712 S OLIVE ST 90014

Certificate Information: 712 S OLIVE ST 90014

Application / Permit
14016-10000-15613
Plan Check / Job No.
B14LA10669
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
Project consists of (1) Convert (E) basement and sub-basement into a total of 47 parking spaces, 46 non-conforming parking and 1 required parking, (2) Install (N) ramps from street to basement and from basement to sub-basement for access parking, (3) (N) stairs (Stair #1) from sub-basement to ground floor, and (4) infill of (E) elevator shafts from ground floor to the 6th floor. NO CHANGE OF USE.
Permit Issued
Issued on 2/19/2016
Issuing Office
Metro
Current Status
Permit Finaled on 5/6/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/6/2014 APPLICANT
Assigned to Plan Check Engineer 8/28/2014 HOK CHI CHIU
Disabled Access Plans Picked Up 8/29/2014 APPLICANT
Corrections Issued 9/6/2014 HOK CHI CHIU
Quality Review Completed 9/16/2014 BILL STUTSMAN
Building Plans Picked Up 9/17/2014 APPLICANT
Applicant returned to address corrections 10/1/2014 HOK CHI CHIU
Applicant returned to address corrections 3/5/2015 WING SUEN
Applicant returned to address corrections 4/8/2015 WING SUEN
Applicant returned to address corrections 4/14/2015 WING SUEN
Applicant returned to address corrections 4/21/2015 WING SUEN
Plan Check Approved 9/14/2015 WING SUEN
Issued 2/19/2016 LADBS
Permit Finaled 5/6/2021 DANIEL COLLINS

Permit Application Clearance Information

Encroachment in public way Cleared 9/24/2014 ARMENIA HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 9/24/2014 RICHARD SOUTHERLAND
Internal circulation Cleared 9/24/2014 COLLINS ALLAN
Permit Cleared 9/24/2014 RICHARD SOUTHERLAND
Project located in CRA area Cleared 9/24/2014 JIM URQUHART
Sewer availability Cleared 9/24/2014 RICHARD SOUTHERLAND
DAS Clearance Cleared 8/12/2015 SHINE LIN
Driveway location Cleared 9/14/2015 COLLINS ALLAN

Contact Information

Architect Youssefian, Sam H; Lic. No.: C12562 1431 HUNTINGTON DR #201      SOUTH PASADENA, CA 91030
Contractor City Constructors Inc; Lic. No.: 834591-B 500 MOLINO ST APT 118      LOS ANGELES, CA 90013
Engineer Tan, Charles; Lic. No.: S4758 3161 DRIGGS AVENUE      ROSEMEAD, CA 91770

Inspector Information

KATY RAMIREZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
PAUL BAZERKANIAN, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Final 5/19/2016 Not Ready for Inspection NICK DANERI
METHANE-Final 5/19/2016 Not Ready for Inspection NICK DANERI
METHANE-Rough 5/19/2016 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 5/19/2016 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 5/19/2016 SGSOV Not Ready NICK DANERI
Smoke Detectors 5/19/2016 Not Ready for Inspection NICK DANERI
Deputy Drilled-In Anchors 8/23/2016 Conditional Approval KATY RAMIREZ
Deputy Grading 4/7/2017 Conditional Approval JOSE GAXIOLA
Deputy Reinf. Concrete 4/7/2017 Conditional Approval JOSE GAXIOLA
Deputy Grading 4/10/2017 No Access for Inspection JONATHAN QUACH
Deputy Grading 4/11/2017 No Access for Inspection JONATHAN QUACH
Deputy Reinf. Concrete 4/11/2017 No Access for Inspection JONATHAN QUACH
Deputy Grading 4/12/2017 No Access for Inspection JONATHAN QUACH
Deputy Grading 4/13/2017 No Access for Inspection JONATHAN QUACH
Deputy Reinf. Concrete 4/13/2017 No Access for Inspection JONATHAN QUACH
Deputy Grading 4/14/2017 No Access for Inspection JONATHAN QUACH
Deputy Reinf. Concrete 4/27/2017 No Access for Inspection JOSE GAXIOLA
Deputy Grading 4/28/2017 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 4/28/2017 Partial Approval JONATHAN QUACH
Deputy Grading 5/1/2017 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/1/2017 Partial Approval JONATHAN QUACH
Deputy Grading 5/2/2017 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/2/2017 Partial Approval JONATHAN QUACH
Deputy Steel/Welding 5/10/2017 No Access for Inspection JONATHAN QUACH
Deputy Steel/Welding 5/15/2017 Conditional Approval JOSE GAXIOLA
Deputy Steel/Welding 5/16/2017 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 5/18/2017 Partial Approval JONATHAN QUACH
Deputy Drilled-In Anchors 8/1/2017 Conditional Approval JOSE GAXIOLA
Deputy Reinf. Concrete 8/18/2017 Partial Approval JUSTIN CURTIS
Deputy Reinf. Concrete 10/23/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/17/2017 Partial Approval JONATHAN QUACH
Structural Steel Frame 11/30/2017 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 12/6/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 12/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/12/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 1/29/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/6/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/14/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/28/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 5/3/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 6/27/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 10/5/2018 Partial Approval JOSE GAXIOLA
Deputy Shotcrete 10/12/2018 Conditional Approval NICK DANERI
Reinforced Concrete Frame 11/5/2018 Partial Approval NICK DANERI
Deputy Grading 1/25/2019 Conditional Approval NICK DANERI
Deputy Grading 1/28/2019 Conditional Approval NICK DANERI
Deputy Grading 1/29/2019 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 1/31/2019 Partial Approval NICK DANERI
Deputy Reinf. Concrete 2/1/2019 Conditional Approval KATY RAMIREZ
Deputy Reinf. Masonry 2/12/2019 Conditional Approval DANIEL COLLINS
Deputy Reinf. Masonry 2/13/2019 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 2/14/2019 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 2/15/2019 Conditional Approval NICK DANERI
Deputy Grading 2/25/2019 Conditional Approval DANIEL COLLINS
Deputy Grading 2/26/2019 Conditional Approval NICK DANERI
Final 12/19/2019 Not Ready for Inspection DANIEL COLLINS
METHANE-Final 12/19/2019 Approved DANIEL COLLINS
METHANE-Rough 12/19/2019 Approved DANIEL COLLINS
Reinforced Masonry Frame 12/19/2019 Approved DANIEL COLLINS
SGSOV-Seismic Gas S/O Valve 12/19/2019 SGSOV Approved DANIEL COLLINS
Smoke Detectors 12/19/2019 Approved DANIEL COLLINS
Deputy Steel/Welding 3/4/2020 Conditional Approval DANIEL COLLINS
Final 6/11/2020 Partial Inspection DANIEL COLLINS