1201 S HOPE ST 90015

Certificate Information: 1201 S HOPE ST 90015

Application / Permit
14010-10000-01777
Plan Check / Job No.
B14LA07822
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
PROPOSED 32 story highrise TOWER AT FLOWER ST with 303 apartment Units, 3,211sf of ground floor retail including 4 levels of subterranean parking and 7 levels of podium parking. THE 2ND TOWER IS AT 12TH ST AND DESCRIBED AS 40 story high rise with 363 apartment Units, 4,101sf of ground floor retail including 3 levels of subterranean parking and 7 levels of podium parking. BOTH TOWERS SHARE A COMMON PODIUM
Permit Issued
Issued on 4/7/2017
Issuing Office
Metro
Current Status
CofO Issued on 12/19/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/24/2014 APPLICANT
Assigned to Plan Check Engineer 6/26/2014 CHARLES CHANG
Corrections Issued 9/16/2014 HOK CHI CHIU
Quality Review Completed 9/25/2014 CHARLES CHANG
Applicant returned to address corrections 10/31/2014 HOK CHI CHIU
Applicant returned to address corrections 2/2/2017 JOHN VASQUEZ
Applicant returned to address corrections 2/16/2017 JOHN VASQUEZ
Applicant returned to address corrections 2/21/2017 JOHN VASQUEZ
Applicant returned to address corrections 3/1/2017 JOHN VASQUEZ
Applicant returned to address corrections 3/7/2017 MINYE PAK
Applicant returned to address corrections 3/8/2017 MINYE PAK
Plan Check Approved 3/8/2017 JOHN VASQUEZ
Issued 4/7/2017 LADBS
TCO Issued (Expire Date: 06-28-2020) 12/31/2019 TERRY HERR
TCO Issued (Expire Date: 12-23-2020) 6/26/2020 JAMES GARRISON
TCO Issued (Expire Date: 07-19-2021) 1/20/2021 TED RIES
TCO Issued (Expire Date: 01-09-2022) 7/13/2021 DAVID TSAU
CofO in Progress 11/30/2022 ERNESTO CORRAL
CofO Issued 12/19/2022 ERNESTO CORRAL
Permit Finaled 12/19/2022 ERNESTO CORRAL

Permit Application Clearance Information

Miscellaneous Cleared 1/29/2016 KIT AWAKUNI
Low Impact Development Cleared 10/13/2016 MICHAEL SCADUTO
Project located in CRA area Cleared 10/13/2016 JIM URQUHART
Project located in CRA area Cleared 10/13/2016 JIM URQUHART
Stormwater Pollution Mitigatn Cleared 10/13/2016 MICHAEL SCADUTO
Permit Cleared 10/18/2016 TERRY PHAN
Permit Cleared 10/18/2016 TERRY PHAN
Roof/Waste drainage to street Cleared 10/18/2016 TERRY PHAN
Eng Process Fee Ord 176,300 Cleared 10/19/2016 SEVAK ISAKHAYAN
Fire Marshall Fire Life Safety Cleared 1/19/2017 DAVE MYERS
Sewer availability Cleared 1/25/2017 ROCHELLE DUNGCA
Hydrant and Access approval Cleared 2/2/2017 JOHN CONNEALLY
Abandoned oil well Cleared 2/10/2017 JOHN CONNEALLY
Abandoned oil well approval Cleared 2/10/2017 JOHN CONNEALLY
Driveway location Cleared 2/13/2017 COLLINS ALLAN
Driveway location Cleared 2/13/2017 COLLINS ALLAN
Highway dedication Cleared 2/13/2017 CELINA MORENO
Internal circulation Cleared 2/13/2017 COLLINS ALLAN
"D" conditions Cleared 2/15/2017 EDBER MACEDO
"D" conditions Cleared 2/15/2017 EDBER MACEDO
"Q" conditions Cleared 2/15/2017 EDBER MACEDO
"Q" conditions Cleared 2/15/2017 EDBER MACEDO
CPC Cleared 2/15/2017 EDBER MACEDO
CPC Cleared 2/15/2017 EDBER MACEDO
Miscellaneous Cleared 2/15/2017 EDBER MACEDO
Opn space landscape/Water mgmt Cleared 2/15/2017 EDBER MACEDO
Prkng lot landscape/Water mgmt Cleared 2/15/2017 EDBER MACEDO
Site Plan review Cleared 2/15/2017 EDBER MACEDO
Site Plan review Cleared 2/15/2017 EDBER MACEDO
Tract Map conditions Cleared 2/15/2017 EDBER MACEDO
Tract Map conditions Cleared 2/15/2017 EDBER MACEDO
ZA Case Cleared 2/15/2017 EDBER MACEDO
Address approval Cleared 2/16/2017 RAVIL MANAPOV
Building over 3-story or 36-ft Cleared 2/16/2017 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 2/16/2017 CALOSHA APPROVED
Green Code Cleared 2/16/2017 RICHARD DOCKUS
Green Code Cleared 2/16/2017 RICHARD DOCKUS
Work Adjacent to Public Way Cleared 2/16/2017 RAVIL MANAPOV
Encroachment in public way Cleared 2/22/2017 JACOB BIGLER
DAS Clearance Cleared 2/23/2017 JOHN VASQUEZ
Metro Rail approval Cleared 3/2/2017 ASPET DAVIDIAN
Methane Ordinance Cleared 4/7/2017 MENOA AGHAJANI

Contact Information

Architect Dikeakos, Christos; Lic. No.: C28024 212-3989 HENNING DR      BURNABY BC, V5C 6N5
Contractor Onni Contracting (California) Inc; Lic. No.: 976929-B 315 WEST 9TH STREET #801      LOS ANGELES, CA 90015
Engineer Cortez, Artedi Baligod; Lic. No.: GE239 7091 LISA LANE      WESTMINSTER, CA 92683
Engineer O'Keeffe, Michael John; Lic. No.: S4879 1661 W 5TH AVE      VANCOUVER, BC, V6J1N5
Engineer Powers, Brian Frederick; Lic. No.: C75902 2090 WEST 31ST STREET      LOS ANGELES, CA 90018

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Methane Barrier 5/2/2017 Conditional Approval LESLIE TRUJILLO
Grading Pre-Inspection 5/2/2017 Approved LESLIE TRUJILLO
METHANE-Subgrade 5/2/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/5/2017 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/5/2017 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 5/5/2017 Partial Approval LESLIE TRUJILLO
METHANE-Subgrade 5/5/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/9/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/18/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/18/2017 Partial Approval LESLIE TRUJILLO
Footing/Foundation/Slab 5/18/2017 Partial Approval LESLIE TRUJILLO
METHANE-Barrier 5/18/2017 Conditional Approval LESLIE TRUJILLO
METHANE-Subgrade 5/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 5/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 5/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 6/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/1/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/1/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/2/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/2/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/2/2017 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/2/2017 Partial Approval JAMES POWERS
METHANE-Barrier 6/2/2017 Partial Approval JAMES POWERS
METHANE-Subgrade 6/2/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/3/2017 Off-Hour Fees Due
Deputy Methane Barrier 6/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/5/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/6/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/8/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 6/9/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/9/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/9/2017 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 6/10/2017 Partial Approval JAMES POWERS
METHANE-Barrier 6/10/2017 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 6/10/2017 Not Ready for Inspection JAMES POWERS
Deputy Other (see comments) 6/12/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/12/2017 Partial Approval LESLIE TRUJILLO
METHANE-Final 6/12/2017 Partial Inspection LESLIE TRUJILLO
Deputy Methane Barrier 6/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/13/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/13/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/13/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Other (see comments) 6/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 6/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/15/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/15/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/15/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/19/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/19/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/19/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/20/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/20/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/20/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/21/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/21/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/21/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/22/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/22/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/22/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/23/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/23/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/23/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 6/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 6/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 6/29/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/29/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 6/29/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/29/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 6/30/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/3/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/5/2017 Conditional Approval LESLIE TRUJILLO
METHANE-Rough 7/5/2017 Approved LESLIE TRUJILLO
Reinforced Concrete Frame 7/5/2017 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 7/5/2017 Not Ready for Inspection LESLIE TRUJILLO
Deputy Methane Barrier 7/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/7/2017 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 7/7/2017 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 7/7/2017 Partial Inspection LESLIE TRUJILLO
Deputy Methane Barrier 7/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/10/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/10/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/11/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/11/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/12/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/12/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/13/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/13/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/14/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/14/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/17/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/17/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/18/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/18/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/19/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/19/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/20/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/20/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/21/2017 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 7/21/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/21/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/24/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/24/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/25/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/25/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/26/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/26/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/28/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/28/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 7/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 7/31/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/31/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/1/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/1/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/2/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/2/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/3/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/3/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/7/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/7/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/7/2017 Partial Approval JAMES POWERS
Deputy Methane Barrier 8/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/8/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/8/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/9/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/9/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/9/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/9/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/10/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/10/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/11/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/11/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/14/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/14/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/15/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/18/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/21/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/21/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/22/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/22/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/23/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/24/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/24/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/25/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/25/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/29/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/29/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/30/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/30/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/5/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/5/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 9/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/8/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/8/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/21/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/21/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/22/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/22/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/28/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/28/2017 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 9/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/29/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/29/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/2/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/2/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/4/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/4/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/5/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/5/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/10/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/12/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/20/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/20/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/23/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/31/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/31/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/8/2017 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 11/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/8/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/13/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/14/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/14/2017 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 11/14/2017 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 11/14/2017 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 11/14/2017 Partial Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 11/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/15/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/16/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/16/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 11/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/17/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 11/17/2017 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 11/17/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 11/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 11/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/27/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/27/2017 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 11/27/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 11/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 11/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/30/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/4/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/4/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/5/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/6/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/8/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/8/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/8/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/12/2017 Corrections Issued LESLIE TRUJILLO
Deputy Reinf. Masonry 12/12/2017 Corrections Issued LESLIE TRUJILLO
Deputy Steel/Welding 12/12/2017 Corrections Issued LESLIE TRUJILLO
Deputy Reinf. Concrete 12/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/13/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/14/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/14/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/14/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/15/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 12/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/18/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 12/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/19/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 12/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/20/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/20/2017 Partial Approval LESLIE TRUJILLO
Masonry Wall/Backfill 12/20/2017 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 12/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 12/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/28/2017 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/28/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/29/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 1/5/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/5/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/11/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/11/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/17/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/23/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/23/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/30/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 1/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 1/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 1/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/2/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/8/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/8/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/13/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/13/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/14/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/14/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/14/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/15/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/15/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/15/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/15/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/16/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/16/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/16/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/16/2018 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/16/2018 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 2/19/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/20/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/20/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/20/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/20/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/21/2018 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/21/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/21/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/21/2018 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 2/21/2018 Off-Hour Fees Due
Green Building Rough 2/21/2018 Off-Hour Fees Due
Reinforced Concrete Frame 2/21/2018 Off-Hour Fees Due
Verify Sprinkler Sign Off 2/21/2018 Off-Hour Fees Due
Deputy Drilled-In Anchors 2/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/22/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/22/2018 Off-Hour Fees Due
METHANE-Barrier 2/22/2018 Off-Hour Fees Due
METHANE-Subgrade 2/22/2018 Off-Hour Fees Due
Deputy Drilled-In Anchors 2/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/23/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/23/2018 Off-Hour Fees Due
Deputy Drilled-In Anchors 2/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/26/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/28/2018 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/28/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/28/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/28/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/2/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/9/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/9/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/13/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/13/2018 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 3/13/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/15/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/15/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/28/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/30/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/2/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/4/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/4/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/6/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/6/2018 Partial Approval LESLIE TRUJILLO
Insulation 4/6/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/12/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/12/2018 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/16/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/16/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/17/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/19/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/19/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 4/23/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 4/24/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/24/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/26/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 4/26/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 4/26/2018 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Masonry 4/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/30/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/30/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/2/2018 Conditional Approval LESLIE TRUJILLO
Insulation 5/2/2018 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Masonry 5/3/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/3/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/4/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/7/2018 Conditional Approval NICK DANERI
Drywall Nailing 5/7/2018 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 5/7/2018 Partial Approval NICK DANERI
Green Building Rough 5/7/2018 Partial Inspection NICK DANERI
Deputy Reinf. Concrete 5/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/10/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/11/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 5/14/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/14/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/16/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 5/16/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 5/16/2018 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/17/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/22/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/22/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/24/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/24/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/25/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/25/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/29/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/29/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/30/2018 Conditional Approval LESLIE TRUJILLO
Insulation 5/30/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/30/2018 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/31/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/31/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/31/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/4/2018 Conditional Approval ERNESTO CORRAL
Insulation 6/4/2018 Partial Inspection ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/5/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/5/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/5/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 6/6/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/6/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/6/2018 Conditional Approval NICK DANERI
Drywall Nailing 6/6/2018 Partial Approval NICK DANERI
Green Building Rough 6/6/2018 Not Ready for Inspection NICK DANERI
Insulation 6/6/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 6/7/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/7/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 6/8/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/8/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/8/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 6/11/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/11/2018 Conditional Approval NICK DANERI
Drywall Nailing 6/11/2018 Partial Approval NICK DANERI
Green Building Rough 6/11/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 6/12/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/12/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/12/2018 Not Ready for Inspection NICK DANERI
Deputy Pre-Stress Concrete 6/13/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/13/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/13/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/13/2018 Partial Approval NICK DANERI
Light Gage Steel Frame 6/13/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 6/14/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/14/2018 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 6/14/2018 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 6/14/2018 Partial Approval NICK DANERI
Deputy Pre-Stress Concrete 6/15/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/15/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/15/2018 Conditional Approval NICK DANERI
Drywall Nailing 6/15/2018 Partial Approval NICK DANERI
Green Building Rough 6/15/2018 Not Ready for Inspection NICK DANERI
Insulation 6/15/2018 Partial Approval NICK DANERI
Deputy Reinf. Masonry 6/18/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/18/2018 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/19/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/19/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/19/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/20/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/20/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 6/20/2018 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/21/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/21/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/22/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/22/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 6/22/2018 Partial Inspection LESLIE TRUJILLO
Insulation 6/22/2018 Partial Approval LESLIE TRUJILLO
Smoke Detectors 6/22/2018 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/26/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/26/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/26/2018 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/27/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/27/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 6/27/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/27/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/28/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/28/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/28/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/28/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 6/29/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 6/29/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 6/29/2018 Partial Approval LESLIE TRUJILLO
Insulation 6/29/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/2/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/5/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/5/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/5/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 7/5/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/5/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/9/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/9/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/10/2018 Corrections Issued LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/10/2018 Partial Inspection LESLIE TRUJILLO
Insulation 7/10/2018 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 7/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/11/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/11/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/12/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/12/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 7/12/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/13/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/13/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/16/2018 Conditional Approval LESLIE TRUJILLO
Insulation 7/16/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/16/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/17/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/17/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/17/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 7/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/18/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/18/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/19/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/19/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/23/2018 Conditional Approval LESLIE TRUJILLO
Insulation 7/23/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/24/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/24/2018 Partial Approval LESLIE TRUJILLO
Insulation 7/24/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/25/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/25/2018 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/26/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/26/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/26/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 7/26/2018 Partial Approval LESLIE TRUJILLO
Insulation 7/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 7/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/30/2018 Conditional Approval LESLIE TRUJILLO
Insulation 7/30/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 7/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/31/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/31/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/1/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/1/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 8/1/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/1/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/2/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/2/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/3/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/3/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 8/3/2018 Partial Approval LESLIE TRUJILLO
Insulation 8/3/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/7/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/7/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/7/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 8/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/8/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/8/2018 Conditional Approval LESLIE TRUJILLO
Insulation 8/8/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/8/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/9/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/9/2018 Partial Approval LESLIE TRUJILLO
Insulation 8/9/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/10/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/10/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 8/10/2018 Conditional Approval LESLIE TRUJILLO
Insulation 8/10/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/14/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/14/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/14/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/15/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/15/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 8/15/2018 Partial Approval LESLIE TRUJILLO
Insulation 8/15/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/15/2018 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/16/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/16/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/17/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/17/2018 Partial Approval LESLIE TRUJILLO
Green Building Rough 8/17/2018 Approved LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/21/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/21/2018 Partial Approval LESLIE TRUJILLO
Insulation 8/21/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/21/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/22/2018 Conditional Approval LESLIE TRUJILLO
Insulation 8/22/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/22/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/23/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/23/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/23/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/24/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/24/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/27/2018 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/28/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/28/2018 Partial Approval LESLIE TRUJILLO
Insulation 8/28/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/28/2018 Not Ready for Inspection LESLIE TRUJILLO
Deputy Methane Barrier 8/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/29/2018 Conditional Approval LESLIE TRUJILLO
Insulation 8/29/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/29/2018 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/30/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/30/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/30/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/30/2018 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 8/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 8/31/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/31/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 8/31/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/5/2018 Partial Approval JAMES POWERS
Drywall Nailing 9/5/2018 Partial Approval JAMES POWERS
Insulation 9/5/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/5/2018 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/6/2018 Conditional Approval NICK DANERI
Insulation 9/6/2018 Partial Approval NICK DANERI
Light Gage Steel Frame 9/6/2018 Partial Approval NICK DANERI
Deputy Methane Barrier 9/7/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/7/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/7/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/10/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/12/2018 Conditional Approval LESLIE TRUJILLO
Insulation 9/12/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/12/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/13/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/13/2018 Partial Approval LESLIE TRUJILLO
Insulation 9/13/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/13/2018 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/17/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/17/2018 Partial Approval LESLIE TRUJILLO
Structural Steel Frame 9/17/2018 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 9/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/18/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/20/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/20/2018 Partial Approval LESLIE TRUJILLO
Insulation 9/20/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/20/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/21/2018 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 9/21/2018 Partial Approval JAMES POWERS
Insulation 9/21/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/21/2018 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/24/2018 Partial Approval JAMES POWERS
Deputy Methane Barrier 9/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/25/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/25/2018 Partial Approval LESLIE TRUJILLO
Deputy Methane Barrier 9/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/26/2018 Conditional Approval LESLIE TRUJILLO
Green Building Final 9/26/2018 Not Ready for Inspection LESLIE TRUJILLO
Insulation 9/26/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/27/2018 Conditional Approval NICK DANERI
Deputy Pre-Stress Concrete 9/28/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/28/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/28/2018 Partial Approval LESLIE TRUJILLO
Insulation 9/28/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/3/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/3/2018 Partial Approval LESLIE TRUJILLO
Insulation 10/3/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/3/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/4/2018 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/4/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/5/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/5/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/10/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/10/2018 Partial Approval LESLIE TRUJILLO
Insulation 10/10/2018 Partial Approval LESLIE TRUJILLO
Structural Steel Frame 10/10/2018 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 10/10/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/12/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/12/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/12/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/12/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/17/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/17/2018 Partial Approval LESLIE TRUJILLO
Insulation 10/17/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/17/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/18/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/18/2018 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/19/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/19/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/22/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/23/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/23/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/24/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/24/2018 Partial Approval LESLIE TRUJILLO
Insulation 10/24/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 10/24/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/25/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 10/25/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 10/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 10/31/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 10/31/2018 Not Ready for Inspection LESLIE TRUJILLO
Insulation 10/31/2018 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 10/31/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/1/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/5/2018 Conditional Approval LESLIE TRUJILLO
Green Building Final 11/5/2018 Partial Inspection LESLIE TRUJILLO
Insulation 11/5/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/5/2018 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/7/2018 Conditional Approval LESLIE TRUJILLO
Insulation 11/7/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/7/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/8/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/8/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/9/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/13/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 11/13/2018 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/13/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/13/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/14/2018 Conditional Approval LESLIE TRUJILLO
Insulation 11/14/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/14/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/16/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 11/16/2018 Partial Approval LESLIE TRUJILLO
Green Building Final 11/16/2018 Not Ready for Inspection LESLIE TRUJILLO
Insulation 11/16/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/19/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 11/19/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/21/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/26/2018 Conditional Approval LESLIE TRUJILLO
Green Building Final 11/26/2018 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 11/26/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/28/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 11/28/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 11/28/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/29/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/30/2018 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 12/1/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/3/2018 Conditional Approval LESLIE TRUJILLO
Insulation 12/3/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/4/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 12/4/2018 Partial Approval LESLIE TRUJILLO
Insulation 12/4/2018 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 12/4/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/5/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/6/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/7/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 12/7/2018 Partial Approval LESLIE TRUJILLO
Green Building Final 12/7/2018 Partial Inspection LESLIE TRUJILLO
Insulation 12/7/2018 Partial Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/10/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/12/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/12/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/12/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/13/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/13/2018 Conditional Approval LESLIE TRUJILLO
Insulation 12/13/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/13/2018 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/14/2018 Conditional Approval LESLIE TRUJILLO
Green Building Final 12/14/2018 Not Ready for Inspection LESLIE TRUJILLO
Insulation 12/14/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/17/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/18/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 12/18/2018 Partial Approval LESLIE TRUJILLO
Pre-Inspection 12/18/2018 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Concrete 12/19/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/20/2018 Conditional Approval LESLIE TRUJILLO
Insulation 12/20/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/20/2018 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/21/2018 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 12/21/2018 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 12/21/2018 Partial Approval LESLIE TRUJILLO
Pre-Inspection 12/21/2018 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 12/21/2018 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/3/2019 Partial Approval LESLIE TRUJILLO
Insulation 1/3/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/3/2019 Partial Approval LESLIE TRUJILLO
Structural Steel Frame 1/3/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 1/3/2019 Partial Approval LESLIE TRUJILLO
Insulation 1/10/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/10/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 1/10/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/11/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/11/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/14/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 1/14/2019 Partial Inspection LESLIE TRUJILLO
Insulation 1/16/2019 Partial Approval LESLIE TRUJILLO
Insulation 1/17/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/22/2019 Partial Approval LESLIE TRUJILLO
Insulation 1/22/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 1/22/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 1/28/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 1/28/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 2/1/2019 Partial Approval LESLIE TRUJILLO
Insulation 2/1/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/1/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/6/2019 Partial Inspection LESLIE TRUJILLO
Special/Order Compliance 2/6/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/8/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/11/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/11/2019 Conditional Approval LESLIE TRUJILLO
Insulation 2/11/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/11/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/14/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 2/14/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/15/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/15/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/15/2019 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 2/20/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 2/21/2019 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/22/2019 Conditional Approval LESLIE TRUJILLO
Insulation 2/25/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 2/25/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 2/25/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 3/4/2019 Partial Inspection LESLIE TRUJILLO
Structural Steel Frame 3/4/2019 Partial Inspection LESLIE TRUJILLO
Verify Sprinkler Sign Off 3/4/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/5/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 3/5/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 3/6/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 3/7/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 3/12/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/14/2019 Conditional Approval LESLIE TRUJILLO
Special/Order Compliance 3/22/2019 No Access for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 3/26/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/27/2019 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 3/28/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 3/28/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 3/29/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 3/29/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/5/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 4/5/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/8/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/9/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 4/10/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/11/2019 Not Ready for Inspection LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 4/12/2019 Partial Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 4/13/2019 Off-Hour Fees Due
Insulation 4/15/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/15/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/17/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/18/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 4/18/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/18/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 4/18/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/19/2019 Conditional Approval ERNESTO CORRAL
Insulation 4/19/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/19/2019 Partial Approval LESLIE TRUJILLO
Pre-Inspection 4/19/2019 Partial Approval LESLIE TRUJILLO
Verify Sprinkler Sign Off 4/19/2019 Approved LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/22/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/24/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/26/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/26/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/7/2019 Conditional Approval LESLIE TRUJILLO
Special/Order Compliance 5/7/2019 Partial Approval LESLIE TRUJILLO
Insulation 5/13/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/13/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/14/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/15/2019 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 5/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/20/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/22/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 5/23/2019 Not Ready for Inspection LESLIE TRUJILLO
Deputy Steel/Welding 5/24/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/28/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 5/31/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 5/31/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 5/31/2019 Partial Inspection LESLIE TRUJILLO
Drywall Nailing 6/4/2019 Partial Approval LESLIE TRUJILLO
Insulation 6/5/2019 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 6/5/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/6/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 6/11/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/11/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 6/11/2019 Partial Inspection LESLIE TRUJILLO
Light Gage Steel Frame 6/12/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/13/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/17/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/19/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 6/24/2019 Partial Approval LESLIE TRUJILLO
Insulation 6/24/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/24/2019 No Access for Inspection LESLIE TRUJILLO
Special/Order Compliance 6/24/2019 No Access for Inspection LESLIE TRUJILLO
Deputy Steel/Welding 6/26/2019 Conditional Approval LESLIE TRUJILLO
Special/Order Compliance 6/26/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 6/27/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 6/27/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/28/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/1/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/1/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/2/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/5/2019 No Access for Inspection ERNESTO CORRAL
Light Gage Steel Frame 7/5/2019 Not Ready for Inspection ERNESTO CORRAL
Special/Order Compliance 7/5/2019 Not Ready for Inspection ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 7/8/2019 Partial Inspection LESLIE TRUJILLO
Insulation 7/8/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/8/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/10/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/10/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/10/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/11/2019 Conditional Approval LESLIE TRUJILLO
Insulation 7/11/2019 Partial Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 7/17/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 7/22/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/22/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 7/22/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/24/2019 Conditional Approval LESLIE TRUJILLO
Grading Pre-Inspection 7/24/2019 Partial Inspection LESLIE TRUJILLO
Insulation 7/24/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/26/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 7/30/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 7/31/2019 No Access for Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/2/2019 Conditional Approval LESLIE TRUJILLO
Insulation 8/2/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/6/2019 Conditional Approval LESLIE TRUJILLO
Structural Steel Frame 8/6/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/7/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/7/2019 Conditional Approval LESLIE TRUJILLO
Insulation 8/9/2019 Partial Approval LESLIE TRUJILLO
Special/Order Compliance 8/9/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/13/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/14/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/15/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/16/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/16/2019 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/19/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/21/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/21/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/21/2019 Partial Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/22/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/23/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 8/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/27/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/27/2019 Partial Inspection LESLIE TRUJILLO
Deputy Steel/Welding 8/29/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/30/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/3/2019 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 9/4/2019 Partial Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/11/2019 Conditional Approval LESLIE TRUJILLO
Excavation/Setback/Form/Re-Bar 9/11/2019 Partial Inspection LESLIE TRUJILLO
Deputy Steel/Welding 9/12/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/13/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/16/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/17/2019 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 9/19/2019 Approved LESLIE TRUJILLO
Deputy Steel/Welding 9/20/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/23/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/25/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/26/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/27/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/1/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 10/2/2019 Conditional Approval LESLIE TRUJILLO
Pre-Inspection 10/25/2019 Partial Inspection LESLIE TRUJILLO
Final 10/29/2019 Not Ready for Inspection LESLIE TRUJILLO
Footing/Foundation/Slab 10/29/2019 Partial Approval LESLIE TRUJILLO
Green Building Final 10/29/2019 Not Ready for Inspection LESLIE TRUJILLO
METHANE-Barrier 10/29/2019 Approved LESLIE TRUJILLO
METHANE-Subgrade 10/29/2019 Approved LESLIE TRUJILLO
Reinforced Concrete Frame 10/29/2019 Approved LESLIE TRUJILLO
SGSOV-Seismic Gas S/O Valve 10/29/2019 SGSOV Approved LESLIE TRUJILLO
Smoke Detectors 10/29/2019 Approved LESLIE TRUJILLO
Structural Steel Frame 10/29/2019 Approved LESLIE TRUJILLO
Deputy Drilled-In Anchors 10/30/2019 Conditional Approval LESLIE TRUJILLO
Final 11/5/2019 Not Ready for Inspection LESLIE TRUJILLO
Footing/Foundation/Slab 11/5/2019 Approved LESLIE TRUJILLO
Green Building Final 11/5/2019 Not Ready for Inspection LESLIE TRUJILLO
Pre-Inspection 11/20/2019 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 12/11/2019 Corrections Issued LESLIE TRUJILLO
Pre-Inspection 12/17/2019 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 12/20/2019 Partial Inspection LESLIE TRUJILLO
Pre-Inspection 12/23/2019 Partial Inspection LESLIE TRUJILLO
Special/Order Compliance 6/4/2020 Partial Approval NICK DANERI
Special/Order Compliance 11/30/2020 Conditional Approval NICK DANERI
Green Building Final 12/10/2020 Not Ready for Inspection NICK DANERI
Special/Order Compliance 6/23/2021 Approved JAMES POWERS
Special/Order Compliance 12/15/2021 Conditional Approval NICK DANERI
Final 11/30/2022 OK to Issue CofO ERNESTO CORRAL
Green Building Final 11/30/2022 Approved ERNESTO CORRAL