2525 W WILSHIRE BLVD 90057

Certificate Information: 2525 W WILSHIRE BLVD 90057

Application / Permit
14010-20000-02537
Plan Check / Job No.
B14VN09678
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 7-story (5 stories of Type IIIA over 2 stories of Type IA) mixed-use (152 unit apartment with retail) over 3 levels of subterrean parking garage.
Permit Issued
Issued on 8/19/2015
Issuing Office
Metro
Current Status
CofO Issued on 11/23/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/14/2014 APPLICANT
Assigned to Plan Check Engineer 8/28/2014 BINH PHAN
Corrections Issued 9/3/2014 BINH PHAN
Quality Review Completed 9/5/2014 TAMERA SVETICH
Building Plans Picked Up 9/11/2014 APPLICANT
Applicant returned to address corrections 3/13/2015 BINH PHAN
Applicant returned to address corrections 6/4/2015 BINH PHAN
Plan Check Approved 8/19/2015 BINH PHAN
Issued 8/19/2015 LADBS
TCO Issued (Expire Date: 11-20-2020) 10/23/2020 DENVER HARGIS
TCO Issued (Expire Date: 05-02-2021) 11/3/2020 DENVER HARGIS
CofO in Progress 11/18/2021 RAFAEL ESPINOZA
Permit Finaled 11/23/2021 ERNESTO CORRAL
CofO Issued 11/23/2021 ERNESTO CORRAL
Permit Finaled 11/23/2021 ERNESTO CORRAL

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/27/2015 SHANNON CAMPBELL
Address approval Cleared 3/31/2015 ARMENIA HERNANDEZ
Metro Rail approval Cleared 4/8/2015 THAN WIN
Low Impact Development Cleared 5/13/2015 AYMAN JABBOURI
Hydrant and Access approval Cleared 6/4/2015 JOHN DALLAS
Methane Ordinance Cleared 6/4/2015 DAVE MYERS
Miscellaneous Cleared 6/4/2015 DAVE MYERS
DAS Clearance Cleared 6/22/2015 BINH PHAN
Green Code Cleared 6/22/2015 BINH PHAN
Highway dedication Cleared 8/12/2015 ARMENIA HERNANDEZ
Permit Cleared 8/12/2015 ARMENIA HERNANDEZ
Roof/Waste drainage to street Cleared 8/12/2015 ARMENIA HERNANDEZ
Miscellaneous Cleared 8/17/2015 JAMES KHO
Sewer availability Cleared 8/17/2015 JAMES KHO
Work Adjacent to Public Way Cleared 8/17/2015 DAVID PEREZ
Comm Cor/Mini-Mall Cleared 8/18/2015 ALFREDO PEREZ
Comm Cor/Mini-Mall Cleared 8/18/2015 ALFREDO PEREZ
Frnt yard landscape/Water mgmt Cleared 8/18/2015 ALFREDO PEREZ
Miscellaneous Cleared 8/18/2015 ALFREDO PEREZ
Opn space landscape/Water mgmt Cleared 8/18/2015 ALFREDO PEREZ
Project located in CRA area Cleared 8/18/2015 JIM URQUHART
Site Plan review Cleared 8/18/2015 ALFREDO PEREZ
Tract Map conditions Cleared 8/18/2015 ALFREDO PEREZ
ZA Case Cleared 8/18/2015 ALFREDO PEREZ
ZA Case Cleared 8/18/2015 ALFREDO PEREZ
Fire Marshall Fire Life Safety Cleared 8/19/2015 DAVE MYERS

Contact Information

Contractor Fassberg Contracting Corporation; Lic. No.: 878820-B 17000 VENTURA BLVD SUITE 200      ENCINO, CA 91316
Engineer Ghodsi, Afshin; Lic. No.: S3248 3621 HARBOR BL 125      SANTA ANA, CA 92704
Engineer Thomas, Jelisa Margaret; Lic. No.: C74946 336 E VERDIGO AVE 107      BURBANK, CA 91502
Geologist Kirkgard, Susan Franzen; Lic. No.: EG1754 1481 STONEBROOK STREET      AZUSA, CA 91702

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/5/2016 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 8/30/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 8/30/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 8/30/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/1/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/21/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/3/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/14/2016 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 10/14/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 10/14/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 10/14/2016 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 10/20/2016 Partial Inspection WINSTON DUNNING
METHANE-Barrier 10/20/2016 Partial Approval WINSTON DUNNING
METHANE-Subgrade 10/20/2016 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 10/21/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/25/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/26/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/27/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/28/2016 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 11/1/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 11/1/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/1/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 11/2/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/3/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/4/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/7/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/10/2016 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 11/14/2016 Not Ready for Inspection WINSTON DUNNING
METHANE-Barrier 11/14/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/14/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 11/16/2016 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 11/16/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 11/16/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/16/2016 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 11/18/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 11/18/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/18/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 11/23/2016 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 11/23/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 11/23/2016 Partial Approval WINSTON DUNNING
METHANE-Subgrade 11/23/2016 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/29/2016 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 11/29/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 11/29/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/29/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 11/30/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/1/2016 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 12/1/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 12/1/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 12/1/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 12/2/2016 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 12/2/2016 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 12/5/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 12/5/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 12/5/2016 Partial Inspection WINSTON DUNNING
Deputy Other (see comments) 12/6/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/6/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/7/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/8/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/9/2016 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 12/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/14/2016 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 12/14/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 12/14/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 12/14/2016 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 12/15/2016 Conditional Approval WINSTON DUNNING
Pre-Inspection 12/15/2016 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/16/2016 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 12/20/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/20/2016 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 12/20/2016 Partial Approval WINSTON DUNNING
METHANE-Barrier 12/20/2016 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 12/20/2016 Partial Inspection WINSTON DUNNING
Deputy Methane Barrier 12/21/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/21/2016 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 12/22/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/22/2016 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 12/22/2016 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 12/23/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/23/2016 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 12/27/2016 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 12/28/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/29/2016 Conditional Approval WINSTON DUNNING
Deputy Methane Barrier 12/30/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/30/2016 Conditional Approval WINSTON DUNNING
Reinforced Concrete Frame 12/30/2016 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/6/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 1/6/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 1/6/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 1/6/2017 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 1/11/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 1/11/2017 Conditional Approval WINSTON DUNNING
METHANE-Subgrade 1/11/2017 Conditional Approval WINSTON DUNNING
Deputy Other (see comments) 1/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/18/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 1/18/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 1/18/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 1/18/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 1/24/2017 Conditional Approval WINSTON DUNNING
Deputy Other (see comments) 1/25/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/25/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 1/25/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 1/25/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 1/25/2017 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/26/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/27/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/30/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 2/24/2017 Partial Inspection WINSTON DUNNING
METHANE-Barrier 2/24/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 2/24/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 2/27/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/28/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 3/1/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/2/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/3/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 3/3/2017 Conditional Approval WINSTON DUNNING
METHANE-Barrier 3/3/2017 Conditional Approval WINSTON DUNNING
METHANE-Subgrade 3/3/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Masonry 3/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 3/22/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/24/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 3/24/2017 Order to Comply Issued WINSTON DUNNING
METHANE-Barrier 3/24/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 3/24/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 3/28/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/29/2017 Conditional Approval WINSTON DUNNING
Deputy Other (see comments) 3/30/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/30/2017 Conditional Approval WINSTON DUNNING
Pre-Inspection 4/13/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 4/17/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/19/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 4/19/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 4/19/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 4/19/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 4/20/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/21/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 4/21/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 4/21/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 4/21/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 4/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/25/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/26/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/27/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/28/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/4/2017 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 5/4/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 5/4/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 5/4/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 5/4/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 5/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/9/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 5/9/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 5/9/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 5/9/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 5/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 5/10/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 5/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/11/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 5/11/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/12/2017 Conditional Approval WINSTON DUNNING
Deputy Other (see comments) 5/15/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/15/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/18/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 5/18/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 5/18/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 5/18/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 5/19/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/22/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/23/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/24/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/25/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 5/26/2017 Conditional Approval NICK DANERI
Deputy Other (see comments) 5/31/2017 Conditional Approval NICK DANERI
Deputy Shotcrete 5/31/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/2/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/5/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/6/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/7/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/8/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 6/8/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 6/8/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 6/8/2017 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 7/7/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 7/7/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 7/7/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 7/11/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/12/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/13/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/14/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/28/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 7/28/2017 Partial Inspection WINSTON DUNNING
METHANE-Barrier 7/28/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 7/28/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 8/9/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 8/9/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 8/9/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 8/9/2017 Partial Inspection WINSTON DUNNING
Drywall Nailing 8/15/2017 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 8/15/2017 Partial Inspection WINSTON DUNNING
Deputy Wood Construction 8/29/2017 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/29/2017 Partial Approval JAMES POWERS
METHANE-Rough 8/29/2017 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/29/2017 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 9/19/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 9/19/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 9/19/2017 Partial Inspection WINSTON DUNNING
Deputy Wood Construction 9/26/2017 Conditional Approval WINSTON DUNNING
METHANE-Rough 9/26/2017 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 9/26/2017 Partial Inspection WINSTON DUNNING
Wood Frame 9/26/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 10/11/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 10/11/2017 Partial Inspection WINSTON DUNNING
Masonry Wall/Backfill 10/11/2017 Partial Approval WINSTON DUNNING
Drywall Nailing 10/16/2017 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 10/16/2017 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 10/16/2017 Not Ready for Inspection JAMES POWERS
METHANE-Rough 10/19/2017 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 10/19/2017 Partial Inspection WINSTON DUNNING
Wood Frame 10/19/2017 Partial Approval WINSTON DUNNING
Green Building Rough 12/4/2017 Partial Inspection WINSTON DUNNING
METHANE-Rough 12/4/2017 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 12/4/2017 Partial Inspection WINSTON DUNNING
Wood Frame 12/4/2017 Partial Approval WINSTON DUNNING
Deputy Wood Construction 12/12/2017 Conditional Approval WINSTON DUNNING
Pre-Inspection 12/21/2017 Partial Inspection WINSTON DUNNING
Deputy Steel/Welding 2/2/2018 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 2/5/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 2/26/2018 Partial Inspection LESLIE TRUJILLO
METHANE-Barrier 2/26/2018 Approved LESLIE TRUJILLO
METHANE-Subgrade 2/26/2018 Approved LESLIE TRUJILLO
Deputy Wood Construction 3/29/2018 Conditional Approval LESLIE TRUJILLO
Green Building Rough 4/9/2018 Partial Inspection WINSTON DUNNING
METHANE-Rough 4/9/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 4/9/2018 Partial Inspection WINSTON DUNNING
Wood Frame 4/9/2018 Partial Approval WINSTON DUNNING
Green Building Rough 5/1/2018 Partial Inspection WINSTON DUNNING
Insulation 5/1/2018 Partial Approval WINSTON DUNNING
METHANE-Rough 5/1/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 5/1/2018 Partial Inspection WINSTON DUNNING
Wood Frame 5/1/2018 Partial Approval WINSTON DUNNING
Insulation 6/15/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 7/23/2018 Partial Approval NICK DANERI
Green Building Rough 7/23/2018 Partial Inspection NICK DANERI
Insulation 7/23/2018 Partial Approval NICK DANERI
Drywall Nailing 8/2/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 8/2/2018 Partial Inspection WINSTON DUNNING
Insulation 8/2/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 8/10/2018 Partial Approval WINSTON DUNNING
Green Building Rough 8/10/2018 Partial Inspection WINSTON DUNNING
Insulation 8/10/2018 Partial Approval WINSTON DUNNING
Pre-Inspection 8/13/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 9/19/2018 Partial Approval WINSTON DUNNING
Green Building Rough 9/19/2018 Partial Inspection WINSTON DUNNING
Insulation 9/19/2018 Partial Approval WINSTON DUNNING
Wood Frame 9/19/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 9/25/2018 Partial Approval WINSTON DUNNING
Green Building Rough 9/25/2018 Partial Inspection WINSTON DUNNING
Light Gage Steel Frame 10/15/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 10/23/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 10/24/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 10/30/2018 Partial Approval WINSTON DUNNING
Green Building Rough 10/30/2018 Partial Inspection WINSTON DUNNING
Light Gage Steel Frame 11/14/2018 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 11/14/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 11/20/2018 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 11/20/2018 Partial Approval WINSTON DUNNING
Green Building Rough 11/20/2018 Partial Inspection WINSTON DUNNING
Verify Sprinkler Sign Off 12/4/2018 Partial Inspection WINSTON DUNNING
Insulation 12/28/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 12/28/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 1/10/2019 Partial Approval WINSTON DUNNING
Green Building Rough 1/11/2019 Partial Inspection WINSTON DUNNING
Deputy Steel/Welding 1/28/2019 Conditional Approval LESLIE TRUJILLO
Interior/Exterior Lathing 2/25/2019 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 4/3/2019 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/8/2019 Partial Approval LESLIE TRUJILLO
Insulation 4/15/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 4/23/2019 Partial Approval LESLIE TRUJILLO
Green Building Rough 4/23/2019 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 4/30/2019 Partial Approval DANIEL COLLINS
Green Building Rough 4/30/2019 Approved DANIEL COLLINS
Interior/Exterior Lathing 5/28/2019 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 6/14/2019 Partial Approval LESLIE TRUJILLO
Insulation 7/5/2019 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 7/10/2019 Partial Approval LESLIE TRUJILLO
METHANE-Rough 7/10/2019 Approved LESLIE TRUJILLO
Reinforced Concrete Frame 7/10/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 7/10/2019 Partial Inspection LESLIE TRUJILLO
Insulation 8/20/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/20/2019 Partial Approval LESLIE TRUJILLO
Insulation 8/23/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 9/4/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 9/16/2019 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 9/26/2019 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 10/29/2019 Partial Inspection LESLIE TRUJILLO
Insulation 11/8/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/8/2019 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 12/2/2019 Partial Inspection ERNESTO CORRAL
Drywall Nailing 12/9/2019 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 12/20/2019 No Access for Inspection LESLIE TRUJILLO
Special/Order Compliance 12/26/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/27/2019 Partial Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 1/8/2020 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 1/31/2020 Partial Inspection LESLIE TRUJILLO
Masonry Wall/Backfill 2/6/2020 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 2/11/2020 Partial Approval LESLIE TRUJILLO
Drywall Nailing 2/26/2020 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 2/26/2020 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 3/2/2020 Partial Approval RAFAEL ESPINOZA
Masonry Wall/Backfill 3/10/2020 Partial Inspection LESLIE TRUJILLO
Deputy Shotcrete 4/6/2020 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 5/14/2020 Partial Approval NICK DANERI
Footing/Foundation/Slab 5/15/2020 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 5/15/2020 Conditional Approval NICK DANERI
Drywall Nailing 5/19/2020 Partial Approval JAMES POWERS
Special/Order Compliance 6/9/2020 Corrections Issued NICK DANERI
Special/Order Compliance 8/20/2020 Partial Approval NICK DANERI
Drywall Nailing 9/10/2020 Approved NICK DANERI
Final 9/10/2020 Partial Inspection NICK DANERI
Footing/Foundation/Slab 9/10/2020 Approved NICK DANERI
Green Building Final 9/10/2020 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 9/10/2020 Partial Inspection NICK DANERI
Reinforced Masonry Frame 9/10/2020 Partial Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 9/10/2020 SGSOV Not Ready NICK DANERI
Smoke Detectors 9/10/2020 Not Ready for Inspection NICK DANERI
Verify Sprinkler Sign Off 9/10/2020 Not Ready for Inspection NICK DANERI
Wood Frame 9/10/2020 Not Ready for Inspection NICK DANERI
Final 9/14/2020 Corrections Issued NICK DANERI
Green Building Final 9/14/2020 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 9/14/2020 Partial Inspection NICK DANERI
Reinforced Masonry Frame 9/14/2020 Partial Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 9/14/2020 SGSOV Not Ready NICK DANERI
Smoke Detectors 9/14/2020 Approved NICK DANERI
Verify Sprinkler Sign Off 9/14/2020 Not Ready for Inspection NICK DANERI
Wood Frame 9/14/2020 Partial Inspection NICK DANERI
Final 9/25/2020 Not Ready for Inspection NICK DANERI
Green Building Final 9/25/2020 Not Ready for Inspection NICK DANERI
Reinforced Concrete Frame 9/25/2020 Not Ready for Inspection NICK DANERI
Reinforced Masonry Frame 9/25/2020 Not Ready for Inspection NICK DANERI
SGSOV-Seismic Gas S/O Valve 9/25/2020 SGSOV Not Ready NICK DANERI
Verify Sprinkler Sign Off 9/25/2020 Not Ready for Inspection NICK DANERI
Wood Frame 9/25/2020 Not Ready for Inspection NICK DANERI
Final 10/5/2020 Not Ready for Inspection NICK DANERI
Green Building Final 10/5/2020 Partial Approval NICK DANERI
Pre-Inspection 10/5/2020 Conditional Approval NICK DANERI
Reinforced Concrete Frame 10/5/2020 Conditional Approval NICK DANERI
Reinforced Masonry Frame 10/5/2020 Conditional Approval NICK DANERI
SGSOV-Seismic Gas S/O Valve 10/5/2020 SGSOV Approved NICK DANERI
Verify Sprinkler Sign Off 10/5/2020 Conditional Approval NICK DANERI
Wood Frame 10/5/2020 Conditional Approval NICK DANERI
Special/Order Compliance 10/6/2020 Partial Approval NICK DANERI
Pre-Inspection 10/8/2020 Not Ready for Inspection NICK DANERI
Special/Order Compliance 10/8/2020 Not Ready for Inspection NICK DANERI
Special/Order Compliance 10/9/2020 Corrections Issued NICK DANERI
Special/Order Compliance 10/13/2020 Conditional Approval NICK DANERI
Special/Order Compliance 10/15/2020 Partial Inspection NICK DANERI
Final 10/21/2020 Not Ready for Inspection NICK DANERI
Green Building Final 10/21/2020 Approved NICK DANERI
Reinforced Concrete Frame 10/21/2020 Partial Inspection NICK DANERI
Reinforced Masonry Frame 10/21/2020 Partial Approval NICK DANERI
Verify Sprinkler Sign Off 10/21/2020 Not Ready for Inspection NICK DANERI
Wood Frame 10/21/2020 Not Ready for Inspection NICK DANERI
Special/Order Compliance 11/4/2020 Conditional Approval NICK DANERI
Special/Order Compliance 11/19/2020 Partial Approval NICK DANERI
Special/Order Compliance 12/24/2020 Partial Approval NICK DANERI
Special/Order Compliance 2/17/2021 Partial Approval NICK DANERI
Special/Order Compliance 3/11/2021 Partial Approval NICK DANERI
Special/Order Compliance 4/7/2021 Conditional Approval NICK DANERI
Final 9/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 9/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Masonry Frame 9/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
Verify Sprinkler Sign Off 9/3/2021 Approved RAFAEL ESPINOZA
Wood Frame 9/3/2021 Not Ready for Inspection RAFAEL ESPINOZA
Final 11/18/2021 OK to Issue CofO RAFAEL ESPINOZA
Reinforced Concrete Frame 11/18/2021 Approved RAFAEL ESPINOZA
Reinforced Masonry Frame 11/18/2021 Approved RAFAEL ESPINOZA
Wood Frame 11/18/2021 Approved RAFAEL ESPINOZA