684 N FIRTH AVE 90049

Certificate Information: 684 N FIRTH AVE 90049

Application / Permit
14010-10000-00565
Plan Check / Job No.
B14LA02588
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2-STORY SINGLE FAMILY DWELLING WITH ATTACHED GARAGE OVER BASEMENT.
Permit Issued
Issued on 10/7/2015
Issuing Office
Metro
Current Status
CofO Issued on 11/19/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/4/2014 APPLICANT
Assigned to Plan Check Engineer 3/6/2014 ERIC WONG
Corrections Issued 3/17/2014 ERIC WONG
Quality Review Completed 3/27/2014 GARO TELMI
Building Plans Picked Up 4/2/2014 APPLICANT
Green Plans Picked Up 4/2/2014 APPLICANT
Applicant returned to address corrections 5/6/2015 ERIC WONG
Applicant returned to address corrections 6/2/2015 ERIC WONG
Applicant returned to address corrections 6/19/2015 ERIC WONG
Applicant returned to address corrections 7/1/2015 ERIC WONG
Applicant returned to address corrections 10/6/2015 ERIC WONG
Plan Check Approved 10/7/2015 ERIC HUANG
Issued 10/7/2015 LADBS
Permit Expired-Status Void 11/2/2017 APPLICANT
Re-Activate Permit 12/13/2017 DANIEL ORRANTE
CofO in Progress 11/15/2024 CARLOS MATAMOROS
CofO in Progress 11/15/2024 CARLOS MATAMOROS
Permit Finaled 11/19/2024 RICHARD STEINBACH
CofO Issued 11/19/2024 RICHARD STEINBACH
Permit Finaled 11/19/2024 RICHARD STEINBACH

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 5/12/2015 AVALYN KAMACHI
BHO/Hillside ordinance Cleared 5/12/2015 AVALYN KAMACHI
BHO/Hillside ordinance Cleared 5/12/2015 AVALYN KAMACHI
BHO/Hillside ordinance Cleared 5/12/2015 AVALYN KAMACHI
Eng Process Fee Ord 176,300 Cleared 5/12/2015 AVALYN KAMACHI
Sewer availability Cleared 9/30/2015 ADRIAN HERNANDEZ
Low Impact Development Cleared 10/5/2015 IDA MEISAMI-FARD
BHO/Hillside ordinance Cleared 10/6/2015 ANGEL SALCEDO
Grading Pre-Inspection Cleared 10/6/2015 ERIC HUANG
Green Code Cleared 10/6/2015 ALDO UBAU
Green Code Cleared 10/6/2015 ROLLIN GETTLE III
Hydrant and Access approval Cleared 10/6/2015 ROBERT DUFF
Mailing Labels Cleared 10/6/2015 ERIC HUANG
Miscellaneous Cleared 10/6/2015 MARITZA PRZEKOP
Miscellaneous Cleared 10/6/2015 MARITZA PRZEKOP
Miscellaneous Cleared 10/6/2015 ROBERT DUFF
Roof/Waste drainage to street Cleared 10/6/2015 ANGEL SALCEDO
ZA Case Cleared 10/6/2015 MARITZA PRZEKOP

Contact Information

Architect Bernstein, William Marlon; Lic. No.: C12137 1725 C ABBOT KINNEY BLVD      VENICE, CA 90241
Contractor Kambur Construction Group Inc; Lic. No.: 847202-B 2014 S SEPULVEDA BLVD STE. 101      LOS ANGELES, CA 90025
Engineer Hollingsworth, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Engineer Logan, Gene Thomas; Lic. No.: C56724 PO BOX 19075      NEWBURY PARK, CA 91320
Engineer Resnick, Bruce Daniel; Lic. No.: S3293 1927 PONTIUS AVE      LOS ANGELES, CA 90025

Inspector Information

EVAN COOPER, (310) 914-3861 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/5/2016 Approved DAVID JAMES
Pre-Inspection 6/22/2016 Partial Approval DANIEL ORRANTE
Posting Pre-Inspection 12/6/2016 Partial Inspection THOMAS FINNILA
Deputy Grading 10/16/2017 Conditional Approval DANIEL ORRANTE
Excavation/Setback/Form/Re-Bar 10/20/2017 Partial Approval THOMAS FINNILA
Deputy Reinf. Concrete 10/25/2017 Conditional Approval THOMAS FINNILA
Excavation/Setback/Form/Re-Bar 1/5/2018 Partial Approval THOMAS FINNILA
Piling/Pier/Caisson 1/5/2018 Partial Approval THOMAS FINNILA
Footing/Foundation/Slab 5/18/2018 Partial Approval CHRISTOPHER WILSON
Special/Order Compliance 7/7/2018 Partial Inspection CHRISTOPHER WILSON
Special/Order Compliance 7/14/2018 Partial Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 12/14/2018 Partial Approval JOEL LAUNCHBAUGH
Excavation/Setback/Form/Re-Bar 1/25/2019 Not Ready for Inspection CARLOS MATAMOROS
Reinforced Concrete Frame 1/30/2019 Partial Approval CARLOS MATAMOROS
Footing/Foundation/Slab 2/27/2019 Partial Approval ANTHONY MCDOWALL
Reinforced Concrete Frame 2/27/2019 Partial Approval ANTHONY MCDOWALL
Green Building Rough 3/15/2019 Corrections Issued CRAIG DAVIS
Footing/Foundation/Slab 3/19/2019 Not Ready for Inspection ANTHONY MCDOWALL
Grading Pre-Inspection 3/19/2019 Not Ready for Inspection ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 3/22/2019 Partial Approval ANTHONY MCDOWALL
Grading Pre-Inspection 3/22/2019 Not Ready for Inspection ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 4/1/2019 Partial Approval ANTHONY MCDOWALL
Footing/Foundation/Slab 4/1/2019 Partial Approval ANTHONY MCDOWALL
Deputy Reinf. Concrete 4/2/2019 Conditional Approval ANTHONY MCDOWALL
Footing/Foundation/Slab 4/8/2019 Not Ready for Inspection ANTHONY MCDOWALL
Sewer 4/8/2019 Partial Inspection ANTHONY MCDOWALL
Deputy Shotcrete 5/8/2019 Conditional Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 5/8/2019 Partial Approval ANTHONY MCDOWALL
Deputy Reinf. Concrete 5/21/2019 Conditional Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 5/22/2019 Partial Approval ANTHONY MCDOWALL
Footing/Foundation/Slab 5/22/2019 Partial Approval ANTHONY MCDOWALL
PLUMBING-Rough 5/22/2019 Partial Approval ANTHONY MCDOWALL
Sewer 5/22/2019 Not Ready for Inspection ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 6/4/2019 Partial Approval ANTHONY MCDOWALL
Footing/Foundation/Slab 6/4/2019 Not Ready for Inspection ANTHONY MCDOWALL
PLUMBING-Rough 6/4/2019 Not Ready for Inspection ANTHONY MCDOWALL
Sewer 6/4/2019 Partial Approval ANTHONY MCDOWALL
Footing/Foundation/Slab 6/17/2019 Partial Inspection ANTHONY MCDOWALL
PLUMBING-Rough 6/17/2019 Partial Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 7/1/2019 Partial Approval ANTHONY MCDOWALL
Footing/Foundation/Slab 7/1/2019 Partial Approval ANTHONY MCDOWALL
PLUMBING-Rough 7/1/2019 Not Ready for Inspection ANTHONY MCDOWALL
ELECTRICAL-Rough 7/2/2019 Partial Approval ANTHONY MCDOWALL
Deputy Steel/Welding 7/22/2019 Conditional Approval ANTHONY MCDOWALL
Deputy Steel/Welding 7/24/2019 Conditional Approval ANTHONY MCDOWALL
ELECTRICAL-Rough 8/30/2019 Not Ready for Inspection MICHAEL TEMPLE
Excavation/Setback/Form/Re-Bar 8/30/2019 Corrections Issued MICHAEL TEMPLE
Footing/Foundation/Slab 8/30/2019 Not Ready for Inspection MICHAEL TEMPLE
Deputy Steel/Welding 9/3/2019 Conditional Approval ANTHONY MCDOWALL
ELECTRICAL-Rough 9/4/2019 Partial Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 9/4/2019 Partial Approval ANTHONY MCDOWALL
PLUMBING-Rough 9/4/2019 Partial Approval ANTHONY MCDOWALL
Deputy Drilled-In Anchors 9/10/2019 Conditional Approval ANTHONY MCDOWALL
Deputy Steel/Welding 9/11/2019 Conditional Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 9/11/2019 Partial Approval ANTHONY MCDOWALL
PLUMBING-Rough 9/11/2019 Approved ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 9/19/2019 Partial Approval ANTHONY MCDOWALL
Deputy Drilled-In Anchors 10/3/2019 Conditional Approval ANTHONY MCDOWALL
PLUMBING-Rough 10/3/2019 Corrections Issued ANTHONY MCDOWALL
Deck 10/4/2019 Not Ready for Inspection CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 10/4/2019 Partial Approval CARLOS MATAMOROS
Green Building Rough 10/4/2019 Not Ready for Inspection CARLOS MATAMOROS
Structural Steel Frame 10/4/2019 Not Ready for Inspection CARLOS MATAMOROS
Verify Sprinkler Sign Off 10/4/2019 Not Ready for Inspection CARLOS MATAMOROS
Deputy Steel/Welding 10/7/2019 Conditional Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 11/15/2019 Partial Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 11/20/2019 Partial Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 12/2/2019 Partial Approval ANTHONY MCDOWALL
Deputy Shotcrete 12/9/2019 Conditional Approval ANTHONY MCDOWALL
Excavation/Setback/Form/Re-Bar 12/9/2019 Partial Approval ANTHONY MCDOWALL
Deputy Steel/Welding 1/30/2020 Partial Approval MATT KELLERMAN
Deputy Steel/Welding 1/31/2020 Conditional Approval CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 1/31/2020 Approved CARLOS MATAMOROS
Deputy Steel/Welding 3/12/2020 Conditional Approval CARLOS MATAMOROS
Wood Frame 3/12/2020 Not Ready for Inspection CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 5/13/2020 Not Ready for Inspection CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 6/18/2020 Corrections Issued CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 6/22/2020 Corrections Issued CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 6/24/2020 Not Ready for Inspection CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 7/9/2020 Partial Approval CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 7/13/2020 Approved CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 8/31/2020 Partial Approval CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 10/9/2020 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Rough 10/9/2020 Corrections Issued CARLOS MATAMOROS
PLUMBING-Rough 10/9/2020 Corrections Issued CARLOS MATAMOROS
HVAC-Rough 12/8/2020 Partial Approval CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 12/14/2020 Approved CARLOS MATAMOROS
Green Building Rough 12/14/2020 Not Ready for Inspection CARLOS MATAMOROS
Structural Steel Frame 12/14/2020 Not Ready for Inspection CARLOS MATAMOROS
Verify Sprinkler Sign Off 12/14/2020 Not Ready for Inspection CARLOS MATAMOROS
ELECTRICAL-Rough 2/26/2021 Partial Approval CARLOS MATAMOROS
Underground Mechanical 2/26/2021 Partial Approval CARLOS MATAMOROS
PLUMBING-Rough 3/31/2021 Corrections Issued CARLOS MATAMOROS
HVAC-Rough 4/21/2021 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Rough 6/28/2021 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Rough 7/6/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 7/9/2021 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Rough 7/9/2021 Partial Approval CARLOS MATAMOROS
PLUMBING-Rough 7/13/2021 Partial Approval CARLOS MATAMOROS
Green Building Rough 7/15/2021 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Rough 7/15/2021 Not Ready for Inspection CARLOS MATAMOROS
Structural Steel Frame 7/15/2021 Corrections Issued CARLOS MATAMOROS
Verify Sprinkler Sign Off 7/15/2021 Approved CARLOS MATAMOROS
HVAC-Rough 7/16/2021 Not Ready for Inspection CARLOS MATAMOROS
Shower Pan 7/16/2021 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Rough 7/21/2021 Not Ready for Inspection CARLOS MATAMOROS
Interior/Exterior Lathing 7/23/2021 Partial Approval CARLOS MATAMOROS
Shower Pan 7/23/2021 Partial Approval CARLOS MATAMOROS
PLUMBING-Rough 7/26/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
HVAC-Rough 7/28/2021 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Rough 7/28/2021 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Rough 8/3/2021 Partial Approval CARLOS MATAMOROS
PLUMBING-Rough 8/4/2021 Partial Approval CARLOS MATAMOROS
ELECTRICAL-Rough 8/10/2021 Not Ready for Inspection CARLOS MATAMOROS
BUILDING-Rough-Frame 8/12/2021 Partial Approval CARLOS MATAMOROS
Green Building Rough 8/12/2021 Partial Approval CARLOS MATAMOROS
Structural Steel Frame 8/12/2021 Partial Approval CARLOS MATAMOROS
BUILDING-Rough-Frame 8/13/2021 Partial Approval CARLOS MATAMOROS
ELECTRICAL-Rough 8/13/2021 Partial Approval CARLOS MATAMOROS
Deputy Steel/Welding 8/16/2021 Conditional Approval ANTHONY MCDOWALL
BUILDING-Rough-Frame 8/25/2021 Partial Approval CARLOS MATAMOROS
ELECTRICAL-Rough 8/25/2021 Partial Approval CARLOS MATAMOROS
Green Building Rough 8/25/2021 Approved CARLOS MATAMOROS
Shower Pan 8/25/2021 Approved CARLOS MATAMOROS
BUILDING-Rough-Frame 9/7/2021 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 9/13/2021 Not Ready for Inspection CARLOS MATAMOROS
BUILDING-Rough-Frame 9/15/2021 Approved CARLOS MATAMOROS
ELECTRICAL-Rough 9/15/2021 Approved CARLOS MATAMOROS
Green Building Rough 9/15/2021 Approved CARLOS MATAMOROS
Drywall Nailing 10/18/2022 Not Ready for Inspection CARLOS MATAMOROS
Sewer 10/18/2022 Not Ready for Inspection CARLOS MATAMOROS
Sewer 10/28/2022 Partial Approval CARLOS MATAMOROS
Underground Mechanical 12/21/2022 Approved CARLOS MATAMOROS
HVAC-Final 7/20/2023 No Access for Inspection CARLOS MATAMOROS
PLUMBING-Final 7/21/2023 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Final 7/27/2023 Not Ready for Inspection CARLOS MATAMOROS
Smoke Detectors 7/27/2023 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Final 8/2/2023 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Final 9/14/2023 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Final 9/21/2023 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Final 9/25/2023 Not Ready for Inspection CARLOS MATAMOROS
ELECTRICAL-Final 9/26/2023 Not Ready for Inspection CARLOS MATAMOROS
Pre-Inspection 9/27/2023 Approved CARLOS MATAMOROS
Service/Power Release 10/2/2023 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Final 10/27/2023 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Final 11/1/2023 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Final 11/2/2023 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Final 11/3/2023 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Final 11/16/2023 Not Ready for Inspection CARLOS MATAMOROS
HVAC-Final 11/20/2023 Partial Approval CARLOS MATAMOROS
HVAC-Final 11/22/2023 Approved CARLOS MATAMOROS
Gas Test 11/27/2023 Not Ready for Inspection MICHAEL PELHAM
ELECTRICAL-Final 12/8/2023 Partial Approval CARLOS MATAMOROS
ELECTRICAL-Final 12/11/2023 Approved CARLOS MATAMOROS
Gas Test 12/12/2023 Approved CARLOS MATAMOROS
PLUMBING-Final 12/15/2023 Partial Approval CARLOS MATAMOROS
Service/Power Release 12/15/2023 Approved CARLOS MATAMOROS
PLUMBING-Final 12/18/2023 Not Ready for Inspection MICHAEL PELHAM
ELECTRICAL-Final 12/20/2023 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Final 12/20/2023 Not Ready for Inspection CARLOS MATAMOROS
Footing/Foundation/Slab 12/22/2023 Approved CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 12/22/2023 SGSOV Not Ready CARLOS MATAMOROS
Structural Steel Frame 12/22/2023 Approved CARLOS MATAMOROS
ELECTRICAL-Final 1/3/2024 Partial Approval CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 1/5/2024 SGSOV Not Ready CARLOS MATAMOROS
ELECTRICAL-Final 1/9/2024 No Access for Inspection CARLOS MATAMOROS
PLUMBING-Final 1/10/2024 Not Ready for Inspection CARLOS MATAMOROS
ELECTRICAL-Final 1/11/2024 Approved CARLOS MATAMOROS
PLUMBING-Final 1/16/2024 Partial Approval CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 1/17/2024 SGSOV Not Ready CARLOS MATAMOROS
Gas Test 1/23/2024 No Access for Inspection CARLOS MATAMOROS
Special/Order Compliance 1/27/2024 Approved CARLOS MATAMOROS
PLUMBING-Final 1/29/2024 Not Ready for Inspection CARLOS MATAMOROS
Gas Test 1/30/2024 Approved CARLOS MATAMOROS
Smoke Detectors 1/30/2024 Approved CARLOS MATAMOROS
Special/Order Compliance 1/30/2024 Approved CARLOS MATAMOROS
Verify Rec and Parks Fee Memo 1/30/2024 Approved CARLOS MATAMOROS
Final 1/31/2024 Not Ready for Inspection CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 1/31/2024 SGSOV Not Ready CARLOS MATAMOROS
Special/Order Compliance 2/1/2024 Approved CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 4/5/2024 SGSOV Not Ready CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 5/24/2024 SGSOV Not Ready CHRISTOPHER WILSON
Final 6/25/2024 Partial Approval CARLOS MATAMOROS
Green Building Final 6/25/2024 Approved CARLOS MATAMOROS
PLUMBING-Final 6/25/2024 Approved CARLOS MATAMOROS
SGSOV-Seismic Gas S/O Valve 6/25/2024 SGSOV Approved CARLOS MATAMOROS
Enclosure/Fence 6/27/2024 Not Ready for Inspection CARLOS MATAMOROS
Gas Test 6/27/2024 Not Ready for Inspection CARLOS MATAMOROS
Pool/Spa Cover 6/27/2024 Not Ready for Inspection CARLOS MATAMOROS
Enclosure/Fence 7/3/2024 Not Ready for Inspection CARLOS MATAMOROS
PLUMBING-Final 7/3/2024 Not Ready for Inspection CARLOS MATAMOROS
Pool/Spa Cover 7/3/2024 Approved CARLOS MATAMOROS
Final 7/5/2024 Conditional Approval CARLOS MATAMOROS
Gas Test 7/5/2024 Approved CARLOS MATAMOROS
Final 7/11/2024 Corrections Issued CARLOS MATAMOROS
PLUMBING-Final 7/12/2024 Approved CARLOS MATAMOROS
Final 9/3/2024 Corrections Issued MICHAEL PELHAM
Final 10/10/2024 Partial Approval CARLOS MATAMOROS
ELECTRICAL-Final 10/11/2024 Approved CARLOS MATAMOROS
Final 11/15/2024 OK to Issue CofO CARLOS MATAMOROS