5790 W JEFFERSON BLVD 90016

Certificate Information: 5790 W JEFFERSON BLVD 90016

Application / Permit
14010-10005-00780
Plan Check / Job No.
B18LA04100
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
SUPPLEMENTAL #14010-10000-00780 ; MINOR NON-STRUCTURAL ITEM REVISIONS, PLAN SHEETS RE-ORGANIZATION, OFFSET CHORD GIRDERS TO EXTERIOR BAND NODE SUPPORTS FOR CONCEALMENT, REVISE ISOLATOR TRANSFER GIRDERS AT GROUND LEVEL, ***see comment for continuation***
Permit Issued
Issued on 6/18/2018
Issuing Office
Metro
Current Status
Permit Finaled on 12/19/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Plan Check Approved 3/14/2018 MINYE PAK
Building Plans Picked Up 4/27/2018 APPLICANT
Plan Check Approved 6/18/2018 SUEN LIEU
Issued 6/18/2018 LADBS
Permit Finaled 12/19/2023 EDWIN GREGORYONA

Permit Application Clearance Information

DAS Clearance Cleared 3/13/2018 MINYE PAK
Fire Marshall Fire Life Safety Cleared 3/14/2018 DAVE MYERS

Contact Information

Architect Moss, Eric Owen; Lic. No.: C8408 8557 HIGUERA ST.      CULVER CITY, CA 90232
Contractor Matt Construction Corporation; Lic. No.: 631020-B 9814 NORWALK BLVD #100      SANTA FE SPRINGS, CA 90670
Engineer Jordan, Ricardo; Lic. No.: C68436 5937 DARWIN CT STE 105      CARLSBAD, CA 92008
Engineer Kirby, Anthony David; Lic. No.: C79357 12777 WEST JEFFERSON BLVD STE 200      LOS ANGELES, CA 90066
Engineer Lew, Marshall; Lic. No.: GE522 700 FLORES DE ORO      SOUTH PASADENA, CA 910303635
Engineer Ponnaboyina, Hari; Lic. No.: C75269 3509 EAST ANDY ST      LONG BEACH, CA 90805
Engineer Zekioglu, Atila; Lic. No.: S3455 12777 W JEFFERSON BL 200      LOS ANGELES, CA 90066
Geologist Elliott, Paul James; Lic. No.: EG1435 25410 BAYSIDE PLACE      HARBOR CITY, CA 90710

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Steel/Welding 2/7/2020 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 2/10/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/11/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/12/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/13/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/14/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/18/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/19/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/20/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/21/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/24/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/25/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/26/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/27/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/2/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/3/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/4/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/5/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/9/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/9/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/10/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/10/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/11/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/11/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/12/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/12/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 3/13/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/13/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/17/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/18/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/19/2020 No Access for Inspection LARRY ARNICK
Deputy Steel/Welding 3/20/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/23/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/31/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/1/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/2/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/3/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/6/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/13/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/14/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/15/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/16/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 4/17/2020 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 4/17/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 4/20/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/21/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/21/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/22/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/22/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/23/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/24/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/24/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/27/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/30/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/1/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/1/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/4/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/4/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/5/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/5/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/6/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/7/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/11/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/11/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/12/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/12/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/13/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/14/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/14/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/15/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/18/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/18/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/19/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/19/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/20/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/21/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/21/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/22/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/22/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/26/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/26/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/27/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/27/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/29/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/1/2020 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/1/2020 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/2/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/2/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/3/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/3/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/4/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/4/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/8/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/8/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/9/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/10/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/11/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/12/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/15/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/16/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/17/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/18/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/22/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/23/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/24/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/25/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/25/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/26/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/26/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/29/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/30/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/1/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/1/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/2/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/2/2020 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 7/2/2020 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 7/6/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/6/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/7/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/7/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/8/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/9/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/9/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/10/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/13/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/13/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/14/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/14/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/14/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/15/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/15/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/16/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/16/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/17/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/17/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/20/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/21/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/21/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/22/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/22/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/22/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/23/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/23/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/24/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/24/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/27/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/27/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/27/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/28/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/29/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/29/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/30/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/30/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/31/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/31/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/31/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/3/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/3/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/5/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/5/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/6/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/6/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/7/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/7/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/10/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/10/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/10/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/11/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/11/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/11/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/12/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/12/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/12/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/13/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/13/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/14/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/14/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/14/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/17/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/17/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/17/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/18/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/18/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/18/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/19/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/19/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/19/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/20/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/20/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/20/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/21/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/21/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/21/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/24/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/24/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/25/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/25/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/25/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/26/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/26/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/26/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/27/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 8/27/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/27/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/28/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 8/31/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/31/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 8/31/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/1/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/1/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/1/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/2/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/2/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/2/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/3/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/3/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/3/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/4/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/4/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/4/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/8/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/8/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/9/2020 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 9/9/2020 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 9/9/2020 Conditional Approval JONATHAN QUACH
Deputy Fireproofing 9/10/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/10/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/10/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/11/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/11/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/11/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/14/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/14/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/14/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/15/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/15/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/16/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/16/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/16/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/17/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/17/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/17/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/18/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/18/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/18/2020 Conditional Approval LARRY ARNICK
Drywall Nailing 9/18/2020 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 9/18/2020 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 9/18/2020 Not Ready for Inspection LARRY ARNICK
Deputy Fireproofing 9/21/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/21/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/21/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/22/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/22/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/22/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/23/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/23/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/23/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/24/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/24/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/25/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/25/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/25/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/28/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/28/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/29/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/29/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/29/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 9/30/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/30/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/30/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/1/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/1/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/1/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/2/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/2/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/2/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/5/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/5/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/5/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/6/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/6/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/6/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/7/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/7/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/7/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/8/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/8/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/8/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/8/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/9/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/9/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/9/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/9/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/13/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/13/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/13/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/13/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/14/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 10/14/2020 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/14/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/14/2020 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/14/2020 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 10/15/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/15/2020 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/15/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/15/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 10/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/16/2020 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 10/16/2020 Conditional Approval DAVID BURKHEAD
Drywall Nailing 10/16/2020 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 10/16/2020 Partial Approval TIMOTHY BUXTON
Deputy Drilled-In Anchors 10/19/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/19/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/19/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/20/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/20/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/20/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/21/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/21/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/21/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/22/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/22/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/22/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/23/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/23/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/23/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/26/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/26/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/26/2020 Conditional Approval LARRY ARNICK
Drywall Nailing 10/26/2020 Partial Approval LARRY ARNICK
Light Gage Steel Frame 10/26/2020 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 10/27/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/27/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/27/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/28/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/29/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/30/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/30/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/30/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/2/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/2/2020 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/2/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/4/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 11/4/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/4/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/5/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 11/5/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/5/2020 Conditional Approval LARRY ARNICK
Drywall Nailing 11/5/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/6/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 11/6/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/6/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/9/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 11/9/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/9/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/10/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 11/10/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/10/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/16/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/16/2020 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/16/2020 Approved DANIEL MC AULIFFE
Deputy Steel/Welding 11/16/2020 Approved DANIEL MC AULIFFE
Deputy Fireproofing 11/17/2020 Conditional Approval DANIEL COLLINS
Deputy Reinf. Concrete 11/17/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/17/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 11/18/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/18/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/18/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/19/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/19/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/19/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/19/2020 Corrections Issued EDWIN GREGORYONA
Footing/Foundation/Slab 11/19/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/20/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/20/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 11/20/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/23/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/23/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/23/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/24/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/25/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/25/2020 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/25/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/30/2020 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 11/30/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/30/2020 Conditional Approval DANIEL COLLINS
Deputy Steel/Welding 11/30/2020 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/30/2020 Partial Approval DANIEL COLLINS
Light Gage Steel Frame 11/30/2020 Not Ready for Inspection DANIEL COLLINS
Deputy Drilled-In Anchors 12/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Steel/Welding 12/1/2020 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/2/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/2/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/2/2020 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/3/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/4/2020 Partial Approval JAMES POWERS
Deputy Fireproofing 12/4/2020 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/4/2020 Partial Approval JAMES POWERS
Drywall Nailing 12/4/2020 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 12/4/2020 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 12/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/7/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/8/2020 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/8/2020 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/8/2020 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/10/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/10/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/10/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/11/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/11/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/11/2020 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 12/11/2020 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/14/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/14/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/14/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/15/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/15/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/15/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/16/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/16/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/16/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/17/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/17/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/17/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/18/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/18/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/18/2020 Conditional Approval LARRY ARNICK
Drywall Nailing 12/18/2020 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/21/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/21/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/21/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/22/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/22/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/22/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/23/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/23/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/23/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/24/2020 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/24/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/24/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/28/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/28/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/29/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/29/2020 Conditional Approval LARRY ARNICK
Drywall Nailing 12/29/2020 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 12/30/2020 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/30/2020 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/4/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 1/4/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/4/2021 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/5/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/5/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/5/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/6/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/6/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/6/2021 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 1/6/2021 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/7/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/7/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/7/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/8/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/8/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/8/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/11/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 1/11/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/11/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/12/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 1/12/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/12/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/13/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 1/13/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/13/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/14/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 1/14/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/14/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/15/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 1/15/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/15/2021 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 1/15/2021 Not Ready for Inspection LARRY ARNICK
Deputy Fireproofing 1/19/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/19/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/19/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/20/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/20/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/20/2021 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 1/20/2021 Partial Approval LARRY ARNICK
Deputy Fireproofing 1/21/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/21/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/21/2021 Conditional Approval LARRY ARNICK
Deputy Fireproofing 1/22/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/22/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/22/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/25/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/25/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/25/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/26/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/26/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/26/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/27/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/27/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/27/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/28/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/28/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/28/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/29/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/29/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/29/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/1/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/1/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/1/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/2/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/2/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/2/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/3/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/3/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/3/2021 Conditional Approval LARRY ARNICK
Drywall Nailing 2/3/2021 Partial Approval LARRY ARNICK
Structural Steel Frame 2/3/2021 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 2/4/2021 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 2/4/2021 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 2/4/2021 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 2/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/10/2021 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 2/10/2021 Conditional Approval TIMOTHY BUXTON
Deputy Steel/Welding 2/10/2021 Conditional Approval TIMOTHY BUXTON
Deputy Fireproofing 2/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/1/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/22/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 3/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 3/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/29/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 5/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 5/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/10/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/10/2021 Partial Inspection EDWIN GREGORYONA
Deputy Fireproofing 5/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/12/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/26/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 5/26/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 5/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 5/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 6/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 6/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 6/1/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 6/2/2021 Conditional Approval TIMOTHY BUXTON
Deputy Fireproofing 6/2/2021 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 6/2/2021 Conditional Approval TIMOTHY BUXTON
Deputy Steel/Welding 6/2/2021 Conditional Approval TIMOTHY BUXTON
Deputy Drilled-In Anchors 6/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/3/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/10/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2021 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/10/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 6/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/11/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/11/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Fireproofing 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/15/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Steel/Welding 6/17/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 6/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/21/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/24/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/24/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Fireproofing 6/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/28/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 7/1/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/1/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 7/2/2021 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/2/2021 Partial Approval JAMES POWERS
Deputy Fireproofing 7/6/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/6/2021 Conditional Approval JONATHAN QUACH
Deputy Fireproofing 7/7/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/7/2021 Conditional Approval JONATHAN QUACH
Deputy Fireproofing 7/8/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 7/8/2021 Conditional Approval RUSSELL BONVOULOIR
Deputy Fireproofing 7/9/2021 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 7/9/2021 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 7/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/22/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 7/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/27/2021 Conditional Approval TIMOTHY BUXTON
Deputy Steel/Welding 7/27/2021 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 7/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/28/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 7/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/30/2021 Conditional Approval TIMOTHY BUXTON
Deputy Steel/Welding 7/30/2021 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 8/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/11/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 8/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/19/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 8/19/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 8/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/31/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/3/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/13/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 9/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/17/2021 Conditional Approval MARK FERRARI
Deputy Fireproofing 9/17/2021 Conditional Approval MARK FERRARI
Deputy Fireproofing 9/20/2021 Conditional Approval JONATHAN QUACH
Deputy Fireproofing 9/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/30/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/4/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/5/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/6/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 10/6/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/7/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/15/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/20/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/22/2021 Conditional Approval DANIEL COLLINS
Deputy Fireproofing 10/22/2021 Conditional Approval DANIEL COLLINS
Deputy Drilled-In Anchors 10/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/25/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/26/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/28/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 10/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 10/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/1/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/2/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/3/2021 Conditional Approval TED RIES
Deputy Fireproofing 11/3/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/4/2021 Conditional Approval TED RIES
Deputy Fireproofing 11/4/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/5/2021 Conditional Approval TED RIES
Deputy Fireproofing 11/5/2021 Conditional Approval TED RIES
Deputy Drilled-In Anchors 11/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/10/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/10/2021 Not Ready for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/12/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/15/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/18/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/19/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/22/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/23/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/23/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 11/23/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 11/24/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 11/29/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 11/30/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/1/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/2/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/3/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/6/2021 Conditional Approval NICK DANERI
Deputy Fireproofing 12/6/2021 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 12/7/2021 Conditional Approval RAFAEL ESPINOZA
Deputy Fireproofing 12/7/2021 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 12/7/2021 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 12/7/2021 Partial Approval RAFAEL ESPINOZA
Deputy Drilled-In Anchors 12/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/8/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/9/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/10/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 12/10/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/13/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/14/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/15/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/16/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/17/2021 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/20/2021 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/21/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 12/21/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/23/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 12/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/27/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/28/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 12/29/2021 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 12/29/2021 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 12/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 12/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/30/2021 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/4/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 1/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/11/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/19/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/19/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 1/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/21/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/21/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/24/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/24/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/24/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/28/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 1/28/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 1/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 1/31/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 1/31/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 1/31/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/10/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 2/10/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 2/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 2/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 2/22/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 2/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/24/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/24/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 2/24/2022 Not Ready for Inspection EDWIN GREGORYONA
Deputy Fireproofing 2/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 2/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 2/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 2/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/2/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/8/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/22/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 3/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/24/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/24/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/24/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 3/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/30/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/30/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/30/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 3/31/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 3/31/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 3/31/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/7/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/8/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/11/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/11/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/14/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/15/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/21/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 4/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/25/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/26/2022 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/26/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/26/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/26/2022 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/27/2022 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 4/27/2022 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 4/27/2022 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/27/2022 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/28/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 4/28/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 4/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 4/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 4/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 4/29/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/3/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/4/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/9/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/10/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/16/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/17/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/20/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 5/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 5/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 5/23/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/25/2022 Conditional Approval TERRY HERR
Deputy Fireproofing 5/25/2022 Conditional Approval TERRY HERR
Deputy Reinf. Concrete 5/25/2022 Conditional Approval TERRY HERR
Deputy Steel/Welding 5/25/2022 Conditional Approval TERRY HERR
Deputy Drilled-In Anchors 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/31/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/1/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/1/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 6/1/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/1/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/2/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/9/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/13/2022 Partial Approval EDWIN GREGORYONA
Drywall Nailing 6/13/2022 Not Ready for Inspection EDWIN GREGORYONA
Interior/Exterior Lathing 6/13/2022 Partial Approval EDWIN GREGORYONA
Light Gage Steel Frame 6/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 6/17/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 6/21/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/21/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/21/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/21/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 6/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 6/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 6/22/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/23/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/24/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/28/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/29/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/30/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/1/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/6/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/7/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/11/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 7/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/12/2022 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 7/12/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/13/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/14/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/15/2022 Conditional Approval TED RIES
Deputy Fireproofing 7/15/2022 Conditional Approval TED RIES
Deputy Reinf. Concrete 7/15/2022 Conditional Approval TED RIES
Deputy Steel/Welding 7/15/2022 Conditional Approval TED RIES
Deputy Drilled-In Anchors 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/18/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/18/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 7/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/19/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 7/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 7/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 7/20/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/21/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/22/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/25/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/25/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/25/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/25/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 7/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/27/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 7/29/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 7/29/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 7/29/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 7/29/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/2/2022 Partial Approval JAMES POWERS
Deputy Fireproofing 8/2/2022 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2022 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/2/2022 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/3/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/4/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/5/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/8/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/9/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/10/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/11/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/12/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/15/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/16/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/17/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 8/18/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 8/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 8/22/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 8/22/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/22/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/23/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/24/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 8/24/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/24/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/25/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 8/25/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/25/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 8/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 8/26/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 8/29/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 8/29/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/29/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/30/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 8/30/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/30/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/31/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 8/31/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/31/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Fireproofing 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 9/1/2022 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 9/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/2/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 9/12/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 9/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 9/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 9/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 9/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/19/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 9/20/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 9/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 9/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/27/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 9/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 9/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 9/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Steel/Welding 9/28/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 10/3/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 10/13/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/13/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 10/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 10/24/2022 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/4/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/4/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/4/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 11/4/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/10/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/14/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/15/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/16/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/17/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 11/30/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 12/1/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 12/2/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 12/5/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/6/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/6/2022 Partial Approval EDWIN GREGORYONA
Deputy Fireproofing 12/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/7/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/8/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/9/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/9/2022 Conditional Approval MICHAEL ROSENBERG