546 N MCCADDEN PL 90004

Certificate Information: 546 N MCCADDEN PL 90004

Application / Permit
14014-30003-03721
Plan Check / Job No.
B15WL06574
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
supplemental ref to pcis # 14014-30000-03721, to enlarge basement. Include additional work to originally approved plan. Add "Repair existing stucco wall, remove and replace existing same windows at same location and type, remove and replace portion of existing roof framing and members, relocate existing light-wells, repair front entry steps/stairway/walkway."
Permit Issued
Issued on 2/10/2017
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 9/20/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Plan Check Approved 2/9/2017 CHIHARU SUZUKI
Issued 2/10/2017 LADBS
Permit Finaled-Status Void 2/6/2021 BRIAN SULLIVAN
Re-Activate Permit 3/24/2021 BRAD BESCOS
Permit Finaled 9/20/2021 BRIAN SULLIVAN

Permit Application Clearance Information

Green Code Cleared 2/1/2017 CHIHARU SUZUKI
HPOZ Cleared 2/2/2017 RENATA DRAGLAND
ZA Case Cleared 2/2/2017 RENATA DRAGLAND
ZA Case Cleared 2/2/2017 RENATA DRAGLAND
ZA Case Cleared 2/2/2017 RENATA DRAGLAND
ZA Case Cleared 2/2/2017 RENATA DRAGLAND
ZI Cleared 2/2/2017 RENATA DRAGLAND

Contact Information

Architect Caplow, Bradley Richard; Lic. No.: C29973 3620 VALLEY MEADOW ROAD      SHERMAN OAKS, CA 91403
Contractor Chastain Construction; Lic. No.: 669868-B 3574 SCHAEFER STREET      CULVER CITY, CA 90230
Engineer Mahn, Jonathan Edward; Lic. No.: C60293 12848 FOOTHILL BLVD      SYLMAR, CA 91381
Engineer Polon, Gordon Leonard; Lic. No.: C28564 709 19TH STREET      SANTA MONICA, CA 90402

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 3/7/2017 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 3/7/2017 Partial Approval BRIAN SULLIVAN
METHANE-Barrier 3/7/2017 Approved BRIAN SULLIVAN
METHANE-Subgrade 3/7/2017 Approved BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 3/20/2017 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 4/19/2017 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 4/19/2017 Partial Approval BRIAN SULLIVAN
PLUMBING-Rough 5/3/2017 Partial Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 5/24/2017 Partial Approval BRIAN SULLIVAN
HVAC-Rough 6/8/2017 Partial Approval BRIAN SULLIVAN
PLUMBING-Rough 6/8/2017 Partial Approval BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 7/14/2017 Partial Approval TIMOTHY O CONNER
BUILDING-Rough-Frame 8/8/2017 Corrections Issued BRIAN SULLIVAN
PLUMBING-Rough 9/6/2017 Partial Approval BRIAN SULLIVAN
ELECTRICAL-Rough 11/20/2017 Partial Inspection BRIAN SULLIVAN
Interior/Exterior Lathing 1/18/2018 Partial Approval BRIAN SULLIVAN
Interior/Exterior Lathing 2/1/2018 Partial Approval BRIAN SULLIVAN
Interior/Exterior Lathing 5/14/2018 Partial Approval RAUL BARAJAS
PLUMBING-Rough 5/15/2018 Approved RAUL BARAJAS
Interior/Exterior Lathing 7/23/2018 Approved BRIAN SULLIVAN
Rough-Elec/Plmb/HVAC 7/23/2018 Partial Approval BRIAN SULLIVAN
ELECTRICAL-Rough 11/27/2018 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 11/28/2018 Approved BRIAN SULLIVAN
Green Building Rough 11/28/2018 Approved BRIAN SULLIVAN
METHANE-Rough 11/28/2018 Approved BRIAN SULLIVAN
Insulation 6/6/2019 Approved BRIAN SULLIVAN
Drywall Nailing 6/20/2019 Approved RAUL BARAJAS
Pre-Inspection 8/9/2019 Partial Inspection BRIAN SULLIVAN