|
Deputy Other (see comments)
|
4/5/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
4/5/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
4/20/2017
|
No Access for Inspection
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
4/20/2017
|
No Access for Inspection
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
4/25/2017
|
No Access for Inspection
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
4/25/2017
|
No Access for Inspection
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
4/26/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
4/26/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
4/27/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
4/28/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/1/2017
|
Approved
|
TIMOTHY LYNN
|
|
Deputy Drilled-In Anchors
|
5/1/2017
|
No Access for Inspection
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
5/1/2017
|
No Access for Inspection
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/2/2017
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Drilled-In Anchors
|
5/3/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/4/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/8/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/9/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/10/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/11/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/12/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
5/12/2017
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
5/15/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
5/17/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/23/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/24/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/25/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/25/2017
|
No Access for Inspection
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
5/25/2017
|
No Access for Inspection
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
5/26/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
6/2/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
6/12/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
6/13/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
6/14/2017
|
Partial Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/15/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
6/16/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
6/26/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
6/27/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
6/28/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
6/29/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
6/30/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/7/2017
|
Conditional Approval
|
AJA COLLAY
|
|
Deputy Drilled-In Anchors
|
7/10/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/11/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/12/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/13/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
7/13/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/14/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/17/2017
|
Approved
|
TIMOTHY LYNN
|
|
Deputy Drilled-In Anchors
|
7/18/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
7/18/2017
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/19/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/20/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
7/20/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
7/20/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/21/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
7/24/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
7/24/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/25/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/26/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/27/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/28/2017
|
Conditional Approval
|
AJA COLLAY
|
|
Deputy Drilled-In Anchors
|
7/31/2017
|
Approved
|
TIMOTHY LYNN
|
|
Deputy Drilled-In Anchors
|
8/1/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
8/2/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
8/2/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
8/2/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
8/3/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
8/4/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
8/11/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
8/11/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
8/16/2017
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
8/17/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
8/18/2017
|
Partial Approval
|
JUSTIN CURTIS
|
|
Excavation/Setback/Form/Re-Bar
|
9/5/2017
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
9/7/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
9/14/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
9/18/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
9/19/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
9/20/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
9/20/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
9/20/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
9/21/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
9/21/2017
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
9/22/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
9/28/2017
|
Partial Approval
|
JONATHAN QUACH
|
|
Deputy Other (see comments)
|
9/29/2017
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Shotcrete
|
9/29/2017
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
10/6/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Shotcrete
|
10/6/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
10/6/2017
|
Partial Inspection
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
10/10/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Shotcrete
|
10/10/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
10/11/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Shotcrete
|
10/11/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
10/11/2017
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
10/12/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Shotcrete
|
10/12/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
10/13/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Shotcrete
|
10/13/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
10/20/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
10/20/2017
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Shotcrete
|
10/23/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Shotcrete
|
10/24/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
11/1/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
11/2/2017
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
11/3/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
11/3/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
11/7/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
11/8/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Shotcrete
|
11/22/2017
|
Approved
|
JOEY BUCHANAN
|
|
Deputy Other (see comments)
|
11/27/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
11/27/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
12/6/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Shotcrete
|
12/6/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
12/7/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
12/11/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
12/14/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
12/14/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
12/15/2017
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
12/28/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
12/28/2017
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
1/3/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
1/4/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
1/4/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
1/9/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
1/10/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
1/10/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
1/16/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Drywall Nailing
|
1/16/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Green Building Rough
|
1/16/2018
|
Not Ready for Inspection
|
JOSE GAXIOLA
|
|
Light Gage Steel Frame
|
1/16/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
1/17/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
1/17/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
1/19/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Other (see comments)
|
1/22/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Reinf. Concrete
|
1/22/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Light Gage Steel Frame
|
1/25/2018
|
Partial Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
1/29/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
1/31/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
2/5/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
2/6/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
2/7/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
2/14/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Excavation/Setback/Form/Re-Bar
|
2/20/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
2/21/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
2/23/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Structural Steel Frame
|
2/28/2018
|
Not Ready for Inspection
|
JOSE GAXIOLA
|
|
Deputy Seismic Resistance
|
3/1/2018
|
Conditional Approval
|
JONATHAN QUACH
|
|
Structural Steel Frame
|
3/6/2018
|
Not Ready for Inspection
|
JOSE GAXIOLA
|
|
Structural Steel Frame
|
3/7/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
3/13/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Drywall Nailing
|
3/15/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Green Building Rough
|
3/15/2018
|
Approved
|
JOSE GAXIOLA
|
|
Light Gage Steel Frame
|
3/15/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Structural Steel Frame
|
3/15/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
3/16/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Drywall Nailing
|
4/13/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Light Gage Steel Frame
|
4/13/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Structural Steel Frame
|
4/13/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Drywall Nailing
|
5/2/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Drywall Nailing
|
5/15/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Light Gage Steel Frame
|
5/15/2018
|
Approved
|
JOSE GAXIOLA
|
|
Light Gage Steel Frame
|
6/22/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/17/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/18/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Drilled-In Anchors
|
7/19/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Drywall Nailing
|
8/28/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Light Gage Steel Frame
|
8/28/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Light Gage Steel Frame
|
10/4/2018
|
Partial Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
10/5/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
10/11/2018
|
Conditional Approval
|
JOSE GAXIOLA
|
|
Deputy Steel/Welding
|
10/12/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
10/15/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
10/15/2018
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2018
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
10/16/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
10/16/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
10/17/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
10/17/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
10/19/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
10/22/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
10/24/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
10/25/2018
|
Approved
|
WINSTON DUNNING
|
|
Deputy Steel/Welding
|
10/26/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
10/29/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
10/30/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/2/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/2/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/5/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/5/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/6/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/6/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/7/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/7/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/8/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/8/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/15/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/16/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/16/2018
|
Conditional Approval
|
NICK DANERI
|
|
Drywall Nailing
|
11/16/2018
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/20/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/21/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/21/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/26/2018
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Drilled-In Anchors
|
11/27/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
11/27/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/28/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/29/2018
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
12/4/2018
|
Conditional Approval
|
NICK DANERI
|
|
Drywall Nailing
|
12/5/2018
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
12/5/2018
|
Partial Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
12/12/2018
|
Conditional Approval
|
NICK DANERI
|
|
Drywall Nailing
|
12/20/2018
|
Partial Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
1/10/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
1/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Shotcrete
|
1/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Structural Steel Frame
|
1/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
1/31/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
1/31/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
1/31/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Insulation
|
1/31/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/1/2019
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
2/1/2019
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
2/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/6/2019
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
2/6/2019
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
2/7/2019
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
2/7/2019
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
2/8/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/8/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
2/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Excavation/Setback/Form/Re-Bar
|
2/15/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Other (see comments)
|
2/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Reinf. Concrete
|
2/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
2/20/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/26/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/27/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
2/28/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/1/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/8/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/8/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
3/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/21/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/22/2019
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
3/27/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/28/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
3/29/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/2/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/4/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/5/2019
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
4/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/10/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/10/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
4/10/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
4/10/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Structural Steel Frame
|
4/10/2019
|
Corrections Issued
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/11/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
4/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
4/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Insulation
|
4/16/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Interior/Exterior Lathing
|
4/16/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
4/16/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
5/3/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/13/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
5/13/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/13/2019
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Steel/Welding
|
5/14/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/15/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/16/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/17/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/23/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/30/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
5/30/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
5/31/2019
|
Approved
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
6/4/2019
|
Approved
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
6/5/2019
|
Approved
|
DANIEL COLLINS
|
|
Drywall Nailing
|
6/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Structural Steel Frame
|
6/12/2019
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
7/5/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
7/5/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Structural Steel Frame
|
7/5/2019
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
7/24/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
7/24/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
8/9/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
8/20/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/5/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/6/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/12/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/13/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/18/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/19/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/24/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Steel/Welding
|
9/25/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Special/Order Compliance
|
9/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Structural Steel Frame
|
9/26/2019
|
Conditional Approval
|
DANIEL COLLINS
|
|
Structural Steel Frame
|
10/17/2019
|
Partial Approval
|
DANIEL COLLINS
|
|
Pre-Inspection
|
12/20/2019
|
Approved
|
DANIEL COLLINS
|
|
Pre-Inspection
|
3/18/2020
|
Partial Inspection
|
DANIEL COLLINS
|
|
Special/Order Compliance
|
5/27/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
11/9/2020
|
Partial Inspection
|
DANIEL COLLINS
|
|
Pre-Inspection
|
11/9/2020
|
Partial Inspection
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
11/24/2020
|
Conditional Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
12/11/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
12/11/2020
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/1/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
2/8/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/8/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
2/16/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/24/2021
|
Partial Approval
|
KATY RAMIREZ
|
|
Drywall Nailing
|
2/25/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
2/25/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
3/3/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Light Gage Steel Frame
|
6/16/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Drywall Nailing
|
6/25/2021
|
Partial Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
6/28/2021
|
Conditional Approval
|
DANIEL COLLINS
|
|
Deputy Drilled-In Anchors
|
8/2/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
8/3/2021
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
8/25/2021
|
Conditional Approval
|
TIMOTHY BUXTON
|
|
Drywall Nailing
|
8/25/2021
|
Approved
|
DANIEL COLLINS
|
|
Final
|
8/25/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Footing/Foundation/Slab
|
8/25/2021
|
Approved
|
DANIEL COLLINS
|
|
Green Building Final
|
8/25/2021
|
Not Ready for Inspection
|
DANIEL COLLINS
|
|
METHANE-Barrier
|
8/25/2021
|
Approved
|
DANIEL COLLINS
|
|
METHANE-Final
|
8/25/2021
|
Approved
|
DANIEL COLLINS
|
|
METHANE-Rough
|
8/25/2021
|
Approved
|
DANIEL COLLINS
|
|
METHANE-Subgrade
|
8/25/2021
|
Approved
|
DANIEL COLLINS
|
|
Reinforced Concrete Frame
|
8/25/2021
|
Approved
|
DANIEL COLLINS
|
|
SGSOV-Seismic Gas S/O Valve
|
8/25/2021
|
SGSOV Approved
|
DANIEL COLLINS
|
|
Smoke Detectors
|
8/25/2021
|
Approved
|
DANIEL COLLINS
|
|
Final
|
10/18/2021
|
Partial Inspection
|
DANIEL COLLINS
|
|
Green Building Final
|
10/18/2021
|
Approved
|
DANIEL COLLINS
|
|
Final
|
12/20/2021
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Final
|
12/22/2021
|
Conditional Approval
|
TIMOTHY BUXTON
|