440 S SEATON ST 90013

Certificate Information: 440 S SEATON ST 90013

Application / Permit
14016-10000-22437
Plan Check / Job No.
B14LA15038
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
Project scope includes (1) Change of use to allow for A occupancy with maximum of 300 occupants on the first level (Core and Shell), (2) Change of use on the second and third floor from warehouse/manufacturing to office (Core and Shell), (3) Seismic upgrade to comply with Appendix A1, (4) BASE BUIDING IMPROVEMENT TO EXISTING 3-STORY WAREHOUSE INCLUDING: NEW FIRE STAIRS (3), HORIZONTAL FIRE EXITS AT 1ST LEVEL, NEW ADA COMPLIANT RESTROOMS AT 1ST, 2ND AND 3RD FLOORS, NEW ELEVATOR, NEW MAIN ENTRY LOBBY W/STOREFRONT AND ADA RAMP AT SEATON ST, NEW INSULATING ROOFING AND MINOR MOD. TO EXT. ROOF, and (5) Restriping of the surface parking lot; no repaving the lot. Tenant Improvement for the restaurant and office space to be under separate permit.
Permit Issued
Issued on 8/10/2017
Issuing Office
Metro
Current Status
CofO Issued on 1/25/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/3/2014 APPLICANT
Assigned to Plan Check Engineer 11/21/2014 WING SUEN
Green Plans Picked Up 11/24/2014 APPLICANT
Corrections Issued 12/11/2014 WING SUEN
Quality Review Completed 12/16/2014 JOHN VASQUEZ
Building Plans Picked Up 12/24/2014 APPLICANT
Applicant returned to address corrections 1/28/2015 WING SUEN
Disabled Access Plans Picked Up 3/31/2015 APPLICANT
Applicant returned to address corrections 9/12/2016 WING SUEN
Applicant returned to address corrections 9/19/2016 WING SUEN
Applicant returned to address corrections 9/26/2016 WING SUEN
Applicant returned to address corrections 10/6/2016 WING SUEN
Applicant returned to address corrections 12/12/2016 WING SUEN
Applicant returned to address corrections 3/3/2017 WING SUEN
Applicant returned to address corrections 5/1/2017 WING SUEN
Applicant returned to address corrections 5/2/2017 WING SUEN
Applicant returned to address corrections 5/24/2017 WING SUEN
Applicant returned to address corrections 5/25/2017 WING SUEN
Applicant returned to address corrections 5/30/2017 WING SUEN
Plan Check Approved 6/29/2017 WING SUEN
Issued 8/10/2017 LADBS
CofO in Progress 1/23/2024 RAFAEL ESPINOZA
CofO Issued 1/25/2024 ERNESTO CORRAL
Permit Finaled 1/25/2024 ERNESTO CORRAL

Permit Application Clearance Information

DAS Clearance Cleared 1/25/2017 WING SUEN
Address approval Cleared 3/8/2017 ROCHELLE DUNGCA
Green Code Cleared 3/8/2017 MICKEY YAMASHITA
Prkng lot landscape/Water mgmt Cleared 3/8/2017 NORALI MARTINEZ
ZA Case Cleared 3/8/2017 NORALI MARTINEZ
ZI Cleared 3/8/2017 NORALI MARTINEZ
Eng Process Fee Ord 176,300 Cleared 3/16/2017 ADRIAN SANCHEZ
Highway dedication Cleared 3/16/2017 ADRIAN SANCHEZ
Tract Map conditions Cleared 4/7/2017 NOAH MCCOY
ZA Case Cleared 4/7/2017 NOAH MCCOY
Food Service Establishment Cleared 4/14/2017 PAWAN VERMA
Fire Marshall Fire Life Safety Cleared 4/24/2017 DOMINIQUE MEDINA
Sewer availability Cleared 4/25/2017 RAVIL MANAPOV
DAS Clearance Cleared 5/26/2017 WING SUEN
Prkng lot landscape/Water mgmt Cleared 6/6/2017 EDBER MACEDO
Mechanical Car Lift Cleared 6/19/2017 DOMINIQUE MEDINA
Permit Cleared 6/19/2017 CARLA VALLADARES

Contact Information

Architect Chudnovsky, Daniel; Lic. No.: C12195 2566 S. OVERLAND AVE SUITE 640      LOS ANGELES, CA 90064
Contractor Mccormick J H Inc; Lic. No.: 245757-B 2507 EMPIRE AVENUE      BURBANK, CA 91504
Engineer Lyons, Robert Thomas; Lic. No.: S2719 700 S FLOWER STREET      LOS ANGELES, CA 90017

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/25/2018 Approved FELIX CEBALLOS
Deputy Grading 2/5/2018 Partial Approval FELIX CEBALLOS
Wood Frame 3/28/2018 Partial Approval FELIX CEBALLOS
Deputy Reinf. Masonry 4/25/2018 Partial Approval FELIX CEBALLOS
Footing/Foundation/Slab 6/13/2018 Partial Approval FELIX CEBALLOS
Deputy Reinf. Concrete 6/28/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/3/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/12/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/17/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 7/17/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/19/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/19/2018 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 7/19/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/25/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/26/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/26/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 7/27/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/30/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/31/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/1/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/2/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/3/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/7/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 8/7/2018 Partial Approval NICK DANERI
Deputy Reinf. Concrete 8/8/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/9/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/10/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/14/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/15/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/16/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/17/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/22/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 8/30/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 8/31/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/18/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/19/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 9/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/1/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/2/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/3/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/4/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/5/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 10/5/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 10/15/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 10/16/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/17/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/18/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/19/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 10/22/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/24/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/25/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 10/26/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/14/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/15/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/16/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/19/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/27/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/28/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/29/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/30/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/3/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/4/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/5/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/6/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/7/2018 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 12/10/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/11/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/12/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/14/2018 Conditional Approval JEFFREY FULTON
Deputy Reinf. Masonry 12/17/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/18/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/19/2018 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 12/19/2018 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 12/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/26/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 12/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/28/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 1/2/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 1/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/3/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/4/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 1/4/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 1/7/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/9/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/10/2019 Conditional Approval ERNESTO CORRAL
Wood Frame 1/10/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 1/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/16/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/16/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 1/16/2019 No Access for Inspection ERNESTO CORRAL
Footing/Foundation/Slab 1/16/2019 No Access for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 1/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/17/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/23/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/23/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/24/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/24/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/28/2019 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 1/28/2019 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 1/29/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/29/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/30/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 1/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 1/31/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/21/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/21/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/22/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/25/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/25/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 2/25/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 2/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/26/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/28/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 2/28/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 3/5/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 3/6/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 3/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/11/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/11/2019 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 3/11/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 3/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/13/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/14/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/18/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/20/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/21/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/22/2019 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 3/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/28/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 3/29/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/1/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/2/2019 Conditional Approval ERNESTO CORRAL
Footing/Foundation/Slab 4/2/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 4/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/4/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/9/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/10/2019 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/11/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 4/11/2019 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 4/12/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 4/15/2019 Conditional Approval NICK DANERI
Deputy Wood Construction 4/15/2019 Conditional Approval NICK DANERI
Deputy Wood Construction 5/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/3/2019 Conditional Approval ERNESTO CORRAL
Deputy Wood Construction 5/10/2019 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 5/15/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 5/28/2019 Partial Inspection ERNESTO CORRAL
Wood Frame 6/10/2019 Partial Inspection ERNESTO CORRAL
Drywall Nailing 6/12/2019 Partial Inspection ERNESTO CORRAL
Green Building Rough 6/12/2019 Approved ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/18/2019 Partial Inspection ERNESTO CORRAL
Interior/Exterior Lathing 6/26/2019 Partial Inspection ERNESTO CORRAL
Deputy Steel/Welding 6/27/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/2/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/3/2019 Conditional Approval ERNESTO CORRAL
Deputy EIFS 7/8/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/9/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/19/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/22/2019 Conditional Approval ERNESTO CORRAL
Deputy EIFS 7/23/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/29/2019 Conditional Approval ERNESTO CORRAL
Light Gage Steel Frame 7/31/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 8/14/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 8/21/2019 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 11/7/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 7/1/2020 Not Ready for Inspection RAFAEL ESPINOZA
Light Gage Steel Frame 7/22/2020 Partial Approval RAFAEL ESPINOZA
Insulation 10/19/2020 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 12/8/2020 Partial Approval NICK DANERI
Pre-Inspection 9/1/2021 Partial Inspection RAFAEL ESPINOZA
Drywall Nailing 10/27/2022 Not Ready for Inspection RAFAEL ESPINOZA
Final 10/27/2022 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 10/27/2022 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Final 10/27/2022 Approved RAFAEL ESPINOZA
METHANE-Rough 10/27/2022 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 10/27/2022 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 10/27/2022 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 10/27/2022 Not Ready for Inspection RAFAEL ESPINOZA
Structural Steel Frame 10/27/2022 Approved RAFAEL ESPINOZA
Drywall Nailing 11/29/2022 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 8/22/2023 Approved RAFAEL ESPINOZA
Final 8/22/2023 Not Ready for Inspection RAFAEL ESPINOZA
Green Building Final 8/22/2023 Not Ready for Inspection RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 8/22/2023 SGSOV Not Ready RAFAEL ESPINOZA
Smoke Detectors 8/22/2023 Approved RAFAEL ESPINOZA
Final 10/31/2023 Partial Inspection RAFAEL ESPINOZA
Green Building Final 10/31/2023 Approved RAFAEL ESPINOZA
SGSOV-Seismic Gas S/O Valve 10/31/2023 SGSOV Approved RAFAEL ESPINOZA
Final 1/23/2024 OK to Issue CofO RAFAEL ESPINOZA