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
Reinforced Concrete Frame
|
1/28/2021
|
Partial Approval
|
LARRY ARNICK
|
Verify Sprinkler Sign Off
|
1/28/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
Footing/Foundation/Slab
|
1/29/2021
|
Partial Approval
|
LARRY ARNICK
|
METHANE-Barrier
|
1/29/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
METHANE-Subgrade
|
1/29/2021
|
Not Ready for Inspection
|
LARRY ARNICK
|
Deputy Reinf. Concrete
|
2/3/2021
|
Conditional Approval
|
LARRY ARNICK
|
Light Gage Steel Frame
|
2/11/2021
|
Partial Approval
|
TIMOTHY BUXTON
|
Green Building Rough
|
2/23/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
2/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
METHANE-Rough
|
2/23/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
2/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Verify Sprinkler Sign Off
|
2/23/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Green Building Rough
|
2/26/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
METHANE-Rough
|
2/26/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
2/26/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Verify Sprinkler Sign Off
|
2/26/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Reinforced Masonry Frame
|
3/1/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Green Building Rough
|
3/9/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
METHANE-Rough
|
3/9/2021
|
Approved
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
3/9/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Verify Sprinkler Sign Off
|
3/9/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Green Building Rough
|
3/12/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
3/12/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Verify Sprinkler Sign Off
|
3/12/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Wall Anchors
|
3/18/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
4/5/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Footing/Foundation/Slab
|
4/12/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Green Building Rough
|
4/12/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
METHANE-Barrier
|
4/12/2021
|
Approved
|
EDWIN GREGORYONA
|
METHANE-Subgrade
|
4/12/2021
|
Approved
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
4/12/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Verify Sprinkler Sign Off
|
4/12/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Green Building Rough
|
4/21/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
4/21/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Verify Sprinkler Sign Off
|
4/21/2021
|
Approved
|
EDWIN GREGORYONA
|
Drywall Nailing
|
4/23/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
4/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
5/14/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Reinforced Masonry Frame
|
5/20/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
5/24/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Green Building Rough
|
5/26/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
5/26/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Structural Steel Frame
|
5/26/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Drywall Nailing
|
6/7/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
6/7/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
6/11/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
6/11/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Masonry Wall/Backfill
|
6/17/2021
|
Partial Approval
|
JONATHAN QUACH
|
Reinforced Masonry Frame
|
6/17/2021
|
Partial Approval
|
JONATHAN QUACH
|
Excavation/Setback/Form/Re-Bar
|
6/24/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Green Building Rough
|
6/24/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Reinforced Concrete Frame
|
6/24/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Drywall Nailing
|
6/30/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
6/30/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Structural Steel Frame
|
7/6/2021
|
Partial Approval
|
JONATHAN QUACH
|
Drywall Nailing
|
7/9/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
Light Gage Steel Frame
|
7/9/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
Drywall Nailing
|
7/20/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
7/20/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
7/23/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Excavation/Setback/Form/Re-Bar
|
7/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
7/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
7/30/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
Light Gage Steel Frame
|
7/30/2021
|
Not Ready for Inspection
|
JONATHAN QUACH
|
Light Gage Steel Frame
|
8/2/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Insulation
|
8/5/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
8/5/2021
|
Partial Inspection
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
8/18/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
8/24/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
8/24/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
9/1/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
9/7/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
9/7/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/8/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/9/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Drilled-In Anchors
|
9/10/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Reinf. Concrete
|
9/10/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/10/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Drilled-In Anchors
|
9/13/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Reinf. Concrete
|
9/13/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/13/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
9/13/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Drilled-In Anchors
|
9/14/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Reinf. Concrete
|
9/14/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/14/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Drilled-In Anchors
|
9/15/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Reinf. Concrete
|
9/15/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/15/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/16/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
9/16/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
9/16/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/17/2021
|
Conditional Approval
|
JONATHAN QUACH
|
Deputy Steel/Welding
|
9/20/2021
|
Conditional Approval
|
JONATHAN QUACH
|
Deputy Steel/Welding
|
9/21/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/22/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
9/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
9/23/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/24/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/27/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
9/27/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/28/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Steel/Welding
|
9/29/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
10/4/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
10/4/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Interior/Exterior Lathing
|
10/7/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
10/12/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Drilled-In Anchors
|
10/14/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Drilled-In Anchors
|
10/15/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Drilled-In Anchors
|
10/18/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Drilled-In Anchors
|
10/19/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
10/19/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
10/19/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Deputy Drilled-In Anchors
|
10/20/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
10/25/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
10/29/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
10/29/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Drywall Nailing
|
11/2/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Light Gage Steel Frame
|
11/2/2021
|
Partial Approval
|
EDWIN GREGORYONA
|
Interior/Exterior Lathing
|
11/30/2021
|
Partial Approval
|
JONATHAN QUACH
|
Light Gage Steel Frame
|
1/10/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
Special/Order Compliance
|
6/5/2023
|
Approved
|
EDWIN GREGORYONA
|
Special/Order Compliance
|
11/21/2023
|
Approved
|
EDWIN GREGORYONA
|
Special/Order Compliance
|
5/29/2024
|
Approved
|
EDWIN GREGORYONA
|
Special/Order Compliance
|
11/7/2024
|
Partial Inspection
|
CHRISTOPHER BLACKWOOD
|
Special/Order Compliance
|
11/14/2024
|
Corrections Issued
|
EDWIN GREGORYONA
|