1122 N OLANCHA DR 90065

Certificate Information: 1122 N OLANCHA DR 90065

Application / Permit
14010-10000-02764
Plan Check / Job No.
B14LA11626
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
New 2 story, single-family dwelling with roof-deck pool and attached two car garage.
Permit Issued
Issued on 1/20/2017
Issuing Office
Metro
Current Status
CofO Issued on 12/18/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/26/2014 APPLICANT
Assigned to Plan Check Engineer 10/16/2014 KESETE HAREGOT
Corrections Issued 10/31/2014 JESSE CARDOZA
Quality Review Completed 11/4/2014 BILL STUTSMAN
Building Plans Picked Up 11/17/2014 APPLICANT
Green Plans Picked Up 11/17/2014 APPLICANT
Applicant returned to address corrections 6/4/2015 KESETE HAREGOT
Applicant returned to address corrections 7/1/2015 KESETE HAREGOT
Applicant returned to address corrections 7/21/2015 KESETE HAREGOT
Plan Check Approved 3/22/2016 KESETE HAREGOT
Plan Check Approved 6/22/2016 KESETE HAREGOT
Issued 1/20/2017 LADBS
Refund in Progress 12/11/2017 ELIZABETH HERNANDEZ
Refund Closed 4/3/2018 CHRISTINA TABIRARA
Reactivate - Status Void 4/3/2018 CHRISTINA TABIRARA
CofO in Progress 11/19/2020 HAMIK HARTOUNIAN
Permit Finaled 11/30/2020 DEROLD HAUFF
CofO Issued 12/18/2020 DEROLD HAUFF
Permit Finaled 12/18/2020 DEROLD HAUFF

Permit Application Clearance Information

Green Code Cleared 2/2/2015 AREN PILAVJIAN
Eng Process Fee Ord 176,300 Cleared 2/23/2015 JOSHUA LOPEZ
Hydrant and Access approval Cleared 2/23/2015 ROBERT DUFF
BHO/Hillside ordinance Cleared 6/15/2015 RICHARD SOUTHERLAND
BHO/Hillside ordinance Cleared 6/15/2015 RICHARD SOUTHERLAND
BHO/Hillside ordinance Cleared 6/15/2015 RICHARD SOUTHERLAND
BHO/Hillside ordinance Cleared 6/15/2015 RICHARD SOUTHERLAND
Low Impact Development Cleared 7/16/2015 MICHAEL SCADUTO
Roof/Waste drainage to street Cleared 7/16/2015 ARNULFO NUNO
BHO/Hillside ordinance Cleared 8/7/2015 TERRY PHAN
Sewer availability Cleared 8/7/2015 VALENTINO PUEBLOS
Miscellaneous Cleared 10/9/2015 CASSANDRA ZWEEP
Specific Plan Cleared 10/9/2015 CASSANDRA ZWEEP
Work Adjacent to Public Way Cleared 3/1/2016 WARREN LIU
Building over 3-story or 36-ft Cleared 3/15/2016 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 3/15/2016 CALOSHA APPROVED
Grading Pre-Inspection Cleared 3/15/2016 JESSE CARDOZA
Miscellaneous Cleared 3/15/2016 JESSE CARDOZA

Contact Information

Contractor Owner-Builder       ,
Engineer Simonian, Ara; Lic. No.: C37208 314 E BROADWAY STE A      GLENDALE, CA 91205
Engineer Tsai, Steve Shi-Shen; Lic. No.: GE2268 1545 VICTORY BLVD      GLENDALE, CA 91201
Engineer Zhong, Raymond Meng; Lic. No.: M27635 2416 W VALLEY BLVD      ALHAMBRA, CA 91803
Geologist Fishburn, Scott David; Lic. No.: EG2114 1545 VICTORY BLVD.      GLENDALE, CA 91201

Inspector Information

NICHOLAS LOPEZ, (213) 202-3224 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 9/14/2017 Partial Approval BRIAN SULLIVAN
Piling/Pier/Caisson 9/14/2017 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 10/18/2017 Partial Approval RAUL BARAJAS
Piling/Pier/Caisson 10/18/2017 Partial Approval RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 11/22/2017 Partial Approval LUIS ALVAREZ
Piling/Pier/Caisson 11/22/2017 Partial Approval LUIS ALVAREZ
Excavation/Setback/Form/Re-Bar 12/13/2017 Corrections Issued LUIS ALVAREZ
Footing/Foundation/Slab 12/13/2017 Not Ready for Inspection LUIS ALVAREZ
Excavation/Setback/Form/Re-Bar 12/14/2017 Partial Approval LUIS ALVAREZ
Excavation/Setback/Form/Re-Bar 12/28/2017 Corrections Issued LUIS ALVAREZ
Footing/Foundation/Slab 12/28/2017 Not Ready for Inspection LUIS ALVAREZ
Excavation/Setback/Form/Re-Bar 1/2/2018 Partial Approval LUIS ALVAREZ
ELECTRICAL-Rough 3/13/2019 Not Ready for Inspection HAMIK HARTOUNIAN
HVAC-Rough 3/13/2019 Corrections Issued HAMIK HARTOUNIAN
PLUMBING-Rough 3/13/2019 Not Ready for Inspection HAMIK HARTOUNIAN
Special/Order Compliance 3/13/2019 Approved RUBEN SALAS
Structural Steel Frame 3/13/2019 Corrections Issued HAMIK HARTOUNIAN
Interior/Exterior Lathing 4/10/2019 Partial Approval HAMIK HARTOUNIAN
Shower Pan 4/10/2019 Corrections Issued HAMIK HARTOUNIAN
Structural Steel Frame 7/22/2019 Partial Inspection ROBERT VORHIS
Deputy Steel/Welding 7/24/2019 Conditional Approval ROBERT VORHIS
BUILDING-Rough-Frame 7/25/2019 Conditional Approval HAMIK HARTOUNIAN
Green Building Rough 7/25/2019 Approved HAMIK HARTOUNIAN
Verify Sprinkler Sign Off 7/25/2019 Partial Approval HAMIK HARTOUNIAN
Insulation 8/5/2019 Approved HAMIK HARTOUNIAN
Sewer 10/24/2019 Approved HAMIK HARTOUNIAN
Underground Mechanical 10/24/2019 Not Ready for Inspection HAMIK HARTOUNIAN
Sewer 3/25/2020 Approved SABAS ALONSO
ELECTRICAL-Rough 4/28/2020 Partial Inspection OSVALDO PARAMO
Special/Order Compliance 6/30/2020 Partial Inspection HAMIK HARTOUNIAN
BUILDING-Rough-Frame 8/3/2020 Conditional Approval HAMIK HARTOUNIAN
Drywall Nailing 8/3/2020 Approved HAMIK HARTOUNIAN
Final 8/3/2020 Not Ready for Inspection HAMIK HARTOUNIAN
Footing/Foundation/Slab 8/3/2020 Approved HAMIK HARTOUNIAN
Green Building Final 8/3/2020 Approved HAMIK HARTOUNIAN
Reinforced Concrete Frame 8/3/2020 Conditional Approval HAMIK HARTOUNIAN
SGSOV-Seismic Gas S/O Valve 8/3/2020 SGSOV No Gas HAMIK HARTOUNIAN
Service/Power Release 8/3/2020 Not Ready for Inspection HAMIK HARTOUNIAN
Smoke Detectors 8/3/2020 Approved HAMIK HARTOUNIAN
Verify Sprinkler Sign Off 8/3/2020 Approved HAMIK HARTOUNIAN
BUILDING-Rough-Frame 8/12/2020 Approved HAMIK HARTOUNIAN
Final 8/12/2020 Corrections Issued HAMIK HARTOUNIAN
Reinforced Concrete Frame 8/12/2020 Approved HAMIK HARTOUNIAN
Service/Power Release 8/12/2020 Not Ready for Inspection HAMIK HARTOUNIAN
Pre-Inspection 9/9/2020 Partial Inspection HAMIK HARTOUNIAN
Final 11/18/2020 OK to Issue CofO HAMIK HARTOUNIAN
Service/Power Release 11/18/2020 Approved HAMIK HARTOUNIAN