Fully sprinklered 78'-5" x 317'-10" irreg. shaped 4 story, 42 unit Type III-A, apartment with roof deck and attached Type I-A garage.
Permit Issued
Issued on 2/25/2016
Issuing Office
Valley
Current Status
CofO Issued on 9/6/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/9/2013 APPLICANT
Assigned to Plan Check Engineer 5/16/2013 VAHE SARKISSIAN
Corrections Issued 5/29/2013 VAHE SARKISSIAN
Building Plans Picked Up 5/29/2013 APPLICANT
Disabled Access Plans Picked Up 5/29/2013 APPLICANT
Quality Review Completed 5/30/2013 TAMERA SVETICH
Green Plans Picked Up 6/10/2013 APPLICANT
Applicant returned to address corrections 7/26/2013 VAHE SARKISSIAN
Applicant returned to address corrections 3/4/2015 STEVEN KIM
Applicant returned to address corrections 3/6/2015 STEVEN KIM
Plan Check Approved 12/16/2015 STEVEN KIM
Issued 2/25/2016 LADBS
CofO in Progress 9/1/2023 DANNY RODRIGUEZ
Permit Finaled 9/6/2023 RICKEY JACKSON
CofO Issued 9/6/2023 RICKEY JACKSON
Permit Finaled 9/6/2023 RICKEY JACKSON

Permit Application Clearance Information

Stormwater Pollution Mitigatn Cleared 8/20/2014 MARTIN FRAGOSO
CPC Cleared 8/28/2014 RICK TORRES
CPC Cleared 8/28/2014 RICK TORRES
ZA Case Cleared 8/28/2014 RICK TORRES
ZA Case Cleared 8/28/2014 RICK TORRES
ZA Case Cleared 8/28/2014 RICK TORRES
ZA Case Cleared 8/28/2014 RICK TORRES
ZA Case Cleared 8/28/2014 RICK TORRES
ZA Case Cleared 8/28/2014 RICK TORRES
Address approval Cleared 9/16/2014 LEE GUILBEAUX
Highway dedication Cleared 3/5/2015 SANDRA FIGUEROA
Green Code Cleared 4/3/2015 MICHAEL AYERS
DAS Clearance Cleared 4/7/2015 VAHE SARKISSIAN
Eng Process Fee Ord 176,300 Cleared 4/9/2015 MIKE KOUYOUMDJIAN
Permit Cleared 4/9/2015 MIKE KOUYOUMDJIAN
Sewer availability Cleared 4/9/2015 MIKE KOUYOUMDJIAN
Miscellaneous Cleared 4/14/2015 CHRISTINE KEUSHGUERIAN
Roof/Waste drainage to street Cleared 4/14/2015 CHRISTINE KEUSHGUERIAN
Driveway location Cleared 4/23/2015 DURRE SHAMSI
VHFHSZ Cleared 6/4/2015 ROBERT DUFF
Building over 3-story or 36-ft Cleared 6/10/2015 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 6/10/2015 CALOSHA APPROVED
Certificate of Compliance Cleared 7/10/2015 SUSAN ZERMENO
Hydrant and Access approval Cleared 9/3/2015 ROBERT DUFF
Title 19 building approval Cleared 9/3/2015 ANDREW KO
"Q" conditions Cleared 12/10/2015 ANNA VIDAL
"T" removal Cleared 12/10/2015 ANNA VIDAL
Frnt yard landscape/Water mgmt Cleared 12/10/2015 ANNA VIDAL
Miscellaneous Cleared 12/10/2015 ANNA VIDAL
Opn space landscape/Water mgmt Cleared 12/10/2015 ANNA VIDAL
CPC Cleared 12/16/2015 ANNA VIDAL
Miscellaneous Cleared 12/16/2015 ANNA VIDAL

Contact Information

Contractor Hassid Yoram; Lic. No.: 413779-B 740 HARTZELL STREET      PACIFIC PALISADES, CA 90272
Engineer Mirzadeh, Amir; Lic. No.: C58119 P O BOX 572110      TARZANA, CA 91357
Engineer Walter, Scott John; Lic. No.: GE2476 14428 HAMLIN ST STE 200      VAN NUYS, CA 91401

Inspector Information

JOHN KITCKO, (818) 374-1109 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 6/1/2016 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 6/1/2016 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/6/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/7/2016 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 6/7/2016 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 6/7/2016 No Access for Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/8/2016 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/9/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/10/2016 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/14/2016 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 6/14/2016 Not Ready for Inspection DANNY RODRIGUEZ
Masonry Wall/Backfill 6/14/2016 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/17/2016 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/17/2016 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 6/17/2016 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 6/17/2016 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/21/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 6/21/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/22/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 6/22/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/23/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 6/23/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/24/2016 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/24/2016 Not Ready for Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 6/24/2016 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/27/2016 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/27/2016 Partial Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 6/27/2016 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/28/2016 Approved DANNY RODRIGUEZ
Deputy Shotcrete 6/28/2016 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/28/2016 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 6/28/2016 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 6/29/2016 Partial Approval JOHN CARPENTER
Deputy Shotcrete 6/29/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 6/30/2016 Conditional Approval JAMES STEPHENS
Deputy Reinf. Masonry 7/1/2016 Conditional Approval ROBERT COLE
Deputy Reinf. Masonry 7/6/2016 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/7/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/8/2016 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/13/2016 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 7/14/2016 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/15/2016 Conditional Approval DANNY RODRIGUEZ
Reinforced Concrete Frame 7/20/2016 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 7/20/2016 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/21/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/22/2016 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 7/25/2016 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 7/25/2016 Not Ready for Inspection DANNY RODRIGUEZ
Masonry Wall/Backfill 7/26/2016 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 7/26/2016 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 7/27/2016 Conditional Approval ANDREW DORSO
Deputy Reinf. Masonry 7/27/2016 Conditional Approval CAMERON CHABAN
Footing/Foundation/Slab 8/15/2016 Partial Inspection CAMERON CHABAN
Grading Pre-Inspection 8/15/2016 Partial Inspection CAMERON CHABAN
Pre-Inspection 8/15/2016 Partial Inspection CAMERON CHABAN
Footing/Foundation/Slab 8/19/2016 Partial Approval DANNY RODRIGUEZ
Grading Pre-Inspection 8/19/2016 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/13/2016 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/14/2016 Conditional Approval DANNY RODRIGUEZ
Pre-Inspection 9/16/2016 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/21/2016 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/22/2016 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/22/2016 Corrections Issued DANNY RODRIGUEZ
Pre-Inspection 9/22/2016 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/23/2016 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/27/2016 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 9/27/2016 Partial Inspection ANDREW DORSO
Excavation/Setback/Form/Re-Bar 9/29/2016 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/30/2016 Partial Inspection CAMERON CHABAN
Deputy Reinf. Concrete 10/4/2016 Conditional Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/22/2016 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 11/28/2016 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/28/2016 Corrections Issued DANNY RODRIGUEZ
Green Building Rough 11/28/2016 Not Ready for Inspection RICHARD DOCKUS
Verify Sprinkler Sign Off 11/28/2016 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Wood Construction 11/29/2016 Approved DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 11/29/2016 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 1/5/2017 Conditional Approval DANNY RODRIGUEZ
Pre-Inspection 1/9/2017 Not Ready for Inspection ROBERT COLE
Floor/Roof Diaphrgm/Shear Wall 1/10/2017 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 3/13/2017 Not Ready for Inspection JOHN KITCKO
Special/Order Compliance 3/13/2017 Not Ready for Inspection JOHN KITCKO
Deputy Wood Construction 3/16/2017 Conditional Approval DANNY RODRIGUEZ
Pre-Inspection 3/16/2017 Partial Inspection DANNY RODRIGUEZ
Wood Frame 3/17/2017 Corrections Issued DANNY RODRIGUEZ
Pre-Inspection 5/22/2017 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 5/25/2017 Corrections Issued DANNY RODRIGUEZ
Wood Frame 6/6/2017 Partial Approval DANNY RODRIGUEZ
Green Building Rough 6/8/2017 Partial Inspection MICKEY YAMASHITA
Wood Frame 6/8/2017 Corrections Issued DANNY RODRIGUEZ
Insulation 6/12/2017 Partial Approval DANNY RODRIGUEZ
Wood Frame 6/13/2017 Partial Approval DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 6/14/2017 Corrections Issued DANNY RODRIGUEZ
Wood Frame 6/15/2017 Partial Approval DANNY RODRIGUEZ
Deputy Wood Construction 6/16/2017 Conditional Approval DANNY RODRIGUEZ
Drywall Nailing 6/20/2017 Not Ready for Inspection DANNY RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 6/20/2017 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 6/20/2017 Not Ready for Inspection DANNY RODRIGUEZ
Green Building Rough 6/20/2017 Not Ready for Inspection MICKEY YAMASHITA
Insulation 6/20/2017 Partial Approval DANNY RODRIGUEZ
Insulation 6/22/2017 Corrections Issued DANNY RODRIGUEZ
Insulation 6/27/2017 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 6/27/2017 Partial Approval DANNY RODRIGUEZ
Insulation 6/29/2017 Partial Inspection DANNY RODRIGUEZ
Wood Frame 6/29/2017 Partial Inspection DANNY RODRIGUEZ
Wood Frame 6/30/2017 Partial Approval DANNY RODRIGUEZ
T-Bar Ceiling 7/6/2017 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 7/6/2017 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 7/10/2017 Partial Inspection DANNY RODRIGUEZ
Insulation 7/13/2017 Partial Approval DANNY RODRIGUEZ
Wood Frame 7/13/2017 Partial Approval DANNY RODRIGUEZ
Wood Frame 7/18/2017 Partial Approval DANNY RODRIGUEZ
Insulation 7/20/2017 Partial Approval DANNY RODRIGUEZ
Wood Frame 7/20/2017 Partial Approval DANNY RODRIGUEZ
Insulation 7/25/2017 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 7/25/2017 Partial Approval DANNY RODRIGUEZ
Verify Sprinkler Sign Off 7/26/2017 Partial Inspection DANNY RODRIGUEZ
Wood Frame 7/26/2017 Partial Approval DANNY RODRIGUEZ
Green Building Rough 7/27/2017 Not Ready for Inspection DAVID MATSON
Green Building Rough 7/28/2017 Partial Inspection DAVID MATSON
Insulation 8/1/2017 Partial Approval DANNY RODRIGUEZ
Wood Frame 8/1/2017 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 8/24/2017 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 8/28/2017 Partial Inspection DANNY RODRIGUEZ
Drywall Nailing 8/31/2017 Partial Approval DANNY RODRIGUEZ
Green Building Rough 8/31/2017 Corrections Issued MICKEY YAMASHITA
Drywall Nailing 9/18/2017 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 9/26/2017 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 10/4/2017 Partial Approval DANNY RODRIGUEZ
Interior/Exterior Lathing 10/16/2017 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 10/23/2017 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 10/26/2017 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 11/6/2017 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 3/20/2018 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 5/2/2018 Partial Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/21/2018 Corrections Issued JOHN KITCKO
Excavation/Setback/Form/Re-Bar 7/19/2018 Corrections Issued JOHN KITCKO
Pre-Inspection 8/14/2018 Corrections Issued DANNY RODRIGUEZ
Pre-Inspection 9/27/2018 Partial Inspection ROBERT COLE
Special/Order Compliance 1/30/2019 Order to Comply Issued DANNY RODRIGUEZ
Special/Order Compliance 3/13/2019 Order to Comply Issued DANNY RODRIGUEZ
Pre-Inspection 11/22/2019 Partial Inspection DANNY RODRIGUEZ
Pre-Inspection 11/25/2019 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/26/2019 Partial Approval DANNY RODRIGUEZ
Pre-Inspection 2/5/2020 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 3/16/2020 Partial Inspection DANNY RODRIGUEZ
Pre-Inspection 3/23/2020 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 4/3/2020 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 8/6/2020 Corrections Issued DANNY RODRIGUEZ
Grading Pre-Inspection 8/13/2020 Partial Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/25/2020 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/27/2020 No Access for Inspection DANNY RODRIGUEZ
Grading Pre-Inspection 9/1/2020 Corrections Issued DANNY RODRIGUEZ
Footing/Foundation/Slab 9/3/2020 Not Ready for Inspection DANNY RODRIGUEZ
Grading Pre-Inspection 9/8/2020 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 9/10/2021 Partial Inspection ANDREW DORSO
Special/Order Compliance 9/15/2021 Partial Inspection ANDREW DORSO
Special/Order Compliance 9/29/2021 Partial Inspection DANNY RODRIGUEZ
Special/Order Compliance 10/27/2021 Partial Inspection DANNY RODRIGUEZ
Special/Order Compliance 10/29/2021 Partial Inspection DANNY RODRIGUEZ
Special/Order Compliance 11/19/2021 Corrections Issued DANNY RODRIGUEZ
Special/Order Compliance 11/24/2021 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 12/1/2021 Not Ready for Inspection DAVID BURKHEAD
Special/Order Compliance 12/6/2021 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 12/9/2021 Partial Inspection DANNY RODRIGUEZ
Special/Order Compliance 12/10/2021 Not Ready for Inspection DANNY RODRIGUEZ
Wood Frame 12/16/2021 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 12/17/2021 Partial Approval DANNY RODRIGUEZ
Grading Pre-Inspection 2/22/2022 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 5/6/2022 Partial Inspection DANNY RODRIGUEZ
Special/Order Compliance 2/2/2023 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 2/2/2023 Not Ready for Inspection STEVEN LEVITT
Special/Order Compliance 2/6/2023 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 2/13/2023 Not Ready for Inspection DANNY RODRIGUEZ
Verify Sprinkler Sign Off 2/13/2023 Partial Inspection DANNY RODRIGUEZ
Special/Order Compliance 3/20/2023 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 3/24/2023 Partial Approval BRIAN KELLY
Special/Order Compliance 3/24/2023 Partial Inspection JOHN KITCKO
Special/Order Compliance 3/29/2023 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 4/4/2023 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 4/11/2023 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 4/28/2023 Partial Inspection DANNY RODRIGUEZ
Special/Order Compliance 5/4/2023 Partial Inspection DANNY RODRIGUEZ
Special/Order Compliance 6/27/2023 Partial Inspection DANNY RODRIGUEZ
Final 6/29/2023 Partial Inspection DANNY RODRIGUEZ
Green Building Final 6/29/2023 Approved DANNY RODRIGUEZ
Special/Order Compliance 7/19/2023 Not Ready for Inspection DANNY RODRIGUEZ
Special/Order Compliance 8/4/2023 Partial Inspection DANNY RODRIGUEZ
Drywall Nailing 9/1/2023 Approved DANNY RODRIGUEZ
Final 9/1/2023 OK to Issue CofO DANNY RODRIGUEZ
Footing/Foundation/Slab 9/1/2023 Approved DANNY RODRIGUEZ
Green Building Rough 9/1/2023 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 9/1/2023 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 9/1/2023 Approved DANNY RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 9/1/2023 SGSOV Approved DANNY RODRIGUEZ
Smoke Detectors 9/1/2023 Approved DANNY RODRIGUEZ
Structural Steel Frame 9/1/2023 Approved DANNY RODRIGUEZ
Verify Sprinkler Sign Off 9/1/2023 Approved DANNY RODRIGUEZ