712 S OLIVE ST 90014
Certificate Information: 712 S OLIVE ST 90014
- Application / Permit
- 14016-10000-15613
- Plan Check / Job No.
- B14LA10669
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (16) Retail
- Work Description
- Project consists of (1) Convert (E) basement and sub-basement into a total of 47 parking spaces, 46 non-conforming parking and 1 required parking, (2) Install (N) ramps from street to basement and from basement to sub-basement for access parking, (3) (N) stairs (Stair #1) from sub-basement to ground floor, and (4) infill of (E) elevator shafts from ground floor to the 6th floor. NO CHANGE OF USE.
- Permit Issued
- Issued on 2/19/2016
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 5/6/2021
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
Submitted | 8/6/2014 | APPLICANT |
Assigned to Plan Check Engineer | 8/28/2014 | HOK CHI CHIU |
Disabled Access Plans Picked Up | 8/29/2014 | APPLICANT |
Corrections Issued | 9/6/2014 | HOK CHI CHIU |
Quality Review Completed | 9/16/2014 | BILL STUTSMAN |
Building Plans Picked Up | 9/17/2014 | APPLICANT |
Applicant returned to address corrections | 10/1/2014 | HOK CHI CHIU |
Applicant returned to address corrections | 3/5/2015 | WING SUEN |
Applicant returned to address corrections | 4/8/2015 | WING SUEN |
Applicant returned to address corrections | 4/14/2015 | WING SUEN |
Applicant returned to address corrections | 4/21/2015 | WING SUEN |
Plan Check Approved | 9/14/2015 | WING SUEN |
Issued | 2/19/2016 | LADBS |
Permit Finaled | 5/6/2021 | DANIEL COLLINS |
Permit Application Clearance Information
Encroachment in public way | Cleared | 9/24/2014 | ARMENIA HERNANDEZ |
Eng Process Fee Ord 176,300 | Cleared | 9/24/2014 | RICHARD SOUTHERLAND |
Internal circulation | Cleared | 9/24/2014 | COLLINS ALLAN |
Permit | Cleared | 9/24/2014 | RICHARD SOUTHERLAND |
Project located in CRA area | Cleared | 9/24/2014 | JIM URQUHART |
Sewer availability | Cleared | 9/24/2014 | RICHARD SOUTHERLAND |
DAS Clearance | Cleared | 8/12/2015 | SHINE LIN |
Driveway location | Cleared | 9/14/2015 | COLLINS ALLAN |
Contact Information
Architect | Youssefian, Sam H; Lic. No.: C12562 | 1431 HUNTINGTON DR #201 SOUTH PASADENA, CA 91030 |
Contractor | City Constructors Inc; Lic. No.: 834591-B | 500 MOLINO ST APT 118 LOS ANGELES, CA 90013 |
Engineer | Tan, Charles; Lic. No.: S4758 | 3161 DRIGGS AVENUE ROSEMEAD, CA 91770 |
Inspector Information
KATY RAMIREZ, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
JEROME BLACKWOOD, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
PAUL BAZERKANIAN, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
No Data Available. |
Inspection Request History
Final | 5/19/2016 | Not Ready for Inspection | NICK DANERI |
METHANE-Final | 5/19/2016 | Not Ready for Inspection | NICK DANERI |
METHANE-Rough | 5/19/2016 | Not Ready for Inspection | NICK DANERI |
Reinforced Masonry Frame | 5/19/2016 | Not Ready for Inspection | NICK DANERI |
SGSOV-Seismic Gas S/O Valve | 5/19/2016 | SGSOV Not Ready | NICK DANERI |
Smoke Detectors | 5/19/2016 | Not Ready for Inspection | NICK DANERI |
Deputy Drilled-In Anchors | 8/23/2016 | Conditional Approval | KATY RAMIREZ |
Deputy Grading | 4/7/2017 | Conditional Approval | JOSE GAXIOLA |
Deputy Reinf. Concrete | 4/7/2017 | Conditional Approval | JOSE GAXIOLA |
Deputy Grading | 4/10/2017 | No Access for Inspection | JONATHAN QUACH |
Deputy Grading | 4/11/2017 | No Access for Inspection | JONATHAN QUACH |
Deputy Reinf. Concrete | 4/11/2017 | No Access for Inspection | JONATHAN QUACH |
Deputy Grading | 4/12/2017 | No Access for Inspection | JONATHAN QUACH |
Deputy Grading | 4/13/2017 | No Access for Inspection | JONATHAN QUACH |
Deputy Reinf. Concrete | 4/13/2017 | No Access for Inspection | JONATHAN QUACH |
Deputy Grading | 4/14/2017 | No Access for Inspection | JONATHAN QUACH |
Deputy Reinf. Concrete | 4/27/2017 | No Access for Inspection | JOSE GAXIOLA |
Deputy Grading | 4/28/2017 | Partial Approval | JONATHAN QUACH |
Deputy Reinf. Concrete | 4/28/2017 | Partial Approval | JONATHAN QUACH |
Deputy Grading | 5/1/2017 | Partial Approval | JONATHAN QUACH |
Deputy Reinf. Concrete | 5/1/2017 | Partial Approval | JONATHAN QUACH |
Deputy Grading | 5/2/2017 | Partial Approval | JONATHAN QUACH |
Deputy Reinf. Concrete | 5/2/2017 | Partial Approval | JONATHAN QUACH |
Deputy Steel/Welding | 5/10/2017 | No Access for Inspection | JONATHAN QUACH |
Deputy Steel/Welding | 5/15/2017 | Conditional Approval | JOSE GAXIOLA |
Deputy Steel/Welding | 5/16/2017 | Conditional Approval | NICK DANERI |
Deputy Drilled-In Anchors | 5/18/2017 | Partial Approval | JONATHAN QUACH |
Deputy Drilled-In Anchors | 8/1/2017 | Conditional Approval | JOSE GAXIOLA |
Deputy Reinf. Concrete | 8/18/2017 | Partial Approval | JUSTIN CURTIS |
Deputy Reinf. Concrete | 10/23/2017 | Conditional Approval | NICK DANERI |
Deputy Reinf. Concrete | 11/17/2017 | Partial Approval | JONATHAN QUACH |
Structural Steel Frame | 11/30/2017 | Partial Approval | NICK DANERI |
Deputy Drilled-In Anchors | 12/6/2017 | Conditional Approval | NICK DANERI |
Deputy Reinf. Concrete | 12/15/2017 | Partial Approval | JAMES POWERS |
Deputy Reinf. Concrete | 1/12/2018 | Conditional Approval | NICK DANERI |
Deputy Drilled-In Anchors | 1/29/2018 | Conditional Approval | NICK DANERI |
Deputy Reinf. Concrete | 2/6/2018 | Conditional Approval | NICK DANERI |
Deputy Reinf. Concrete | 2/14/2018 | Conditional Approval | NICK DANERI |
Deputy Reinf. Concrete | 3/28/2018 | Conditional Approval | NICK DANERI |
Deputy Reinf. Concrete | 5/3/2018 | Conditional Approval | NICK DANERI |
Deputy Steel/Welding | 6/27/2018 | Conditional Approval | NICK DANERI |
Excavation/Setback/Form/Re-Bar | 10/5/2018 | Partial Approval | JOSE GAXIOLA |
Deputy Shotcrete | 10/12/2018 | Conditional Approval | NICK DANERI |
Reinforced Concrete Frame | 11/5/2018 | Partial Approval | NICK DANERI |
Deputy Grading | 1/25/2019 | Conditional Approval | NICK DANERI |
Deputy Grading | 1/28/2019 | Conditional Approval | NICK DANERI |
Deputy Grading | 1/29/2019 | Conditional Approval | NICK DANERI |
Excavation/Setback/Form/Re-Bar | 1/31/2019 | Partial Approval | NICK DANERI |
Deputy Reinf. Concrete | 2/1/2019 | Conditional Approval | KATY RAMIREZ |
Deputy Reinf. Masonry | 2/12/2019 | Conditional Approval | DANIEL COLLINS |
Deputy Reinf. Masonry | 2/13/2019 | Conditional Approval | NICK DANERI |
Deputy Reinf. Masonry | 2/14/2019 | Conditional Approval | NICK DANERI |
Deputy Reinf. Masonry | 2/15/2019 | Conditional Approval | NICK DANERI |
Deputy Grading | 2/25/2019 | Conditional Approval | DANIEL COLLINS |
Deputy Grading | 2/26/2019 | Conditional Approval | NICK DANERI |
Final | 12/19/2019 | Not Ready for Inspection | DANIEL COLLINS |
METHANE-Final | 12/19/2019 | Approved | DANIEL COLLINS |
METHANE-Rough | 12/19/2019 | Approved | DANIEL COLLINS |
Reinforced Masonry Frame | 12/19/2019 | Approved | DANIEL COLLINS |
SGSOV-Seismic Gas S/O Valve | 12/19/2019 | SGSOV Approved | DANIEL COLLINS |
Smoke Detectors | 12/19/2019 | Approved | DANIEL COLLINS |
Deputy Steel/Welding | 3/4/2020 | Conditional Approval | DANIEL COLLINS |
Final | 6/11/2020 | Partial Inspection | DANIEL COLLINS |