740 S RIDGELEY DR 90036

Certificate Information: 740 S RIDGELEY DR 90036

Application / Permit
13010-30000-03736
Plan Check / Job No.
B13WL04654
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW FIVE STORY 25 UNIT MULTI-FAMILY DWELLING, WITH TWO STORY SUBTERRANEAN GARAGE.
Permit Issued
Issued on 12/6/2016
Issuing Office
Valley
Current Status
CofO Issued on 7/2/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/6/2013 APPLICANT
Assigned to Plan Check Engineer 12/12/2013 KAMRAN GHOTBI RAVANDI
Corrections Issued 12/16/2013 KAMRAN GHOTBI RAVANDI
Quality Review Completed 12/17/2013 ARA SARGSYAN
Building Plans Picked Up 2/25/2014 APPLICANT
Disabled Access Plans Picked Up 2/25/2014 APPLICANT
Green Plans Picked Up 2/25/2014 APPLICANT
Applicant returned to address corrections 6/14/2016 KAMRAN GHOTBI RAVANDI
Applicant returned to address corrections 7/21/2016 KAMRAN GHOTBI RAVANDI
Plan Check Approved 7/27/2016 KAMRAN GHOTBI RAVANDI
Issued 12/6/2016 LADBS
CofO in Progress 7/2/2020 LARRY ARNICK
CofO Issued 7/2/2020 TERRY HERR
Permit Finaled 7/2/2020 TERRY HERR

Permit Application Clearance Information

Low Impact Development Cleared 5/7/2015 AYMAN JABBOURI
Housing density bonus Cleared 3/31/2016 VICKY LIT
Address approval Cleared 4/26/2016 JAMES MORALEZ
Bicycle Parking Cleared 4/26/2016 ARMENIA HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 4/26/2016 JAMES MORALEZ
Hydrant and Access approval Cleared 4/26/2016 ROBERT DUFF
Permit Cleared 4/26/2016 JAMES MORALEZ
Highway dedication Cleared 5/19/2016 RAVIL MANAPOV
Sewer availability Cleared 5/19/2016 RAVIL MANAPOV
Housing rent stabilization Cleared 5/24/2016 DANIEL WILLIAMS
Roof/Waste drainage to street Cleared 5/26/2016 ROBERT SAMONTE
Metro Rail approval Cleared 5/27/2016 THAN WIN
Green Code Cleared 6/27/2016 MARCUS LEVIAS
Work Adjacent to Public Way Cleared 6/27/2016 DAVID PEREZ
Title 19 building approval Cleared 6/30/2016 ANDREW KO
Driveway location Cleared 7/7/2016 EILEEN HUNT
Internal circulation Cleared 7/7/2016 EILEEN HUNT
"Q" conditions Cleared 7/13/2016 DANIEL SKOLNICK
Opn space landscape/Water mgmt Cleared 7/13/2016 DANIEL SKOLNICK
Tract Map conditions Cleared 7/13/2016 DANIEL SKOLNICK
DAS Clearance Cleared 7/18/2016 KAMRAN GHOTBI RAVANDI
Building over 3-story or 36-ft Cleared 7/21/2016 CALOSHA APPROVED
Frnt yard landscape/Water mgmt Cleared 7/21/2016 DANIEL SKOLNICK
Miscellaneous Cleared 7/21/2016 DANIEL SKOLNICK
Excavation more than 5-ft deep Cleared 7/27/2016 CALOSHA APPROVED

Contact Information

Contractor Owner-Builder       ,

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/20/2017 Partial Inspection GREGORY POMISH
Footing/Foundation/Slab 8/30/2017 Not Ready for Inspection GREGORY POMISH
METHANE-Barrier 8/30/2017 Not Ready for Inspection GREGORY POMISH
METHANE-Subgrade 8/30/2017 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 10/18/2017 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 10/20/2017 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 12/4/2017 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 12/5/2017 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 12/6/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 12/7/2017 Not Ready for Inspection GREGORY POMISH
METHANE-Barrier 12/7/2017 Partial Inspection GREGORY POMISH
METHANE-Subgrade 12/7/2017 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 12/13/2017 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 12/13/2017 Partial Approval GREGORY POMISH
METHANE-Barrier 12/13/2017 Partial Approval GREGORY POMISH
METHANE-Subgrade 12/13/2017 Partial Approval GREGORY POMISH
Deputy Methane Barrier 1/25/2018 Conditional Approval GREGORY POMISH
Deputy Methane Barrier 1/26/2018 Conditional Approval GREGORY POMISH
METHANE-Barrier 1/29/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/2/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 2/2/2018 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 2/2/2018 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 2/2/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 2/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 2/12/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 2/12/2018 Partial Approval GREGORY POMISH
METHANE-Barrier 2/12/2018 Partial Approval GREGORY POMISH
METHANE-Subgrade 2/12/2018 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 2/13/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/6/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 3/6/2018 Partial Approval GREGORY POMISH
METHANE-Barrier 3/6/2018 Conditional Approval GREGORY POMISH
METHANE-Subgrade 3/6/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 3/7/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 3/8/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 3/12/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 3/13/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 3/15/2018 Conditional Approval GREGORY POMISH
Green Building Rough 3/15/2018 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 3/15/2018 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 3/15/2018 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 3/15/2018 Not Ready for Inspection GREGORY POMISH
Deputy Shotcrete 3/16/2018 Conditional Approval DAVID BURKHEAD
Footing/Foundation/Slab 3/16/2018 Not Ready for Inspection DAVID BURKHEAD
METHANE-Barrier 3/16/2018 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 3/16/2018 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 3/20/2018 Conditional Approval GREGORY POMISH
Deputy Shotcrete 3/21/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 3/21/2018 Partial Approval GREGORY POMISH
METHANE-Barrier 3/21/2018 Approved GREGORY POMISH
METHANE-Subgrade 3/21/2018 Approved GREGORY POMISH
Deputy Reinf. Masonry 4/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/3/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/4/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/5/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/6/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 4/9/2018 Conditional Approval LESLIE TRUJILLO
Reinforced Concrete Frame 4/9/2018 Not Ready for Inspection LESLIE TRUJILLO
Deputy Reinf. Masonry 4/10/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 4/10/2018 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Masonry 4/11/2018 Conditional Approval GREGORY POMISH
Green Building Rough 4/11/2018 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 4/11/2018 Approved GREGORY POMISH
Reinforced Masonry Frame 4/11/2018 Partial Approval GREGORY POMISH
Verify Sprinkler Sign Off 4/11/2018 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Masonry 4/12/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Concrete 5/1/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 5/1/2018 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 5/2/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/8/2018 Conditional Approval GREGORY POMISH
Footing/Foundation/Slab 5/8/2018 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 5/9/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/11/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/15/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/16/2018 Conditional Approval GREGORY POMISH
Masonry Wall/Backfill 5/16/2018 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Masonry 5/17/2018 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 5/18/2018 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 5/18/2018 Partial Approval DAVID BURKHEAD
Masonry Wall/Backfill 5/21/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 5/22/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/25/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 5/29/2018 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 5/29/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Masonry 5/30/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 5/30/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/1/2018 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 6/5/2018 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Masonry 6/7/2018 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 6/14/2018 Approved LARRY ARNICK
Deputy Reinf. Concrete 6/19/2018 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 6/21/2018 Conditional Approval LARRY ARNICK
Footing/Foundation/Slab 6/21/2018 Not Ready for Inspection LARRY ARNICK
Masonry Wall/Backfill 6/22/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 6/23/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 6/25/2018 Conditional Approval LARRY ARNICK
Green Building Rough 7/11/2018 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 7/11/2018 Not Ready for Inspection LARRY ARNICK
Wood Frame 7/11/2018 Not Ready for Inspection LARRY ARNICK
Green Building Rough 7/23/2018 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 7/23/2018 Not Ready for Inspection LARRY ARNICK
Wood Frame 7/23/2018 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 7/27/2018 Conditional Approval LARRY ARNICK
Deputy Wood Construction 8/8/2018 Conditional Approval LARRY ARNICK
Green Building Rough 8/8/2018 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 8/8/2018 Not Ready for Inspection LARRY ARNICK
Wood Frame 8/8/2018 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/27/2018 Partial Approval LARRY ARNICK
Green Building Rough 8/27/2018 Not Ready for Inspection LARRY ARNICK
Verify Sprinkler Sign Off 8/27/2018 Not Ready for Inspection LARRY ARNICK
Wood Frame 8/27/2018 Partial Approval LARRY ARNICK
Deputy Wood Construction 8/28/2018 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/28/2018 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 9/20/2018 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 9/20/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 9/26/2018 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 10/1/2018 Not Ready for Inspection GREGORY POMISH
Masonry Wall/Backfill 10/3/2018 Approved LARRY ARNICK
Drywall Nailing 10/10/2018 Not Ready for Inspection GREGORY POMISH
Green Building Rough 10/10/2018 Not Ready for Inspection GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 10/12/2018 Not Ready for Inspection LARRY ARNICK
Deputy Drilled-In Anchors 10/16/2018 Conditional Approval LARRY ARNICK
Masonry Wall/Backfill 10/23/2018 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/24/2018 Not Ready for Inspection LARRY ARNICK
Deputy Wood Construction 11/1/2018 Conditional Approval GREGORY POMISH
Floor/Roof Diaphrgm/Shear Wall 11/1/2018 Partial Approval JEFF BYTHEWAY
Deputy Wood Construction 11/16/2018 Conditional Approval LARRY ARNICK
Drywall Nailing 11/16/2018 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/16/2018 Not Ready for Inspection LARRY ARNICK
Green Building Rough 11/16/2018 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 11/20/2018 Partial Approval LARRY ARNICK
Drywall Nailing 12/5/2018 Partial Approval TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/5/2018 Not Ready for Inspection TED RIES
Green Building Rough 12/5/2018 Not Ready for Inspection TED RIES
Floor/Roof Diaphrgm/Shear Wall 12/14/2018 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/18/2018 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/19/2018 Partial Approval LARRY ARNICK
Deputy Drilled-In Anchors 12/26/2018 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 12/26/2018 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 1/2/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/2/2019 Not Ready for Inspection LARRY ARNICK
Green Building Rough 1/2/2019 Not Ready for Inspection LARRY ARNICK
Insulation 1/3/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/24/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 1/25/2019 Partial Approval LESLIE TRUJILLO
Deputy Wood Construction 1/28/2019 Conditional Approval LARRY ARNICK
Drywall Nailing 1/29/2019 Partial Approval LARRY ARNICK
Deputy Wood Construction 2/12/2019 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 2/12/2019 Partial Approval LARRY ARNICK
Insulation 2/19/2019 Partial Approval LARRY ARNICK
Drywall Nailing 2/22/2019 Partial Approval LARRY ARNICK
Green Building Rough 2/22/2019 Not Ready for Inspection LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/11/2019 Partial Approval LARRY ARNICK
Insulation 3/11/2019 Partial Approval LARRY ARNICK
Insulation 3/15/2019 Approved LARRY ARNICK
Deputy Wood Construction 3/19/2019 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/19/2019 Partial Approval LARRY ARNICK
Insulation 3/19/2019 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 3/20/2019 Approved LARRY ARNICK
Drywall Nailing 3/21/2019 Partial Approval LARRY ARNICK
Insulation 3/21/2019 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 3/22/2019 Partial Approval LARRY ARNICK
Green Building Rough 3/22/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 4/10/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 4/11/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 4/18/2019 Partial Approval LARRY ARNICK
Green Building Rough 4/22/2019 Approved LARRY ARNICK
Insulation 4/22/2019 Approved LARRY ARNICK
Wood Frame 4/23/2019 Partial Approval LARRY ARNICK
Green Building Final 4/25/2019 Not Ready for Inspection LARRY ARNICK
Insulation 4/25/2019 Not Ready for Inspection LARRY ARNICK
Insulation 4/26/2019 Partial Approval LARRY ARNICK
Drywall Nailing 4/30/2019 Not Ready for Inspection HAMID PISHEHVAR
Green Building Final 4/30/2019 Approved HAMID PISHEHVAR
Insulation 4/30/2019 Partial Approval HAMID PISHEHVAR
Insulation 5/2/2019 Partial Approval DERRICK SPENCER
Drywall Nailing 5/8/2019 Partial Approval LARRY ARNICK
Insulation 5/15/2019 Partial Approval LARRY ARNICK
Insulation 5/17/2019 Partial Approval LARRY ARNICK
Drywall Nailing 5/22/2019 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 5/23/2019 Partial Approval LARRY ARNICK
Drywall Nailing 5/28/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 5/28/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 5/29/2019 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 5/30/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 5/30/2019 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 6/3/2019 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 6/3/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 6/7/2019 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 6/11/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 6/11/2019 Not Ready for Inspection LARRY ARNICK
Drywall Nailing 6/12/2019 Approved LARRY ARNICK
Interior/Exterior Lathing 6/12/2019 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 6/20/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 6/21/2019 Partial Inspection LESLIE TRUJILLO
Deputy Reinf. Masonry 7/26/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/7/2019 Conditional Approval DAVID BURKHEAD
Insulation 8/7/2019 Partial Approval DAVID BURKHEAD
Footing/Foundation/Slab 8/8/2019 Not Ready for Inspection LARRY ARNICK
Deputy Reinf. Concrete 8/9/2019 Conditional Approval LARRY ARNICK
Deputy Reinf. Concrete 8/13/2019 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/13/2019 Not Ready for Inspection LARRY ARNICK
Footing/Foundation/Slab 8/13/2019 Approved LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/16/2019 Approved LARRY ARNICK
Deputy Wood Construction 8/19/2019 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 8/20/2019 Partial Approval LARRY ARNICK
Interior/Exterior Lathing 8/30/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 9/4/2019 Not Ready for Inspection LARRY ARNICK
Interior/Exterior Lathing 9/6/2019 Approved LARRY ARNICK
Deputy Reinf. Concrete 9/10/2019 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 9/20/2019 Conditional Approval LARRY ARNICK
Reinforced Masonry Frame 9/20/2019 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 9/20/2019 Not Ready for Inspection LARRY ARNICK
Final 1/9/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 1/9/2020 Not Ready for Inspection LARRY ARNICK
Reinforced Masonry Frame 1/9/2020 Not Ready for Inspection LARRY ARNICK
SGSOV-Seismic Gas S/O Valve 1/9/2020 SGSOV Approved LARRY ARNICK
Smoke Detectors 1/9/2020 Approved LARRY ARNICK
Verify Sprinkler Sign Off 1/9/2020 Not Ready for Inspection LARRY ARNICK
Wood Frame 1/9/2020 Conditional Approval LARRY ARNICK
T-Bar Ceiling 1/12/2020 Approved LARRY ARNICK
Green Building Final 1/13/2020 Approved LARRY ARNICK
Masonry Wall/Backfill 1/13/2020 Approved LARRY ARNICK
Reinforced Concrete Frame 1/13/2020 Approved LARRY ARNICK
Smoke Detectors 1/13/2020 Approved LARRY ARNICK
T-Bar Ceiling 1/13/2020 Approved LARRY ARNICK
Verify Sprinkler Sign Off 1/13/2020 Approved LARRY ARNICK
Wall Anchors 1/13/2020 Approved LARRY ARNICK
Wood Frame 1/13/2020 Approved LARRY ARNICK
Final 1/16/2020 Conditional Approval LARRY ARNICK
Reinforced Concrete Frame 1/16/2020 Approved LARRY ARNICK
Reinforced Masonry Frame 1/16/2020 Approved LARRY ARNICK
Verify Sprinkler Sign Off 1/16/2020 Approved LARRY ARNICK
Wood Frame 1/16/2020 Approved LARRY ARNICK
Final 2/5/2020 Not Ready for Inspection LARRY ARNICK