Pre-Inspection
|
2/2/2016
|
Partial Inspection
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/4/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/5/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
2/8/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/9/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
2/9/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/10/2016
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Steel/Welding
|
2/10/2016
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Drilled-In Anchors
|
2/11/2016
|
Approved
|
TIMOTHY LYNN
|
Deputy Steel/Welding
|
2/11/2016
|
Approved
|
TIMOTHY LYNN
|
Deputy Drilled-In Anchors
|
2/12/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
2/12/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/19/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/24/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
2/24/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/25/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
2/25/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
2/25/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/26/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
2/29/2016
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Reinf. Concrete
|
3/1/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/2/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
3/2/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/3/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/4/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
3/4/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/10/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
3/11/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/14/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
3/16/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/17/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/18/2016
|
Approved
|
TIMOTHY LYNN
|
Deputy Reinf. Concrete
|
3/21/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/22/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/23/2016
|
Approved
|
TIMOTHY LYNN
|
Deputy Drilled-In Anchors
|
3/23/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/24/2016
|
Approved
|
TIMOTHY LYNN
|
Deputy Drilled-In Anchors
|
3/24/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/25/2016
|
Approved
|
TIMOTHY LYNN
|
Deputy Drilled-In Anchors
|
4/5/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/8/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/8/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/11/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/11/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/12/2016
|
No Access for Inspection
|
TIMOTHY LYNN
|
Deputy Steel/Welding
|
4/12/2016
|
No Access for Inspection
|
TIMOTHY LYNN
|
Deputy Reinf. Concrete
|
4/13/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/13/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
4/13/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/25/2016
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
4/25/2016
|
Partial Inspection
|
NICK DANERI
|
METHANE-Rough
|
4/25/2016
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
4/25/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
4/27/2016
|
Approved
|
TIMOTHY LYNN
|
Deputy Steel/Welding
|
4/28/2016
|
No Access for Inspection
|
TIMOTHY LYNN
|
Deputy Steel/Welding
|
4/29/2016
|
Conditional Approval
|
DANIEL COLLINS
|
Deputy Steel/Welding
|
5/2/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
5/2/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/4/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
5/9/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
5/10/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
5/11/2016
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
5/11/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
5/20/2016
|
Approved
|
KATY RAMIREZ
|
Footing/Foundation/Slab
|
5/25/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/27/2016
|
Conditional Approval
|
DANIEL COLLINS
|
Footing/Foundation/Slab
|
6/13/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
6/20/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
6/21/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
6/22/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
6/23/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
6/24/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
6/27/2016
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
7/11/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
7/14/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/18/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
8/16/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
8/25/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Footing/Foundation/Slab
|
8/30/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
9/28/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/30/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
10/5/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
10/5/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/7/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/13/2016
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
10/14/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/17/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
10/17/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/18/2016
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
10/27/2016
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
11/8/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
12/6/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
12/14/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
12/20/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/21/2016
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/18/2017
|
Conditional Approval
|
NICK DANERI
|
METHANE-Rough
|
1/18/2017
|
Not Ready for Inspection
|
NICK DANERI
|
Reinforced Concrete Frame
|
1/18/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/19/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/26/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
1/26/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
1/27/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
1/27/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
2/2/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/6/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
2/6/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
2/6/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/9/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
2/9/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/10/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/14/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
2/14/2017
|
Partial Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
2/22/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/28/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
3/3/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
3/8/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/13/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
3/23/2017
|
Partial Approval
|
WINSTON DUNNING
|
Deputy Other (see comments)
|
3/24/2017
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
3/24/2017
|
Conditional Approval
|
WINSTON DUNNING
|
Excavation/Setback/Form/Re-Bar
|
3/30/2017
|
Partial Inspection
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
4/3/2017
|
Partial Approval
|
JAMES POWERS
|
Excavation/Setback/Form/Re-Bar
|
4/7/2017
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/12/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Steel/Welding
|
4/12/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
4/13/2017
|
Partial Approval
|
LESLIE TRUJILLO
|
Excavation/Setback/Form/Re-Bar
|
4/20/2017
|
Partial Approval
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
4/20/2017
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
4/25/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Floor/Roof Diaphrgm/Shear Wall
|
5/1/2017
|
Partial Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
5/2/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
5/11/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
5/11/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/11/2017
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
5/16/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
5/19/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/19/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
5/25/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/2/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/7/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/14/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
6/15/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/15/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
6/19/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
6/19/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
6/20/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
6/21/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/26/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
6/27/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
6/27/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
6/28/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
6/28/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
6/29/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
6/30/2017
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
6/30/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
7/3/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
7/3/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
7/6/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
7/6/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
7/17/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
7/19/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/19/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
7/27/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/27/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
7/28/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/28/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
8/1/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
8/8/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/8/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
8/10/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/10/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
8/11/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
8/15/2017
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
8/16/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Other (see comments)
|
8/17/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/17/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
8/18/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
8/22/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/22/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/23/2017
|
Conditional Approval
|
WINSTON DUNNING
|
Deputy Drilled-In Anchors
|
8/25/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
8/25/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
8/28/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
8/28/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/31/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/1/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/7/2017
|
Conditional Approval
|
NICK DANERI
|
Footing/Foundation/Slab
|
9/7/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/8/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
9/8/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/8/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
9/11/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/11/2017
|
Conditional Approval
|
NICK DANERI
|
Special/Order Compliance
|
9/12/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/18/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
9/21/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
9/21/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
9/27/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
9/27/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/4/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/16/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
10/16/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
10/16/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
10/19/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/20/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/23/2017
|
Partial Approval
|
JAMES POWERS
|
Deputy Reinf. Concrete
|
10/24/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
10/26/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
10/30/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
11/6/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/6/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
11/14/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/14/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
11/21/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
11/27/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
11/27/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
11/28/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
12/1/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/1/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
12/1/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
12/8/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/8/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
12/8/2017
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/11/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
12/11/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
12/12/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/12/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/13/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
12/13/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
12/15/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/15/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/19/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Other (see comments)
|
12/19/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
12/20/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Other (see comments)
|
12/20/2017
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
12/21/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
12/22/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Other (see comments)
|
12/22/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Reinf. Concrete
|
12/27/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
12/28/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
12/29/2017
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
12/29/2017
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
1/4/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
1/5/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/5/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
1/8/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/8/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/9/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
1/9/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
1/17/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/17/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Steel/Welding
|
1/17/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/18/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
1/19/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/19/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/22/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
1/23/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
1/23/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
1/24/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
1/26/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
1/26/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
2/2/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Reinf. Concrete
|
2/2/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Deputy Drilled-In Anchors
|
2/5/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
Excavation/Setback/Form/Re-Bar
|
2/7/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/12/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/15/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
2/15/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
2/21/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/21/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
2/26/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
2/27/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
2/27/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/2/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/5/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
3/5/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
3/6/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/6/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
3/13/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/16/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
3/19/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/19/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
3/21/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
3/22/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/22/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
3/23/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
3/23/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
4/2/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/3/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/10/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
4/10/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
4/10/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/18/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
4/25/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
4/25/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
4/30/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
4/30/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
6/22/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
Deputy Drilled-In Anchors
|
7/9/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
7/9/2018
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
7/12/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Drilled-In Anchors
|
7/13/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/16/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/23/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
7/26/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
7/26/2018
|
Conditional Approval
|
NICK DANERI
|
Excavation/Setback/Form/Re-Bar
|
7/26/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Other (see comments)
|
8/13/2018
|
Conditional Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/13/2018
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
8/14/2018
|
Partial Approval
|
NICK DANERI
|
Deputy Reinf. Concrete
|
8/22/2018
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/6/2018
|
Partial Approval
|
WINSTON DUNNING
|
Deputy Reinf. Concrete
|
9/25/2018
|
Conditional Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
9/25/2018
|
Partial Approval
|
NICK DANERI
|
Floor/Roof Diaphrgm/Shear Wall
|
3/7/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
Floor/Roof Diaphrgm/Shear Wall
|
3/13/2019
|
Conditional Approval
|
NICK DANERI
|