6067 W WILSHIRE BLVD 90036

Certificate Information: 6067 W WILSHIRE BLVD 90036

Application / Permit
13014-10000-03762
Plan Check / Job No.
B13LA11252
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(21) Theater
Work Description
ADD THEATER STRUCTURE TO (E) MUSEUM/RESTAURANT/OFFICE BLDG PER CPC 2014-3119-ZC-SN-CDO-MCUP-ZV-ZAI-SPR.
Permit Issued
Issued on 11/9/2016
Issuing Office
Metro
Current Status
CofO Issued on 3/23/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/14/2013 APPLICANT
Assigned to Plan Check Engineer 11/21/2013 QUAN NGHIEM
Corrections Issued 11/25/2013 QUAN NGHIEM
Quality Review Completed 12/2/2013 LAWRENCE QUIRANTE
Building Plans Picked Up 12/13/2013 APPLICANT
Applicant returned to address corrections 5/26/2015 LAWRENCE QUIRANTE
Applicant returned to address corrections 6/5/2015 ROSHANAK VARJAVAND
Applicant returned to address corrections 10/25/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 10/27/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 10/31/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 11/1/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 11/2/2016 LAWRENCE QUIRANTE
Applicant returned to address corrections 11/4/2016 LAWRENCE QUIRANTE
Plan Check Approved 11/9/2016 MATTHEW CAMPBELL
Issued 11/9/2016 LADBS
TCO Issued (Expire Date: 04-08-2020) 10/11/2019 TERRY HERR
TCO Issued (Expire Date: 06-03-2020) 12/6/2019 DAVID TSAU
TCO Issued (Expire Date: 12-01-2020) 6/4/2020 DAVID TSAU
CofO in Progress 3/19/2021 JAMES POWERS
Permit Finaled 3/23/2021 TERRY HERR
CofO Issued 3/23/2021 TERRY HERR
Permit Finaled 3/23/2021 TERRY HERR

Permit Application Clearance Information

Building over 3-story or 36-ft Cleared 10/7/2015 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 8/9/2016 DAVID PEREZ
Eng Process Fee Ord 176,300 Cleared 9/8/2016 RAVIL MANAPOV
Highway dedication Cleared 9/8/2016 RAVIL MANAPOV
Hydrant and Access approval Cleared 9/14/2016 ROBERT DUFF
Food Service Establishment Cleared 9/19/2016 KENNETH BROWNE
Low Impact Development Cleared 10/4/2016 AMMAR ELTAWIL
Sewer availability Cleared 10/6/2016 RAVIL MANAPOV
City Hist. Cultural Monument Cleared 10/12/2016 LAMBERT GIESSINGER
Metro Rail approval Cleared 10/24/2016 QUAN NGHIEM
Permit Cleared 10/28/2016 JAMES KHO
Green Code Cleared 11/1/2016 DAVID MATSON
Roof/Waste drainage to street Cleared 11/1/2016 TERRY PHAN
"Q" conditions Cleared 11/2/2016 MARITZA PRZEKOP
CPC Cleared 11/2/2016 MARITZA PRZEKOP
CPC Cleared 11/2/2016 MARITZA PRZEKOP
Frnt yard landscape/Water mgmt Cleared 11/2/2016 MARITZA PRZEKOP
Miscellaneous Cleared 11/2/2016 MARITZA PRZEKOP
Site Plan review Cleared 11/2/2016 MARITZA PRZEKOP
Supp. Use District POD/CDO/TDO Cleared 11/2/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 11/2/2016 MARITZA PRZEKOP
ZA Case Cleared 11/2/2016 MARITZA PRZEKOP
DAS Clearance Cleared 11/4/2016 QUAN NGHIEM
Title 19 building approval Cleared 11/7/2016 ANDREW KO

Contact Information

Architect Jernigan, Robert Allen; Lic. No.: C23940 500 SO FIGUEROA STREET   GENSLER    LOS ANGELES, CA 90071
Engineer Deane, Richard Travis; Lic. No.: GE2544 664 WEST BROADWAY      GLENDALE, CA 91204
Engineer Roorda, Derrick Duane; Lic. No.: S4607 1207 REGENT ST      ALAMEDA, CA 94501

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 11/15/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/15/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/16/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/16/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/17/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/17/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/18/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/18/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/21/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/21/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 11/21/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 11/21/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/22/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/22/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/23/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/23/2016 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 11/23/2016 Partial Approval GREGORY POMISH
METHANE-Barrier 11/23/2016 Partial Inspection GREGORY POMISH
METHANE-Subgrade 11/23/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/28/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/28/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 11/28/2016 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 11/28/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 11/29/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/29/2016 Conditional Approval GREGORY POMISH
Structural Steel Frame 11/29/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 11/30/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/30/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/2/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/2/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/5/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/5/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/6/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/6/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 12/6/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 12/6/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/7/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/7/2016 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/7/2016 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 12/7/2016 Partial Approval GREGORY POMISH
METHANE-Barrier 12/7/2016 Partial Approval GREGORY POMISH
METHANE-Subgrade 12/7/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/8/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/8/2016 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/8/2016 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 12/8/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/9/2016 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/9/2016 Partial Inspection GREGORY POMISH
Masonry Wall/Backfill 12/9/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/12/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/12/2016 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 12/12/2016 Partial Approval GREGORY POMISH
METHANE-Rough 12/12/2016 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 12/12/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/13/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/13/2016 Conditional Approval GREGORY POMISH
Wood Frame 12/13/2016 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/14/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/14/2016 Conditional Approval GREGORY POMISH
METHANE-Rough 12/14/2016 Partial Approval GREGORY POMISH
Masonry Wall/Backfill 12/14/2016 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 12/14/2016 Partial Inspection GREGORY POMISH
Reinforced Masonry Frame 12/14/2016 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/15/2016 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/15/2016 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/16/2016 No Access for Inspection JEFFREY FULTON
Deputy Steel/Welding 12/16/2016 No Access for Inspection JEFFREY FULTON
Masonry Wall/Backfill 12/16/2016 Partial Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 12/19/2016 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/21/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/21/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/22/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/22/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/23/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/23/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/27/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/27/2016 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/28/2016 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/28/2016 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 1/4/2017 Partial Inspection GREGORY POMISH
METHANE-Rough 1/5/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 1/5/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 1/6/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/11/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/12/2017 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 1/12/2017 Conditional Approval KATY RAMIREZ
Deputy Reinf. Concrete 1/13/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/13/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/13/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 1/13/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 1/13/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 1/17/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/18/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/20/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/23/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/24/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/24/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 1/24/2017 Not Ready for Inspection GREGORY POMISH
Masonry Wall/Backfill 1/24/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 1/24/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 1/25/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/25/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 1/25/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 1/26/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/26/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/27/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 1/27/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/30/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/30/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/31/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/31/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 1/31/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 1/31/2017 Partial Approval GREGORY POMISH
Deputy Steel/Welding 2/2/2017 Conditional Approval GREGORY POMISH
Grading Pre-Inspection 2/2/2017 Partial Inspection JOHN YAKUBYAN
Reinforced Masonry Frame 2/2/2017 Partial Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 2/3/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 2/9/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/10/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/10/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 2/10/2017 Partial Approval GREGORY POMISH
METHANE-Barrier 2/10/2017 Partial Inspection GREGORY POMISH
METHANE-Subgrade 2/10/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 2/13/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/13/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 2/13/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/14/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/14/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 2/14/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/15/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/15/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 2/16/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 2/16/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/17/2017 No Access for Inspection JEFFREY FULTON
Deputy Steel/Welding 2/17/2017 No Access for Inspection JEFFREY FULTON
Reinforced Masonry Frame 2/17/2017 No Access for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 2/21/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/22/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/22/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/23/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/24/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/9/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/10/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/13/2017 Conditional Approval BARRY SILLS
Deputy Steel/Welding 3/13/2017 Conditional Approval BARRY SILLS
Deputy Reinf. Concrete 3/14/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/14/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 3/14/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 3/15/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/15/2017 Conditional Approval GREGORY POMISH
Excavation/Setback/Form/Re-Bar 3/16/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/22/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/22/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/23/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/23/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 3/23/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 3/23/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 3/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/24/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 3/28/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/28/2017 Conditional Approval DAVID BURKHEAD
Reinforced Masonry Frame 3/28/2017 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 3/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 3/30/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/30/2017 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 3/30/2017 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 3/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/31/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/3/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/4/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/4/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/5/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/6/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/7/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/10/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/11/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/11/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 4/14/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 4/14/2017 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 4/14/2017 Partial Approval GREGORY POMISH
Structural Steel Frame 4/18/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 4/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/19/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/19/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/20/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/20/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/21/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/21/2017 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 4/21/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 4/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/24/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/24/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/25/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/25/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/26/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 4/26/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/26/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/27/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 4/27/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/27/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/28/2017 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 4/28/2017 Conditional Approval JEFFREY FULTON
Deputy Shotcrete 4/28/2017 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 4/28/2017 No Access for Inspection JEFFREY FULTON
Structural Steel Frame 4/28/2017 Partial Inspection JEFFREY FULTON
Deputy Drilled-In Anchors 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/1/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/1/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 5/1/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 5/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/2/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/2/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/2/2017 Conditional Approval GREGORY POMISH
Wall Anchors 5/2/2017 Partial Inspection GREGORY POMISH
Deputy Shotcrete 5/3/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/3/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/4/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/4/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/5/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/5/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/8/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/8/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 5/11/2017 Partial Approval GREGORY POMISH
METHANE-Rough 5/12/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 5/12/2017 Partial Approval GREGORY POMISH
Deputy Shotcrete 5/15/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 5/15/2017 Partial Inspection GREGORY POMISH
Deputy Shotcrete 5/16/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 5/16/2017 Partial Approval GREGORY POMISH
Deputy Shotcrete 5/17/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 5/17/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 5/17/2017 Partial Inspection GREGORY POMISH
T-Bar Ceiling 5/17/2017 Partial Inspection GREGORY POMISH
Wood Frame 5/17/2017 Partial Inspection GREGORY POMISH
Deputy Shotcrete 5/18/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/19/2017 Approved SAKO AGHAZARIAN
Deputy Steel/Welding 5/19/2017 Approved SAKO AGHAZARIAN
Reinforced Masonry Frame 5/19/2017 Partial Approval SAKO AGHAZARIAN
Deputy Reinf. Concrete 5/22/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/22/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/22/2017 Conditional Approval GREGORY POMISH
Masonry Wall/Backfill 5/22/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 5/23/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/23/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/24/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/24/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/25/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/25/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/30/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 5/30/2017 Partial Inspection GREGORY POMISH
Piling/Pier/Caisson 5/30/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 5/30/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 5/31/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/1/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 6/1/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 6/1/2017 Partial Inspection GREGORY POMISH
Wood Frame 6/1/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 6/2/2017 Conditional Approval GREGORY POMISH
Masonry Wall/Backfill 6/2/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/5/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/5/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/5/2017 Conditional Approval GREGORY POMISH
Green Building Rough 6/5/2017 Not Ready for Inspection WILLIAM ROSE
METHANE-Rough 6/5/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 6/5/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/6/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/6/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/7/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/7/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/7/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/8/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/8/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/9/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/9/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/9/2017 Conditional Approval GREGORY POMISH
Structural Steel Frame 6/12/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/13/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/14/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 6/14/2017 Partial Approval GREGORY POMISH
METHANE-Barrier 6/14/2017 Partial Inspection GREGORY POMISH
METHANE-Rough 6/14/2017 Partial Inspection GREGORY POMISH
METHANE-Subgrade 6/14/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 6/16/2017 Conditional Approval JEFFREY FULTON
Deputy Steel/Welding 6/16/2017 Conditional Approval JEFFREY FULTON
Reinforced Concrete Frame 6/16/2017 Not Ready for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 6/19/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/20/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/20/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 6/20/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/21/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/22/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/22/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 6/23/2017 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 6/23/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 6/26/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/26/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/27/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/27/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/27/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 6/27/2017 Partial Approval GREGORY POMISH
METHANE-Barrier 6/27/2017 Partial Inspection GREGORY POMISH
METHANE-Subgrade 6/27/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 6/28/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/28/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/28/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/29/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/29/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/29/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/30/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 6/30/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/30/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/5/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/5/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 7/5/2017 Partial Approval GREGORY POMISH
METHANE-Barrier 7/5/2017 Partial Inspection GREGORY POMISH
METHANE-Subgrade 7/5/2017 Partial Inspection GREGORY POMISH
Deputy Shotcrete 7/6/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 7/6/2017 Conditional Approval DAVID BURKHEAD
METHANE-Rough 7/6/2017 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 7/6/2017 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 7/7/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/7/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/10/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/10/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/11/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/11/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/11/2017 Conditional Approval GREGORY POMISH
METHANE-Rough 7/13/2017 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 7/13/2017 Partial Approval GREGORY POMISH
Deputy Shotcrete 7/14/2017 Conditional Approval GREGORY POMISH
Green Building Rough 7/17/2017 Not Ready for Inspection WILLIAM ROSE
METHANE-Rough 7/17/2017 Partial Approval ERNESTO CORRAL
Reinforced Concrete Frame 7/17/2017 Partial Approval ERNESTO CORRAL
Deputy Shotcrete 7/18/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/18/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/19/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/19/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 7/19/2017 Partial Approval GREGORY POMISH
METHANE-Barrier 7/19/2017 Approved GREGORY POMISH
METHANE-Rough 7/19/2017 Approved GREGORY POMISH
METHANE-Subgrade 7/19/2017 Approved GREGORY POMISH
Reinforced Concrete Frame 7/19/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Masonry Frame 7/19/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 7/20/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/20/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/21/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/21/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/21/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/24/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/25/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/26/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/26/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 7/26/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/27/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/27/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 7/27/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 7/27/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 7/28/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/28/2017 Conditional Approval GREGORY POMISH
Structural Steel Frame 7/31/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/1/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/1/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/1/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/2/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/2/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/2/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/3/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/3/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/3/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/7/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/7/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/7/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 8/7/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/8/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 8/10/2017 Partial Approval GREGORY POMISH
Green Building Rough 8/11/2017 Not Ready for Inspection WILLIAM ROSE
Reinforced Concrete Frame 8/11/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/14/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/14/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/15/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/15/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/15/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/16/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/16/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/16/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 8/16/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/17/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/17/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/18/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/24/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 8/28/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 8/29/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/29/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/29/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 8/29/2017 Partial Approval GREGORY POMISH
Structural Steel Frame 8/29/2017 Partial Inspection JONATHAN QUACH
Deputy Reinf. Concrete 8/30/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/30/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/30/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 8/30/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 8/31/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/31/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/31/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/1/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/1/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/5/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/5/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/6/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/6/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/7/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/7/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/7/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 9/7/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 9/8/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/8/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/11/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/11/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/12/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/12/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/12/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 9/12/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 9/15/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/18/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/18/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 9/18/2017 Partial Approval GREGORY POMISH
Deputy Fireproofing 9/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/19/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/19/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 9/19/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/20/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/20/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/20/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/20/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 9/20/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/21/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/21/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/21/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/21/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 9/21/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/22/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/22/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/22/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/22/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/22/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/25/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/25/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/25/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/25/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 9/25/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/26/2017 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/26/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/26/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/26/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 9/26/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/27/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/27/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/27/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/28/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/28/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/28/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/28/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/29/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 9/29/2017 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 9/29/2017 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 9/29/2017 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 10/4/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/4/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/4/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/5/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/5/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/5/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/6/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/6/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/6/2017 Conditional Approval GREGORY POMISH
Wall Anchors 10/6/2017 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 10/10/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/10/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/10/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/10/2017 Conditional Approval GREGORY POMISH
Green Building Rough 10/10/2017 Not Ready for Inspection WILLIAM ROSE
Reinforced Concrete Frame 10/10/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/11/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/11/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/11/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 10/11/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/12/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/12/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/12/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/12/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/13/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/13/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/13/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/13/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/16/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/16/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/16/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/16/2017 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 10/16/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/17/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/17/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/17/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 10/17/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/18/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/18/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/18/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/20/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/20/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/20/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/23/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/23/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/23/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/23/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/24/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/24/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/24/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/24/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/25/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/25/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/25/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/25/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/26/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/26/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/26/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/26/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/27/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/27/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/27/2017 Conditional Approval GREGORY POMISH
Green Building Rough 10/27/2017 Not Ready for Inspection WILLIAM ROSE
Reinforced Concrete Frame 10/27/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/30/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/30/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/30/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/30/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/31/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/31/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/31/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/31/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 10/31/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/1/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/1/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/1/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 11/1/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/2/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/2/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/2/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/2/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/3/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/3/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/3/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/3/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/6/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/6/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/6/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/7/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/7/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/7/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/8/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/8/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/8/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/9/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/9/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/9/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/9/2017 Conditional Approval GREGORY POMISH
Green Building Rough 11/9/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 11/9/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/13/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/13/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/13/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/13/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 11/13/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/14/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/14/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/14/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/15/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/15/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/15/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/15/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/16/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/16/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/16/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/16/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/17/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/17/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/17/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/17/2017 Conditional Approval GREGORY POMISH
Green Building Rough 11/17/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 11/17/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/20/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/20/2017 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 11/20/2017 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/21/2017 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 11/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 11/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 11/22/2017 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 11/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/27/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/27/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/27/2017 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 11/27/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/28/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/28/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/28/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/28/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/29/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/30/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/30/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/30/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 11/30/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/1/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/1/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/1/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/1/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/4/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/4/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/4/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/4/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/5/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/5/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/5/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/5/2017 Conditional Approval GREGORY POMISH
Green Building Rough 12/5/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 12/5/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/6/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/6/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/6/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/6/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/7/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/7/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/7/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/7/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/8/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/8/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/8/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/8/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 12/8/2017 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 12/11/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/11/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/11/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/11/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/12/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/12/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/12/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/12/2017 Conditional Approval GREGORY POMISH
Green Building Rough 12/12/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 12/12/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/13/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/13/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/13/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/13/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/14/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/14/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/14/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/14/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 12/14/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/15/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/15/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/15/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/15/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/18/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/18/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/18/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/19/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/19/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/19/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/19/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/20/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/20/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/20/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/20/2017 Conditional Approval GREGORY POMISH
Green Building Rough 12/20/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 12/20/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/21/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/21/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/21/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/21/2017 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 12/22/2017 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 12/26/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/26/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/26/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/27/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/27/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/27/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/27/2017 Conditional Approval GREGORY POMISH
Green Building Rough 12/27/2017 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 12/27/2017 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/28/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/28/2017 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/28/2017 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/28/2017 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 12/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 12/29/2017 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 12/29/2017 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 12/29/2017 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 1/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 1/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 1/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 1/8/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/8/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/8/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/8/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/9/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/9/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/9/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/10/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/10/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/10/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/10/2018 Conditional Approval GREGORY POMISH
Green Building Rough 1/10/2018 Not Ready for Inspection GREGORY POMISH
Reinforced Concrete Frame 1/10/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/11/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/11/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/11/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/12/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/12/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/12/2018 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 1/12/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/16/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/16/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/16/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/16/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/17/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/17/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/17/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/17/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/18/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/18/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/18/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/18/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/19/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/19/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/19/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/19/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/22/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/22/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/22/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/22/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/23/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/23/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/23/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/23/2018 Conditional Approval GREGORY POMISH
Green Building Rough 1/23/2018 Approved GREGORY POMISH
Reinforced Concrete Frame 1/23/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/24/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/24/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/24/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/25/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/25/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/25/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/25/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/26/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/26/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/26/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/26/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/29/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/29/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/29/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/29/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/30/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/30/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/30/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/30/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/31/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 1/31/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 1/31/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 1/31/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 1/31/2018 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 1/31/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/1/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/1/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 2/1/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/1/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 2/1/2018 Partial Approval GREGORY POMISH
Structural Steel Frame 2/1/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 2/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 2/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/2/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 2/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/5/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/6/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/6/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/6/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 2/6/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/6/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/7/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/7/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/7/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 2/7/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/7/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/8/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/8/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 2/8/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/8/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/9/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/9/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 2/9/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/9/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 2/9/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/12/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/12/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/12/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/13/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/13/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/13/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 2/13/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/14/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/14/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/14/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/14/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/15/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/15/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/15/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/15/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/16/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/16/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/16/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/16/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/20/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/20/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/20/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/21/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/21/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/21/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/21/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 2/21/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/22/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/22/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/22/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/22/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/23/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/23/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/23/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/23/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 2/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/26/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 2/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 2/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 2/27/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 2/28/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 2/28/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/28/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 2/28/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/1/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/1/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/1/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/1/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/2/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/2/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/2/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/5/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/5/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/5/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/5/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/6/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/6/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/6/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/6/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/7/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/7/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/7/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/7/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 3/7/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/8/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/8/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/8/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/8/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/9/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/9/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/9/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/12/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/12/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/12/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/13/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/13/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/13/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/14/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/14/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/14/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/14/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/15/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/15/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/15/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/15/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Fireproofing 3/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 3/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 3/16/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 3/19/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/19/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/19/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/20/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/20/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/20/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/21/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/21/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/21/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/22/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/22/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/22/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/23/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/23/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/23/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 3/23/2018 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/27/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/27/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 3/27/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/28/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/28/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/28/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/29/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/29/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/29/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/30/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 3/30/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 3/30/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 3/30/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/2/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/2/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/3/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/3/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/3/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/4/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/4/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/4/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/5/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/5/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/5/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/6/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/6/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/6/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 4/6/2018 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 4/6/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Shotcrete 4/9/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 4/9/2018 Conditional Approval DAVID BURKHEAD
Reinforced Concrete Frame 4/9/2018 Partial Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 4/10/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/10/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 4/10/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/10/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/11/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 4/11/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/11/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/12/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 4/12/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/12/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/13/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 4/13/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/13/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 4/13/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/16/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/16/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/16/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/17/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/17/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/17/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/18/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/18/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/18/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 4/18/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/19/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/19/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/19/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/20/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/20/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 4/20/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 4/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 4/23/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 4/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/24/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/24/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 4/24/2018 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 4/24/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/25/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/25/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/25/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/26/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/26/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/26/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 4/26/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/27/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/27/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/27/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 4/30/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 4/30/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 4/30/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/1/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/1/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/1/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/2/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/2/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/3/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/3/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/3/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/4/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/4/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/4/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/7/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/7/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/7/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/8/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/8/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/8/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 5/8/2018 Partial Approval GREGORY POMISH
Wall Anchors 5/8/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 5/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/9/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/9/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/10/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/10/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/10/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/11/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/11/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/14/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/14/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/14/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 5/14/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/15/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/15/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/15/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/16/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/16/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/16/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/17/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/17/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/17/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Reinf. Concrete 5/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Steel/Welding 5/18/2018 Conditional Approval DAVID BURKHEAD
Deputy Drilled-In Anchors 5/21/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/21/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/21/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/21/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 5/21/2018 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 5/21/2018 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 5/21/2018 Partial Inspection GREGORY POMISH
Wall Anchors 5/21/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 5/22/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/22/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/22/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/22/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/23/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/23/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/23/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/23/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/24/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/24/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/24/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 5/24/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/25/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/25/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 5/25/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/25/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 5/25/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/29/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/29/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/29/2018 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 5/29/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/30/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/30/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/30/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 5/31/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/31/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 5/31/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/1/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/1/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/1/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/4/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/4/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/4/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 6/4/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/5/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/5/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/5/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 6/5/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/6/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/6/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/6/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 6/6/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 6/7/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/7/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/7/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/8/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 6/8/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/8/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/8/2018 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 6/8/2018 Not Ready for Inspection LARRY ARNICK
T-Bar Ceiling 6/8/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 6/11/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/11/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/11/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/12/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/12/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/12/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/13/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/13/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/13/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/14/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/14/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/14/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/14/2018 Conditional Approval GREGORY POMISH
Insulation 6/14/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/15/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/15/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/15/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/15/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/18/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/18/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/18/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/18/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/19/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/19/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/19/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/19/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 6/19/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/20/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/20/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/20/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/20/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/21/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/21/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/21/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/21/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/22/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/22/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/22/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/25/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/25/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/25/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/25/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/26/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/26/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/26/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/26/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/27/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/27/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/27/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/27/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 6/27/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/28/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/28/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/28/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/28/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 6/28/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 6/29/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 6/29/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 6/29/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 6/29/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 6/29/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/2/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/2/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/2/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/3/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/3/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/3/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/3/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/5/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/5/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/5/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/5/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/6/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/6/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/6/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/6/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/9/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/9/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/9/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/10/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/10/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/10/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/10/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 7/10/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/11/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/11/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/11/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/12/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/12/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/12/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/13/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/13/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 7/13/2018 Partial Approval GREGORY POMISH
Wall Anchors 7/13/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 7/16/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/16/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/16/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/16/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/17/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/17/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/17/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/17/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/18/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/18/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/18/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/18/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/19/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/19/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 7/19/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/19/2018 Conditional Approval LARRY ARNICK
Interior/Exterior Lathing 7/19/2018 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 7/19/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/20/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 7/20/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 7/20/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 7/20/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 7/20/2018 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 7/20/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 7/23/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/23/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/23/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/23/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/23/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 7/23/2018 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 7/23/2018 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 7/23/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 7/24/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 7/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/24/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/24/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/24/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/25/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/25/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/25/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/25/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 7/25/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 7/26/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/26/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/26/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/26/2018 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 7/26/2018 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 7/26/2018 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 7/26/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/27/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/27/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 7/27/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/27/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/30/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/30/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 7/30/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/30/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 7/31/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 7/31/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 7/31/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 7/31/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 7/31/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/1/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/1/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/1/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/1/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/2/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/2/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/3/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/3/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/3/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/3/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 8/10/2018 Partial Approval LARRY ARNICK
Light Gage Steel Frame 8/10/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 8/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/13/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/13/2018 Conditional Approval GREGORY POMISH
Reinforced Masonry Frame 8/13/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/14/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/14/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/14/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 8/14/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/14/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/15/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/15/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 8/15/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/15/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 8/15/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 8/15/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 8/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/17/2018 Approved JEFF BYTHEWAY
Deputy Fireproofing 8/17/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 8/17/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 8/17/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 8/17/2018 Approved JEFF BYTHEWAY
Deputy Fireproofing 8/20/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/20/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 8/20/2018 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 8/21/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 8/21/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/21/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/21/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/22/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 8/22/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/22/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/22/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/23/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 8/23/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/23/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/23/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 8/23/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/24/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 8/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/24/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/24/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/27/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/27/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/27/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/28/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/28/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/28/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/29/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/29/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/29/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 8/29/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/30/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/30/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/30/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 8/31/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 8/31/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 8/31/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/4/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/4/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/4/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/5/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/5/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/5/2018 Conditional Approval GREGORY POMISH
Interior/Exterior Lathing 9/5/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 9/6/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/6/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/6/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/7/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/7/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/7/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/10/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/10/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/10/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/10/2018 Conditional Approval GREGORY POMISH
Interior/Exterior Lathing 9/10/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/11/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/11/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/11/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/12/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/12/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/12/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/13/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/13/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/13/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/14/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 9/14/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/14/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/14/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 9/14/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/17/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/17/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/17/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 9/17/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/18/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/18/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/18/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/19/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/19/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/19/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/20/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/20/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/20/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/21/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/21/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/21/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 9/21/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/24/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/24/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/24/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 9/24/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/25/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/25/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/25/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/25/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/26/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/26/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/26/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/26/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/27/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/27/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/27/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/27/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 9/27/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 9/28/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 9/28/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 9/28/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 9/28/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 9/28/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/1/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/1/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/1/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/1/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 10/1/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/2/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/2/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/2/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/2/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/3/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/3/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/3/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/3/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/3/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/4/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/4/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/4/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/4/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/4/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 10/4/2018 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 10/4/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/5/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 10/5/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 10/5/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 10/5/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 10/5/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 10/9/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/9/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/9/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/9/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/10/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/10/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/10/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/10/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/10/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 10/10/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/11/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/11/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/11/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/11/2018 Conditional Approval GREGORY POMISH
Reinforced Concrete Frame 10/11/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 10/12/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/12/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/12/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/12/2018 Conditional Approval GREGORY POMISH
Light Gage Steel Frame 10/12/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/15/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/15/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/15/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/16/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/16/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/16/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/17/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/17/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/17/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/18/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/18/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/18/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/19/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/19/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/19/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 10/19/2018 Partial Approval GREGORY POMISH
Reinforced Concrete Frame 10/19/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/22/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/22/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/22/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/23/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/23/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/23/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/23/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/23/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/24/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/24/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/24/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/24/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/24/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/25/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/25/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/25/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/25/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/25/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/26/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/26/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/26/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/26/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/26/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/29/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/29/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/29/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/29/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/29/2018 Conditional Approval GREGORY POMISH
Drywall Nailing 10/29/2018 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 10/29/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/30/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/30/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/30/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/30/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/30/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 10/31/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 10/31/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/31/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 10/31/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 10/31/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/1/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/1/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 11/1/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/1/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/1/2018 Approved GREGORY POMISH
Drywall Nailing 11/1/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/1/2018 Partial Approval GREGORY POMISH
Wall Anchors 11/1/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 11/2/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/2/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/2/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/2/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 11/2/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/2/2018 Approved GREGORY POMISH
Footing/Foundation/Slab 11/2/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/2/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/5/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/5/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/5/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/5/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/5/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/6/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/6/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/6/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/6/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/6/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/7/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/7/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/7/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/7/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/7/2018 Approved GREGORY POMISH
Special/Order Compliance 11/7/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/8/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/8/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/8/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/8/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/8/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/9/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/9/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/9/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/9/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/9/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/13/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/13/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/13/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/14/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/14/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/14/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/15/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/15/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/15/2018 Approved GREGORY POMISH
Drywall Nailing 11/15/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/15/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 11/16/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/16/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/16/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/19/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 11/19/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 11/19/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 11/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 11/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 11/20/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 11/20/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 11/20/2018 Not Ready for Inspection ERNESTO CORRAL
Pre-Inspection 11/20/2018 Not Ready for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 11/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Fireproofing 11/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 11/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Shotcrete 11/21/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 11/21/2018 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 11/21/2018 Not Ready for Inspection ERNESTO CORRAL
Pre-Inspection 11/21/2018 Not Ready for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 11/26/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/26/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/26/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/26/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/26/2018 Approved GREGORY POMISH
Light Gage Steel Frame 11/26/2018 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 11/27/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/27/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/27/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/27/2018 Approved GREGORY POMISH
Deputy Steel/Welding 11/27/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/28/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/28/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/28/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/28/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/29/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/29/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/29/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/29/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 11/30/2018 Approved GREGORY POMISH
Deputy Fireproofing 11/30/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 11/30/2018 Approved GREGORY POMISH
Deputy Shotcrete 11/30/2018 Approved GREGORY POMISH
Drywall Nailing 11/30/2018 Partial Approval GREGORY POMISH
Insulation 11/30/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 11/30/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/3/2018 Conditional Approval GREGORY POMISH
Deputy Fireproofing 12/3/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 12/3/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 12/3/2018 Conditional Approval GREGORY POMISH
Deputy Steel/Welding 12/3/2018 Conditional Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Fireproofing 12/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Shotcrete 12/4/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/4/2018 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 12/4/2018 Not Ready for Inspection LESLIE TRUJILLO
Light Gage Steel Frame 12/4/2018 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/5/2018 Approved JEFF BYTHEWAY
Deputy Fireproofing 12/5/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 12/5/2018 Approved JEFF BYTHEWAY
Deputy Shotcrete 12/5/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 12/5/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 12/6/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/6/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/6/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/6/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/6/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/7/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/7/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/7/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/7/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/7/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/10/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/10/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/10/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/10/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/10/2018 Conditional Approval LARRY ARNICK
Light Gage Steel Frame 12/10/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/11/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/11/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/11/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/11/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/11/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/12/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/12/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/12/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/12/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/12/2018 Conditional Approval LARRY ARNICK
Drywall Nailing 12/12/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/13/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/13/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/13/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/13/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/13/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/14/2018 Conditional Approval LARRY ARNICK
Deputy Fireproofing 12/14/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/14/2018 Conditional Approval LARRY ARNICK
Deputy Shotcrete 12/14/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/14/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/17/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/17/2018 Approved GREGORY POMISH
Deputy Steel/Welding 12/17/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 12/18/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/18/2018 Approved GREGORY POMISH
Deputy Steel/Welding 12/18/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 12/19/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/19/2018 Approved GREGORY POMISH
Deputy Steel/Welding 12/19/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 12/20/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/20/2018 Approved GREGORY POMISH
Deputy Steel/Welding 12/20/2018 Approved GREGORY POMISH
Drywall Nailing 12/20/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/20/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/21/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/21/2018 Approved GREGORY POMISH
Deputy Steel/Welding 12/21/2018 Approved GREGORY POMISH
Drywall Nailing 12/21/2018 Partial Approval GREGORY POMISH
Light Gage Steel Frame 12/21/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/24/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/24/2018 Approved GREGORY POMISH
Deputy Steel/Welding 12/24/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 12/26/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/26/2018 Approved GREGORY POMISH
Deputy Steel/Welding 12/26/2018 Approved GREGORY POMISH
Drywall Nailing 12/26/2018 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 12/26/2018 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 12/27/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/27/2018 Approved GREGORY POMISH
Deputy Steel/Welding 12/27/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 12/28/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 12/28/2018 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/28/2018 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/31/2018 Approved GREGORY POMISH
Deputy Reinf. Concrete 12/31/2018 Approved GREGORY POMISH
Deputy Steel/Welding 12/31/2018 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/2/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/2/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/2/2019 Approved GREGORY POMISH
Drywall Nailing 1/2/2019 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/2/2019 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/3/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/3/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/3/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/4/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/4/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/4/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/7/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/7/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/7/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/8/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/8/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/8/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/9/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/9/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/9/2019 Approved GREGORY POMISH
Drywall Nailing 1/9/2019 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/10/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/10/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/10/2019 Approved GREGORY POMISH
Drywall Nailing 1/10/2019 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 1/10/2019 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 1/11/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/11/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/11/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/14/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/14/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/14/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/15/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/15/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/15/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/16/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/16/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/16/2019 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 1/17/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/17/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/17/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/18/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 1/18/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 1/18/2019 No Access for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 1/22/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/22/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/22/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/23/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/23/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/23/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/24/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/24/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/24/2019 Approved GREGORY POMISH
Drywall Nailing 1/24/2019 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/24/2019 Partial Approval GREGORY POMISH
T-Bar Ceiling 1/24/2019 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 1/25/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/25/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/25/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/28/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/28/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/28/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/29/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/29/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/29/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/30/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/30/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/30/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 1/31/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 1/31/2019 Approved GREGORY POMISH
Deputy Steel/Welding 1/31/2019 Approved GREGORY POMISH
Drywall Nailing 1/31/2019 Partial Approval GREGORY POMISH
Insulation 1/31/2019 Partial Approval GREGORY POMISH
Interior/Exterior Lathing 1/31/2019 Partial Approval GREGORY POMISH
Light Gage Steel Frame 1/31/2019 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/1/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/1/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/1/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/4/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/4/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/4/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/5/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/5/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/5/2019 Approved GREGORY POMISH
Light Gage Steel Frame 2/5/2019 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 2/6/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/6/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/6/2019 Approved GREGORY POMISH
Drywall Nailing 2/6/2019 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 2/6/2019 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 2/7/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/7/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/7/2019 Approved GREGORY POMISH
Footing/Foundation/Slab 2/7/2019 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/8/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/8/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/8/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/11/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/11/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/11/2019 Approved GREGORY POMISH
Drywall Nailing 2/11/2019 Partial Inspection GREGORY POMISH
Insulation 2/11/2019 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 2/11/2019 Partial Inspection GREGORY POMISH
Wall Anchors 2/11/2019 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 2/12/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/12/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/12/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/13/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/13/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/13/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/14/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/14/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/14/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/15/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/15/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/15/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/19/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/19/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/19/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/20/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/20/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/20/2019 Approved GREGORY POMISH
Light Gage Steel Frame 2/20/2019 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 2/21/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/21/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/21/2019 Approved GREGORY POMISH
Light Gage Steel Frame 2/21/2019 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 2/22/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/22/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/22/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/25/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/25/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/25/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/26/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/26/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/26/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/27/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/27/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/27/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 2/28/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 2/28/2019 Approved GREGORY POMISH
Deputy Steel/Welding 2/28/2019 Approved GREGORY POMISH
Drywall Nailing 2/28/2019 Partial Approval GREGORY POMISH
Insulation 2/28/2019 Partial Approval GREGORY POMISH
Light Gage Steel Frame 2/28/2019 Partial Approval GREGORY POMISH
Deputy Drilled-In Anchors 3/1/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/1/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/1/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/4/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/4/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/4/2019 Approved GREGORY POMISH
Drywall Nailing 3/4/2019 Partial Inspection GREGORY POMISH
Insulation 3/4/2019 Partial Inspection GREGORY POMISH
Light Gage Steel Frame 3/4/2019 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/5/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/5/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/5/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/6/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/6/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/6/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/7/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/7/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/7/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/8/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/8/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/8/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/11/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/11/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/11/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/12/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/12/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/12/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/13/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/13/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/13/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/14/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/14/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/14/2019 Approved GREGORY POMISH
Interior/Exterior Lathing 3/14/2019 Partial Inspection GREGORY POMISH
T-Bar Ceiling 3/14/2019 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/15/2019 Approved GREGORY POMISH
Deputy Grading 3/15/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/15/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/15/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/18/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/18/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/18/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/19/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/19/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/19/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/20/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/20/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/20/2019 Approved GREGORY POMISH
Drywall Nailing 3/20/2019 Partial Inspection GREGORY POMISH
Insulation 3/20/2019 Not Ready for Inspection GREGORY POMISH
Light Gage Steel Frame 3/20/2019 Not Ready for Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/21/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/21/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/21/2019 Approved GREGORY POMISH
Footing/Foundation/Slab 3/21/2019 Partial Inspection GREGORY POMISH
Deputy Drilled-In Anchors 3/22/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 3/22/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 3/22/2019 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 3/26/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/26/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/26/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/27/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/27/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/27/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/28/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/28/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/28/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 3/29/2019 Approved GREGORY POMISH
Deputy Reinf. Concrete 3/29/2019 Approved GREGORY POMISH
Deputy Steel/Welding 3/29/2019 Approved GREGORY POMISH
Deputy Drilled-In Anchors 4/1/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/1/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/1/2019 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/2/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/2/2019 Partial Approval JAMES POWERS
Drywall Nailing 4/2/2019 Not Ready for Inspection JAMES POWERS
Interior/Exterior Lathing 4/2/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/3/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/3/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/4/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/4/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/5/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/5/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/8/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 4/8/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/10/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/10/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/11/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/11/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 4/11/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/12/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/12/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/15/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/15/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/16/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/17/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/18/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/18/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/19/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/19/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/19/2019 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/22/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/22/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 4/22/2019 Approved JEFF BYTHEWAY
Drywall Nailing 4/22/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 4/22/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/23/2019 Approved JEFF BYTHEWAY
Deputy Grading 4/23/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/23/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 4/23/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/24/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/24/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/24/2019 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/25/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 4/25/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/25/2019 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 4/26/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 4/26/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 4/26/2019 Approved JEFF BYTHEWAY
Drywall Nailing 4/26/2019 Partial Approval JEFF BYTHEWAY
Light Gage Steel Frame 4/26/2019 Partial Approval JEFF BYTHEWAY
Deputy Drilled-In Anchors 4/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/29/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/29/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/30/2019 Approved TED RIES
Deputy Reinf. Concrete 4/30/2019 Approved TED RIES
Deputy Steel/Welding 4/30/2019 Approved TED RIES
Deputy Drilled-In Anchors 5/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/1/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/1/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/2/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/2/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/2/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 5/3/2019 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 5/3/2019 Approved JEFF BYTHEWAY
Deputy Steel/Welding 5/3/2019 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 5/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/6/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/6/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/7/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/7/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/8/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/8/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/9/2019 Partial Approval JAMES POWERS
Drywall Nailing 5/9/2019 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 5/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/13/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/13/2019 Partial Approval JAMES POWERS
Drywall Nailing 5/13/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/13/2019 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/13/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/14/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/14/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/15/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/15/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/16/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/17/2019 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/20/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/20/2019 Partial Approval JAMES POWERS
Drywall Nailing 5/20/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/21/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/21/2019 Partial Approval JAMES POWERS
Deputy Grading 5/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/22/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/22/2019 Partial Approval JAMES POWERS
Deputy Grading 5/23/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 5/23/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 5/23/2019 Conditional Approval LARRY ARNICK
Deputy Grading 5/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/28/2019 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/28/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/28/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/30/2019 Partial Approval JAMES POWERS
Deputy Fireproofing 5/31/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/31/2019 Partial Approval JAMES POWERS
Deputy Fireproofing 6/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/4/2019 Conditional Approval LARRY ARNICK
Drywall Nailing 6/4/2019 Not Ready for Inspection LARRY ARNICK
Light Gage Steel Frame 6/4/2019 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/6/2019 Partial Approval JAMES POWERS
Deputy Grading 6/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/11/2019 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 6/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/14/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/17/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/18/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/19/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/20/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/20/2019 Partial Approval JAMES POWERS
Drywall Nailing 6/20/2019 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 6/21/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Reinf. Concrete 6/21/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Steel/Welding 6/21/2019 Conditional Approval DANIEL MC AULIFFE
Deputy Drilled-In Anchors 6/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/24/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/25/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/25/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/25/2019 Partial Approval JAMES POWERS
Drywall Nailing 6/25/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/26/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/26/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/27/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/27/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 6/27/2019 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 6/28/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/28/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/28/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/1/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/1/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/2/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/2/2019 Partial Approval JAMES POWERS
Drywall Nailing 7/2/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/2/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/3/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/3/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/5/2019 Partial Approval JAMES POWERS
Deputy Grading 7/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/5/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/5/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/8/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/8/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/10/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/10/2019 Partial Approval JAMES POWERS
Interior/Exterior Lathing 7/10/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/11/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/11/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/12/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/12/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/15/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/15/2019 Partial Approval JAMES POWERS
Insulation 7/15/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/15/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/16/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/17/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/18/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/18/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/19/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/19/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/22/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/22/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/23/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/23/2019 Partial Approval JAMES POWERS
Drywall Nailing 7/23/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/23/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/24/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/25/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/25/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/25/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/26/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/26/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/29/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/29/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/30/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/30/2019 Partial Approval JAMES POWERS
Drywall Nailing 7/30/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/30/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/31/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/31/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/31/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/1/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/1/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/2/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/5/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/5/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/5/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/6/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/6/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/7/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/7/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/8/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/8/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/12/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/13/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/13/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/14/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/14/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/14/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/15/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/15/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/15/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/16/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/19/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/19/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/20/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/20/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/21/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/21/2019 Partial Approval JAMES POWERS
Drywall Nailing 8/21/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/21/2019 Approved JAMES POWERS
Deputy Drilled-In Anchors 8/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/22/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/22/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/26/2019 Approved DERRICK SPENCER
Deputy Reinf. Concrete 8/26/2019 Approved DERRICK SPENCER
Deputy Steel/Welding 8/26/2019 Approved DERRICK SPENCER
Deputy Drilled-In Anchors 8/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/27/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/27/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/28/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/28/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/28/2019 Partial Approval JAMES POWERS
Drywall Nailing 8/28/2019 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 8/28/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/29/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/29/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/29/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/30/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/30/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/3/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/3/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/4/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/4/2019 Partial Approval JAMES POWERS
Drywall Nailing 9/4/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/4/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 9/5/2019 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/6/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 9/6/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 9/6/2019 Conditional Approval LARRY ARNICK
Deputy Drilled-In Anchors 9/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/10/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/10/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/11/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/11/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/12/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/12/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/12/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/13/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/13/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/13/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/16/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/16/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/16/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/17/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/17/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/17/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/18/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/18/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/18/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/19/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/19/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/19/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/20/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/20/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/20/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/23/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/23/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/23/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/24/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/24/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/25/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/25/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/25/2019 Partial Approval JAMES POWERS
Drywall Nailing 9/25/2019 Partial Approval JAMES POWERS
Interior/Exterior Lathing 9/25/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/26/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/26/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/26/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/27/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/27/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/27/2019 Partial Approval JAMES POWERS
Final 9/27/2019 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 9/30/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/30/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/30/2019 Partial Approval JAMES POWERS
Final 9/30/2019 OK for TCO JAMES POWERS
Footing/Foundation/Slab 9/30/2019 Approved JAMES POWERS
Green Building Final 9/30/2019 Approved JAMES POWERS
Reinforced Concrete Frame 9/30/2019 Approved JAMES POWERS
SGSOV-Seismic Gas S/O Valve 9/30/2019 SGSOV Not Ready JAMES POWERS
Smoke Detectors 9/30/2019 Approved JAMES POWERS
Deputy Drilled-In Anchors 10/1/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/1/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/1/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/2/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/2/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/2/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/3/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/3/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/3/2019 Partial Approval JAMES POWERS
Final 10/3/2019 OK for TCO JAMES POWERS
Deputy Drilled-In Anchors 10/4/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/4/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/4/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/7/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/7/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/7/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/8/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/8/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/8/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/9/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/9/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/10/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/10/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/10/2019 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/11/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/11/2019 Partial Approval JAMES POWERS
Final 11/8/2019 OK for TCO JAMES POWERS
SGSOV-Seismic Gas S/O Valve 11/8/2019 SGSOV Not Ready JAMES POWERS
Special/Order Compliance 11/12/2019 Approved JAMES POWERS
Deputy Reinf. Concrete 11/21/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/22/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/25/2019 Conditional Approval LARRY ARNICK
Deputy Grading 11/26/2019 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 12/5/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/6/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/9/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/10/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/11/2019 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/12/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/24/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/4/2020 Conditional Approval JONATHAN QUACH
Deputy Steel/Welding 2/5/2020 Partial Approval JAMES POWERS
Special/Order Compliance 5/14/2020 No Access for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/20/2020 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/20/2020 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 5/21/2020 Not Ready for Inspection LARRY ARNICK
Special/Order Compliance 11/10/2020 Conditional Approval JONATHAN QUACH
Final 3/19/2021 OK to Issue CofO JAMES POWERS
SGSOV-Seismic Gas S/O Valve 3/19/2021 SGSOV Approved JAMES POWERS