Pre-Inspection
|
9/26/2016
|
Approved
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
4/7/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
4/14/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
4/14/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
4/14/2017
|
No Access for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
4/14/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
4/17/2017
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/19/2017
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
4/19/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/20/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
8/30/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
8/31/2017
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
9/1/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
9/5/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/6/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/7/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
9/11/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
9/12/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
9/13/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
9/14/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
9/15/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
9/26/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
9/27/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
9/27/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/28/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/29/2017
|
Partial Approval
|
JONATHAN QUACH
|
|
METHANE-Barrier
|
10/3/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
10/3/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
10/3/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/10/2017
|
Partial Approval
|
JONATHAN QUACH
|
|
Excavation/Setback/Form/Re-Bar
|
10/23/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
10/23/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
10/23/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
10/23/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
10/24/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
10/25/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/26/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/30/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/3/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
11/22/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/22/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
11/22/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
11/29/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
12/1/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
12/1/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
12/19/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
12/19/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
12/19/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
12/19/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/22/2017
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
12/26/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
12/26/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
12/26/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
12/26/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
12/26/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
12/28/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
12/29/2017
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
12/29/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
12/29/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
12/29/2017
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
12/29/2017
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
12/29/2017
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
12/29/2017
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
1/2/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/11/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
1/12/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
1/12/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
1/12/2018
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/17/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
1/23/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
1/24/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
1/24/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
1/24/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
1/25/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
1/25/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
1/25/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
1/26/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/26/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
1/26/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
1/29/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
2/1/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
2/5/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
2/5/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Methane Barrier
|
2/7/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
2/8/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
2/8/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
2/8/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
2/12/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/12/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
2/12/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/12/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
2/13/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/17/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
2/17/2018
|
Partial Approval
|
JAMES POWERS
|
|
Reinforced Masonry Frame
|
2/17/2018
|
Partial Approval
|
JAMES POWERS
|
|
Verify Sprinkler Sign Off
|
2/17/2018
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Excavation/Setback/Form/Re-Bar
|
2/26/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/18/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
4/24/2018
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
5/3/2018
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
5/3/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
5/3/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
5/3/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
5/3/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
5/3/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
5/7/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/7/2018
|
Approved
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
5/8/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
5/8/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
5/8/2018
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
5/8/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
5/8/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
5/10/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
5/10/2018
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
6/4/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
6/5/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
6/6/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
6/8/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/13/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
6/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
6/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
6/25/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
6/28/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
6/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
6/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
6/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
6/28/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
7/2/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
7/2/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
7/2/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
7/2/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
7/19/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
7/19/2018
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
7/25/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/27/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
7/30/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
8/16/2018
|
Approved
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/16/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
9/6/2018
|
Approved
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/6/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/14/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/1/2018
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
10/2/2018
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/29/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
11/7/2018
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/13/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
11/13/2018
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/7/2018
|
Partial Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/8/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
2/8/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/8/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/13/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
2/13/2019
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
2/13/2019
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
3/4/2019
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
3/20/2019
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
3/20/2019
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
11/20/2019
|
Corrections Issued
|
JONATHAN QUACH
|
|
Masonry Wall/Backfill
|
11/20/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Masonry Wall/Backfill
|
12/6/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/10/2019
|
Partial Approval
|
JONATHAN QUACH
|
|
Masonry Wall/Backfill
|
12/10/2019
|
Partial Approval
|
JONATHAN QUACH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/18/2019
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/14/2020
|
Approved
|
LARRY ARNICK
|
|
Drywall Nailing
|
2/21/2020
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
3/4/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
3/4/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
3/24/2020
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
3/31/2020
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
3/31/2020
|
Approved
|
LARRY ARNICK
|
|
Drywall Nailing
|
4/1/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
4/1/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
6/22/2020
|
Partial Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
6/22/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/22/2020
|
Partial Approval
|
JONATHAN QUACH
|
|
Drywall Nailing
|
8/6/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
8/7/2020
|
Approved
|
LARRY ARNICK
|
|
Green Building Rough
|
9/4/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
9/4/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
9/4/2020
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Footing/Foundation/Slab
|
12/15/2020
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
12/31/2020
|
Partial Approval
|
LARRY ARNICK
|
|
Masonry Wall/Backfill
|
2/4/2021
|
Approved
|
LARRY ARNICK
|
|
Special/Order Compliance
|
2/18/2021
|
Approved
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
4/28/2021
|
Approved
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
6/16/2021
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
3/11/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
4/13/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
4/13/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
4/13/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
4/20/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
4/26/2022
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
4/28/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
4/29/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
8/17/2022
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
8/19/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
10/12/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Final
|
10/18/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
10/18/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Green Building Final
|
10/18/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
10/18/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Reinforced Masonry Frame
|
10/18/2022
|
Approved
|
EDWIN GREGORYONA
|
|
SGSOV-Seismic Gas S/O Valve
|
10/18/2022
|
SGSOV Not Ready
|
EDWIN GREGORYONA
|
|
Smoke Detectors
|
10/18/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
10/18/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Structural Steel Frame
|
10/18/2022
|
Approved
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
1/13/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
1/13/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Final
|
1/17/2023
|
Partial Inspection
|
EDWIN GREGORYONA
|
|
Green Building Final
|
1/17/2023
|
Approved
|
EDWIN GREGORYONA
|
|
Pre-Inspection
|
1/17/2023
|
Approved
|
EDWIN GREGORYONA
|
|
SGSOV-Seismic Gas S/O Valve
|
1/17/2023
|
SGSOV Approved
|
EDWIN GREGORYONA
|
|
Smoke Detectors
|
1/17/2023
|
Approved
|
EDWIN GREGORYONA
|
|
Final
|
2/6/2023
|
Conditional Approval
|
EDWIN GREGORYONA
|