6030 S SEABLUFF DR 1-75 90094

Certificate Information: 6030 S SEABLUFF DR 1-75 90094

Application / Permit
14010-10000-01971
Plan Check / Job No.
B14LA08553
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(35) Condo-Multi Family
Work Description
PROPOSED 3 STORY, TYPE VA OVER TYPE IA, 75 UNIT CONDOMINIUM W/ GARAGE. 3 TYPE VA STORIES OF RESIDENTIAL OVER 2 STORIES OF TYPE IA RESIDENTIAL AND PARKING OVER 1 BASEMENT LEVEL OF GARAGE. TRUSSES, STAIRS, RAILS AND TIE-DOWNS ARE DEFERRED. THIS BLDG IS LOCATED W/IN PHASE I OF THE PLAYA VISTA PROJECT. THIS BLDG COMPLIES WITH DESIGN LEVEL 3. THE PILES HAVE BEEN TESTED AS REQUIRED BY THE ORIG SOIL REPORT AND HAVE CONFIRMED ASSUMED CAPACITIES. AN ADDITIONAL SOIL REPORT HAS BEEN SUBMITTED AND APPROVED
Permit Issued
Issued on 10/24/2016
Issuing Office
Metro
Current Status
CofO Issued on 4/30/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/30/2014 APPLICANT
Assigned to Plan Check Engineer 7/10/2014 JOHN VASQUEZ
Corrections Issued 7/22/2014 JOHN VASQUEZ
Quality Review Completed 7/24/2014 CHARLES CHANG
Green Plans Picked Up 7/25/2014 APPLICANT
Building Plans Picked Up 8/4/2014 APPLICANT
Disabled Access Plans Picked Up 8/4/2014 APPLICANT
Applicant returned to address corrections 12/31/2014 JOHN VASQUEZ
Applicant returned to address corrections 2/10/2015 JOHN VASQUEZ
Applicant returned to address corrections 5/27/2015 JOHN VASQUEZ
Applicant returned to address corrections 6/10/2015 JOHN VASQUEZ
Applicant returned to address corrections 6/25/2015 JOHN VASQUEZ
Applicant returned to address corrections 1/29/2016 JOHN VASQUEZ
Applicant returned to address corrections 8/15/2016 JOHN VASQUEZ
Applicant returned to address corrections 9/13/2016 JOHN VASQUEZ
Plan Check Approved 10/24/2016 JOHN VASQUEZ
Issued 10/24/2016 LADBS
TCO Issued (Expire Date: 09-22-2019) 3/26/2019 HENRY BAGHDASSARIAN
TCO Issued (Expire Date: 11-11-2019) 5/15/2019 JONATHAN ALLEN
TCO Issued (Expire Date: 12-08-2019) 6/11/2019 HENRY BAGHDASSARIAN
TCO Issued (Expire Date: 06-05-2020) 12/8/2019 HENRY BAGHDASSARIAN
TCO Issued (Expire Date: 12-02-2020) 6/5/2020 NICK LAROCCA
TCO Issued (Expire Date: 05-10-2021) 11/11/2020 NICK LAROCCA
CofO in Progress 4/28/2021 NICK LAROCCA
Permit Finaled 4/30/2021 HENRY BAGHDASSARIAN
CofO Issued 4/30/2021 HENRY BAGHDASSARIAN
Permit Finaled 4/30/2021 HENRY BAGHDASSARIAN

Permit Application Clearance Information

Permit Cleared 3/25/2015 KARAN PATEL
Address approval Cleared 4/6/2015 JOSHUA LOPEZ
Eng Process Fee Ord 176,300 Cleared 4/8/2015 RICHARD SOUTHERLAND
Low Impact Development Cleared 4/8/2015 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 4/8/2015 KARAN PATEL
Stormwater Pollution Mitigatn Cleared 4/8/2015 AMMAR ELTAWIL
Sewer availability Cleared 4/20/2015 JOSHUA LOPEZ
Building over 3-story or 36-ft Cleared 6/8/2015 CALOSHA APPROVED
Green Code Cleared 6/23/2015 MARTHA DIAZ
Excavation more than 5-ft deep Cleared 7/1/2015 CALOSHA APPROVED
Hydrant and Access approval Cleared 7/7/2015 ROBERT DUFF
Methane Ordinance Cleared 7/30/2015 DAVE MYERS
Frnt yard landscape/Water mgmt Cleared 10/23/2015 ANDY RODRIGUEZ
Fire Marshall Fire Life Safety Cleared 4/6/2016 ANDREW KO
DAS Clearance Cleared 8/26/2016 WAI LAU
Highway dedication Cleared 9/1/2016 LUZ RABELO
Historic monument Cleared 9/8/2016 DAVID TEHRANI
Miscellaneous Cleared 9/8/2016 DAVID TEHRANI
Miscellaneous Cleared 9/8/2016 DAVID TEHRANI
Miscellaneous Cleared 9/8/2016 DAVID TEHRANI
Miscellaneous Cleared 9/8/2016 DAVID TEHRANI
Opn space landscape/Water mgmt Cleared 9/8/2016 DAVID TEHRANI
Site Plan review Cleared 9/8/2016 DAVID TEHRANI
Specific Plan Cleared 9/8/2016 DAVID TEHRANI
Tract Map conditions Cleared 9/8/2016 DAVID TEHRANI
ZA Case Cleared 9/8/2016 DAVID TEHRANI
ZA Case Cleared 9/8/2016 DAVID TEHRANI
Miscellaneous Cleared 9/30/2016 HUGO RICO
Specific Plan Cleared 10/5/2016 EDER ROMERO

Contact Information

Architect Arnold, John Howard; Lic. No.: C30834 2166 W 30TH STREET      LOS ANGELES, CA 90018
Contractor Owner-Builder       ,
Engineer Wilkerson, Ryan Lee; Lic. No.: S4728 20734 SARDINIA WAY      PORTER RANCH, CA 91326

Inspector Information

VASIL MIHALEV, (310) 914-3920 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 3/14/2017 Conditional Approval JONATHAN ALLEN
Deputy Grading 3/15/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/15/2017 Approved JONATHAN ALLEN
Deputy Grading 3/16/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/16/2017 Approved JONATHAN ALLEN
Deputy Grading 3/17/2017 Approved JONATHAN ALLEN
Pre-Inspection 3/17/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/20/2017 Conditional Approval JONATHAN ALLEN
Piling/Pier/Caisson 3/21/2017 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 3/24/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 3/24/2017 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 3/28/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 3/28/2017 Partial Approval JONATHAN ALLEN
Deputy EIFS 3/29/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/29/2017 Approved JONATHAN ALLEN
Deputy EIFS 3/30/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/30/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 3/30/2017 Partial Approval JONATHAN ALLEN
Deputy EIFS 3/31/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 3/31/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 4/3/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/4/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 4/4/2017 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/5/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/6/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/7/2017 Conditional Approval DANIEL MC AULIFFE
Piling/Pier/Caisson 4/7/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 4/10/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/11/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/12/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/13/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 4/13/2017 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/14/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/18/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 4/19/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 4/19/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 4/25/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 5/8/2017 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 5/10/2017 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 5/11/2017 Conditional Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 5/22/2017 Not Ready for Inspection TONY HARTONO
Footing/Foundation/Slab 5/22/2017 Partial Approval TONY HARTONO
METHANE-Barrier 5/22/2017 Not Ready for Inspection JASON BORUTA
METHANE-Subgrade 5/22/2017 Not Ready for Inspection JASON BORUTA
Deputy Reinf. Concrete 5/23/2017 Approved JONATHAN ALLEN
METHANE-Rough 5/24/2017 Not Ready for Inspection JONATHAN ALLEN
Piling/Pier/Caisson 5/24/2017 Partial Inspection JONATHAN ALLEN
Reinforced Concrete Frame 5/24/2017 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 5/24/2017 Not Ready for Inspection JONATHAN ALLEN
Deputy Reinf. Concrete 5/25/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 5/25/2017 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 5/31/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 6/7/2017 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 6/8/2017 Conditional Approval JONATHAN ALLEN
METHANE-Rough 6/15/2017 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 6/15/2017 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 6/15/2017 Not Ready for Inspection JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 6/21/2017 Partial Approval JONATHAN ALLEN
Piling/Pier/Caisson 6/23/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 6/27/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 6/30/2017 Approved JONATHAN ALLEN
Piling/Pier/Caisson 7/7/2017 Partial Approval JONATHAN ALLEN
SUSMP-Std. Urban Storm Water 7/10/2017 Not Ready for Inspection JONATHAN ALLEN
Piling/Pier/Caisson 7/11/2017 Partial Approval JONATHAN ALLEN
Deputy Methane Barrier 7/21/2017 Approved DERRICK SPENCER
METHANE-Subgrade 7/21/2017 Approved DERRICK SPENCER
Footing/Foundation/Slab 8/1/2017 Partial Approval JONATHAN ALLEN
METHANE-Barrier 8/1/2017 Partial Approval JONATHAN ALLEN
Footing/Foundation/Slab 8/11/2017 Partial Approval JONATHAN ALLEN
METHANE-Barrier 8/11/2017 Approved JONATHAN ALLEN
Footing/Foundation/Slab 8/18/2017 Partial Approval JONATHAN ALLEN
Deputy Reinf. Concrete 8/21/2017 Conditional Approval DANIEL MC AULIFFE
Footing/Foundation/Slab 8/23/2017 Not Ready for Inspection DANIEL MC AULIFFE
Excavation/Setback/Form/Re-Bar 8/25/2017 Partial Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 8/28/2017 Approved JONATHAN ALLEN
METHANE-Rough 8/28/2017 Approved JONATHAN ALLEN
Reinforced Concrete Frame 8/28/2017 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 8/28/2017 Not Ready for Inspection JONATHAN ALLEN
Deputy Reinf. Concrete 8/31/2017 Approved JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 8/31/2017 Partial Approval JONATHAN ALLEN
Deputy Shotcrete 9/1/2017 Conditional Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 9/7/2017 Partial Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 9/14/2017 Partial Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 9/28/2017 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 9/29/2017 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 9/29/2017 Not Ready for Inspection JONATHAN ALLEN
Green Building Rough 10/4/2017 Not Ready for Inspection BRYAN MEYER
Reinforced Concrete Frame 10/4/2017 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 10/4/2017 Not Ready for Inspection JONATHAN ALLEN
Footing/Foundation/Slab 10/10/2017 Partial Approval JONATHAN ALLEN
Reinforced Concrete Frame 10/10/2017 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 10/10/2017 Not Ready for Inspection JONATHAN ALLEN
Footing/Foundation/Slab 10/13/2017 Partial Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 10/20/2017 Partial Approval JONATHAN ALLEN
Footing/Foundation/Slab 10/23/2017 Partial Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 11/14/2017 Partial Approval JONATHAN ALLEN
Masonry Wall/Backfill 11/20/2017 Partial Approval JONATHAN ALLEN
Excavation/Setback/Form/Re-Bar 11/28/2017 Partial Approval JONATHAN ALLEN
Footing/Foundation/Slab 11/29/2017 Partial Approval JONATHAN ALLEN
Reinforced Masonry Frame 12/7/2017 Partial Approval JONATHAN ALLEN
Deputy Reinf. Masonry 12/13/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/18/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/20/2017 Approved JONATHAN ALLEN
Green Building Rough 12/20/2017 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 12/20/2017 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 12/20/2017 Not Ready for Inspection JONATHAN ALLEN
Deputy Reinf. Concrete 12/21/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/22/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/26/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/27/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/28/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 12/29/2017 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 1/2/2018 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 1/3/2018 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 1/4/2018 Approved JONATHAN ALLEN
Green Building Rough 1/4/2018 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/4/2018 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 1/4/2018 Not Ready for Inspection JONATHAN ALLEN
Deputy Reinf. Concrete 1/5/2018 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 1/8/2018 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 1/11/2018 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 1/12/2018 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 1/16/2018 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 1/17/2018 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 1/18/2018 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/19/2018 Approved DANIEL MC AULIFFE
Deputy Reinf. Concrete 1/22/2018 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 1/23/2018 Approved JONATHAN ALLEN
Green Building Rough 1/23/2018 Not Ready for Inspection JONATHAN ALLEN
Reinforced Concrete Frame 1/23/2018 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 1/23/2018 Not Ready for Inspection JONATHAN ALLEN
Deputy Reinf. Concrete 1/24/2018 Approved JONATHAN ALLEN
Deputy Reinf. Concrete 1/25/2018 Conditional Approval JONATHAN ALLEN
Deputy Reinf. Concrete 1/26/2018 Approved JONATHAN ALLEN
Wood Frame 2/6/2018 Partial Approval JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 2/13/2018 Partial Approval JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 2/23/2018 Partial Approval JONATHAN ALLEN
Deputy Wood Construction 3/2/2018 Conditional Approval JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 3/12/2018 Partial Approval JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 4/16/2018 Partial Approval JONATHAN ALLEN
Green Building Rough 4/19/2018 Partial Inspection JONATHAN ALLEN
Verify Sprinkler Sign Off 4/19/2018 Not Ready for Inspection JONATHAN ALLEN
Wall Anchors 4/19/2018 Partial Inspection JONATHAN ALLEN
Wood Frame 4/19/2018 Partial Approval JONATHAN ALLEN
Deputy Wood Construction 4/20/2018 Approved DERRICK SPENCER
Deputy Wood Construction 4/24/2018 Approved JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 4/26/2018 Partial Approval JONATHAN ALLEN
Floor/Roof Diaphrgm/Shear Wall 5/1/2018 Partial Approval JONATHAN ALLEN
Deputy Drilled-In Anchors 5/8/2018 Approved JONATHAN ALLEN
Green Building Rough 5/10/2018 Partial Approval JONATHAN ALLEN
Verify Sprinkler Sign Off 5/10/2018 Partial Approval JONATHAN ALLEN
Wall Anchors 5/10/2018 Partial Approval JONATHAN ALLEN
Wood Frame 5/10/2018 Partial Approval JONATHAN ALLEN
Deputy Wood Construction 5/18/2018 Approved JONATHAN ALLEN
Footing/Foundation/Slab 5/18/2018 Partial Approval JONATHAN ALLEN
Deputy Wood Construction 5/22/2018 Conditional Approval JONATHAN ALLEN
Deputy Wood Construction 6/5/2018 Approved JONATHAN ALLEN
Deputy Wood Construction 6/6/2018 Conditional Approval JONATHAN ALLEN
Light Gage Steel Frame 6/8/2018 Partial Approval JONATHAN ALLEN
Green Building Rough 6/13/2018 Not Ready for Inspection NICK LAROCCA
Verify Sprinkler Sign Off 6/13/2018 Not Ready for Inspection NICK LAROCCA
Wood Frame 6/13/2018 Partial Inspection NICK LAROCCA
Deputy Wood Construction 6/15/2018 Approved NICK LAROCCA
Deputy Wood Construction 6/18/2018 Approved DERRICK SPENCER
Insulation 6/18/2018 Partial Approval DERRICK SPENCER
Insulation 6/28/2018 Not Ready for Inspection DERRICK SPENCER
Drywall Nailing 7/3/2018 Partial Approval DERRICK SPENCER
Insulation 7/10/2018 Partial Approval NICK LAROCCA
Insulation 7/23/2018 Partial Approval NICK LAROCCA
Insulation 7/31/2018 Partial Approval NICK LAROCCA
Insulation 8/13/2018 Partial Approval DERRICK SPENCER
Insulation 8/17/2018 Partial Approval DERRICK SPENCER
Drywall Nailing 8/23/2018 Partial Approval DERRICK SPENCER
Deputy Wood Construction 8/28/2018 Conditional Approval NICK LAROCCA
Insulation 8/29/2018 Corrections Issued NICK LAROCCA
Insulation 9/4/2018 Partial Approval NICK LAROCCA
Drywall Nailing 9/10/2018 Partial Approval NICK LAROCCA
Insulation 9/14/2018 Partial Approval NICK LAROCCA
Insulation 9/18/2018 Not Ready for Inspection NICK LAROCCA
Insulation 9/20/2018 Partial Approval NICK LAROCCA
Insulation 9/21/2018 Partial Approval NICK LAROCCA
Drywall Nailing 9/26/2018 Partial Approval NICK LAROCCA
Interior/Exterior Lathing 9/27/2018 Partial Inspection NICK LAROCCA
Green Building Rough 10/1/2018 Approved NICK LAROCCA
Interior/Exterior Lathing 10/1/2018 Partial Approval NICK LAROCCA
Verify Sprinkler Sign Off 10/1/2018 Approved NICK LAROCCA
Wood Frame 10/1/2018 Partial Approval NICK LAROCCA
Light Gage Steel Frame 10/3/2018 Partial Approval TONY HARTONO
Insulation 10/5/2018 Partial Inspection NICK LAROCCA
Insulation 10/11/2018 Partial Approval NICK LAROCCA
Drywall Nailing 10/18/2018 Partial Approval DERRICK SPENCER
Interior/Exterior Lathing 10/18/2018 Not Ready for Inspection DERRICK SPENCER
Wood Frame 10/22/2018 Partial Approval NICK LAROCCA
Light Gage Steel Frame 10/24/2018 Corrections Issued NICK LAROCCA
Drywall Nailing 10/26/2018 Partial Approval NICK LAROCCA
Drywall Nailing 10/29/2018 Partial Inspection NICK LAROCCA
Reinforced Concrete Frame 11/6/2018 Corrections Issued NICK LAROCCA
Insulation 11/8/2018 Partial Approval NICK LAROCCA
Insulation 11/14/2018 Partial Inspection NICK LAROCCA
Wall Anchors 11/14/2018 Partial Inspection NICK LAROCCA
Insulation 11/15/2018 Partial Approval NICK LAROCCA
Drywall Nailing 11/20/2018 Partial Approval NICK LAROCCA
Insulation 11/28/2018 Partial Inspection NICK LAROCCA
Light Gage Steel Frame 11/28/2018 Partial Approval NICK LAROCCA
Insulation 11/30/2018 Partial Approval NICK LAROCCA
Deputy Drilled-In Anchors 12/3/2018 Approved NICK LAROCCA
Light Gage Steel Frame 12/4/2018 Partial Inspection NICK LAROCCA
Drywall Nailing 12/6/2018 Approved NICK LAROCCA
Light Gage Steel Frame 12/6/2018 Partial Approval NICK LAROCCA
Light Gage Steel Frame 12/11/2018 Partial Approval NICK LAROCCA
Masonry Wall/Backfill 12/21/2018 Approved NICK LAROCCA
Masonry Wall/Backfill 12/31/2018 Partial Approval NICK LAROCCA
Light Gage Steel Frame 1/4/2019 Partial Approval NICK LAROCCA
Final 1/8/2019 Partial Inspection NICK LAROCCA
Footing/Foundation/Slab 1/8/2019 Approved NICK LAROCCA
Green Building Final 1/8/2019 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 1/8/2019 Not Ready for Inspection NICK LAROCCA
SGSOV-Seismic Gas S/O Valve 1/8/2019 SGSOV Approved NICK LAROCCA
SUSMP-Std. Urban Storm Water 1/8/2019 Not Ready for Inspection NICK LAROCCA
Smoke Detectors 1/8/2019 Approved NICK LAROCCA
Wood Frame 1/8/2019 Not Ready for Inspection NICK LAROCCA
Masonry Wall/Backfill 1/10/2019 Partial Approval NICK LAROCCA
Light Gage Steel Frame 1/24/2019 Partial Approval NICK LAROCCA
Light Gage Steel Frame 1/28/2019 Partial Approval NICK LAROCCA
Final 2/7/2019 Partial Inspection NICK LAROCCA
Green Building Final 2/7/2019 Not Ready for Inspection NICK LAROCCA
Reinforced Concrete Frame 2/7/2019 Approved NICK LAROCCA
SUSMP-Std. Urban Storm Water 2/7/2019 Approved NICK LAROCCA
Wood Frame 2/7/2019 Approved NICK LAROCCA
Masonry Wall/Backfill 2/19/2019 Partial Approval NICK LAROCCA
T-Bar Ceiling 2/26/2019 Approved NICK LAROCCA
Final 3/1/2019 Not Ready for Inspection NICK LAROCCA
Green Building Final 3/1/2019 Not Ready for Inspection NICK LAROCCA
T-Bar Ceiling 3/1/2019 Approved NICK LAROCCA
Insulation 3/4/2019 Partial Approval NICK LAROCCA
Grading Pre-Inspection 3/5/2019 Approved NICK LAROCCA
T-Bar Ceiling 3/5/2019 Approved NICK LAROCCA
Light Gage Steel Frame 3/6/2019 Partial Inspection NICK LAROCCA
Final 3/7/2019 Partial Inspection NICK LAROCCA
Interior/Exterior Lathing 3/8/2019 Approved NICK LAROCCA
Final 3/11/2019 Partial Inspection NICK LAROCCA
Pre-Inspection 3/12/2019 Approved NICK LAROCCA
Masonry Wall/Backfill 3/13/2019 Approved NICK LAROCCA
Drywall Nailing 3/14/2019 Approved NICK LAROCCA
T-Bar Ceiling 3/14/2019 Approved NICK LAROCCA
Final 3/15/2019 Partial Inspection NICK LAROCCA
Green Building Final 3/15/2019 Not Ready for Inspection NICK LAROCCA
T-Bar Ceiling 3/18/2019 Approved NICK LAROCCA
Final 3/19/2019 Not Ready for Inspection NICK LAROCCA
Final 3/20/2019 Partial Inspection NICK LAROCCA
Green Building Final 3/20/2019 Not Ready for Inspection NICK LAROCCA
T-Bar Ceiling 3/21/2019 Approved NICK LAROCCA
Final 3/22/2019 Partial Inspection NICK LAROCCA
Final 3/26/2019 Partial Inspection NICK LAROCCA
Green Building Final 3/26/2019 Not Ready for Inspection NICK LAROCCA
T-Bar Ceiling 3/26/2019 Approved NICK LAROCCA
Drywall Nailing 3/27/2019 Partial Inspection NICK LAROCCA
Masonry Wall/Backfill 3/28/2019 Partial Approval NICK LAROCCA
Drywall Nailing 3/29/2019 Not Ready for Inspection NICK LAROCCA
Pre-Inspection 4/1/2019 Partial Inspection NICK LAROCCA
Excavation/Setback/Form/Re-Bar 4/9/2019 Partial Approval NICK LAROCCA
Masonry Wall/Backfill 4/12/2019 Partial Approval NICK LAROCCA
Pre-Inspection 4/16/2019 Approved NICK LAROCCA
Masonry Wall/Backfill 4/18/2019 Not Ready for Inspection DERRICK SPENCER
Final 4/19/2019 Partial Inspection NICK LAROCCA
Green Building Final 4/19/2019 Not Ready for Inspection NICK LAROCCA
Insulation 4/23/2019 Partial Approval NICK LAROCCA
Final 5/6/2019 Partial Inspection NICK LAROCCA
Green Building Final 5/6/2019 Not Ready for Inspection NICK LAROCCA
T-Bar Ceiling 5/7/2019 Approved NICK LAROCCA
Insulation 5/8/2019 Partial Approval NICK LAROCCA
Final 5/9/2019 Partial Inspection NICK LAROCCA
Final 5/10/2019 Not Ready for Inspection NICK LAROCCA
Final 5/13/2019 Not Ready for Inspection NICK LAROCCA
Green Building Final 5/13/2019 Not Ready for Inspection NICK LAROCCA
T-Bar Ceiling 5/14/2019 Partial Approval NICK LAROCCA
Final 5/20/2019 Partial Inspection NICK LAROCCA
Final 5/28/2019 Partial Inspection NICK LAROCCA
Green Building Final 5/28/2019 Approved NICK LAROCCA
Final 5/31/2019 Partial Inspection NICK LAROCCA
Final 6/6/2019 Partial Approval DERRICK SPENCER
Final 6/7/2019 Partial Inspection NICK LAROCCA
Special/Order Compliance 11/15/2019 Approved TED RIES
Special/Order Compliance 5/14/2020 Approved NICK LAROCCA
Special/Order Compliance 11/10/2020 Approved NICK LAROCCA
Special/Order Compliance 4/14/2021 Approved NICK LAROCCA