10905 W CHALON ROAD 90077

Certificate Information: 10905 W CHALON ROAD 90077

Application / Permit
14010-20000-03942
Plan Check / Job No.
B14VN15321
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 3-STORY SFD W/10-CAR BASEMENT GARAGE
Permit Issued
Issued on 6/7/2016
Issuing Office
Metro
Current Status
CofO Issued on 8/18/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/12/2014 APPLICANT
Green Plans Picked Up 1/22/2015 APPLICANT
Assigned to Plan Check Engineer 1/29/2015 JESSE JIMENEZ
Corrections Issued 2/10/2015 JESSE JIMENEZ
Quality Review Completed 2/13/2015 BINH PHAN
Building Plans Picked Up 2/17/2015 APPLICANT
Applicant returned to address corrections 3/17/2015 JESSE JIMENEZ
Applicant returned to address corrections 4/25/2016 JESSE JIMENEZ
Applicant returned to address corrections 4/27/2016 JESSE JIMENEZ
Applicant returned to address corrections 5/2/2016 JESSE JIMENEZ
Applicant returned to address corrections 5/3/2016 JESSE JIMENEZ
Applicant returned to address corrections 5/10/2016 JESSE JIMENEZ
Plan Check Approved 6/7/2016 JESSE JIMENEZ
Issued 6/7/2016 LADBS
CofO in Progress 8/15/2023 CHRISTOPHER WILSON
Permit Finaled 8/18/2023 DANIEL ORRANTE
Permit Finaled 8/18/2023 DANIEL ORRANTE
CofO Issued 8/18/2023 DANIEL ORRANTE

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 2/1/2016 RICHARD SOUTHERLAND
BHO/Hillside ordinance Cleared 2/1/2016 RICHARD SOUTHERLAND
BHO/Hillside ordinance Cleared 2/1/2016 RICHARD SOUTHERLAND
BHO/Hillside ordinance Cleared 2/1/2016 RICHARD SOUTHERLAND
Disturb/Remove Protected Trees Cleared 2/1/2016 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 4/26/2016 NATALIE MOORE
Sewer availability Cleared 4/26/2016 NATALIE MOORE
BHO/Hillside ordinance Cleared 5/3/2016 RICHARD SOUTHERLAND
Excavation more than 5-ft deep Cleared 5/3/2016 CALOSHA APPROVED
Green Code Cleared 5/11/2016 MICHAEL AYERS
Hydrant and Access approval Cleared 5/17/2016 ROBERT DUFF
Low Impact Development Cleared 6/1/2016 IDA MEISAMI-FARD
Permit Cleared 6/1/2016 SEVAK ISAKHAYAN
Roof/Waste drainage to street Cleared 6/1/2016 SEVAK ISAKHAYAN

Contact Information

Architect Sinclair, Robert A; Lic. No.: C13516 412 31ST STREET, STUDIO B      NEWPORT BEACH, CA 92663
Contractor Owner-Builder       ,
Engineer Pirbadian, Amir; Lic. No.: C72413 5435 BALBOA BLVD 212      ENCINO, CA 91436

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/2/2016 Approved ANTHONY ANDERSON
Piling/Pier/Caisson 4/4/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 4/14/2017 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 4/20/2017 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 5/1/2017 Conditional Approval ANTHONY ANDERSON
Piling/Pier/Caisson 5/1/2017 Partial Approval ANTHONY ANDERSON
Piling/Pier/Caisson 5/5/2017 Partial Approval ANTHONY ANDERSON
Deputy Shotcrete 5/9/2017 Conditional Approval ANTHONY ANDERSON
Piling/Pier/Caisson 5/25/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 5/31/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 6/9/2017 Corrections Issued ANTHONY ANDERSON
Footing/Foundation/Slab 6/13/2017 Partial Approval ANTHONY ANDERSON
Piling/Pier/Caisson 6/13/2017 Partial Inspection ANTHONY ANDERSON
Deputy Drilled-In Anchors 6/15/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 6/15/2017 Conditional Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 6/16/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 6/16/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 6/19/2017 Conditional Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 6/20/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 6/20/2017 Conditional Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 6/21/2017 Approved ANTHONY ANDERSON
Deputy Shotcrete 6/21/2017 Approved ANTHONY ANDERSON
Deputy Drilled-In Anchors 6/22/2017 Approved ANTHONY ANDERSON
Deputy Shotcrete 6/22/2017 Approved ANTHONY ANDERSON
Deputy Drilled-In Anchors 6/23/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 6/23/2017 Conditional Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 6/26/2017 Approved ANTHONY ANDERSON
Deputy Shotcrete 6/26/2017 Approved ANTHONY ANDERSON
Footing/Foundation/Slab 6/26/2017 Partial Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 6/27/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 6/27/2017 Approved ANTHONY ANDERSON
Deputy Drilled-In Anchors 6/28/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 6/28/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 6/29/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 6/30/2017 Approved JOEL LAUNCHBAUGH
Deputy Shotcrete 7/3/2017 No Access for Inspection KENNETH NAGLE
Piling/Pier/Caisson 7/3/2017 No Access for Inspection KENNETH NAGLE
Piling/Pier/Caisson 7/12/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 7/13/2017 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 7/19/2017 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 7/26/2017 Approved ANTHONY ANDERSON
Deputy Shotcrete 7/26/2017 Approved ANTHONY ANDERSON
Piling/Pier/Caisson 7/26/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 7/27/2017 Approved ANTHONY ANDERSON
Piling/Pier/Caisson 8/11/2017 Partial Approval ANTHONY ANDERSON
Footing/Foundation/Slab 8/29/2017 Partial Approval ANTHONY ANDERSON
Deputy Shotcrete 9/20/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 9/21/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 9/22/2017 Approved DANIEL ORRANTE
Footing/Foundation/Slab 9/22/2017 Partial Approval DANIEL ORRANTE
Deputy Shotcrete 9/25/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 9/26/2017 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 9/29/2017 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 10/4/2017 Conditional Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 10/10/2017 Approved ANTHONY ANDERSON
Deputy Reinf. Concrete 10/10/2017 Approved ANTHONY ANDERSON
Deputy Shotcrete 10/10/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 10/10/2017 Partial Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 10/11/2017 Conditional Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 10/24/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 10/30/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 11/1/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 11/3/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 11/3/2017 Partial Approval ANTHONY ANDERSON
Deputy Shotcrete 11/6/2017 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 11/6/2017 Partial Approval MATT KELLERMAN
Deputy Shotcrete 11/7/2017 Conditional Approval ANTHONY ANDERSON
Deputy Shotcrete 11/17/2017 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 11/17/2017 Conditional Approval ANTHONY ANDERSON
Deputy Drilled-In Anchors 11/20/2017 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 11/22/2017 Approved JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 11/28/2017 Approved ANTHONY ANDERSON
Piling/Pier/Caisson 11/28/2017 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 11/30/2017 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 1/8/2018 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 1/17/2018 Approved DANIEL ORRANTE
Excavation/Setback/Form/Re-Bar 1/17/2018 Approved DANIEL ORRANTE
Footing/Foundation/Slab 1/18/2018 Partial Inspection ANTHONY ANDERSON
Deputy Reinf. Concrete 1/23/2018 Conditional Approval ANTHONY ANDERSON
Deputy Steel/Welding 1/29/2018 Conditional Approval ANTHONY ANDERSON
Deputy Steel/Welding 2/5/2018 Conditional Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 2/16/2018 Approved JONATHAN HOM
Reinforced Concrete Frame 2/20/2018 Partial Approval ANTHONY ANDERSON
Deputy Shotcrete 2/21/2018 Conditional Approval ANTHONY ANDERSON
Underground Mechanical 3/1/2018 Partial Approval ANTHONY ANDERSON
Underground Mechanical 3/8/2018 Approved JONATHAN HOM
Deputy Reinf. Concrete 3/20/2018 Approved ANTHONY ANDERSON
Piling/Pier/Caisson 3/20/2018 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 3/27/2018 Conditional Approval ANTHONY ANDERSON
Piling/Pier/Caisson 3/28/2018 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 4/2/2018 Conditional Approval ANTHONY ANDERSON
Footing/Foundation/Slab 4/30/2018 Partial Approval MATT KELLERMAN
PLUMBING-Rough 4/30/2018 Not Ready for Inspection MATT KELLERMAN
Sewer 5/1/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 5/9/2018 Approved ANTHONY ANDERSON
Piling/Pier/Caisson 5/9/2018 Partial Approval ANTHONY ANDERSON
Deputy Reinf. Concrete 5/24/2018 Conditional Approval JOEL LAUNCHBAUGH
Reinforced Concrete Frame 5/25/2018 Partial Approval MATT KELLERMAN
Deputy Shotcrete 5/29/2018 Conditional Approval JOEL LAUNCHBAUGH
Footing/Foundation/Slab 6/11/2018 Conditional Approval MATT KELLERMAN
Deputy Reinf. Concrete 6/13/2018 Conditional Approval MATT KELLERMAN
Deputy Reinf. Concrete 6/28/2018 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 6/28/2018 Conditional Approval THOMAS FINNILA
Deputy Reinf. Concrete 6/29/2018 Partial Approval MATT KELLERMAN
Deputy Shotcrete 6/29/2018 Partial Approval MATT KELLERMAN
Reinforced Concrete Frame 6/29/2018 Partial Approval MATT KELLERMAN
PLUMBING-Rough 7/13/2018 Not Ready for Inspection MATT KELLERMAN
Reinforced Concrete Frame 7/13/2018 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 7/23/2018 Approved JONATHAN HOM
Deputy Reinf. Concrete 7/24/2018 Partial Approval MATT KELLERMAN
PLUMBING-Rough 7/30/2018 Partial Approval MATT KELLERMAN
Deputy Shotcrete 8/13/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Shotcrete 8/13/2018 Partial Approval CHRISTOPHER WILSON
Masonry Wall/Backfill 8/13/2018 No Access for Inspection CHRISTOPHER WILSON
Deputy Drilled-In Anchors 8/14/2018 Conditional Approval CRAIG DAVIS
Deputy Reinf. Concrete 8/14/2018 Conditional Approval CRAIG DAVIS
Deputy Reinf. Concrete 8/15/2018 Conditional Approval MATT KELLERMAN
Piling/Pier/Caisson 8/16/2018 Partial Approval CHRISTOPHER WILSON
Wood Frame 8/21/2018 Corrections Issued CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 8/23/2018 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 9/19/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/27/2018 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 9/28/2018 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 9/28/2018 Corrections Issued CHRISTOPHER WILSON
Reinforced Concrete Frame 9/28/2018 Corrections Issued CHRISTOPHER WILSON
Reinforced Concrete Frame 10/1/2018 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 10/2/2018 Partial Approval MATT KELLERMAN
Reinforced Concrete Frame 10/2/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 10/17/2018 Partial Approval MATT KELLERMAN
Reinforced Concrete Frame 10/18/2018 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 10/26/2018 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 10/29/2018 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 11/2/2018 Conditional Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 11/15/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 11/19/2018 Conditional Approval CARLOS MATAMOROS
Deputy Reinf. Concrete 11/29/2018 Conditional Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 12/3/2018 Approved DANIEL ORRANTE
Reinforced Concrete Frame 12/3/2018 Approved DANIEL ORRANTE
Deputy Reinf. Concrete 12/4/2018 Conditional Approval DANIEL ORRANTE
Piling/Pier/Caisson 12/10/2018 Partial Inspection JOEL LAUNCHBAUGH
Reinforced Concrete Frame 12/10/2018 Partial Inspection JOEL LAUNCHBAUGH
Floor/Roof Diaphrgm/Shear Wall 12/12/2018 Partial Approval JOEL LAUNCHBAUGH
Piling/Pier/Caisson 12/12/2018 Partial Approval JOEL LAUNCHBAUGH
Deputy Reinf. Concrete 12/20/2018 Conditional Approval CHRISTOPHER WILSON
Underground Mechanical 12/21/2018 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 1/3/2019 Conditional Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 1/3/2019 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 1/8/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 1/9/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 1/10/2019 Conditional Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 1/22/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 2/1/2019 Partial Approval MATT KELLERMAN
Piling/Pier/Caisson 2/6/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 2/8/2019 Partial Approval MATT KELLERMAN
Deputy Reinf. Concrete 2/21/2019 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 2/21/2019 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 2/21/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 2/22/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 3/5/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 3/15/2019 Conditional Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 3/15/2019 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 3/18/2019 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 3/19/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/15/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/17/2019 Conditional Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 4/19/2019 Approved ROBERT SHELLY
Wood Frame 4/22/2019 Corrections Issued CHRISTOPHER WILSON
Reinforced Concrete Frame 5/1/2019 Approved CHRISTOPHER WILSON
Footing/Foundation/Slab 5/28/2019 Partial Inspection CHRISTOPHER WILSON
Deputy Reinf. Concrete 6/14/2019 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/25/2019 Partial Approval CARLOS MATAMOROS
Deputy Wood Construction 6/28/2019 Conditional Approval CHRISTOPHER WILSON
Wood Frame 7/1/2019 Corrections Issued CHRISTOPHER WILSON
Piling/Pier/Caisson 7/8/2019 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 7/22/2019 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 8/7/2019 Not Ready for Inspection DANIEL ORRANTE
Special/Order Compliance 8/21/2019 Not Ready for Inspection DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 8/23/2019 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 8/26/2019 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 8/27/2019 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 9/23/2019 Partial Approval CHRISTOPHER WILSON
Reinforced Concrete Frame 10/10/2019 Partial Approval CARLOS MATAMOROS
Underground Mechanical 11/5/2019 Corrections Issued CHRISTOPHER WILSON
Reinforced Concrete Frame 11/6/2019 Partial Approval CHRISTOPHER WILSON
Wood Frame 12/17/2019 Corrections Issued CHRISTOPHER WILSON
Wood Frame 12/18/2019 Partial Approval CHRISTOPHER WILSON
Piling/Pier/Caisson 1/21/2020 Partial Approval ANTHONY MCDOWALL
BUILDING-Rough-Frame 1/28/2020 Partial Inspection CHRISTOPHER WILSON
Green Building Rough 1/28/2020 Partial Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 1/28/2020 Partial Inspection CHRISTOPHER WILSON
Pre-Inspection 2/27/2020 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 6/11/2020 Partial Inspection CHRISTOPHER WILSON
PLUMBING-Rough 6/11/2020 Partial Inspection CHRISTOPHER WILSON
Wood Frame 6/11/2020 Partial Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 6/17/2020 Corrections Issued MICHAEL PELHAM
PLUMBING-Rough 6/17/2020 Partial Approval MICHAEL PELHAM
PLUMBING-Rough 6/19/2020 Partial Approval CHRISTOPHER WILSON
Sewer 6/23/2020 Partial Approval CHRISTOPHER WILSON
Sewer 7/10/2020 Corrections Issued ANTHONY MCDOWALL
Sewer 7/14/2020 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 7/30/2020 Corrections Issued MATT KELLERMAN
Underground Mechanical 8/4/2020 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 8/14/2020 Conditional Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 11/4/2020 Corrections Issued CHRISTOPHER WILSON
Underground Mechanical 12/1/2020 Corrections Issued CHRISTOPHER WILSON
Reinforced Concrete Frame 1/13/2021 Partial Inspection CHRISTOPHER WILSON
Underground Mechanical 1/20/2021 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 2/3/2021 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 2/10/2021 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 2/10/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 2/10/2021 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 2/10/2021 Not Ready for Inspection CHRISTOPHER WILSON
Wood Frame 2/22/2021 Partial Approval CHRISTOPHER WILSON
PLUMBING-Rough 2/24/2021 Corrections Issued ANTHONY MCDOWALL
PLUMBING-Rough 2/26/2021 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 3/2/2021 Partial Approval ANTHONY MCDOWALL
PLUMBING-Rough 3/3/2021 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 3/4/2021 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 3/4/2021 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 3/5/2021 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 3/5/2021 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 3/8/2021 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 3/8/2021 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 3/11/2021 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 3/15/2021 Corrections Issued CHRISTOPHER WILSON
Drywall Nailing 3/17/2021 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 3/22/2021 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 3/26/2021 Partial Approval CHRISTOPHER WILSON
HVAC-Rough 3/26/2021 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Rough 3/26/2021 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/30/2021 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 3/30/2021 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/5/2021 Corrections Issued MATT KELLERMAN
Green Building Rough 4/5/2021 Not Ready for Inspection MATT KELLERMAN
HVAC-Rough 4/5/2021 Corrections Issued MATT KELLERMAN
Verify Sprinkler Sign Off 4/5/2021 Corrections Issued MATT KELLERMAN
Wood Frame 4/7/2021 Not Ready for Inspection CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/12/2021 Partial Approval CHRISTOPHER WILSON
Green Building Rough 4/12/2021 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 4/12/2021 Approved CHRISTOPHER WILSON
Rough-Elec/Plmb/HVAC 4/13/2021 Corrections Issued CHRISTOPHER WILSON
Insulation 4/15/2021 Partial Approval CHRISTOPHER WILSON
Wood Frame 4/15/2021 Partial Approval CHRISTOPHER WILSON
Insulation 4/20/2021 Not Ready for Inspection CHRISTOPHER WILSON
Rough-Elec/Plmb/HVAC 4/20/2021 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 4/22/2021 Partial Approval CHRISTOPHER WILSON
Insulation 4/22/2021 Partial Inspection CHRISTOPHER WILSON
Drywall Nailing 4/27/2021 Not Ready for Inspection CHRISTOPHER WILSON
Insulation 4/27/2021 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 5/12/2021 Not Ready for Inspection CHRISTOPHER WILSON
Shower Pan 5/12/2021 Approved CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/21/2021 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 5/21/2021 Corrections Issued CHRISTOPHER WILSON
HVAC-Rough 5/21/2021 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 5/21/2021 Corrections Issued CHRISTOPHER WILSON
ELECTRICAL-Rough 6/1/2021 Partial Approval GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 6/1/2021 Partial Approval GERMAN RODRIGUEZ MENDOZA
PLUMBING-Rough 6/1/2021 Partial Approval GERMAN RODRIGUEZ MENDOZA
Drywall Nailing 6/17/2021 Not Ready for Inspection CHRISTOPHER WILSON
Interior/Exterior Lathing 6/17/2021 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 6/25/2021 Partial Approval CHRISTOPHER WILSON
Interior/Exterior Lathing 7/19/2021 Partial Approval GERMAN RODRIGUEZ MENDOZA
Interior/Exterior Lathing 8/4/2021 Partial Approval KRISTEN CAUSEY
Interior/Exterior Lathing 8/11/2021 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 8/19/2021 No Access for Inspection CHRISTOPHER WILSON
Structural Steel Frame 8/25/2021 Corrections Issued CHRISTOPHER WILSON
Wood Frame 8/25/2021 Corrections Issued CHRISTOPHER WILSON
BUILDING-Rough-Frame 9/15/2021 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 9/15/2021 Partial Approval CHRISTOPHER WILSON
Drywall Nailing 11/1/2021 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 11/16/2021 Partial Approval CHRISTOPHER WILSON
Underground Mechanical 11/16/2021 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 11/30/2021 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 4/25/2022 Approved CHRISTOPHER WILSON
Pre-Inspection 7/22/2022 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 8/11/2022 Partial Approval CHRISTOPHER WILSON
ELECTRICAL-Rough 8/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
Service/Power Release 8/16/2022 Not Ready for Inspection CHRISTOPHER WILSON
Service/Power Release 8/23/2022 Corrections Issued CHRISTOPHER WILSON
Service/Power Release 10/25/2022 Not Ready for Inspection CHRISTOPHER WILSON
Special/Order Compliance 10/25/2022 Partial Inspection ANTHONY MCDOWALL
ELECTRICAL-Final 11/4/2022 Corrections Issued CHRISTOPHER WILSON
Service/Power Release 11/10/2022 Approved CHRISTOPHER WILSON
Pre-Inspection 12/9/2022 Partial Approval CHRISTOPHER WILSON
Service/Power Release 12/19/2022 Approved CHRISTOPHER WILSON
Pre-Inspection 3/24/2023 Approved CHRISTOPHER WILSON
BUILDING-Rough-Frame 3/30/2023 Approved CHRISTOPHER WILSON
ELECTRICAL-Final 3/30/2023 Corrections Issued CHRISTOPHER WILSON
Final 3/30/2023 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 3/30/2023 Approved CHRISTOPHER WILSON
Green Building Final 3/30/2023 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 3/30/2023 Approved CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 3/30/2023 SGSOV Not Ready CHRISTOPHER WILSON
Final 4/17/2023 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Final 4/17/2023 Approved CHRISTOPHER WILSON
Rough-Elec/Plmb/HVAC 4/17/2023 Corrections Issued CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 4/17/2023 SGSOV Not Required CHRISTOPHER WILSON
Smoke Detectors 4/17/2023 Partial Approval CHRISTOPHER WILSON
Final 5/10/2023 Not Ready for Inspection CHRISTOPHER WILSON
Smoke Detectors 5/10/2023 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 5/12/2023 Partial Approval CHRISTOPHER WILSON
Gas Test 5/17/2023 Corrections Issued CHRISTOPHER WILSON
Gas Test 5/22/2023 Corrections Issued CHRISTOPHER WILSON
Special/Order Compliance 5/22/2023 Partial Inspection BRANDON IVES
Gas Test 5/23/2023 Partial Approval CHRISTOPHER WILSON
HVAC-Final 5/23/2023 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 5/30/2023 Approved CHRISTOPHER WILSON
Smoke Detectors 5/30/2023 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Final 6/1/2023 Approved CHRISTOPHER WILSON
HVAC-Final 6/2/2023 Corrections Issued CHRISTOPHER WILSON
HVAC-Final 6/7/2023 Approved CHRISTOPHER WILSON
PLUMBING-Final 6/7/2023 Not Ready for Inspection CHRISTOPHER WILSON
PLUMBING-Final 6/8/2023 Approved CHRISTOPHER WILSON
PLUMBING-Final 6/16/2023 Approved CHRISTOPHER WILSON
Final 8/14/2023 OK to Issue CofO CHRISTOPHER WILSON
Smoke Detectors 8/14/2023 Approved CHRISTOPHER WILSON