440 S SEATON ST 90013
Certificate Information: 440 S SEATON ST 90013
- Application / Permit
- 14016-10000-22437
- Plan Check / Job No.
- B14LA15038
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (13) Office
- Work Description
- Project scope includes (1) Change of use to allow for A occupancy with maximum of 300 occupants on the first level (Core and Shell), (2) Change of use on the second and third floor from warehouse/manufacturing to office (Core and Shell), (3) Seismic upgrade to comply with Appendix A1, (4) BASE BUIDING IMPROVEMENT TO EXISTING 3-STORY WAREHOUSE INCLUDING: NEW FIRE STAIRS (3), HORIZONTAL FIRE EXITS AT 1ST LEVEL, NEW ADA COMPLIANT RESTROOMS AT 1ST, 2ND AND 3RD FLOORS, NEW ELEVATOR, NEW MAIN ENTRY LOBBY W/STOREFRONT AND ADA RAMP AT SEATON ST, NEW INSULATING ROOFING AND MINOR MOD. TO EXT. ROOF, and (5) Restriping of the surface parking lot; no repaving the lot. Tenant Improvement for the restaurant and office space to be under separate permit.
- Permit Issued
- Issued on 8/10/2017
- Issuing Office
- Metro
- Current Status
- CofO Issued on 1/25/2024
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 11/3/2014 | APPLICANT |
| Assigned to Plan Check Engineer | 11/21/2014 | WING SUEN |
| Green Plans Picked Up | 11/24/2014 | APPLICANT |
| Corrections Issued | 12/11/2014 | WING SUEN |
| Quality Review Completed | 12/16/2014 | JOHN VASQUEZ |
| Building Plans Picked Up | 12/24/2014 | APPLICANT |
| Applicant returned to address corrections | 1/28/2015 | WING SUEN |
| Disabled Access Plans Picked Up | 3/31/2015 | APPLICANT |
| Applicant returned to address corrections | 9/12/2016 | WING SUEN |
| Applicant returned to address corrections | 9/19/2016 | WING SUEN |
| Applicant returned to address corrections | 9/26/2016 | WING SUEN |
| Applicant returned to address corrections | 10/6/2016 | WING SUEN |
| Applicant returned to address corrections | 12/12/2016 | WING SUEN |
| Applicant returned to address corrections | 3/3/2017 | WING SUEN |
| Applicant returned to address corrections | 5/1/2017 | WING SUEN |
| Applicant returned to address corrections | 5/2/2017 | WING SUEN |
| Applicant returned to address corrections | 5/24/2017 | WING SUEN |
| Applicant returned to address corrections | 5/25/2017 | WING SUEN |
| Applicant returned to address corrections | 5/30/2017 | WING SUEN |
| Plan Check Approved | 6/29/2017 | WING SUEN |
| Issued | 8/10/2017 | LADBS |
| CofO in Progress | 1/23/2024 | RAFAEL ESPINOZA |
| CofO Issued | 1/25/2024 | ERNESTO CORRAL |
| Permit Finaled | 1/25/2024 | ERNESTO CORRAL |
Permit Application Clearance Information
| DAS Clearance | Cleared | 1/25/2017 | WING SUEN |
| Address approval | Cleared | 3/8/2017 | ROCHELLE DUNGCA |
| Green Code | Cleared | 3/8/2017 | MICKEY YAMASHITA |
| Prkng lot landscape/Water mgmt | Cleared | 3/8/2017 | NORALI MARTINEZ |
| ZA Case | Cleared | 3/8/2017 | NORALI MARTINEZ |
| ZI | Cleared | 3/8/2017 | NORALI MARTINEZ |
| Eng Process Fee Ord 176,300 | Cleared | 3/16/2017 | ADRIAN SANCHEZ |
| Highway dedication | Cleared | 3/16/2017 | ADRIAN SANCHEZ |
| Tract Map conditions | Cleared | 4/7/2017 | NOAH MCCOY |
| ZA Case | Cleared | 4/7/2017 | NOAH MCCOY |
| Food Service Establishment | Cleared | 4/14/2017 | PAWAN VERMA |
| Fire Marshall Fire Life Safety | Cleared | 4/24/2017 | DOMINIQUE MEDINA |
| Sewer availability | Cleared | 4/25/2017 | RAVIL MANAPOV |
| DAS Clearance | Cleared | 5/26/2017 | WING SUEN |
| Prkng lot landscape/Water mgmt | Cleared | 6/6/2017 | EDBER MACEDO |
| Mechanical Car Lift | Cleared | 6/19/2017 | DOMINIQUE MEDINA |
| Permit | Cleared | 6/19/2017 | CARLA VALLADARES |
Contact Information
| Architect | Chudnovsky, Daniel; Lic. No.: C12195 | 2566 S. OVERLAND AVE SUITE 640 LOS ANGELES, CA 90064 |
| Contractor | Mccormick J H Inc; Lic. No.: 245757-B | 2507 EMPIRE AVENUE BURBANK, CA 91504 |
| Engineer | Lyons, Robert Thomas; Lic. No.: S2719 | 700 S FLOWER STREET LOS ANGELES, CA 90017 |
Inspector Information
| RONALD JIMENEZ, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| LARRY ARNICK, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| JOEY BUCHANAN, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| ERNESTO CORRAL, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
| RAFAEL ESPINOZA, (213) 482-0307 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 1/25/2018 | Approved | FELIX CEBALLOS |
| Deputy Grading | 2/5/2018 | Partial Approval | FELIX CEBALLOS |
| Wood Frame | 3/28/2018 | Partial Approval | FELIX CEBALLOS |
| Deputy Reinf. Masonry | 4/25/2018 | Partial Approval | FELIX CEBALLOS |
| Footing/Foundation/Slab | 6/13/2018 | Partial Approval | FELIX CEBALLOS |
| Deputy Reinf. Concrete | 6/28/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/3/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/12/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Drilled-In Anchors | 7/17/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 7/17/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/19/2018 | Conditional Approval | ERNESTO CORRAL |
| Excavation/Setback/Form/Re-Bar | 7/19/2018 | Partial Inspection | ERNESTO CORRAL |
| Footing/Foundation/Slab | 7/19/2018 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/20/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/24/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/25/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/26/2018 | Conditional Approval | ERNESTO CORRAL |
| Excavation/Setback/Form/Re-Bar | 7/26/2018 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/27/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/30/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 7/31/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/1/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/2/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/3/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/7/2018 | Conditional Approval | NICK DANERI |
| Excavation/Setback/Form/Re-Bar | 8/7/2018 | Partial Approval | NICK DANERI |
| Deputy Reinf. Concrete | 8/8/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/9/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/10/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/13/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/14/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/15/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/16/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/17/2018 | Conditional Approval | LESLIE TRUJILLO |
| Excavation/Setback/Form/Re-Bar | 8/17/2018 | Partial Approval | LESLIE TRUJILLO |
| Deputy Reinf. Concrete | 8/20/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/21/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/22/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/23/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 8/24/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 8/30/2018 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 8/31/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 9/18/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 9/19/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 9/20/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 9/21/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/1/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/2/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/3/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/4/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/5/2018 | Conditional Approval | ERNESTO CORRAL |
| Excavation/Setback/Form/Re-Bar | 10/5/2018 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/15/2018 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 10/16/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/17/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/18/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/19/2018 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 10/22/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/23/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/24/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/25/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 10/26/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/14/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/15/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/16/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/19/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/20/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/21/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/27/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/28/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/29/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 11/30/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/3/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/4/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/5/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/6/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/7/2018 | Conditional Approval | JEFFREY FULTON |
| Deputy Reinf. Masonry | 12/10/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/11/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/12/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/13/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/14/2018 | Conditional Approval | JEFFREY FULTON |
| Deputy Reinf. Masonry | 12/17/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/18/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/19/2018 | Conditional Approval | ERNESTO CORRAL |
| Footing/Foundation/Slab | 12/19/2018 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/20/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/21/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/26/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 12/27/2018 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Reinf. Masonry | 12/28/2018 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 1/2/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 1/3/2019 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Steel/Welding | 1/3/2019 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Reinf. Masonry | 1/4/2019 | Approved | JEFF BYTHEWAY |
| Deputy Steel/Welding | 1/4/2019 | Approved | JEFF BYTHEWAY |
| Deputy Reinf. Masonry | 1/7/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/8/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/9/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/10/2019 | Conditional Approval | ERNESTO CORRAL |
| Wood Frame | 1/10/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/11/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/14/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/14/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/15/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/15/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/16/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/16/2019 | Conditional Approval | ERNESTO CORRAL |
| Excavation/Setback/Form/Re-Bar | 1/16/2019 | No Access for Inspection | ERNESTO CORRAL |
| Footing/Foundation/Slab | 1/16/2019 | No Access for Inspection | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/17/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/17/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/18/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/18/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/22/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/22/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/23/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/23/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/24/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/24/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/25/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/25/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/28/2019 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 1/28/2019 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 1/29/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/29/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/30/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/30/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 1/31/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 1/31/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/1/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/1/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/11/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/11/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/12/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/12/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/13/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/13/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/14/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/14/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/15/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/15/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/19/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/19/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/20/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/20/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/21/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/21/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/22/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/22/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/25/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/25/2019 | Conditional Approval | ERNESTO CORRAL |
| Excavation/Setback/Form/Re-Bar | 2/25/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/26/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/26/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/27/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/27/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 2/28/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 2/28/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 3/1/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/1/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 3/4/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/4/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 3/5/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Shotcrete | 3/5/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 3/6/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Shotcrete | 3/6/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 3/7/2019 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Shotcrete | 3/7/2019 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Reinf. Concrete | 3/8/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Shotcrete | 3/8/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 3/11/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/11/2019 | Conditional Approval | ERNESTO CORRAL |
| Excavation/Setback/Form/Re-Bar | 3/11/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 3/12/2019 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Reinf. Masonry | 3/12/2019 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Reinf. Concrete | 3/13/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/13/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 3/14/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/14/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 3/15/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/15/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/18/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/19/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/20/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/21/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/22/2019 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Masonry | 3/27/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/28/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 3/29/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 4/1/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 4/2/2019 | Conditional Approval | ERNESTO CORRAL |
| Footing/Foundation/Slab | 4/2/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 4/3/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 4/4/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Masonry | 4/5/2019 | Conditional Approval | LESLIE TRUJILLO |
| Deputy Reinf. Concrete | 4/8/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 4/9/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 4/10/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 4/11/2019 | Conditional Approval | ERNESTO CORRAL |
| Floor/Roof Diaphrgm/Shear Wall | 4/11/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 4/12/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 4/15/2019 | Conditional Approval | NICK DANERI |
| Deputy Wood Construction | 4/15/2019 | Conditional Approval | NICK DANERI |
| Deputy Wood Construction | 5/2/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Wood Construction | 5/3/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Wood Construction | 5/10/2019 | Conditional Approval | ERNESTO CORRAL |
| Floor/Roof Diaphrgm/Shear Wall | 5/15/2019 | Partial Inspection | ERNESTO CORRAL |
| Light Gage Steel Frame | 5/28/2019 | Partial Inspection | ERNESTO CORRAL |
| Wood Frame | 6/10/2019 | Partial Inspection | ERNESTO CORRAL |
| Drywall Nailing | 6/12/2019 | Partial Inspection | ERNESTO CORRAL |
| Green Building Rough | 6/12/2019 | Approved | ERNESTO CORRAL |
| Excavation/Setback/Form/Re-Bar | 6/18/2019 | Partial Inspection | ERNESTO CORRAL |
| Interior/Exterior Lathing | 6/26/2019 | Partial Inspection | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/27/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/2/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/3/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy EIFS | 7/8/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/9/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/19/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/22/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy EIFS | 7/23/2019 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 7/29/2019 | Conditional Approval | ERNESTO CORRAL |
| Light Gage Steel Frame | 7/31/2019 | Partial Inspection | ERNESTO CORRAL |
| Light Gage Steel Frame | 8/14/2019 | Partial Inspection | ERNESTO CORRAL |
| Light Gage Steel Frame | 8/21/2019 | Partial Approval | DANIEL MC AULIFFE |
| Light Gage Steel Frame | 11/7/2019 | Partial Inspection | ERNESTO CORRAL |
| Light Gage Steel Frame | 7/1/2020 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Light Gage Steel Frame | 7/22/2020 | Partial Approval | RAFAEL ESPINOZA |
| Insulation | 10/19/2020 | Partial Approval | RAFAEL ESPINOZA |
| Drywall Nailing | 12/8/2020 | Partial Approval | NICK DANERI |
| Pre-Inspection | 9/1/2021 | Partial Inspection | RAFAEL ESPINOZA |
| Drywall Nailing | 10/27/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Final | 10/27/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Green Building Final | 10/27/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| METHANE-Final | 10/27/2022 | Approved | RAFAEL ESPINOZA |
| METHANE-Rough | 10/27/2022 | Approved | RAFAEL ESPINOZA |
| Reinforced Masonry Frame | 10/27/2022 | Approved | RAFAEL ESPINOZA |
| SGSOV-Seismic Gas S/O Valve | 10/27/2022 | SGSOV Not Ready | RAFAEL ESPINOZA |
| Smoke Detectors | 10/27/2022 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Structural Steel Frame | 10/27/2022 | Approved | RAFAEL ESPINOZA |
| Drywall Nailing | 11/29/2022 | Partial Approval | RAFAEL ESPINOZA |
| Drywall Nailing | 8/22/2023 | Approved | RAFAEL ESPINOZA |
| Final | 8/22/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| Green Building Final | 8/22/2023 | Not Ready for Inspection | RAFAEL ESPINOZA |
| SGSOV-Seismic Gas S/O Valve | 8/22/2023 | SGSOV Not Ready | RAFAEL ESPINOZA |
| Smoke Detectors | 8/22/2023 | Approved | RAFAEL ESPINOZA |
| Final | 10/31/2023 | Partial Inspection | RAFAEL ESPINOZA |
| Green Building Final | 10/31/2023 | Approved | RAFAEL ESPINOZA |
| SGSOV-Seismic Gas S/O Valve | 10/31/2023 | SGSOV Approved | RAFAEL ESPINOZA |
| Final | 1/23/2024 | OK to Issue CofO | RAFAEL ESPINOZA |