3921 W WILSHIRE BLVD 90010

Certificate Information: 3921 W WILSHIRE BLVD 90010

Application / Permit
13016-10004-26034
Plan Check / Job No.
B17LA18769
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(5) Apartment
Work Description
Supplemental to the original permit 13016-10000-26034 to revise the building elevations, revise the layout of basement, and replace ground floor retail spaces with 7 additional residential units, and replace storage space on second floor to add one residential unit.(total of 8 units). Total number of units of the entire building is 109. Revise layout of 7th floor roof deck and mechanical area Maintain all 3 existing elevators. Original scope of work: Adaptive re-use of existing 7-story commercial bldg (T.I. at basement and 1st floor commercial, change use on floors 1-7 from commercial to 101 residential units. Convert basement from office to exercise room and storage. Convert 1st floor from adult daycare to retail and residential apartments. Convert floors 2 to 7 from office to residential apartments.
Permit Issued
Issued on 4/13/2018
Issuing Office
Metro
Current Status
Permit Finaled on 8/20/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/18/2017 APPLICANT
Disabled Access Plans Picked Up 10/25/2017 APPLICANT
Assigned to Plan Check Engineer 10/26/2017 QUAN NGHIEM
Corrections Issued 10/28/2017 QUAN NGHIEM
Green Plans Picked Up 11/2/2017 APPLICANT
Quality Review Completed 12/11/2017 BILL STUTSMAN
Building Plans Picked Up 12/13/2017 APPLICANT
Applicant returned to address corrections 1/8/2018 QUAN NGHIEM
Applicant returned to address corrections 1/18/2018 QUAN NGHIEM
Applicant returned to address corrections 1/26/2018 QUAN NGHIEM
Plan Check Approved 4/13/2018 NATALIE ZARATE ROBERTS
Issued 4/13/2018 LADBS
Permit Finaled 8/20/2021 TIMOTHY BUXTON

Permit Application Clearance Information

Metro Rail approval Cleared 12/19/2017 QUAN NGHIEM
Project located in CRA area Cleared 12/19/2017 JIM URQUHART
Green Code Cleared 1/18/2018 KATHRYN BUTTERWORTH
DAS Clearance Cleared 1/26/2018 WAI LAU
Title 19 building approval Cleared 4/11/2018 MENOA AGHAJANI
Eng Process Fee Ord 176,300 Cleared 4/13/2018 NAZILA NOORIFAR
Sewer availability Cleared 4/13/2018 NAZILA NOORIFAR

Contact Information

Architect Pak, Christopher C; Lic. No.: C25621 8157 ZITOLA TERRACE      PLAYA DEL REY, CA 90293
Contractor Philmont Management Inc; Lic. No.: 808686-B 3450 WILSHIRE BLVD 850      LOS ANGELES, CA 90010
Engineer Lee, Sang Youck; Lic. No.: S3821 3531 BROOKHILL ST      GLENDALE, CA 91214

Inspector Information

IAN BLINN, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI
CHRISTOPHER BLACKWOOD, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 4/18/2018 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/30/2018 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/1/2018 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 5/1/2018 Partial Approval DAVID BURKHEAD
Green Building Rough 6/19/2018 No Access for Inspection LARRY ARNICK
Reinforced Concrete Frame 6/19/2018 Not Ready for Inspection LARRY ARNICK
Green Building Rough 6/26/2018 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/26/2018 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 6/27/2018 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/3/2018 Partial Approval DAVID BURKHEAD
Reinforced Concrete Frame 7/16/2018 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 7/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/19/2018 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 7/19/2018 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 7/20/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/23/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/25/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/30/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 7/31/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/1/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/3/2018 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/8/2018 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/22/2018 Partial Approval LESLIE TRUJILLO
Deputy Shotcrete 8/24/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 8/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 8/28/2018 Conditional Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 8/28/2018 Partial Approval DAVID BURKHEAD
Deputy Shotcrete 8/29/2018 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 2/5/2019 Not Ready for Inspection DAVID BURKHEAD
Insulation 3/11/2019 Partial Approval DAVID BURKHEAD
Insulation 3/28/2019 Partial Inspection DAVID BURKHEAD
Insulation 4/10/2019 Partial Approval DAVID BURKHEAD
Insulation 4/29/2019 Partial Approval DANIEL COLLINS
Insulation 5/14/2019 Partial Inspection DAVID BURKHEAD
Insulation 6/26/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/15/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 7/22/2019 Partial Approval DAVID BURKHEAD
Insulation 7/25/2019 Partial Approval DAVID BURKHEAD
Insulation 8/1/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/1/2019 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/12/2019 Partial Approval DAVID BURKHEAD
Green Building Rough 8/12/2019 Approved DAVID BURKHEAD
Insulation 8/12/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/12/2019 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/20/2019 Partial Approval DAVID BURKHEAD
Drywall Nailing 8/26/2019 Partial Approval DAVID BURKHEAD
Insulation 8/26/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 8/26/2019 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 10/4/2019 Conditional Approval DAVID BURKHEAD
Light Gage Steel Frame 10/4/2019 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/15/2019 Partial Approval TIMOTHY BUXTON
T-Bar Ceiling 10/15/2019 Partial Approval TIMOTHY BUXTON
Drywall Nailing 10/21/2019 Partial Approval RUSSELL BONVOULOIR
Drywall Nailing 10/24/2019 Partial Approval RUSSELL BONVOULOIR
T-Bar Ceiling 10/25/2019 Partial Approval DAVID BURKHEAD
Light Gage Steel Frame 10/30/2019 Partial Approval DAVID BURKHEAD
Structural Steel Frame 11/1/2019 Partial Approval DAVID BURKHEAD
T-Bar Ceiling 11/12/2019 Partial Approval TIMOTHY BUXTON
Drywall Nailing 11/13/2019 Partial Approval TIMOTHY BUXTON
Drywall Nailing 11/26/2019 Partial Approval TIMOTHY BUXTON
T-Bar Ceiling 12/5/2019 Partial Approval TIMOTHY BUXTON
Insulation 12/17/2019 Partial Approval TIMOTHY BUXTON
Drywall Nailing 12/19/2019 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 1/7/2020 Partial Approval JONATHAN QUACH
Excavation/Setback/Form/Re-Bar 1/27/2020 Conditional Approval TIMOTHY BUXTON
Excavation/Setback/Form/Re-Bar 2/12/2020 Partial Approval TIMOTHY BUXTON
Drywall Nailing 2/19/2020 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 3/2/2020 Partial Approval TIMOTHY BUXTON
Drywall Nailing 3/10/2020 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 4/1/2020 Partial Approval TIMOTHY BUXTON
Insulation 4/6/2020 Partial Approval TIMOTHY BUXTON
T-Bar Ceiling 5/8/2020 Partial Approval TIMOTHY BUXTON
T-Bar Ceiling 5/15/2020 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 5/19/2020 Partial Approval TIMOTHY BUXTON
Drywall Nailing 5/28/2020 Partial Approval TIMOTHY BUXTON
Drywall Nailing 6/17/2020 Partial Approval TIMOTHY BUXTON
Insulation 6/25/2020 Approved TIMOTHY BUXTON
Drywall Nailing 7/15/2020 Partial Approval TIMOTHY BUXTON
Drywall Nailing 9/15/2020 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 9/15/2020 Partial Approval TIMOTHY BUXTON
Deputy Steel/Welding 10/2/2020 Conditional Approval TIMOTHY BUXTON
Drywall Nailing 10/2/2020 Partial Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 10/22/2020 Conditional Approval TIMOTHY BUXTON
Deputy Reinf. Concrete 10/26/2020 Conditional Approval TIMOTHY BUXTON
Excavation/Setback/Form/Re-Bar 10/27/2020 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 11/6/2020 Partial Approval TIMOTHY BUXTON
Light Gage Steel Frame 12/22/2020 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/6/2021 Conditional Approval TIMOTHY BUXTON
Interior/Exterior Lathing 1/22/2021 Partial Approval TIMOTHY BUXTON
Drywall Nailing 2/1/2021 Approved TIMOTHY BUXTON
Interior/Exterior Lathing 2/4/2021 Approved TIMOTHY BUXTON
Excavation/Setback/Form/Re-Bar 3/30/2021 Approved TIMOTHY BUXTON
Light Gage Steel Frame 4/12/2021 Partial Approval TIMOTHY BUXTON
Drywall Nailing 4/30/2021 Approved TIMOTHY BUXTON
Light Gage Steel Frame 4/30/2021 Approved TIMOTHY BUXTON
T-Bar Ceiling 4/30/2021 Approved TIMOTHY BUXTON
Deputy Drilled-In Anchors 5/4/2021 Conditional Approval TIMOTHY BUXTON
Final 7/8/2021 Not Ready for Inspection TIMOTHY BUXTON
Green Building Final 7/8/2021 Not Ready for Inspection TIMOTHY BUXTON
Reinforced Concrete Frame 7/8/2021 Approved TIMOTHY BUXTON
Smoke Detectors 7/8/2021 Approved TIMOTHY BUXTON
Final 8/20/2021 Permit Finaled TIMOTHY BUXTON
Green Building Final 8/20/2021 Approved TIMOTHY BUXTON