124 S CROFT AVE 1-13 90048

Certificate Information: 124 S CROFT AVE 1-13 90048

Application / Permit
14010-10000-02886
Plan Check / Job No.
B14LA12033
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 13 UNITS (ONE VERY LOW INCOME AFFORDABLE UNIT ) APARTMENT BUILDING WITH ONE LEVEL BASEMENT GARAGE PER DIR-2014-4659-DB
Permit Issued
Issued on 3/2/2016
Issuing Office
Metro
Current Status
CofO Issued on 3/17/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/4/2014 APPLICANT
Assigned to Plan Check Engineer 9/18/2014 SAI KHUM
Disabled Access Plans Picked Up 9/24/2014 APPLICANT
Green Plans Picked Up 9/24/2014 APPLICANT
Corrections Issued 10/8/2014 SAI KHUM
Quality Review Completed 10/15/2014 CHARLES CHANG
Building Plans Picked Up 10/16/2014 APPLICANT
Applicant returned to address corrections 11/12/2014 SAI KHUM
Applicant returned to address corrections 1/8/2015 SAI KHUM
Applicant returned to address corrections 3/31/2015 SAI KHUM
Applicant returned to address corrections 5/7/2015 SAI KHUM
Applicant returned to address corrections 5/18/2015 SAI KHUM
Applicant returned to address corrections 6/19/2015 SAI KHUM
Applicant returned to address corrections 10/7/2015 SAI KHUM
Applicant returned to address corrections 10/19/2015 SAI KHUM
Applicant returned to address corrections 11/4/2015 SAI KHUM
Applicant returned to address corrections 1/21/2016 SAI KHUM
Applicant returned to address corrections 2/17/2016 SAI KHUM
Applicant returned to address corrections 2/24/2016 SAI KHUM
Plan Check Approved 3/2/2016 SAI KWAN KHUM
Issued 3/2/2016 LADBS
CofO in Progress 3/7/2023 EDWIN GREGORYONA
Permit Finaled 3/17/2023 TED RIES
CofO Issued 3/17/2023 TED RIES
Permit Finaled 3/17/2023 TED RIES

Permit Application Clearance Information

Address approval Cleared 10/21/2014 JAMES MORALEZ
Permit Cleared 10/21/2014 JAMES MORALEZ
Hydrant and Access approval Cleared 2/24/2015 ROBERT DUFF
Eng Process Fee Ord 176,300 Cleared 2/27/2015 RICHARD SOUTHERLAND
Frnt yard landscape/Water mgmt Cleared 2/27/2015 MINDY NGUYEN
Opn space landscape/Water mgmt Cleared 2/27/2015 MINDY NGUYEN
Sewer availability Cleared 2/27/2015 RICHARD SOUTHERLAND
Miscellaneous Cleared 7/6/2015 PHYLLIS PARKER
Housing density bonus Cleared 10/14/2015 REX LEE
Building over 3-story or 36-ft Cleared 11/10/2015 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 11/10/2015 CALOSHA APPROVED
Miscellaneous Cleared 11/12/2015 ANDY RODRIGUEZ
Work Adjacent to Public Way Cleared 11/12/2015 WARREN LIU
Construction near power lines Cleared 1/23/2016 LUCIO FERRER
Miscellaneous Cleared 2/2/2016 RICK TORRES
DAS Clearance Cleared 2/4/2016 SHINE LIN
Fire Marshall Fire Life Safety Cleared 2/4/2016 DAVE MYERS
Methane Ordinance Cleared 2/4/2016 DAVE MYERS
Green Code Cleared 2/8/2016 DONALD CRICHLOW
Low Impact Development Cleared 2/16/2016 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 2/16/2016 ARMENIA HERNANDEZ

Contact Information

Architect Vanos, Vincent Jay; Lic. No.: C22269 2747 MARQUETTE DR      TOPANGA, CA 90290
Contractor Sapphire Construction & Development Inc; Lic. No.: 1000115-B 12400 VENTURA BLVD #1129      STUDIO CITY, CA 91604
Engineer Fischer, Kurt Mark; Lic. No.: S5432 PO BOX 809      POWAY, CA 92074
Engineer Smith, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/26/2016 Approved GREGORY POMISH
Deputy Steel/Welding 4/7/2017 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 4/14/2017 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 4/14/2017 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 4/14/2017 No Access for Inspection DAVID BURKHEAD
METHANE-Subgrade 4/14/2017 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 4/17/2017 Approved DAVID BURKHEAD
Deputy Reinf. Concrete 4/19/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 4/19/2017 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 8/30/2017 Conditional Approval DAVID BURKHEAD
METHANE-Barrier 8/31/2017 Partial Inspection DAVID BURKHEAD
Deputy Methane Barrier 9/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 9/5/2017 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/6/2017 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/7/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 9/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 9/12/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 9/13/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 9/14/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 9/15/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 9/26/2017 Conditional Approval DAVID BURKHEAD
METHANE-Barrier 9/27/2017 Partial Approval DAVID BURKHEAD
METHANE-Subgrade 9/27/2017 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/28/2017 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 9/29/2017 Partial Approval JONATHAN QUACH
METHANE-Barrier 10/3/2017 Partial Approval DAVID BURKHEAD
METHANE-Rough 10/3/2017 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 10/3/2017 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/10/2017 Partial Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 10/23/2017 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 10/23/2017 Partial Approval DAVID BURKHEAD
METHANE-Barrier 10/23/2017 Partial Approval DAVID BURKHEAD
METHANE-Subgrade 10/23/2017 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 10/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 10/25/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/26/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 10/30/2017 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/3/2017 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 11/22/2017 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/22/2017 Partial Approval DAVID BURKHEAD
METHANE-Barrier 11/22/2017 Partial Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/29/2017 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/1/2017 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/1/2017 Conditional Approval DAVID BURKHEAD
Green Building Rough 12/19/2017 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/19/2017 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 12/19/2017 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/19/2017 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 12/22/2017 Approved DAVID BURKHEAD
Deputy Methane Barrier 12/26/2017 Conditional Approval DAVID BURKHEAD
Green Building Rough 12/26/2017 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/26/2017 Partial Approval DAVID BURKHEAD
Reinforced Masonry Frame 12/26/2017 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/26/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Methane Barrier 12/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 12/29/2017 Conditional Approval DAVID BURKHEAD
Green Building Rough 12/29/2017 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 12/29/2017 Partial Approval DAVID BURKHEAD
METHANE-Rough 12/29/2017 Approved DAVID BURKHEAD
METHANE-Subgrade 12/29/2017 Approved DAVID BURKHEAD
Reinforced Concrete Frame 12/29/2017 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 12/29/2017 Not Ready for Inspection DAVID BURKHEAD
Deputy Methane Barrier 1/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/11/2018 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/12/2018 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 1/12/2018 Partial Approval DAVID BURKHEAD
METHANE-Barrier 1/12/2018 Partial Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 1/17/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Methane Barrier 1/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/24/2018 Conditional Approval DAVID BURKHEAD
METHANE-Barrier 1/24/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Methane Barrier 1/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/25/2018 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/25/2018 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 1/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 1/29/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/5/2018 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 2/5/2018 Partial Approval DAVID BURKHEAD
Deputy Methane Barrier 2/7/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/8/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 2/8/2018 Partial Approval DAVID BURKHEAD
METHANE-Barrier 2/8/2018 Partial Approval DAVID BURKHEAD
Deputy Reinf. Masonry 2/12/2018 Conditional Approval DAVID BURKHEAD
Green Building Rough 2/12/2018 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 2/12/2018 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 2/12/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Masonry 2/13/2018 Conditional Approval DAVID BURKHEAD
Green Building Rough 2/17/2018 Not Ready for Inspection JAMES POWERS
Masonry Wall/Backfill 2/17/2018 Partial Approval JAMES POWERS
Reinforced Masonry Frame 2/17/2018 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/17/2018 Not Ready for Inspection JAMES POWERS
Excavation/Setback/Form/Re-Bar 2/26/2018 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/18/2018 Conditional Approval DAVID BURKHEAD
Special/Order Compliance 4/24/2018 Approved DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/3/2018 Corrections Issued DAVID BURKHEAD
Footing/Foundation/Slab 5/3/2018 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 5/3/2018 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 5/3/2018 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 5/3/2018 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 5/3/2018 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 5/7/2018 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 5/7/2018 Approved DAVID BURKHEAD
Footing/Foundation/Slab 5/8/2018 Conditional Approval DAVID BURKHEAD
Green Building Rough 5/8/2018 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 5/8/2018 Approved DAVID BURKHEAD
Reinforced Concrete Frame 5/8/2018 Conditional Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 5/8/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 5/10/2018 Conditional Approval DAVID BURKHEAD
Special/Order Compliance 5/10/2018 Approved DAVID BURKHEAD
Deputy Steel/Welding 6/4/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/6/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 6/8/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 6/13/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/25/2018 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 6/25/2018 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/25/2018 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/25/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Drilled-In Anchors 6/28/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 6/28/2018 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 6/28/2018 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/28/2018 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/28/2018 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/28/2018 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 7/2/2018 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 7/2/2018 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/2/2018 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 7/2/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 7/19/2018 Conditional Approval DAVID BURKHEAD
Wood Frame 7/19/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Steel/Welding 7/25/2018 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/27/2018 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 7/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Wood Construction 8/16/2018 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/16/2018 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 9/6/2018 Approved DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/6/2018 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 9/14/2018 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 10/1/2018 Partial Approval GREGORY POMISH
Deputy Wood Construction 10/2/2018 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/29/2018 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 11/7/2018 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 11/13/2018 Partial Approval DAVID BURKHEAD
Wood Frame 11/13/2018 Partial Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 12/7/2018 Partial Approval DAVID BURKHEAD
Green Building Rough 2/8/2019 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 2/8/2019 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 2/8/2019 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 2/13/2019 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 2/13/2019 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 2/13/2019 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 3/4/2019 Partial Inspection DAVID BURKHEAD
Drywall Nailing 3/20/2019 Partial Inspection DAVID BURKHEAD
Insulation 3/20/2019 Partial Inspection DAVID BURKHEAD
Drywall Nailing 11/20/2019 Corrections Issued JONATHAN QUACH
Masonry Wall/Backfill 11/20/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/6/2019 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 12/6/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/10/2019 Partial Approval JONATHAN QUACH
Masonry Wall/Backfill 12/10/2019 Partial Approval JONATHAN QUACH
Floor/Roof Diaphrgm/Shear Wall 12/18/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/20/2019 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 2/14/2020 Approved LARRY ARNICK
Drywall Nailing 2/21/2020 Partial Approval LARRY ARNICK
Drywall Nailing 3/4/2020 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 3/4/2020 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 3/24/2020 Partial Approval LARRY ARNICK
Insulation 3/31/2020 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 3/31/2020 Approved LARRY ARNICK
Drywall Nailing 4/1/2020 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 4/1/2020 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 6/22/2020 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 6/22/2020 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 7/22/2020 Partial Approval JONATHAN QUACH
Drywall Nailing 8/6/2020 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 8/7/2020 Approved LARRY ARNICK
Green Building Rough 9/4/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 9/4/2020 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 9/4/2020 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 12/15/2020 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/31/2020 Partial Approval LARRY ARNICK
Masonry Wall/Backfill 2/4/2021 Approved LARRY ARNICK
Special/Order Compliance 2/18/2021 Approved EDWIN GREGORYONA
Special/Order Compliance 4/28/2021 Approved EDWIN GREGORYONA
Pre-Inspection 6/16/2021 Not Ready for Inspection EDWIN GREGORYONA
Special/Order Compliance 3/11/2022 Approved EDWIN GREGORYONA
Green Building Rough 4/13/2022 Approved EDWIN GREGORYONA
Reinforced Concrete Frame 4/13/2022 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/13/2022 Approved EDWIN GREGORYONA
Deputy Drilled-In Anchors 4/20/2022 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 4/26/2022 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 4/28/2022 Partial Approval EDWIN GREGORYONA
Special/Order Compliance 4/29/2022 Approved EDWIN GREGORYONA
Special/Order Compliance 8/17/2022 Not Ready for Inspection GREGORY POMISH
Special/Order Compliance 8/19/2022 Approved EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/12/2022 Partial Approval EDWIN GREGORYONA
Final 10/18/2022 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 10/18/2022 Approved EDWIN GREGORYONA
Green Building Final 10/18/2022 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 10/18/2022 Approved EDWIN GREGORYONA
Reinforced Masonry Frame 10/18/2022 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 10/18/2022 SGSOV Not Ready EDWIN GREGORYONA
Smoke Detectors 10/18/2022 Not Ready for Inspection EDWIN GREGORYONA
Special/Order Compliance 10/18/2022 Approved EDWIN GREGORYONA
Structural Steel Frame 10/18/2022 Approved EDWIN GREGORYONA
Pre-Inspection 1/13/2023 Partial Inspection GREGORY POMISH
Special/Order Compliance 1/13/2023 Partial Inspection GREGORY POMISH
Final 1/17/2023 Partial Inspection EDWIN GREGORYONA
Green Building Final 1/17/2023 Approved EDWIN GREGORYONA
Pre-Inspection 1/17/2023 Approved EDWIN GREGORYONA
SGSOV-Seismic Gas S/O Valve 1/17/2023 SGSOV Approved EDWIN GREGORYONA
Smoke Detectors 1/17/2023 Approved EDWIN GREGORYONA
Final 2/6/2023 Conditional Approval EDWIN GREGORYONA