330 N WESTLAKE AVE 90026

Certificate Information: 330 N WESTLAKE AVE 90026

Application / Permit
13010-30000-04342
Plan Check / Job No.
B13WL04957
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 6-STORY 200 UNIT MIXED USE APARTMENT COMPLEX OVER TWO LEVELS OF SUBTERRANEAN PARKING.
Permit Issued
Issued on 11/15/2016
Issuing Office
Metro
Current Status
CofO Issued on 3/11/2021
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/23/2013 APPLICANT
Assigned to Plan Check Engineer 1/23/2014 VICTOR TURCIOS
Corrections Issued 2/6/2014 VICTOR TURCIOS
Disabled Access Plans Picked Up 2/12/2014 APPLICANT
Quality Review Completed 2/20/2014 DOUGLAS NAKATANI
Building Plans Picked Up 2/24/2014 APPLICANT
Green Plans Picked Up 3/14/2014 APPLICANT
Applicant returned to address corrections 4/4/2014 VICTOR TURCIOS
Applicant returned to address corrections 5/1/2014 VICTOR TURCIOS
Applicant returned to address corrections 8/11/2015 VICTOR TURCIOS
Plan Check Approved 10/24/2016 JOE VO
Issued 11/15/2016 LADBS
TCO Issued (Expire Date: 10-06-2020) 4/9/2020 DAVID TSAU
TCO Issued (Expire Date: 04-04-2021) 10/6/2020 ERNESTO CORRAL
CofO in Progress 3/11/2021 ERNESTO CORRAL
CofO Issued 3/11/2021 ERNESTO CORRAL
Permit Finaled 3/11/2021 ERNESTO CORRAL

Permit Application Clearance Information

Address approval Cleared 3/19/2014 ARMENIA HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 3/19/2014 ARMENIA HERNANDEZ
Highway dedication Cleared 5/5/2014 LEE GUILBEAUX
Hydrant and Access approval Cleared 5/14/2014 JOHN DALLAS
Internal circulation Cleared 5/21/2014 TAIMOUR TANAVOLI
ZA Case Cleared 5/21/2014 ANNA VIDAL
ZA Case Cleared 5/21/2014 ANNA VIDAL
ZA Case Cleared 5/21/2014 ANNA VIDAL
ZA Case Cleared 5/21/2014 ANNA VIDAL
DAS Clearance Cleared 6/16/2014 VICTOR TURCIOS
Grading Pre-Inspection Cleared 10/14/2014 VICTOR TURCIOS
Low Impact Development Cleared 10/21/2014 IDA MEISAMI-FARD
Bicycle Parking Cleared 11/19/2014 EILEEN HUNT
Bicycle Parking Cleared 11/20/2014 AVALYN KAMACHI
Roof/Waste drainage to street Cleared 1/20/2015 HELEN FRANCISCO
Green Code Cleared 9/29/2015 VICTOR TURCIOS
Building over 3-story or 36-ft Cleared 10/21/2015 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 10/21/2015 CALOSHA APPROVED
Miscellaneous Cleared 10/21/2015 JOE VO
Title 19 building approval Cleared 10/22/2015 SUSIE ADAMIAN
Mailing Labels Cleared 11/3/2015 VICTOR TURCIOS
Methane Ordinance Cleared 11/3/2015 SUSIE ADAMIAN
Miscellaneous Cleared 11/3/2015 JOE VO
Permit Cleared 5/12/2016 ARMENIA HERNANDEZ
Sewer availability Cleared 6/23/2016 JACOB BIGLER
Work Adjacent to Public Way Cleared 8/10/2016 TERRY PHAN
Housing density bonus Cleared 9/20/2016 MARITES CUNANAN
"Q" conditions Cleared 10/20/2016 MARITZA PRZEKOP
"T" removal Cleared 10/20/2016 MARITZA PRZEKOP
CPC Cleared 10/20/2016 MARITZA PRZEKOP
Site Plan review Cleared 10/20/2016 MARITZA PRZEKOP
Tract Map conditions Cleared 10/20/2016 MARITZA PRZEKOP

Contact Information

Architect Walters, Jonathan A; Lic. No.: C33220 4634 LAURELGROVE AVENUE      STUDIO CITY, CA 91604
Contractor Maple Construction Ca Lp; Lic. No.: 985892-B 5790 FLEET STREET SUITE 140      CARLSBAD, CA 92008
Engineer Lee, Sang Youck; Lic. No.: S3821 3531 BROOKHILL ST      GLENDALE, CA 91214
Engineer Salem, Rifaat Sammy; Lic. No.: GE2549 4195 W SAMPLE AVE      FRESNO, CA 93722
Geologist Myers, Bruce E; Lic. No.: EG2102 6322 N TAMERA AVE      FRESNO, CA 93711

Inspector Information

RONALD JIMENEZ, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
LARRY ARNICK, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
JOEY BUCHANAN, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
ERNESTO CORRAL, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL ESPINOZA, (213) 482-0307 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 4/24/2017 Partial Inspection WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 8/28/2017 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 9/1/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 9/1/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 9/1/2017 Partial Inspection WINSTON DUNNING
SWPPP-Const. Storm Water 9/1/2017 Completed WINSTON DUNNING
Deputy Reinf. Concrete 9/6/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 9/6/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 9/6/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 9/6/2017 Partial Inspection WINSTON DUNNING
SWPPP-Const. Storm Water 9/6/2017 Completed WINSTON DUNNING
Pre-Inspection 10/4/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 10/10/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/11/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 10/11/2017 Partial Inspection WINSTON DUNNING
METHANE-Barrier 10/11/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 10/11/2017 Partial Inspection WINSTON DUNNING
SWPPP-Const. Storm Water 10/11/2017 Completed WINSTON DUNNING
Deputy Reinf. Concrete 10/12/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 10/13/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 10/13/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 10/13/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 10/17/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/18/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/19/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 10/19/2017 Partial Inspection WINSTON DUNNING
METHANE-Barrier 10/19/2017 Partial Inspection WINSTON DUNNING
METHANE-Rough 10/19/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 10/19/2017 Partial Inspection WINSTON DUNNING
Reinforced Concrete Frame 10/19/2017 Partial Approval WINSTON DUNNING
Verify Sprinkler Sign Off 10/19/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 10/20/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 10/23/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 10/23/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 10/23/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 10/24/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/25/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 10/25/2017 Partial Inspection WINSTON DUNNING
METHANE-Barrier 10/25/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 10/25/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/26/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 10/27/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 10/30/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 10/30/2017 Conditional Approval WINSTON DUNNING
METHANE-Subgrade 10/30/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 11/2/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 11/2/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/2/2017 Partial Inspection WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 11/3/2017 Partial Inspection WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 11/7/2017 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 11/9/2017 Partial Inspection WINSTON DUNNING
METHANE-Barrier 11/9/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/9/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 11/14/2017 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 11/14/2017 Partial Inspection WINSTON DUNNING
Deputy Shotcrete 11/16/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/21/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 11/21/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 11/21/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/21/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 11/22/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/28/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 11/29/2017 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 11/29/2017 Partial Approval WINSTON DUNNING
METHANE-Barrier 11/29/2017 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 11/29/2017 Partial Inspection WINSTON DUNNING
Pre-Inspection 12/5/2017 Partial Inspection WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 12/8/2017 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 12/11/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/12/2017 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 12/12/2017 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/13/2017 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 12/13/2017 Partial Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/14/2017 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 12/15/2017 Conditional Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 12/20/2017 Partial Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 1/2/2018 Partial Approval WINSTON DUNNING
Excavation/Setback/Form/Re-Bar 1/5/2018 Partial Approval WINSTON DUNNING
Footing/Foundation/Slab 1/17/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 1/17/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 1/17/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 1/24/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 1/24/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 1/24/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 1/25/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 2/1/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 2/1/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 2/1/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 2/14/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 2/14/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 2/14/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 2/14/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 2/15/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/16/2018 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 2/20/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/21/2018 Conditional Approval WINSTON DUNNING
Footing/Foundation/Slab 2/23/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 2/23/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 2/23/2018 Partial Inspection WINSTON DUNNING
Deputy Reinf. Concrete 3/7/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 3/27/2018 Partial Inspection LESLIE TRUJILLO
METHANE-Barrier 3/27/2018 Conditional Approval LESLIE TRUJILLO
METHANE-Subgrade 3/27/2018 Conditional Approval LESLIE TRUJILLO
Footing/Foundation/Slab 4/3/2018 Partial Approval WINSTON DUNNING
METHANE-Barrier 4/3/2018 Conditional Approval WINSTON DUNNING
METHANE-Subgrade 4/3/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/9/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/10/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/11/2018 Conditional Approval LESLIE TRUJILLO
Deputy Wood Construction 4/12/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/13/2018 Conditional Approval ERNESTO CORRAL
Drywall Nailing 4/13/2018 No Access for Inspection ERNESTO CORRAL
Green Building Rough 4/13/2018 No Access for Inspection ERNESTO CORRAL
Deputy Reinf. Concrete 4/16/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/17/2018 Conditional Approval WINSTON DUNNING
Drywall Nailing 4/17/2018 Partial Approval WINSTON DUNNING
Green Building Rough 4/17/2018 Partial Inspection WINSTON DUNNING
Deputy Wood Construction 4/18/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/19/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/20/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/24/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/25/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/26/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 4/27/2018 Conditional Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 5/1/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 5/15/2018 Partial Inspection WINSTON DUNNING
Footing/Foundation/Slab 5/15/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 5/15/2018 Partial Inspection WINSTON DUNNING
METHANE-Barrier 5/15/2018 Partial Inspection WINSTON DUNNING
METHANE-Subgrade 5/15/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 5/23/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 5/23/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 5/23/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 5/29/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 6/4/2018 Corrections Issued WINSTON DUNNING
Drywall Nailing 6/5/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 6/5/2018 Partial Inspection WINSTON DUNNING
Special/Order Compliance 6/5/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 6/27/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 6/27/2018 Partial Approval WINSTON DUNNING
Green Building Rough 6/27/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 7/18/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 7/31/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 7/31/2018 Partial Inspection WINSTON DUNNING
Wood Frame 7/31/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 8/6/2018 Partial Inspection WINSTON DUNNING
Special/Order Compliance 8/6/2018 Partial Inspection WINSTON DUNNING
Pre-Inspection 8/8/2018 Partial Inspection WINSTON DUNNING
Deputy Wood Construction 8/13/2018 Conditional Approval WINSTON DUNNING
Deputy Wood Construction 8/14/2018 Conditional Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 8/29/2018 Partial Inspection WINSTON DUNNING
Insulation 8/29/2018 Partial Inspection WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 8/31/2018 Partial Approval WINSTON DUNNING
Insulation 8/31/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 9/5/2018 Partial Approval WINSTON DUNNING
Insulation 9/5/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 9/7/2018 Partial Approval WINSTON DUNNING
Insulation 9/7/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 9/10/2018 Partial Approval WINSTON DUNNING
Insulation 9/14/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 9/17/2018 Partial Inspection WINSTON DUNNING
Insulation 9/17/2018 Partial Inspection WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 9/28/2018 Partial Approval WINSTON DUNNING
Insulation 9/28/2018 Partial Approval WINSTON DUNNING
Insulation 10/5/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 10/10/2018 Partial Approval WINSTON DUNNING
Insulation 10/10/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 10/15/2018 Partial Inspection WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 10/15/2018 Partial Approval WINSTON DUNNING
Green Building Rough 10/15/2018 Partial Inspection WINSTON DUNNING
Insulation 10/15/2018 Partial Approval WINSTON DUNNING
SWPPP-Const. Storm Water 10/15/2018 Completed WINSTON DUNNING
Drywall Nailing 10/17/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 10/17/2018 Partial Inspection WINSTON DUNNING
Insulation 10/17/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 10/19/2018 Partial Inspection WINSTON DUNNING
Insulation 10/19/2018 Partial Inspection WINSTON DUNNING
Drywall Nailing 10/23/2018 Partial Inspection WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 10/23/2018 Partial Approval WINSTON DUNNING
Green Building Rough 10/23/2018 Partial Inspection WINSTON DUNNING
Insulation 10/23/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 11/2/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 11/2/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 11/2/2018 Partial Inspection WINSTON DUNNING
Green Building Rough 11/2/2018 Partial Inspection WINSTON DUNNING
Insulation 11/2/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 11/6/2018 Partial Approval WINSTON DUNNING
Insulation 11/6/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 11/9/2018 Partial Inspection WINSTON DUNNING
Insulation 11/9/2018 Partial Approval WINSTON DUNNING
Light Gage Steel Frame 11/9/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 11/14/2018 Partial Approval WINSTON DUNNING
Insulation 11/14/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 11/16/2018 Partial Approval WINSTON DUNNING
Insulation 11/16/2018 Partial Approval WINSTON DUNNING
Pre-Inspection 11/21/2018 Partial Inspection WINSTON DUNNING
Insulation 11/26/2018 Partial Inspection WINSTON DUNNING
Wood Frame 11/26/2018 Partial Inspection WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 11/28/2018 Partial Approval WINSTON DUNNING
Insulation 11/28/2018 Partial Inspection WINSTON DUNNING
Wood Frame 11/30/2018 Partial Approval WINSTON DUNNING
Drywall Nailing 12/5/2018 Partial Approval WINSTON DUNNING
Insulation 12/5/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 12/17/2018 Partial Approval WINSTON DUNNING
Green Building Rough 12/17/2018 Partial Inspection WINSTON DUNNING
Insulation 12/17/2018 Partial Inspection WINSTON DUNNING
Wood Frame 12/17/2018 Partial Approval WINSTON DUNNING
Floor/Roof Diaphrgm/Shear Wall 12/19/2018 Partial Approval WINSTON DUNNING
Insulation 12/19/2018 Partial Approval WINSTON DUNNING
Interior/Exterior Lathing 1/10/2019 Partial Approval WINSTON DUNNING
Pre-Inspection 1/10/2019 Corrections Issued WINSTON DUNNING
Insulation 1/14/2019 Partial Approval NICK DANERI
Drywall Nailing 1/22/2019 Partial Approval NICK DANERI
Green Building Rough 1/22/2019 Not Ready for Inspection NICK DANERI
Drywall Nailing 1/24/2019 Partial Approval NICK DANERI
Green Building Rough 1/24/2019 Not Ready for Inspection NICK DANERI
Insulation 1/24/2019 Partial Approval NICK DANERI
Interior/Exterior Lathing 1/25/2019 Partial Approval NICK DANERI
Insulation 1/28/2019 Partial Approval NICK DANERI
Drywall Nailing 1/29/2019 Partial Approval NICK DANERI
Green Building Rough 1/29/2019 Partial Inspection NICK DANERI
Insulation 1/29/2019 Partial Approval NICK DANERI
Wood Frame 1/30/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 1/31/2019 Partial Approval NICK DANERI
Green Building Rough 1/31/2019 Not Ready for Inspection NICK DANERI
Insulation 2/1/2019 Partial Approval NICK DANERI
Wood Frame 2/5/2019 Partial Approval NICK DANERI
Insulation 2/7/2019 Partial Approval NICK DANERI
Insulation 2/8/2019 Partial Approval NICK DANERI
Interior/Exterior Lathing 2/8/2019 Partial Approval NICK DANERI
Drywall Nailing 2/11/2019 Not Ready for Inspection NICK DANERI
Green Building Rough 2/11/2019 Not Ready for Inspection NICK DANERI
Drywall Nailing 2/13/2019 Partial Approval NICK DANERI
Green Building Rough 2/13/2019 Not Ready for Inspection NICK DANERI
Wood Frame 2/13/2019 Partial Approval NICK DANERI
Insulation 2/14/2019 Partial Approval NICK DANERI
Wood Frame 2/14/2019 Partial Approval NICK DANERI
Insulation 2/15/2019 Partial Approval NICK DANERI
Wood Frame 2/19/2019 Partial Approval NICK DANERI
Wood Frame 2/21/2019 Partial Approval NICK DANERI
Insulation 2/26/2019 Partial Approval NICK DANERI
Drywall Nailing 2/27/2019 Partial Approval NICK DANERI
Green Building Rough 2/27/2019 Not Ready for Inspection NICK DANERI
Interior/Exterior Lathing 2/27/2019 Partial Approval NICK DANERI
Wood Frame 2/27/2019 Partial Approval NICK DANERI
Insulation 3/1/2019 Partial Approval NICK DANERI
Insulation 3/4/2019 Partial Approval NICK DANERI
Drywall Nailing 3/5/2019 Partial Inspection ERNESTO CORRAL
Green Building Rough 3/5/2019 Not Ready for Inspection ERNESTO CORRAL
Wood Frame 3/5/2019 Partial Inspection ERNESTO CORRAL
Drywall Nailing 3/6/2019 Partial Inspection ERNESTO CORRAL
Wood Frame 3/6/2019 Partial Inspection ERNESTO CORRAL
Insulation 3/7/2019 Partial Approval LESLIE TRUJILLO
Insulation 3/8/2019 Partial Inspection ERNESTO CORRAL
Drywall Nailing 3/12/2019 Partial Approval NICK DANERI
Green Building Rough 3/12/2019 Not Ready for Inspection NICK DANERI
Interior/Exterior Lathing 3/12/2019 Partial Inspection NICK DANERI
Interior/Exterior Lathing 3/13/2019 Partial Approval NICK DANERI
Interior/Exterior Lathing 3/15/2019 Partial Approval NICK DANERI
Insulation 3/19/2019 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 3/19/2019 Partial Inspection ERNESTO CORRAL
Drywall Nailing 3/20/2019 Partial Approval JAMES POWERS
Green Building Rough 3/20/2019 Approved JAMES POWERS
Drywall Nailing 3/22/2019 Partial Approval NICK DANERI
Masonry Wall/Backfill 3/28/2019 Partial Approval NICK DANERI
Drywall Nailing 4/11/2019 Partial Approval NICK DANERI
Insulation 4/11/2019 Partial Approval NICK DANERI
Masonry Wall/Backfill 4/25/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 6/3/2019 Not Ready for Inspection JAMES POWERS
Masonry Wall/Backfill 6/3/2019 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/4/2019 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 6/6/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 6/19/2019 Partial Inspection ERNESTO CORRAL
Masonry Wall/Backfill 6/21/2019 Partial Inspection ERNESTO CORRAL
Drywall Nailing 6/26/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 6/27/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 7/24/2019 Partial Inspection LESLIE TRUJILLO
Insulation 8/30/2019 Partial Inspection ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 9/4/2019 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 9/10/2019 Partial Approval LESLIE TRUJILLO
Drywall Nailing 9/18/2019 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 9/18/2019 Partial Inspection ERNESTO CORRAL
Special/Order Compliance 9/20/2019 Partial Inspection ERNESTO CORRAL
Pre-Inspection 9/27/2019 Partial Inspection ERNESTO CORRAL
Special/Order Compliance 10/17/2019 Partial Inspection ERNESTO CORRAL
Special/Order Compliance 1/24/2020 Approved ERNESTO CORRAL
Special/Order Compliance 1/27/2020 Partial Inspection ERNESTO CORRAL
Special/Order Compliance 2/27/2020 Approved ERNESTO CORRAL
Special/Order Compliance 3/23/2020 Approved ERNESTO CORRAL
Special/Order Compliance 9/8/2020 Approved ERNESTO CORRAL
Special/Order Compliance 9/11/2020 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 11/17/2020 Conditional Approval NICK DANERI
Special/Order Compliance 3/9/2021 Conditional Approval NICK DANERI
Drywall Nailing 3/11/2021 Approved ERNESTO CORRAL
Final 3/11/2021 OK to Issue CofO ERNESTO CORRAL
Footing/Foundation/Slab 3/11/2021 Approved ERNESTO CORRAL
Green Building Final 3/11/2021 Approved ERNESTO CORRAL
METHANE-Barrier 3/11/2021 Approved ERNESTO CORRAL
METHANE-Final 3/11/2021 Approved ERNESTO CORRAL
METHANE-Rough 3/11/2021 Approved ERNESTO CORRAL
METHANE-Subgrade 3/11/2021 Approved ERNESTO CORRAL
Reinforced Concrete Frame 3/11/2021 Approved ERNESTO CORRAL
Reinforced Masonry Frame 3/11/2021 Approved ERNESTO CORRAL
SGSOV-Seismic Gas S/O Valve 3/11/2021 SGSOV Approved ERNESTO CORRAL
SUSMP-Std. Urban Storm Water 3/11/2021 Approved ERNESTO CORRAL
SWPPP-Const. Storm Water 3/11/2021 Completed ERNESTO CORRAL
Smoke Detectors 3/11/2021 Approved ERNESTO CORRAL
Structural Steel Frame 3/11/2021 Approved ERNESTO CORRAL
Verify Sprinkler Sign Off 3/11/2021 Approved ERNESTO CORRAL