11311 W LA GRANGE AVE 90025

Certificate Information: 11311 W LA GRANGE AVE 90025

Application / Permit
14010-10000-04166
Plan Check / Job No.
B14LA17792
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
PROPOSED MIXED USE APARTMENT/OFFICE/RETAIL/PARKING BLDG. PER AA 2013-2709-PMLA AND DIR 2014-2867-DB-SPR-1A. SEE PERMIT 17030-10000-00525 FOR GRADING AND 16020-10000-01338 FOR SHORING.
Permit Issued
Issued on 6/7/2017
Issuing Office
West Los Angeles
Current Status
CofO Issued on 7/16/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/30/2014 APPLICANT
Disabled Access Plans Picked Up 2/12/2015 APPLICANT
Assigned to Plan Check Engineer 2/13/2015 LAWRENCE QUIRANTE
Green Plans Picked Up 2/24/2015 APPLICANT
Corrections Issued 3/9/2015 LAWRENCE QUIRANTE
Quality Review Completed 3/10/2015 TIEN JEN WANG
Building Plans Picked Up 3/11/2015 APPLICANT
Applicant returned to address corrections 5/19/2015 LAWRENCE QUIRANTE
Applicant returned to address corrections 4/20/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/20/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 7/28/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 8/2/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 8/4/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 8/15/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 9/7/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 9/21/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 10/3/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 11/15/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 12/15/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 1/4/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 1/11/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 1/19/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 1/30/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 2/6/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 3/1/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 3/13/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 5/17/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 5/23/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 5/30/2017 LAWRENCE QUIRANTE
Applicant returned to address corrections 5/31/2017 LAWRENCE QUIRANTE
Plan Check Approved 6/5/2017 LAWRENCE QUIRANTE
Issued 6/7/2017 LADBS
TCO Issued (Expire Date: 05-13-2020) 11/15/2019 HENRY BAGHDASSARIAN
TCO Issued (Expire Date: 11-10-2020) 5/14/2020 HENRY BAGHDASSARIAN
CofO in Progress 7/15/2020 DERRICK SPENCER
CofO in Progress 7/15/2020 DERRICK SPENCER
Permit Finaled 7/16/2020 HENRY BAGHDASSARIAN
CofO Issued 7/16/2020 HENRY BAGHDASSARIAN
Permit Finaled 7/16/2020 HENRY BAGHDASSARIAN

Permit Application Clearance Information

CPC Cleared 4/18/2016 JOHN DACEY
Tract Map conditions Cleared 4/18/2016 JOHN DACEY
Tract Map conditions Cleared 4/18/2016 JOHN DACEY
Eng Process Fee Ord 176,300 Cleared 4/20/2016 HISASHI KOBAYAKAWA
Highway dedication Cleared 5/13/2016 HUGO RICO
Sewer availability Cleared 5/26/2016 HUGO RICO
Building over 3-story or 36-ft Cleared 6/29/2016 CALOSHA APPROVED
Housing density bonus Cleared 12/7/2016 ALFREDA MASTERS
Permit Cleared 12/8/2016 LUZ RABELO
Stormwater Pollution Mitigatn Cleared 12/22/2016 MICHAEL SCADUTO
Specific Plan Cleared 12/23/2016 EDER ROMERO
Roof/Waste drainage to street Cleared 1/9/2017 CHEN ZHANG
Work Adjacent to Public Way Cleared 1/9/2017 MARYAM AZARBAYJANI
Bicycle Parking Cleared 2/21/2017 KATHLEEN HUGHEY
Miscellaneous Cleared 2/28/2017 EDBER MACEDO
Miscellaneous Cleared 2/28/2017 EDBER MACEDO
Opn space landscape/Water mgmt Cleared 2/28/2017 EDBER MACEDO
Site Plan review Cleared 2/28/2017 EDBER MACEDO
Address approval Cleared 3/13/2017 ALFREDO JARA
Hydrant and Access approval Cleared 3/20/2017 ROBERT DUFF
DAS Clearance Cleared 5/17/2017 SHINE LIN
Fire Marshall Fire Life Safety Cleared 5/25/2017 MENOA AGHAJANI
Green Code Cleared 5/31/2017 MARCUS LEVIAS

Contact Information

Architect Kudelka, Phillip Roman; Lic. No.: C19548 PK ARCHITECTURE   22663 COLLINS ST    WOODLAND HILLS, CA 913674433
Contractor Owner-Builder       ,
Engineer Funk, David Lyle; Lic. No.: S5421 619 BERYL ST      REDONDO BEACH, CA 90277
Engineer Irvine, Jon Alan; Lic. No.: GE2891 145 N SIERRA MADRE BLVD      PASADENA, CA 91107

Inspector Information

DERRICK SPENCER, (310) 914-3919 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 6/30/2017 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/6/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/6/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 7/7/2017 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/7/2017 Partial Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 7/17/2017 Partial Inspection DANIEL MC AULIFFE
Deputy Wood Construction 7/21/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 7/24/2017 Approved DERRICK SPENCER
Deputy Shotcrete 7/25/2017 Approved DERRICK SPENCER
Deputy Shotcrete 7/26/2017 Approved DERRICK SPENCER
Footing/Foundation/Slab 7/26/2017 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 7/27/2017 Approved DERRICK SPENCER
Deputy Shotcrete 7/27/2017 Approved DERRICK SPENCER
Deputy Reinf. Concrete 7/28/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 7/28/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 7/28/2017 Partial Inspection DANIEL MC AULIFFE
Piling/Pier/Caisson 7/31/2017 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Shotcrete 8/1/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 8/2/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/2/2017 Partial Approval DANIEL MC AULIFFE
Deputy Other (see comments) 8/3/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 8/3/2017 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/3/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/4/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 8/4/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/4/2017 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 8/7/2017 Partial Approval DANIEL MC AULIFFE
Verify Sprinkler Sign Off 8/7/2017 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/9/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/9/2017 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/16/2017 Partial Approval DERRICK SPENCER
Deputy Reinf. Concrete 8/18/2017 Approved DERRICK SPENCER
Piling/Pier/Caisson 8/22/2017 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/24/2017 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 8/29/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 8/30/2017 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 8/31/2017 Partial Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/5/2017 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 9/6/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/8/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/8/2017 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/11/2017 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 9/14/2017 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/15/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/15/2017 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/18/2017 Conditional Approval DANIEL MC AULIFFE
Masonry Wall/Backfill 9/18/2017 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Shotcrete 9/19/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/19/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 9/20/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 9/25/2017 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 9/25/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 9/26/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 9/29/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 9/29/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/2/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 10/5/2017 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/10/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 10/10/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/11/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/13/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 10/13/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 10/17/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 10/17/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/27/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/30/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 10/30/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 10/31/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/1/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/3/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/3/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/6/2017 Conditional Approval DANIEL MC AULIFFE
Reinforced Masonry Frame 11/6/2017 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/7/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/9/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/9/2017 Partial Approval DANIEL MC AULIFFE
Green Building Rough 11/13/2017 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 11/13/2017 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/15/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/15/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/16/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/16/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/16/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/17/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/17/2017 Conditional Approval DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 11/17/2017 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 11/20/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/21/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/21/2017 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/22/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Masonry 11/27/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 11/28/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 11/30/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/13/2017 Approved JONATHAN ALLEN
Footing/Foundation/Slab 12/15/2017 Partial Approval JONATHAN ALLEN
Green Building Rough 12/21/2017 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 12/21/2017 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/22/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 12/22/2017 Partial Approval DANIEL MC AULIFFE
Green Building Rough 12/26/2017 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 12/26/2017 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/27/2017 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 12/27/2017 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/28/2017 Approved DANIEL MC AULIFFE
Reinforced Concrete Frame 12/28/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 12/29/2017 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/4/2018 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 1/4/2018 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/5/2018 Approved DANIEL MC AULIFFE
Green Building Rough 1/5/2018 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 1/5/2018 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/10/2018 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/11/2018 Approved DANIEL MC AULIFFE
Green Building Rough 1/11/2018 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 1/11/2018 Partial Inspection DANIEL MC AULIFFE
Footing/Foundation/Slab 1/15/2018 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 1/16/2018 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 1/16/2018 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 1/16/2018 Partial Approval DANIEL MC AULIFFE
Deputy Shotcrete 1/17/2018 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 1/18/2018 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/19/2018 Conditional Approval DANIEL MC AULIFFE
Deputy Shotcrete 1/19/2018 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 1/22/2018 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/23/2018 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/24/2018 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 1/24/2018 Not Ready for Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 1/25/2018 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/25/2018 Approved DANIEL MC AULIFFE
Green Building Rough 1/25/2018 Not Ready for Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 1/25/2018 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/29/2018 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 1/29/2018 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/14/2018 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/20/2018 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 2/20/2018 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/21/2018 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/27/2018 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 2/27/2018 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/28/2018 Approved DANIEL MC AULIFFE
Reinforced Masonry Frame 3/6/2018 Partial Inspection DANIEL MC AULIFFE
Deputy Drilled-In Anchors 3/7/2018 Approved DANIEL MC AULIFFE
Reinforced Masonry Frame 3/7/2018 Partial Inspection DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/12/2018 Approved DANIEL MC AULIFFE
Footing/Foundation/Slab 3/12/2018 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 3/14/2018 Approved DANIEL MC AULIFFE
Green Building Rough 3/14/2018 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 3/14/2018 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 3/19/2018 Approved DANIEL MC AULIFFE
Green Building Rough 3/19/2018 Not Ready for Inspection DANIEL MC AULIFFE
Wood Frame 3/19/2018 Partial Inspection DANIEL MC AULIFFE
Green Building Rough 3/30/2018 Not Ready for Inspection DANIEL MC AULIFFE
Wood Frame 3/30/2018 Partial Inspection DANIEL MC AULIFFE
Green Building Rough 4/3/2018 Partial Inspection DANIEL MC AULIFFE
Wood Frame 4/3/2018 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 4/10/2018 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 4/10/2018 Partial Inspection DANIEL MC AULIFFE
Wood Frame 4/10/2018 Partial Approval DANIEL MC AULIFFE
Green Building Rough 4/12/2018 Partial Approval DANIEL MC AULIFFE
Wood Frame 4/12/2018 Partial Inspection DANIEL MC AULIFFE
Deputy Wood Construction 4/18/2018 Approved DANIEL MC AULIFFE
Green Building Rough 4/18/2018 Partial Inspection DANIEL MC AULIFFE
Wood Frame 4/18/2018 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 4/19/2018 Conditional Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 4/19/2018 Partial Approval JONATHAN ALLEN
Deputy Wood Construction 5/1/2018 Conditional Approval DANIEL MC AULIFFE
Green Building Rough 5/2/2018 Partial Inspection DANIEL MC AULIFFE
Wood Frame 5/2/2018 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 5/9/2018 Approved DANIEL MC AULIFFE
Green Building Rough 5/10/2018 Partial Inspection DANIEL MC AULIFFE
Wood Frame 5/10/2018 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 5/17/2018 Approved DANIEL MC AULIFFE
Green Building Rough 5/17/2018 Partial Inspection DANIEL MC AULIFFE
Wood Frame 5/17/2018 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 5/30/2018 Approved TONY HARTONO
Deputy Wood Construction 5/31/2018 Approved DERRICK SPENCER
Floor/Roof Diaphrgm/Shear Wall 5/31/2018 Partial Approval DERRICK SPENCER
Deputy Wood Construction 6/22/2018 Approved DANIEL MC AULIFFE
Green Building Rough 6/22/2018 Approved DANIEL MC AULIFFE
Wood Frame 6/22/2018 Partial Inspection DANIEL MC AULIFFE
Deputy Wood Construction 6/28/2018 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 7/26/2018 Conditional Approval DANIEL MC AULIFFE
Deputy Wood Construction 8/28/2018 Conditional Approval DANIEL MC AULIFFE
Wood Frame 8/29/2018 No Access for Inspection TONY HARTONO
Wood Frame 8/31/2018 Partial Approval DANIEL MC AULIFFE
Wood Frame 9/7/2018 Partial Inspection DANIEL MC AULIFFE
Wood Frame 9/12/2018 Partial Approval DANIEL MC AULIFFE
Wood Frame 9/20/2018 Partial Approval DANIEL MC AULIFFE
Insulation 9/24/2018 Partial Approval DANIEL MC AULIFFE
Deputy Wood Construction 9/26/2018 Conditional Approval DANIEL MC AULIFFE
Wood Frame 9/27/2018 Partial Approval DERRICK SPENCER
Wood Frame 10/2/2018 Partial Approval DANIEL MC AULIFFE
Wood Frame 10/15/2018 Partial Inspection DANIEL MC AULIFFE
Insulation 10/16/2018 Partial Approval DANIEL MC AULIFFE
Wood Frame 10/18/2018 Partial Approval DANIEL MC AULIFFE
Wood Frame 10/22/2018 Partial Approval DANIEL MC AULIFFE
Wood Frame 10/25/2018 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 10/31/2018 Partial Approval DANIEL MC AULIFFE
Insulation 10/31/2018 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 11/26/2018 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 12/5/2018 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 12/5/2018 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 12/18/2018 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 12/21/2018 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 1/7/2019 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 1/9/2019 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 1/11/2019 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 1/14/2019 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 1/15/2019 Partial Inspection DANIEL MC AULIFFE
Drywall Nailing 1/24/2019 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 2/7/2019 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 2/8/2019 Partial Approval DANIEL MC AULIFFE
Interior/Exterior Lathing 2/11/2019 Partial Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 2/14/2019 Approved DANIEL MC AULIFFE
Light Gage Steel Frame 2/14/2019 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 2/21/2019 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 2/25/2019 Partial Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 2/28/2019 Partial Approval DANIEL MC AULIFFE
Wood Frame 3/4/2019 Partial Approval DANIEL MC AULIFFE
Reinforced Concrete Frame 3/7/2019 Partial Inspection DANIEL MC AULIFFE
Reinforced Concrete Frame 3/11/2019 Partial Approval DANIEL MC AULIFFE
Wood Frame 3/22/2019 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 3/27/2019 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 4/2/2019 Partial Approval DANIEL MC AULIFFE
Light Gage Steel Frame 4/4/2019 Partial Approval DANIEL MC AULIFFE
Insulation 4/5/2019 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 4/11/2019 Partial Approval PAUL DAVIDSON
Drywall Nailing 4/16/2019 Partial Approval DANIEL MC AULIFFE
Drywall Nailing 4/18/2019 Partial Approval DANIEL MC AULIFFE
Wood Frame 4/23/2019 Partial Approval DANIEL MC AULIFFE
Wood Frame 4/26/2019 Partial Inspection DANIEL MC AULIFFE
Light Gage Steel Frame 5/3/2019 Not Ready for Inspection DANIEL MC AULIFFE
T-Bar Ceiling 5/9/2019 Partial Inspection DANIEL MC AULIFFE
T-Bar Ceiling 5/10/2019 Partial Approval DANIEL MC AULIFFE
Wood Frame 5/20/2019 Corrections Issued DANIEL MC AULIFFE
T-Bar Ceiling 5/29/2019 Corrections Issued DANIEL MC AULIFFE
Light Gage Steel Frame 6/25/2019 Partial Approval DERRICK SPENCER
Light Gage Steel Frame 7/9/2019 Partial Approval DERRICK SPENCER
T-Bar Ceiling 7/9/2019 Not Ready for Inspection DERRICK SPENCER
Pre-Inspection 7/12/2019 Approved SORIN CIRSTOIU
Light Gage Steel Frame 7/24/2019 Partial Approval DERRICK SPENCER
T-Bar Ceiling 7/30/2019 Approved DERRICK SPENCER
Interior/Exterior Lathing 8/1/2019 Partial Approval DERRICK SPENCER
Final 11/5/2019 Not Ready for Inspection DERRICK SPENCER
Footing/Foundation/Slab 11/5/2019 Approved DERRICK SPENCER
Green Building Final 11/5/2019 Approved DERRICK SPENCER
Reinforced Concrete Frame 11/5/2019 Approved DERRICK SPENCER
SGSOV-Seismic Gas S/O Valve 11/5/2019 SGSOV Approved DERRICK SPENCER
Smoke Detectors 11/5/2019 Approved DERRICK SPENCER
Wood Frame 11/5/2019 Approved DERRICK SPENCER
Final 11/7/2019 Partial Approval DERRICK SPENCER
Final 11/13/2019 Not Ready for Inspection DERRICK SPENCER
Final 2/25/2020 Not Ready for Inspection DERRICK SPENCER
Final 3/20/2020 Not Ready for Inspection DERRICK SPENCER
Special/Order Compliance 4/28/2020 Approved DERRICK SPENCER
Final 7/7/2020 OK to Issue CofO DERRICK SPENCER