Excavation/Setback/Form/Re-Bar
|
4/24/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
8/28/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
9/1/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
9/1/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
9/1/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
SWPPP-Const. Storm Water
|
9/1/2017
|
Completed
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
9/6/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
9/6/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
9/6/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
9/6/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
SWPPP-Const. Storm Water
|
9/6/2017
|
Completed
|
WINSTON DUNNING
|
|
Pre-Inspection
|
10/4/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/10/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/11/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
10/11/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
10/11/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
10/11/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
SWPPP-Const. Storm Water
|
10/11/2017
|
Completed
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/12/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
10/13/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
10/13/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
10/13/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/17/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/18/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/19/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
10/19/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
10/19/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Rough
|
10/19/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
10/19/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Reinforced Concrete Frame
|
10/19/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
Verify Sprinkler Sign Off
|
10/19/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/20/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
10/23/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
10/23/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
10/23/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/24/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/25/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
10/25/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
10/25/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
10/25/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/26/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
10/27/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
10/30/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
10/30/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
10/30/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
11/2/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
11/2/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
11/2/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
11/3/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
11/7/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
11/9/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
11/9/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
11/9/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
11/14/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
11/14/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Shotcrete
|
11/16/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
11/21/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
11/21/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
11/21/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
11/21/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
11/22/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
11/28/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
11/29/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
11/29/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
11/29/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
11/29/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Pre-Inspection
|
12/5/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
12/8/2017
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
12/11/2017
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
12/12/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
12/12/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
12/13/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
12/13/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
12/14/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
12/15/2017
|
Conditional Approval
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
12/20/2017
|
Partial Approval
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
1/2/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Excavation/Setback/Form/Re-Bar
|
1/5/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
1/17/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
1/17/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
1/17/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
1/24/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
1/24/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
1/24/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
1/25/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
2/1/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
2/1/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
2/1/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
2/14/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
2/14/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
2/14/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
2/14/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
2/15/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
2/16/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
2/20/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Reinf. Concrete
|
2/21/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
2/23/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
2/23/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
2/23/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Reinf. Concrete
|
3/7/2018
|
Partial Approval
|
JAMES POWERS
|
|
Footing/Foundation/Slab
|
3/27/2018
|
Partial Inspection
|
LESLIE TRUJILLO
|
|
METHANE-Barrier
|
3/27/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
METHANE-Subgrade
|
3/27/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Footing/Foundation/Slab
|
4/3/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
4/3/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
4/3/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/9/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/10/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/11/2018
|
Conditional Approval
|
LESLIE TRUJILLO
|
|
Deputy Wood Construction
|
4/12/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/13/2018
|
Conditional Approval
|
ERNESTO CORRAL
|
|
Drywall Nailing
|
4/13/2018
|
No Access for Inspection
|
ERNESTO CORRAL
|
|
Green Building Rough
|
4/13/2018
|
No Access for Inspection
|
ERNESTO CORRAL
|
|
Deputy Reinf. Concrete
|
4/16/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/17/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Drywall Nailing
|
4/17/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Green Building Rough
|
4/17/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/18/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/19/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/20/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/24/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/25/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/26/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
4/27/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/1/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Drywall Nailing
|
5/15/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Footing/Foundation/Slab
|
5/15/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Green Building Rough
|
5/15/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Barrier
|
5/15/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
METHANE-Subgrade
|
5/15/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Drywall Nailing
|
5/23/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/23/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Green Building Rough
|
5/23/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Pre-Inspection
|
5/29/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Pre-Inspection
|
6/4/2018
|
Corrections Issued
|
WINSTON DUNNING
|
|
Drywall Nailing
|
6/5/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Green Building Rough
|
6/5/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Special/Order Compliance
|
6/5/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Drywall Nailing
|
6/27/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/27/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Green Building Rough
|
6/27/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Pre-Inspection
|
7/18/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Drywall Nailing
|
7/31/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Green Building Rough
|
7/31/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Wood Frame
|
7/31/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Pre-Inspection
|
8/6/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Special/Order Compliance
|
8/6/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Pre-Inspection
|
8/8/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
8/13/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Deputy Wood Construction
|
8/14/2018
|
Conditional Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/29/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
8/29/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/31/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
8/31/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/5/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
9/5/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/7/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
9/7/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/10/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
9/14/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/17/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
9/17/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/28/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
9/28/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
10/5/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/10/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
10/10/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Drywall Nailing
|
10/15/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/15/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Green Building Rough
|
10/15/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
10/15/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
SWPPP-Const. Storm Water
|
10/15/2018
|
Completed
|
WINSTON DUNNING
|
|
Drywall Nailing
|
10/17/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Green Building Rough
|
10/17/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
10/17/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/19/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
10/19/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Drywall Nailing
|
10/23/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/23/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Green Building Rough
|
10/23/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
10/23/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Drywall Nailing
|
11/2/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/2/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/2/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Green Building Rough
|
11/2/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
11/2/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/6/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
11/6/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/9/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
11/9/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Light Gage Steel Frame
|
11/9/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/14/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
11/14/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/16/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
11/16/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Pre-Inspection
|
11/21/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
11/26/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Wood Frame
|
11/26/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/28/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
11/28/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Wood Frame
|
11/30/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Drywall Nailing
|
12/5/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
12/5/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/17/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Green Building Rough
|
12/17/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Insulation
|
12/17/2018
|
Partial Inspection
|
WINSTON DUNNING
|
|
Wood Frame
|
12/17/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/19/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Insulation
|
12/19/2018
|
Partial Approval
|
WINSTON DUNNING
|
|
Interior/Exterior Lathing
|
1/10/2019
|
Partial Approval
|
WINSTON DUNNING
|
|
Pre-Inspection
|
1/10/2019
|
Corrections Issued
|
WINSTON DUNNING
|
|
Insulation
|
1/14/2019
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
1/22/2019
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/22/2019
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
1/24/2019
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/24/2019
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
1/24/2019
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
1/25/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
1/28/2019
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
1/29/2019
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/29/2019
|
Partial Inspection
|
NICK DANERI
|
|
Insulation
|
1/29/2019
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
1/30/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Drywall Nailing
|
1/31/2019
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/31/2019
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
2/1/2019
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
2/5/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
2/7/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
2/8/2019
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
2/8/2019
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/11/2019
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Rough
|
2/11/2019
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
2/13/2019
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
2/13/2019
|
Not Ready for Inspection
|
NICK DANERI
|
|
Wood Frame
|
2/13/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
2/14/2019
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
2/14/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
2/15/2019
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
2/19/2019
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
2/21/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
2/26/2019
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/27/2019
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
2/27/2019
|
Not Ready for Inspection
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
2/27/2019
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
2/27/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
3/1/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
3/4/2019
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
3/5/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Green Building Rough
|
3/5/2019
|
Not Ready for Inspection
|
ERNESTO CORRAL
|
|
Wood Frame
|
3/5/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Drywall Nailing
|
3/6/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Wood Frame
|
3/6/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Insulation
|
3/7/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Insulation
|
3/8/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Drywall Nailing
|
3/12/2019
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
3/12/2019
|
Not Ready for Inspection
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
3/12/2019
|
Partial Inspection
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
3/13/2019
|
Partial Approval
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
3/15/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
3/19/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Masonry Wall/Backfill
|
3/19/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Drywall Nailing
|
3/20/2019
|
Partial Approval
|
JAMES POWERS
|
|
Green Building Rough
|
3/20/2019
|
Approved
|
JAMES POWERS
|
|
Drywall Nailing
|
3/22/2019
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
3/28/2019
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
4/11/2019
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
4/11/2019
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
4/25/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Light Gage Steel Frame
|
6/3/2019
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Masonry Wall/Backfill
|
6/3/2019
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
6/4/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Light Gage Steel Frame
|
6/6/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Drywall Nailing
|
6/19/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Masonry Wall/Backfill
|
6/21/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Drywall Nailing
|
6/26/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Light Gage Steel Frame
|
6/27/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Light Gage Steel Frame
|
7/24/2019
|
Partial Inspection
|
LESLIE TRUJILLO
|
|
Insulation
|
8/30/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/4/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Interior/Exterior Lathing
|
9/10/2019
|
Partial Approval
|
LESLIE TRUJILLO
|
|
Drywall Nailing
|
9/18/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Light Gage Steel Frame
|
9/18/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Special/Order Compliance
|
9/20/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Pre-Inspection
|
9/27/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Special/Order Compliance
|
10/17/2019
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Special/Order Compliance
|
1/24/2020
|
Approved
|
ERNESTO CORRAL
|
|
Special/Order Compliance
|
1/27/2020
|
Partial Inspection
|
ERNESTO CORRAL
|
|
Special/Order Compliance
|
2/27/2020
|
Approved
|
ERNESTO CORRAL
|
|
Special/Order Compliance
|
3/23/2020
|
Approved
|
ERNESTO CORRAL
|
|
Special/Order Compliance
|
9/8/2020
|
Approved
|
ERNESTO CORRAL
|
|
Special/Order Compliance
|
9/11/2020
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
11/17/2020
|
Conditional Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
3/9/2021
|
Conditional Approval
|
NICK DANERI
|
|
Drywall Nailing
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
Final
|
3/11/2021
|
OK to Issue CofO
|
ERNESTO CORRAL
|
|
Footing/Foundation/Slab
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
Green Building Final
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
METHANE-Barrier
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
METHANE-Final
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
METHANE-Rough
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
METHANE-Subgrade
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
Reinforced Concrete Frame
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
Reinforced Masonry Frame
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
SGSOV-Seismic Gas S/O Valve
|
3/11/2021
|
SGSOV Approved
|
ERNESTO CORRAL
|
|
SUSMP-Std. Urban Storm Water
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
SWPPP-Const. Storm Water
|
3/11/2021
|
Completed
|
ERNESTO CORRAL
|
|
Smoke Detectors
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
Structural Steel Frame
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|
|
Verify Sprinkler Sign Off
|
3/11/2021
|
Approved
|
ERNESTO CORRAL
|