1871 N STANLEY AVE 90046

Certificate Information: 1871 N STANLEY AVE 90046

Application / Permit
14010-30000-04159
Plan Check / Job No.
B14WL05942
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED TWO STORY SFD AND ATT GARAGE OVER HABITABLE BSMT AND ATTACHED ELEVATED WALKING DECKS AND ELEVATED POOL.
Permit Issued
Issued on 10/8/2015
Issuing Office
West Los Angeles
Current Status
CofO Issued on 6/11/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/30/2014 APPLICANT
Assigned to Plan Check Engineer 1/15/2015 DOUGLAS NAKATANI
Green Plans Picked Up 1/20/2015 APPLICANT
Corrections Issued 1/22/2015 ARA SARGSYAN
Quality Review Completed 1/22/2015 ARA SARGSYAN
Building Plans Picked Up 1/26/2015 APPLICANT
Applicant returned to address corrections 5/26/2015 DOUGLAS NAKATANI
Applicant returned to address corrections 6/2/2015 DOUGLAS NAKATANI
Applicant returned to address corrections 6/9/2015 DOUGLAS NAKATANI
Applicant returned to address corrections 8/18/2015 DOUGLAS NAKATANI
Applicant returned to address corrections 8/27/2015 DOUGLAS NAKATANI
Applicant returned to address corrections 9/10/2015 DOUGLAS NAKATANI
Plan Check Approved 9/14/2015 DOUGLAS NAKATANI
Issued 10/8/2015 LADBS
Re-Activate Permit 2/19/2020 RAUL BARAJAS
Permit Expired-Status Void 2/19/2020 RAUL BARAJAS
CofO in Progress 6/1/2023 RAUL BARAJAS
Permit Finaled 6/11/2023 DEROLD HAUFF
CofO Issued 6/11/2023 DEROLD HAUFF
Permit Finaled 6/11/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 7/6/2015 JOSHUA LOPEZ
Eng Process Fee Ord 176,300 Cleared 7/6/2015 JOSHUA LOPEZ
Hydrant and Access approval Cleared 7/6/2015 ROBERT DUFF
Sewer availability Cleared 7/6/2015 JOSHUA LOPEZ
ZI Cleared 7/6/2015 LAURA FRAZIN-STEELE
Low Impact Development Cleared 8/21/2015 MARTIN FRAGOSO
Green Code Cleared 8/31/2015 ALDO UBAU
Green Code Cleared 8/31/2015 ALDO UBAU
Roof/Waste drainage to street Cleared 8/31/2015 ARMENIA HERNANDEZ
Excavation more than 5-ft deep Cleared 9/10/2015 CALOSHA APPROVED

Contact Information

Architect Fry, Robert W; Lic. No.: C26322 26710 MENOMINEE PLACE      RANCHO PALOS VERDES, CA 90275
Contractor Owner-Builder       ,
Engineer Moon, Samuel Sukjoon; Lic. No.: C49445 2825 PLAZA DEL AMO #170      TORRANCE, CA 90503

Inspector Information

BRENDAN MORELLI, (213) 202-3412 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 3/24/2016 No Access for Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 3/25/2016 Approved RAUL BARAJAS
Piling/Pier/Caisson 4/7/2016 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 4/12/2016 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 4/26/2016 Not Ready for Inspection MICHAEL TUCK
Excavation/Setback/Form/Re-Bar 5/2/2016 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 5/11/2016 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 5/16/2016 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 5/23/2016 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 5/26/2016 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 6/13/2016 Approved RAUL BARAJAS
Deputy Reinf. Concrete 6/16/2016 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 6/17/2016 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 6/23/2016 No Access for Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 6/28/2016 Partial Approval RAUL BARAJAS
Special/Order Compliance 7/1/2016 Partial Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 7/5/2016 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 7/7/2016 Partial Inspection RAUL BARAJAS
Special/Order Compliance 7/7/2016 Partial Inspection TIMOTHY O CONNER
Excavation/Setback/Form/Re-Bar 7/11/2016 Partial Approval RAUL BARAJAS
PLUMBING-Rough 7/22/2016 Partial Approval RAUL BARAJAS
ELECTRICAL-Rough 8/8/2016 Not Ready for Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 8/8/2016 Not Ready for Inspection RAUL BARAJAS
ELECTRICAL-Rough 8/9/2016 Partial Approval RAUL BARAJAS
Footing/Foundation/Slab 8/9/2016 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 8/29/2016 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 8/30/2016 Partial Approval RAUL BARAJAS
ELECTRICAL-Rough 9/16/2016 Not Ready for Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 9/16/2016 Not Ready for Inspection RAUL BARAJAS
ELECTRICAL-Rough 9/19/2016 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 9/19/2016 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 10/7/2016 Partial Inspection RAUL BARAJAS
PLUMBING-Rough 11/4/2016 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 12/22/2016 Not Ready for Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 1/4/2017 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 2/10/2017 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 2/15/2017 No Access for Inspection RAUL BARAJAS
PLUMBING-Rough 3/17/2017 Approved RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 3/28/2017 Not Ready for Inspection RAUL BARAJAS
Footing/Foundation/Slab 3/29/2017 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 3/30/2017 Approved RAUL BARAJAS
Footing/Foundation/Slab 3/31/2017 Not Ready for Inspection RAUL BARAJAS
ELECTRICAL-Rough 4/4/2017 Not Ready for Inspection RAUL BARAJAS
Footing/Foundation/Slab 4/4/2017 Partial Inspection RAUL BARAJAS
PLUMBING-Rough 4/4/2017 Not Ready for Inspection RAUL BARAJAS
ELECTRICAL-Rough 4/6/2017 Approved RAUL BARAJAS
Footing/Foundation/Slab 4/6/2017 Approved RAUL BARAJAS
Deputy Reinf. Concrete 4/10/2017 Approved RAUL BARAJAS
Deputy Reinf. Concrete 4/12/2017 Approved RAUL BARAJAS
Reinforced Concrete Frame 4/25/2017 Not Ready for Inspection RAUL BARAJAS
Reinforced Concrete Frame 4/26/2017 Approved RAUL BARAJAS
Deputy Reinf. Concrete 4/27/2017 Partial Approval RAUL BARAJAS
Deputy Reinf. Concrete 4/28/2017 Approved RAUL BARAJAS
Reinforced Concrete Frame 5/1/2017 Partial Inspection RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 5/22/2017 Approved RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 5/31/2017 Partial Approval RAUL BARAJAS
Structural Steel Frame 7/19/2017 Partial Approval RAUL BARAJAS
PLUMBING-Rough 11/14/2017 Not Ready for Inspection RAUL BARAJAS
Pre-Inspection 11/14/2017 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 12/6/2017 Partial Approval RAUL BARAJAS
Rough-Elec/Plmb/HVAC 1/29/2018 Partial Approval RAUL BARAJAS
Rough-Elec/Plmb/HVAC 1/30/2018 Partial Inspection RAUL BARAJAS
Reinforced Concrete Frame 3/12/2018 Approved RAUL BARAJAS
BUILDING-Rough-Frame 3/15/2018 Not Ready for Inspection RAUL BARAJAS
Deputy Reinf. Concrete 3/15/2018 Approved RAUL BARAJAS
Green Building Rough 3/15/2018 Not Ready for Inspection RAUL BARAJAS
HVAC-Rough 3/15/2018 Not Ready for Inspection RAUL BARAJAS
PLUMBING-Rough 3/15/2018 Not Ready for Inspection RAUL BARAJAS
Verify Sprinkler Sign Off 3/15/2018 Not Ready for Inspection RAUL BARAJAS
BUILDING-Rough-Frame 3/20/2018 Partial Approval RAUL BARAJAS
Green Building Rough 3/20/2018 Partial Inspection RAUL BARAJAS
HVAC-Rough 3/20/2018 Partial Inspection RAUL BARAJAS
PLUMBING-Rough 3/20/2018 Partial Inspection RAUL BARAJAS
Verify Sprinkler Sign Off 3/20/2018 Not Ready for Inspection RAUL BARAJAS
ELECTRICAL-Rough 5/18/2018 Partial Approval RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 5/18/2018 Partial Approval RAUL BARAJAS
HVAC-Rough 5/18/2018 Partial Approval RAUL BARAJAS
PLUMBING-Rough 5/18/2018 Partial Approval RAUL BARAJAS
HVAC-Rough 6/1/2018 Corrections Issued LUIS BARRALES
Deputy Steel/Welding 6/5/2018 Approved RAUL BARAJAS
PLUMBING-Rough 6/5/2018 Approved RAUL BARAJAS
ELECTRICAL-Rough 6/12/2018 Approved RAUL BARAJAS
Wood Frame 6/12/2018 Approved RAUL BARAJAS
Pre-Gunite 7/5/2018 Approved RAUL BARAJAS
Insulation 8/7/2018 Conditional Approval RAUL BARAJAS
Drywall Nailing 8/13/2018 Partial Approval RAUL BARAJAS
Drywall Nailing 8/21/2018 Approved RAUL BARAJAS
Drywall Nailing 9/17/2018 Approved RAUL BARAJAS
Interior/Exterior Lathing 10/26/2018 Partial Inspection RAUL BARAJAS
Pre-Inspection 11/1/2018 Partial Inspection RAUL BARAJAS
Piling/Pier/Caisson 12/14/2018 Partial Approval RAUL BARAJAS
Special/Order Compliance 1/18/2019 Approved ELMER BLAND
Deputy Reinf. Concrete 4/3/2019 Conditional Approval BRIAN SULLIVAN
Piling/Pier/Caisson 4/4/2019 Partial Approval RAUL BARAJAS
ELECTRICAL-Rough 2/18/2020 Partial Inspection RAUL BARAJAS
Sewer 2/18/2020 Partial Approval RAUL BARAJAS
ELECTRICAL-Rough 2/25/2020 Partial Approval RAUL BARAJAS
PLUMBING-Rough 2/25/2020 Partial Approval RAUL BARAJAS
Interior/Exterior Lathing 3/5/2020 Approved RAUL BARAJAS
Special/Order Compliance 2/22/2021 Partial Inspection RAUL BARAJAS
Final 5/5/2022 Corrections Issued BRIAN SULLIVAN
Smoke Detectors 5/5/2022 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 5/5/2022 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
ELECTRICAL-Final 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
Final 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
Green Building Final 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Final 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Final 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 5/23/2022 SGSOV Not Ready BRIAN SULLIVAN
Smoke Detectors 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
Structural Steel Frame 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 5/23/2022 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 6/24/2022 Approved BRIAN SULLIVAN
ELECTRICAL-Final 6/24/2022 Not Ready for Inspection BRIAN SULLIVAN
Final 6/24/2022 Corrections Issued BRIAN SULLIVAN
Green Building Final 6/24/2022 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 6/24/2022 Approved BRIAN SULLIVAN
HVAC-Final 6/24/2022 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Final 6/24/2022 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 6/24/2022 SGSOV Not Ready BRIAN SULLIVAN
Service/Power Release 6/24/2022 Not Ready for Inspection BRIAN SULLIVAN
Smoke Detectors 6/24/2022 Not Ready for Inspection BRIAN SULLIVAN
Structural Steel Frame 6/24/2022 Approved BRIAN SULLIVAN
Verify Sprinkler Sign Off 6/24/2022 Approved BRIAN SULLIVAN
Final 6/30/2022 Not Ready for Inspection BRIAN SULLIVAN
Green Building Final 6/30/2022 Approved BRIAN SULLIVAN
HVAC-Final 6/30/2022 Partial Approval BRIAN SULLIVAN
PLUMBING-Final 6/30/2022 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 6/30/2022 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 6/30/2022 Not Ready for Inspection BRIAN SULLIVAN
Gas Test 7/5/2022 Approved BRIAN SULLIVAN
Grounding or Bonding 7/5/2022 Approved BRIAN SULLIVAN
Final 11/4/2022 Not Ready for Inspection BRIAN SULLIVAN
Smoke Detectors 11/4/2022 Approved BRIAN SULLIVAN
Final 1/9/2023 Corrections Issued RAUL BARAJAS
Final 2/1/2023 Corrections Issued BRIAN SULLIVAN
Final 2/9/2023 Partial Inspection RAUL BARAJAS
Service/Power Release 2/13/2023 Corrections Issued BRIAN SULLIVAN
Final 3/2/2023 Partial Inspection BRIAN SULLIVAN
Final 3/20/2023 Corrections Issued RAUL BARAJAS
Service/Power Release 3/21/2023 Partial Inspection RAUL BARAJAS
Final 3/24/2023 Not Ready for Inspection RAUL BARAJAS
Final 3/31/2023 Not Ready for Inspection RAUL BARAJAS
Final 4/24/2023 Conditional Approval STUART CHAPMAN
Final 6/1/2023 OK to Issue CofO RAUL BARAJAS
Service/Power Release 6/5/2023 Approved STUART CHAPMAN