825 S HILL ST 90014

Certificate Information: 825 S HILL ST 90014

Application / Permit
14010-10002-01775
Plan Check / Job No.
B15LA14363
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Proposed FOUNDATION ONLY PERMIT FOR A 49 story high rise with 498 APARTMENT Units, 4,489 sf of ground floor retail including 2 levels of subterranean parking and 5 levels of podium parking.
Permit Issued
Issued on 6/30/2016
Issuing Office
Metro
Current Status
Permit Finaled on 1/19/2021

Permit Application Status History

Plan Check Approved 6/17/2016 JOHN VASQUEZ
Issued 6/30/2016 LADBS
Permit Finaled 1/19/2021 NICK DANERI

Permit Application Clearance Information

Highway dedication Cleared 12/16/2015 AVALYN KAMACHI
Permit Cleared 12/16/2015 CHRISTINE SOTELO
Roof/Waste drainage to street Cleared 12/16/2015 CHRISTINE SOTELO
Low Impact Development Cleared 12/22/2015 VIJAY DESAI
Stormwater Pollution Mitigatn Cleared 12/22/2015 VIJAY DESAI
Address approval Cleared 1/21/2016 ARMENIA HERNANDEZ
Sewer availability Cleared 1/21/2016 ARMENIA HERNANDEZ
Work Adjacent to Public Way Cleared 1/21/2016 ARMENIA HERNANDEZ
Project located in CRA area Cleared 1/27/2016 JIM URQUHART
Project located in CRA area Cleared 1/27/2016 JIM URQUHART
Miscellaneous Cleared 1/28/2016 KIT AWAKUNI
DAS Clearance Cleared 2/4/2016 JOHN VASQUEZ
Fire Marshall Fire Life Safety Cleared 2/5/2016 DAVE MYERS
Bicycle Parking Cleared 2/9/2016 COLLINS ALLAN
Driveway location Cleared 2/9/2016 COLLINS ALLAN
Encroachment in public way Cleared 2/9/2016 ARMENIA HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 2/9/2016 PAMELA TENEZA
Internal circulation Cleared 2/9/2016 COLLINS ALLAN
Green Code Cleared 2/11/2016 RUSSELL KELLY
Hydrant and Access approval Cleared 2/11/2016 JOHN CONNEALLY
Methane Ordinance Cleared 2/12/2016 DAVE MYERS
"D" conditions Cleared 2/29/2016 MARITZA PRZEKOP
"Q" conditions Cleared 2/29/2016 MARITZA PRZEKOP
"T" removal Cleared 2/29/2016 MARITZA PRZEKOP
Frnt yard landscape/Water mgmt Cleared 2/29/2016 MARITZA PRZEKOP
Miscellaneous Cleared 2/29/2016 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 2/29/2016 MARITZA PRZEKOP
Site Plan review Cleared 2/29/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 2/29/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 2/29/2016 MARITZA PRZEKOP
Building over 3-story or 36-ft Cleared 3/1/2016 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/1/2016 CALOSHA APPROVED
CPC Cleared 6/15/2016 MARITZA PRZEKOP

Contact Information

Architect Dikeakos, Christos; Lic. No.: C28024 212-3989 HENNING DR      BURNABY BC, V5C 6N5
Contractor Onni Contracting (California) Inc; Lic. No.: 976929-B 315 WEST 9TH STREET #801      LOS ANGELES, CA 90015
Engineer Bittar, Simon Yousef; Lic. No.: C68166 11443 FOX HOLLOW LN      LOS ANGELES, CA 91331
Engineer Cortez, Artedi Baligod; Lic. No.: GE239 7091 LISA LANE      WESTMINSTER, CA 92683
Engineer O'Keeffe, Michael John; Lic. No.: S4879 1661 W 5TH AVE      VANCOUVER, BC, V6J1N5
Engineer Powers, Brian Frederick; Lic. No.: C75902 2090 WEST 31ST STREET      LOS ANGELES, CA 90018

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 7/22/2016 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/25/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/28/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 7/29/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/3/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/4/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/5/2016 Conditional Approval KATY RAMIREZ
Deputy Methane Barrier 8/15/2016 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 8/15/2016 Conditional Approval KATY RAMIREZ
Deputy Methane Barrier 8/16/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/16/2016 Conditional Approval NICK DANERI
Footing/Foundation/Slab 8/16/2016 Partial Approval NICK DANERI
Deputy Methane Barrier 8/17/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/17/2016 Approved TIMOTHY LYNN
Deputy Reinf. Concrete 8/17/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/18/2016 Conditional Approval NICK DANERI
Deputy Methane Barrier 8/19/2016 Approved TIMOTHY LYNN
Deputy Other (see comments) 8/19/2016 Approved TIMOTHY LYNN
Deputy Reinf. Concrete 8/19/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/23/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/24/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/24/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/25/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/25/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/26/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/26/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/26/2016 Corrections Issued LESLIE TRUJILLO
Deputy Other (see comments) 8/29/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/29/2016 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 8/30/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/30/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/2/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/2/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/6/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/6/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/7/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/7/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 9/14/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/15/2016 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 9/15/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/15/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/16/2016 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 9/16/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/16/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/19/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 9/19/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/19/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/20/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 9/20/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/20/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 9/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/23/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/27/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/28/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/28/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/5/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 10/6/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/6/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 10/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/11/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/12/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/13/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/14/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/17/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 10/18/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/18/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 10/19/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/19/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/20/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/21/2016 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/24/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/25/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 10/26/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/26/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/27/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/28/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 10/31/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/31/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/7/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/10/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/14/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/15/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 11/16/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/16/2016 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 11/17/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/17/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/18/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/22/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/23/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/28/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/29/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/30/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/5/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/6/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/7/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/9/2016 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/15/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/27/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/28/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/30/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/26/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 2/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 2/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/9/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 3/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/12/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/20/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 6/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/23/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/25/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 8/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/28/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/6/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/19/2019 Conditional Approval LESLIE TRUJILLO
Final 1/19/2021 Permit Finaled NICK DANERI
Footing/Foundation/Slab 1/19/2021 Approved NICK DANERI
Smoke Detectors 1/19/2021 Approved NICK DANERI