700 W 9TH ST 90015

Certificate Information: 700 W 9TH ST 90015

Application / Permit
14010-10000-02380
Plan Check / Job No.
B14LA09870
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
New 28-story mixed use builidng (apartment,parking garage, and core and shell only retail)
Permit Issued
Issued on 8/4/2016
Issuing Office
Metro
Current Status
CofO Issued on 6/16/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/4/2014 APPLICANT
Assigned to Plan Check Engineer 8/28/2014 JOHN FRANCIA
Corrections Issued 9/23/2014 JOHN FRANCIA
Quality Review Completed 9/26/2014 TIEN JEN WANG
Building Plans Picked Up 9/30/2014 APPLICANT
Applicant returned to address corrections 6/15/2015 JOHN FRANCIA
Applicant returned to address corrections 6/16/2015 JOHN FRANCIA
Applicant returned to address corrections 6/26/2015 JOHN FRANCIA
Applicant returned to address corrections 7/16/2015 JOHN FRANCIA
Applicant returned to address corrections 12/3/2015 SAI KHUM
Applicant returned to address corrections 12/17/2015 SAI KHUM
Applicant returned to address corrections 12/30/2015 SAI KHUM
Plan Check Approved 8/4/2016 SAI KWAN KHUM
Issued 8/4/2016 LADBS
TCO Issued (Expire Date: 05-20-2019) 11/21/2018 HAMID PISHEHVAR
TCO Issued (Expire Date: 11-16-2019) 5/20/2019 TERRY HERR
TCO Issued (Expire Date: 05-14-2020) 11/16/2019 WINSTON DUNNING
TCO Issued (Expire Date: 11-18-2020) 5/22/2020 DAVID TSAU
TCO Issued (Expire Date: 05-12-2021) 11/13/2020 ERNESTO CORRAL
TCO Issued (Expire Date: 11-09-2021) 5/13/2021 DAVID TSAU
TCO Issued (Expire Date: 05-14-2022) 11/15/2021 WINSTON DUNNING
TCO Issued (Expire Date: 11-06-2022) 5/10/2022 ERNESTO CORRAL
TCO Issued (Expire Date: 05-17-2023) 11/18/2022 TED RIES
CofO in Progress 6/16/2023 GREGORY POMISH
Permit Finaled 6/16/2023 WINSTON DUNNING
CofO Issued 6/16/2023 WINSTON DUNNING
Permit Finaled 6/16/2023 WINSTON DUNNING

Permit Application Clearance Information

Address approval Cleared 5/13/2015 ARMENIA HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 5/13/2015 ARMENIA HERNANDEZ
Green Code Cleared 9/16/2015 MARCUS LEVIAS
Low Impact Development Cleared 3/7/2016 AMMAR ELTAWIL
Stormwater Pollution Mitigatn Cleared 3/7/2016 AMMAR ELTAWIL
Driveway location Cleared 3/9/2016 TAIMOUR TANAVOLI
Driveway location Cleared 3/9/2016 TAIMOUR TANAVOLI
Internal circulation Cleared 3/9/2016 TAIMOUR TANAVOLI
Permit Cleared 3/9/2016 JAMES KHO
Roof/Waste drainage to street Cleared 3/9/2016 JAMES KHO
Bicycle Parking Cleared 3/14/2016 JAMES KHO
Work Adjacent to Public Way Cleared 3/14/2016 JAMES KHO
Encroachment in public way Cleared 3/16/2016 ARMENIA HERNANDEZ
Encroachment in public way Cleared 3/16/2016 ARMENIA HERNANDEZ
Highway dedication Cleared 5/3/2016 JAMES KHO
Sewer availability Cleared 6/23/2016 ADRIAN SANCHEZ
Building over 3-story or 36-ft Cleared 7/11/2016 CALOSHA APPROVED
Building over 3-story or 36-ft Cleared 7/11/2016 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 7/11/2016 CALOSHA APPROVED
Metro Rail approval Cleared 7/11/2016 THAN WIN
Project located in CRA area Cleared 7/13/2016 JIM URQUHART
DAS Clearance Cleared 7/26/2016 WAI LAU
"D" conditions Cleared 8/3/2016 MARITZA PRZEKOP
"Q" conditions Cleared 8/3/2016 MARITZA PRZEKOP
Fire Marshall Fire Life Safety Cleared 8/3/2016 DAVE MYERS
Hydrant and Access approval Cleared 8/3/2016 ROBERT DUFF
Miscellaneous Cleared 8/3/2016 MARITZA PRZEKOP
Miscellaneous Cleared 8/3/2016 MARITZA PRZEKOP
Miscellaneous Cleared 8/3/2016 MARITZA PRZEKOP
Miscellaneous Cleared 8/3/2016 MARITZA PRZEKOP
Miscellaneous Cleared 8/3/2016 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 8/3/2016 MARITZA PRZEKOP
Prkng lot landscape/Water mgmt Cleared 8/3/2016 MARITZA PRZEKOP
Site Plan review Cleared 8/3/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 8/3/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 8/3/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 8/3/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 8/3/2016 MARITZA PRZEKOP
ZA Case Cleared 8/3/2016 MARITZA PRZEKOP
ZA Case Cleared 8/3/2016 MARITZA PRZEKOP
ZA Case Cleared 8/3/2016 MARITZA PRZEKOP
ZI Cleared 8/3/2016 MARITZA PRZEKOP
Hold Cleared 1/7/2022 JASON SHEETS

Contact Information

Architect Timothy, Drew Williamson; Lic. No.: C35213 1011 PINE BARK COURT      DUNWOODY, GA 30338
Contractor Owner-Builder       ,
Engineer Cruz, Jose Juan; Lic. No.: C80450 24412 VALLE DEL ORO 204      NEWHALL, CA 91321
Engineer O'Keeffe, Michael John; Lic. No.: S4879 1661 W 5TH AVE      VANCOUVER, BC, V6J1N5
Engineer Tatusian, Sarkis Vortik; Lic. No.: GE2118 24 VISTA DEL SOL      LAGUNA BEACH, CA 92651
Geologist Englehart, Eric Chamness; Lic. No.: EG9183 499 ESTUDILLO AVENUE   #304    SAN LEANDRO, CA 94577
Landscape Architect Larkins, David Kenneth; Lic. No.: LA4226 10335 JEFFERSON BLVD      CULVER CITY, CA 90232

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

METHANE-Rough 8/16/2016 Approved SAKO AGHAZARIAN
Reinforced Concrete Frame 8/16/2016 Partial Approval SAKO AGHAZARIAN
Verify Sprinkler Sign Off 8/16/2016 Approved SAKO AGHAZARIAN
Grading Pre-Inspection 10/13/2016 Partial Inspection SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/20/2016 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/21/2016 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/24/2016 Approved SAKO AGHAZARIAN
Footing/Foundation/Slab 10/24/2016 Partial Inspection SAKO AGHAZARIAN
METHANE-Barrier 10/24/2016 Approved SAKO AGHAZARIAN
METHANE-Subgrade 10/24/2016 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/26/2016 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/27/2016 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/28/2016 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 10/31/2016 Approved SAKO AGHAZARIAN
Deputy Reinf. Concrete 11/1/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/2/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/3/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/4/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/7/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/9/2016 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 11/9/2016 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/9/2016 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/10/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/14/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/15/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/16/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/17/2016 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/17/2016 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/18/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/22/2016 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/22/2016 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/23/2016 Conditional Approval LESLIE TRUJILLO
Wall Anchors 11/23/2016 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/28/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/29/2016 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/29/2016 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/30/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 11/30/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/1/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/1/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/2/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/2/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/5/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/5/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/6/2016 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/6/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/12/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/12/2016 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/13/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/14/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/15/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/16/2016 Conditional Approval LESLIE TRUJILLO
Green Building Rough 12/16/2016 Not Ready for Inspection DONALD CRICHLOW
Reinforced Concrete Frame 12/16/2016 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/19/2016 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 12/19/2016 Partial Approval LESLIE TRUJILLO
Wall Anchors 12/19/2016 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/20/2016 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/3/2017 No Access for Inspection ERNESTO CORRAL
Light Gage Steel Frame 1/4/2017 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/5/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/11/2017 Conditional Approval WINSTON DUNNING
Deputy Shotcrete 1/11/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 1/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/13/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/13/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/17/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Masonry Frame 1/17/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/26/2017 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 1/26/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/30/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 2/1/2017 Not Ready for Inspection LESLIE TRUJILLO
Reinforced Masonry Frame 2/2/2017 Partial Inspection LESLIE TRUJILLO
Green Building Rough 2/3/2017 Partial Inspection DONALD CRICHLOW
Reinforced Concrete Frame 2/3/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/9/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/1/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/2/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/3/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 3/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/16/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 3/16/2017 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/24/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/24/2017 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Masonry 3/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/31/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 3/31/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/31/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 3/31/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 4/3/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 4/3/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 4/3/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 4/3/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 4/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/4/2017 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 4/4/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/6/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/6/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/17/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/17/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/26/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Masonry Frame 4/26/2017 Not Ready for Inspection LESLIE TRUJILLO
Structural Steel Frame 4/26/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/5/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 5/5/2017 Partial Inspection LESLIE TRUJILLO
Reinforced Masonry Frame 5/5/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/15/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 5/15/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/17/2017 Conditional Approval LESLIE TRUJILLO
Special/Order Compliance 5/17/2017 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/23/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 5/23/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/1/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/1/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/1/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/2/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/2/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/5/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/5/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/6/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/6/2017 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/7/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Masonry 6/8/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 6/9/2017 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/9/2017 Conditional Approval NICK DANERI
Reinforced Concrete Frame 6/9/2017 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 6/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/15/2017 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/15/2017 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/19/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/19/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 6/19/2017 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/23/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/27/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 6/27/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 6/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/7/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/7/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/14/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/17/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/19/2017 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/19/2017 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/25/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/25/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/2/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/2/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/9/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/9/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/9/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/10/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 8/10/2017 Partial Approval LESLIE TRUJILLO
Reinforced Masonry Frame 8/10/2017 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/14/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/15/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/15/2017 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 8/16/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/16/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/16/2017 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 8/17/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/17/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/17/2017 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 8/18/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/18/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/18/2017 Conditional Approval NICK DANERI
Deputy Steel/Welding 8/18/2017 Conditional Approval NICK DANERI
Reinforced Concrete Frame 8/18/2017 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 8/21/2017 Conditional Approval WINSTON DUNNING
Deputy Pre-Stress Concrete 8/21/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 8/21/2017 Conditional Approval WINSTON DUNNING
Deputy Steel/Welding 8/21/2017 Conditional Approval WINSTON DUNNING
Deputy Drilled-In Anchors 8/22/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/22/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/22/2017 Conditional Approval NICK DANERI
Deputy Steel/Welding 8/22/2017 Conditional Approval NICK DANERI
Light Gage Steel Frame 8/22/2017 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 8/23/2017 Conditional Approval GREGORY POMISH
Deputy Pre-Stress Concrete 8/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/23/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/23/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/24/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/24/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/24/2017 Conditional Approval NICK DANERI
Deputy Steel/Welding 8/24/2017 Conditional Approval NICK DANERI
Insulation 8/24/2017 Not Ready for Inspection NICK DANERI
Deputy Drilled-In Anchors 8/25/2017 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 8/25/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 8/25/2017 Conditional Approval NICK DANERI
Insulation 8/25/2017 Partial Approval NICK DANERI
Deputy Drilled-In Anchors 8/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/28/2017 Conditional Approval LESLIE TRUJILLO
Green Building Rough 8/28/2017 No Access for Inspection RICHARD DOCKUS
Insulation 8/28/2017 Not Ready for Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 8/28/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/30/2017 Conditional Approval LESLIE TRUJILLO
Insulation 8/30/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/1/2017 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/1/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/5/2017 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/5/2017 Not Ready for Inspection LESLIE TRUJILLO
Insulation 9/5/2017 Not Ready for Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/6/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/6/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/8/2017 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/8/2017 Partial Approval LESLIE TRUJILLO
Green Building Rough 9/8/2017 Partial Inspection RICHARD DOCKUS
Insulation 9/8/2017 Partial Approval LESLIE TRUJILLO
Green Building Final 9/12/2017 Not Ready for Inspection RICHARD DOCKUS
Green Building Rough 9/12/2017 Partial Approval RICHARD DOCKUS
Light Gage Steel Frame 9/13/2017 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/14/2017 Partial Approval LESLIE TRUJILLO
Green Building Rough 9/19/2017 Partial Approval RICHARD DOCKUS
Insulation 9/19/2017 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/25/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 9/25/2017 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/26/2017 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/26/2017 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/27/2017 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/27/2017 Partial Approval LESLIE TRUJILLO
Green Building Rough 9/27/2017 Partial Inspection RICHARD DOCKUS
Deputy Pre-Stress Concrete 9/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/4/2017 Conditional Approval LESLIE TRUJILLO
Green Building Rough 10/4/2017 Not Ready for Inspection RICHARD DOCKUS
Insulation 10/4/2017 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/4/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/11/2017 Conditional Approval LESLIE TRUJILLO
Green Building Final 10/11/2017 Partial Approval RICHARD DOCKUS
Deputy Drilled-In Anchors 10/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/12/2017 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/12/2017 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/12/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/16/2017 Conditional Approval LESLIE TRUJILLO
Green Building Rough 10/16/2017 Partial Approval RICHARD DOCKUS
Light Gage Steel Frame 10/16/2017 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/20/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 10/20/2017 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/23/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 10/23/2017 Conditional Approval NICK DANERI
Deputy Steel/Welding 10/23/2017 Conditional Approval NICK DANERI
Insulation 10/23/2017 Partial Approval NICK DANERI
Light Gage Steel Frame 10/24/2017 Partial Approval LESLIE TRUJILLO
Green Building Rough 10/25/2017 Partial Approval RICHARD DOCKUS
Deputy Drilled-In Anchors 10/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/30/2017 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/30/2017 Partial Approval LESLIE TRUJILLO
Green Building Rough 10/30/2017 Partial Approval RICHARD DOCKUS
Insulation 10/30/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/31/2017 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/31/2017 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/2/2017 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/2/2017 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 11/2/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/7/2017 Conditional Approval LESLIE TRUJILLO
Green Building Rough 11/7/2017 Partial Approval LESLIE TRUJILLO
Insulation 11/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/8/2017 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 11/8/2017 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 11/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/9/2017 Partial Approval JAMES POWERS
Green Building Rough 11/13/2017 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 11/13/2017 Not Ready for Inspection JAMES POWERS
Drywall Nailing 11/14/2017 Partial Approval JAMES POWERS
Insulation 11/14/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/17/2017 Partial Approval JAMES POWERS
Insulation 11/27/2017 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 11/29/2017 Corrections Issued LESLIE TRUJILLO
Light Gage Steel Frame 11/29/2017 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/30/2017 Partial Approval LESLIE TRUJILLO
Green Building Rough 11/30/2017 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/1/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/5/2017 Conditional Approval LESLIE TRUJILLO
Insulation 12/5/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/8/2017 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/8/2017 Partial Approval LESLIE TRUJILLO
Green Building Rough 12/11/2017 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/11/2017 Partial Approval LESLIE TRUJILLO
Insulation 12/12/2017 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/14/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/18/2017 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 12/18/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/20/2017 Conditional Approval LESLIE TRUJILLO
Insulation 12/20/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/21/2017 Conditional Approval LESLIE TRUJILLO
Green Building Rough 12/21/2017 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/21/2017 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/21/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/22/2017 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 12/22/2017 Partial Approval LESLIE TRUJILLO
Insulation 12/28/2017 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/2/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 1/2/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/5/2018 Conditional Approval LESLIE TRUJILLO
Insulation 1/5/2018 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/8/2018 Conditional Approval LESLIE TRUJILLO
Green Building Rough 1/8/2018 Partial Approval LESLIE TRUJILLO
Reinforced Concrete Frame 1/8/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/9/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/10/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 1/10/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 1/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 1/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/12/2018 Conditional Approval LESLIE TRUJILLO
Insulation 1/16/2018 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/17/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 1/17/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/23/2018 Not Ready for Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 1/24/2018 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/25/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 1/25/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/29/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/31/2018 Partial Approval LESLIE TRUJILLO
Insulation 2/1/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 2/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/7/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/8/2018 Conditional Approval LESLIE TRUJILLO
Insulation 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/12/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/12/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 2/13/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/15/2018 Conditional Approval NICK DANERI
Deputy Fireproofing 2/15/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/15/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 2/16/2018 Conditional Approval NICK DANERI
Deputy Fireproofing 2/16/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 2/16/2018 Conditional Approval NICK DANERI
Drywall Nailing 2/20/2018 Partial Inspection ERNESTO CORRAL
Green Building Rough 2/20/2018 Not Ready for Inspection ERNESTO CORRAL
Light Gage Steel Frame 2/20/2018 Partial Inspection ERNESTO CORRAL
Green Building Rough 2/23/2018 Partial Approval LESLIE TRUJILLO
Insulation 2/23/2018 Partial Approval LESLIE TRUJILLO
Reinforced Masonry Frame 2/23/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/27/2018 Conditional Approval LESLIE TRUJILLO
Masonry Wall/Backfill 2/27/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/28/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 2/28/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 3/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/1/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/2/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/2/2018 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/6/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 3/6/2018 Partial Approval LESLIE TRUJILLO
Insulation 3/6/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/6/2018 Partial Approval LESLIE TRUJILLO
Insulation 3/13/2018 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 3/15/2018 Partial Approval LESLIE TRUJILLO
Insulation 3/22/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/22/2018 Partial Approval LESLIE TRUJILLO
Insulation 3/29/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Fireproofing 4/4/2018 Conditional Approval LESLIE TRUJILLO
Insulation 4/4/2018 Partial Approval LESLIE TRUJILLO
Deputy Fireproofing 4/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 4/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 4/9/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 4/9/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 4/9/2018 Approved LESLIE TRUJILLO
Insulation 4/9/2018 Partial Approval LESLIE TRUJILLO
Deputy Fireproofing 4/10/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/12/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/19/2018 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 4/25/2018 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 4/27/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/27/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/8/2018 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 5/14/2018 Not Ready for Inspection LESLIE TRUJILLO
Pre-Inspection 5/23/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/1/2018 Partial Inspection LESLIE TRUJILLO
Insulation 6/7/2018 Partial Approval NICK DANERI
Light Gage Steel Frame 6/21/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/22/2018 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 6/26/2018 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 6/28/2018 Partial Approval LESLIE TRUJILLO
Pre-Inspection 6/28/2018 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 6/29/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/3/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/6/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/10/2018 Partial Approval LESLIE TRUJILLO
Insulation 7/12/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/12/2018 Partial Approval LESLIE TRUJILLO
Insulation 7/16/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/16/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/18/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/20/2018 Partial Approval LESLIE TRUJILLO
Pre-Inspection 9/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/13/2018 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 9/25/2018 Partial Inspection LESLIE TRUJILLO
Insulation 10/11/2018 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 10/17/2018 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 10/25/2018 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 11/8/2018 Corrections Issued LESLIE TRUJILLO
Insulation 11/13/2018 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 11/13/2018 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 11/14/2018 Partial Inspection LESLIE TRUJILLO
T-Bar Ceiling 11/15/2018 Partial Approval LESLIE TRUJILLO
Pre-Inspection 11/19/2018 Partial Approval LESLIE TRUJILLO
Drywall Nailing 11/20/2018 Approved LESLIE TRUJILLO
Final 11/20/2018 OK for TCO LESLIE TRUJILLO
Footing/Foundation/Slab 11/20/2018 Approved LESLIE TRUJILLO
Green Building Final 11/20/2018 Partial Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 11/20/2018 Approved LESLIE TRUJILLO
Reinforced Masonry Frame 11/20/2018 Approved LESLIE TRUJILLO
SGSOV-Seismic Gas S/O Valve 11/20/2018 SGSOV Approved LESLIE TRUJILLO
Smoke Detectors 11/20/2018 Approved LESLIE TRUJILLO
Structural Steel Frame 11/20/2018 Approved LESLIE TRUJILLO
Pre-Inspection 11/21/2018 Approved LESLIE TRUJILLO
Pre-Inspection 1/23/2019 Partial Inspection LESLIE TRUJILLO
Special/Order Compliance 4/24/2019 Partial Approval LESLIE TRUJILLO
Green Building Final 5/30/2019 Partial Inspection LESLIE TRUJILLO
Special/Order Compliance 10/25/2019 Conditional Approval LESLIE TRUJILLO
Special/Order Compliance 4/28/2020 Partial Inspection LESLIE TRUJILLO
Special/Order Compliance 5/6/2020 Conditional Approval NICK DANERI
Special/Order Compliance 5/7/2020 Conditional Approval NICK DANERI
Special/Order Compliance 10/26/2020 Conditional Approval NICK DANERI
Special/Order Compliance 4/14/2021 Conditional Approval NICK DANERI
Special/Order Compliance 10/13/2021 Approved ERNESTO CORRAL
Special/Order Compliance 4/21/2022 Conditional Approval NICK DANERI
Special/Order Compliance 10/19/2022 Partial Inspection GREGORY POMISH
Special/Order Compliance 4/24/2023 Partial Inspection GREGORY POMISH