1200 S FIGUEROA ST 90015

Certificate Information: 1200 S FIGUEROA ST 90015

Application / Permit
13010-10000-04232
Plan Check / Job No.
B13LA15983
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New two 34-story mixed use building (Apartment, core and shell only retail and garage)
Permit Issued
Issued on 11/9/2015
Issuing Office
Metro
Current Status
CofO Issued on 3/9/2020
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/20/2013 APPLICANT
Assigned to Plan Check Engineer 1/17/2014 SAI KHUM
Corrections Issued 1/23/2014 SAI KHUM
Building Plans Picked Up 1/30/2014 APPLICANT
Quality Review Completed 2/4/2014 CHARLES CHANG
Applicant returned to address corrections 4/23/2014 CHARLES CHANG
Applicant returned to address corrections 4/29/2014 ALLEN MANALANSAN
Applicant returned to address corrections 6/12/2014 ALLEN MANALANSAN
Applicant returned to address corrections 7/23/2014 SAI KHUM
Applicant returned to address corrections 7/23/2014 ALLEN MANALANSAN
Applicant returned to address corrections 7/23/2014 CHARLES CHANG
Applicant returned to address corrections 8/13/2014 ALLEN MANALANSAN
Applicant returned to address corrections 8/14/2014 ALLEN MANALANSAN
Applicant returned to address corrections 8/14/2014 SAI KHUM
Applicant returned to address corrections 9/19/2014 ALLEN MANALANSAN
Applicant returned to address corrections 10/9/2014 ALLEN MANALANSAN
Applicant returned to address corrections 10/9/2014 SAI KHUM
Applicant returned to address corrections 10/21/2014 ALLEN MANALANSAN
Applicant returned to address corrections 10/30/2014 SAI KHUM
Applicant returned to address corrections 12/18/2014 ALLEN MANALANSAN
Applicant returned to address corrections 4/2/2015 SAI KHUM
Applicant returned to address corrections 7/9/2015 ALLEN MANALANSAN
Applicant returned to address corrections 8/19/2015 ALLEN MANALANSAN
Applicant returned to address corrections 9/1/2015 ALLEN MANALANSAN
Applicant returned to address corrections 9/9/2015 SAI KHUM
Plan Check Approved 10/6/2015 ALLEN MANALANSAN
Issued 11/9/2015 LADBS
TCO Issued (Expire Date: 03-13-2019) 9/14/2018 RICKEY JACKSON
TCO Issued (Expire Date: 03-28-2019) 9/28/2018 DAVID TSAU
TCO Issued (Expire Date: 05-28-2019) 11/29/2018 DAVID TSAU
TCO Issued (Expire Date: 06-15-2019) 12/17/2018 DAVID TSAU
TCO Issued (Expire Date: 09-10-2019) 3/14/2019 DAVID TSAU
TCO Issued (Expire Date: 03-07-2020) 9/9/2019 DAVID TSAU
CofO in Progress 3/6/2020 JAMES POWERS
Permit Finaled 3/9/2020 TERRY HERR
CofO Issued 3/9/2020 TERRY HERR
Permit Finaled 3/9/2020 TERRY HERR

Permit Application Clearance Information

Address approval Cleared 10/21/2014 JAMES KHO
Eng Process Fee Ord 176,300 Cleared 10/21/2014 JAMES KHO
Sewer availability Cleared 10/21/2014 JAMES KHO
Building over 3-story or 36-ft Cleared 10/30/2014 CALOSHA APPROVED
Work Adjacent to Public Way Cleared 3/26/2015 TERRY PHAN
Methane Ordinance Cleared 5/6/2015 DAVE MYERS
Driveway location Cleared 7/31/2015 WESTON PRINGLE
Encroachment in public way Cleared 7/31/2015 JAMES KHO
Highway dedication Cleared 7/31/2015 JAMES KHO
Internal circulation Cleared 7/31/2015 WESTON PRINGLE
Permit Cleared 7/31/2015 JAMES KHO
Specific Plan Cleared 7/31/2015 WESTON PRINGLE
Low Impact Development Cleared 8/28/2015 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 8/28/2015 JAMES KHO
Stormwater Pollution Mitigatn Cleared 8/28/2015 AMMAR ELTAWIL
Hydrant and Access approval Cleared 8/31/2015 JOHN CONNEALLY
Green Code Cleared 9/1/2015 ALDO UBAU
Title 19 building approval Cleared 9/1/2015 ANDREW KO
DAS Clearance Cleared 9/4/2015 SAI KWAN KHUM
APC Cleared 9/8/2015 MARITZA PRZEKOP
CPC Cleared 9/8/2015 MARITZA PRZEKOP
CPC Cleared 9/8/2015 MARITZA PRZEKOP
CPC Cleared 9/8/2015 MARITZA PRZEKOP
CPC Cleared 9/8/2015 MARITZA PRZEKOP
CPC Cleared 9/8/2015 MARITZA PRZEKOP
CPC Cleared 9/8/2015 MARITZA PRZEKOP
CPC Cleared 9/8/2015 MARITZA PRZEKOP
Frnt yard landscape/Water mgmt Cleared 9/8/2015 MARITZA PRZEKOP
Miscellaneous Cleared 9/8/2015 MARITZA PRZEKOP
Miscellaneous Cleared 9/8/2015 MARITZA PRZEKOP
Miscellaneous Cleared 9/8/2015 MARITZA PRZEKOP
Miscellaneous Cleared 9/8/2015 MARITZA PRZEKOP
Miscellaneous Cleared 9/8/2015 MARITZA PRZEKOP
Miscellaneous Cleared 9/8/2015 MARITZA PRZEKOP
Opn space landscape/Water mgmt Cleared 9/8/2015 MARITZA PRZEKOP
Prkng lot landscape/Water mgmt Cleared 9/8/2015 MARITZA PRZEKOP
Site Plan review Cleared 9/8/2015 MARITZA PRZEKOP
Specific Plan Cleared 9/8/2015 MARITZA PRZEKOP
Tract Map conditions Cleared 9/8/2015 MARITZA PRZEKOP
Tract Map conditions Cleared 9/8/2015 MARITZA PRZEKOP
Tract Map conditions Cleared 9/8/2015 MARITZA PRZEKOP
Tract Map conditions Cleared 9/8/2015 MARITZA PRZEKOP
Tract Map conditions Cleared 9/8/2015 MARITZA PRZEKOP
ZA Case Cleared 9/8/2015 MARITZA PRZEKOP
Excavation more than 5-ft deep Cleared 9/9/2015 CALOSHA APPROVED
Metro Rail approval Cleared 9/9/2015 THAN WIN
Project located in CRA area Cleared 9/30/2015 JIM URQUHART

Contact Information

Architect Sawano, Albert Harumi; Lic. No.: C22918 1481 INDIANA AVE      SOUTH PASADENA, CA 91030
Contractor Lend Lease (Us) Construction Inc; Lic. No.: 483550-B 200 PARK AVENUE 9TH FLOOR   ATTN GENERAL COUNSEL    NEW YORK, NY 10166
Engineer Whiteley, Mark Lynn; Lic. No.: S5204 15312 451ST AVE SE      NORTH BEND, WA 98045
Engineer Zadoorian, Christopher John; Lic. No.: GE2493 2121 S TOWNE CENTRE PLACE SUITE 130      ANAHEIM, CA 92806
Landscape Architect Larkins, David Kenneth; Lic. No.: LA4226 10335 JEFFERSON BLVD      CULVER CITY, CA 90232

Inspector Information

NICK DANERI, (213) 202-5615 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 11/30/2015 Partial Approval JAMES POWERS
Deputy Shotcrete 11/30/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/1/2015 Partial Approval JAMES POWERS
Deputy Shotcrete 12/1/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/2/2015 Partial Approval JAMES POWERS
Deputy Shotcrete 12/2/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/3/2015 Partial Approval JAMES POWERS
Deputy Shotcrete 12/3/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/4/2015 Partial Approval JAMES POWERS
Deputy Shotcrete 12/4/2015 Partial Approval JAMES POWERS
METHANE-Rough 12/4/2015 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/4/2015 Partial Approval JAMES POWERS
SWPPP-Const. Storm Water 12/4/2015 Completed JAMES POWERS
Verify Sprinkler Sign Off 12/4/2015 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/7/2015 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 12/7/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/8/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/9/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/10/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/11/2015 Partial Approval JAMES POWERS
METHANE-Rough 12/11/2015 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/11/2015 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/11/2015 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/14/2015 Partial Approval JAMES POWERS
Deputy Shotcrete 12/14/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/15/2015 Partial Approval JAMES POWERS
Deputy Shotcrete 12/15/2015 Partial Approval JAMES POWERS
METHANE-Rough 12/15/2015 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/15/2015 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/15/2015 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/16/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/17/2015 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/17/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/18/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/21/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/22/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/23/2015 Partial Approval JAMES POWERS
METHANE-Rough 12/24/2015 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/24/2015 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 12/24/2015 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/28/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/29/2015 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/30/2015 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/30/2015 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 12/31/2015 Partial Approval JAMES POWERS
METHANE-Rough 12/31/2015 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/31/2015 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/31/2015 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 1/4/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/4/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 1/5/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/5/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 1/5/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 1/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/6/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/7/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/8/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/8/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/11/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/12/2016 Partial Approval JAMES POWERS
METHANE-Rough 1/12/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/12/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 1/12/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 1/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/13/2016 Partial Approval JAMES POWERS
Footing/Foundation/Slab 1/13/2016 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 1/13/2016 Partial Approval JAMES POWERS
METHANE-Subgrade 1/13/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/14/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/14/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/15/2016 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 1/15/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/19/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/20/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/20/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/21/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/21/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/22/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/22/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 1/25/2016 Conditional Approval LESLIE TRUJILLO
METHANE-Rough 1/25/2016 Not Ready for Inspection LESLIE TRUJILLO
Reinforced Concrete Frame 1/25/2016 Not Ready for Inspection LESLIE TRUJILLO
Verify Sprinkler Sign Off 1/25/2016 Not Ready for Inspection LESLIE TRUJILLO
Deputy Pre-Stress Concrete 1/26/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/26/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/27/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/27/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/28/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/28/2016 Partial Approval JAMES POWERS
Footing/Foundation/Slab 1/28/2016 Partial Approval JAMES POWERS
METHANE-Barrier 1/28/2016 Partial Approval JAMES POWERS
METHANE-Subgrade 1/28/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/29/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/29/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/1/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/1/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/2/2016 Approved MICHAEL KUHN
Deputy Reinf. Concrete 2/2/2016 Approved MICHAEL KUHN
Deputy Pre-Stress Concrete 2/3/2016 Approved MICHAEL KUHN
Deputy Reinf. Concrete 2/3/2016 Approved MICHAEL KUHN
Deputy Pre-Stress Concrete 2/4/2016 Approved MICHAEL KUHN
Deputy Reinf. Concrete 2/4/2016 Approved MICHAEL KUHN
Deputy Pre-Stress Concrete 2/5/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/5/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/9/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/9/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/10/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/10/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/11/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/11/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/12/2016 Partial Approval JAMES POWERS
METHANE-Rough 2/12/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/12/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/12/2016 Not Ready for Inspection JAMES POWERS
Wood Frame 2/13/2016 Off-Hour Fees Due
Wood Frame 2/15/2016 Off-Hour Fees Due
Deputy Pre-Stress Concrete 2/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/16/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/16/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/17/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/17/2016 Partial Approval JAMES POWERS
METHANE-Rough 2/17/2016 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/17/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/17/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 2/18/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/18/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/19/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/19/2016 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 2/22/2016 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 2/22/2016 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 2/22/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/22/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/22/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 2/23/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/23/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/24/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/24/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/25/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/25/2016 Partial Approval JAMES POWERS
METHANE-Barrier 2/25/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/25/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/25/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 2/26/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/26/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/26/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/29/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/1/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/1/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/2/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2016 Partial Approval JAMES POWERS
METHANE-Rough 3/2/2016 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/2/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/2/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/3/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/3/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/4/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/4/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/7/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/7/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/8/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/8/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 3/8/2016 Partial Approval JAMES POWERS
METHANE-Barrier 3/8/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/8/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/8/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/9/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/9/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/10/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/10/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/11/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/11/2016 Partial Approval JAMES POWERS
METHANE-Rough 3/11/2016 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/11/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/11/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/14/2016 Conditional Approval WINSTON DUNNING
Deputy Reinf. Concrete 3/14/2016 Conditional Approval WINSTON DUNNING
Structural Steel Frame 3/14/2016 Not Ready for Inspection WINSTON DUNNING
Deputy Pre-Stress Concrete 3/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/15/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/15/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/16/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/16/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/17/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/18/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/18/2016 Approved JAMES POWERS
Deputy Reinf. Concrete 3/18/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/21/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/21/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/21/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/22/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/22/2016 Partial Approval JAMES POWERS
METHANE-Rough 3/22/2016 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/22/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/22/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/23/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/23/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/24/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/24/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/25/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/25/2016 Partial Approval JAMES POWERS
Green Building Rough 3/28/2016 Not Ready for Inspection JAMES POWERS
Green Building Rough 3/28/2016 Off-Hour Fees Due
METHANE-Rough 3/28/2016 Not Ready for Inspection JAMES POWERS
METHANE-Rough 3/28/2016 Off-Hour Fees Due
Reinforced Concrete Frame 3/28/2016 Off-Hour Fees Due
Reinforced Concrete Frame 3/28/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/28/2016 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 3/28/2016 Off-Hour Fees Due
Deputy Pre-Stress Concrete 3/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/29/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/30/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/30/2016 Partial Approval JAMES POWERS
METHANE-Rough 3/30/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/30/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/30/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/31/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/31/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/1/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/1/2016 Partial Approval JAMES POWERS
METHANE-Barrier 4/1/2016 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 4/1/2016 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 4/1/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/4/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/4/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/5/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/5/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/6/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 4/6/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/7/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/8/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/12/2016 No Access for Inspection JAMES POWERS
Deputy Reinf. Concrete 4/12/2016 No Access for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 4/13/2016 No Access for Inspection JAMES POWERS
Deputy Reinf. Concrete 4/13/2016 No Access for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 4/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/14/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/15/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/19/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/20/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/20/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/21/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/21/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/22/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/22/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/22/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/25/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/25/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/26/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/26/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/27/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/27/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/28/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/28/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/29/2016 Approved MICHAEL KUHN
Deputy Reinf. Concrete 4/29/2016 Approved MICHAEL KUHN
Floor/Roof Diaphrgm/Shear Wall 4/29/2016 Partial Approval MICHAEL KUHN
Footing/Foundation/Slab 4/29/2016 Partial Approval MICHAEL KUHN
METHANE-Barrier 4/29/2016 Partial Approval MICHAEL KUHN
METHANE-Subgrade 4/29/2016 Partial Approval MICHAEL KUHN
Deputy Pre-Stress Concrete 5/2/2016 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/2/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/2/2016 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/3/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/3/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 5/3/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/4/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/4/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 5/4/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/4/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/5/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/5/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 5/5/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/5/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/6/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 5/6/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/6/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/9/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/9/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/10/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/10/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/11/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/11/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/11/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/12/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/13/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/16/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/16/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/17/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/17/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/18/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/18/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/19/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/19/2016 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 5/19/2016 Partial Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/20/2016 Approved MICHAEL KUHN
Deputy Reinf. Concrete 5/20/2016 Approved MICHAEL KUHN
Deputy Pre-Stress Concrete 5/23/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/23/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/24/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/24/2016 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/24/2016 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 5/24/2016 Partial Approval JAMES POWERS
METHANE-Subgrade 5/24/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/24/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/25/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/25/2016 Partial Approval JAMES POWERS
Footing/Foundation/Slab 5/25/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/26/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/26/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/26/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/27/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/27/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/31/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/31/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/1/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/1/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/1/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/2/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/2/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/2/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/3/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/3/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/6/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/6/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/7/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/7/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/8/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/8/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 6/10/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/10/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/13/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/13/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/14/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 6/14/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 6/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/15/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/16/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/16/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/17/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/17/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/20/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/20/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 6/20/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/20/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 6/21/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/21/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/21/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/22/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/22/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/22/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/23/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/23/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/24/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/24/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/24/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/27/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/27/2016 Partial Approval JAMES POWERS
METHANE-Rough 6/27/2016 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 6/27/2016 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 6/27/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 6/28/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/28/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/28/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 6/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/29/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 6/29/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/30/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/30/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/1/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/1/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/5/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/5/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 7/5/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/5/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/6/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 7/6/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/7/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 7/7/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/8/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/8/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 7/8/2016 Partial Approval JAMES POWERS
Pre-Inspection 7/11/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 7/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/12/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 7/12/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/13/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 7/13/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 7/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/14/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/15/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/18/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/18/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/18/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 7/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/19/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/20/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/20/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/20/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/21/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/21/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/21/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/22/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/22/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/25/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/25/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/26/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/26/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 7/26/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/27/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/27/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/28/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/28/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/29/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/1/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/1/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/2/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/2/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/2/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/3/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/3/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/4/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/4/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/4/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/5/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/5/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/8/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/8/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/9/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/9/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/9/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/10/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/10/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/11/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/11/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/11/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 8/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/12/2016 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/12/2016 Off-Hour Fees Due
Deputy Pre-Stress Concrete 8/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/15/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/15/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/15/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/16/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/17/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/17/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/18/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/18/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/19/2016 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/19/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/22/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/22/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/23/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/23/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/23/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 8/24/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/24/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/24/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/25/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/25/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/25/2016 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 8/25/2016 Partial Approval JAMES POWERS
METHANE-Rough 8/25/2016 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/25/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 8/26/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/26/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/26/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/29/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/29/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/30/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/30/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/30/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/30/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/31/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/31/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/31/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/31/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/1/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/1/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/1/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/1/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/1/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/2/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/2/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/2/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/2/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/6/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/6/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/7/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/7/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/7/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/8/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/8/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/8/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/8/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/9/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 9/9/2016 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 9/9/2016 Not Ready for Inspection LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/12/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/12/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/12/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/13/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/13/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/13/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/14/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/14/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/15/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/15/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/16/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/16/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/16/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/19/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/19/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/19/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 9/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/19/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/19/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/20/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/20/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/20/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/21/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/21/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/21/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/22/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/22/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/22/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/23/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/23/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/23/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 9/23/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/26/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/26/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/26/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/27/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/27/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/27/2016 Partial Approval JAMES POWERS
Insulation 9/27/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/27/2016 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 9/28/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/28/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/28/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/28/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/29/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/29/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 9/29/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/30/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 9/30/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/30/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/3/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/3/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/4/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/4/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/4/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/5/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/5/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/5/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/6/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/6/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/7/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/7/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/11/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/11/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/11/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/11/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/12/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/12/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/12/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/13/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/13/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/14/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/14/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/14/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/17/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/17/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/17/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/17/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/17/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/18/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/18/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/18/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/18/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/19/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/19/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/19/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/20/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/20/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/20/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/20/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/21/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/21/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/21/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/21/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 10/21/2016 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 10/24/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/24/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/24/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/24/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 10/24/2016 Off-Hour Fees Due
Piling/Pier/Caisson 10/24/2016 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 10/25/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/25/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/25/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/25/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/25/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/25/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/26/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/26/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/26/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/26/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/26/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/27/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/27/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/27/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/27/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/27/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/28/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/28/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/28/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/28/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/28/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 10/28/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/31/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/31/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/31/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/31/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/31/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/31/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/1/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/1/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/1/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/1/2016 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/1/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/2/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/2/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/2/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/2/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/2/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/2/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/3/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/3/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/3/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/3/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/3/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/4/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/4/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/4/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/4/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/4/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/7/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/7/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/7/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/7/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/9/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/9/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/9/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/9/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/9/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/10/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/10/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/10/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/10/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/10/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/10/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/14/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/14/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/14/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/14/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/15/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/15/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/15/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/16/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/16/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/16/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 11/16/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/17/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/17/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/17/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/17/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/17/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/18/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/18/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/18/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/18/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/18/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/21/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/22/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/22/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/22/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/22/2016 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/22/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/23/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 11/23/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/23/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/23/2016 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/23/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/28/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/28/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/28/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/28/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/28/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/28/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/29/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/29/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/29/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 11/29/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/30/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 11/30/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/30/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/30/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/30/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/1/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/1/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/1/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/1/2016 Partial Approval JAMES POWERS
Structural Steel Frame 12/1/2016 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 12/2/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/2/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/2/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/5/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/5/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/5/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/5/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/5/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/6/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/6/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/6/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/6/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/6/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/7/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/7/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/7/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/7/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 12/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 12/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 12/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 12/8/2016 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 12/9/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/9/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/9/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/9/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/9/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/9/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/12/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/12/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/12/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/12/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/13/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/13/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/13/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/13/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/14/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/14/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/14/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/14/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/14/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/15/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/15/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/15/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/15/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/16/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/16/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/16/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/16/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/19/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/19/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/19/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 12/19/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/19/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/20/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/20/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 12/20/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/20/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/21/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/21/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 12/21/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/21/2016 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 12/22/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/22/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 12/22/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/22/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/23/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/23/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/23/2016 Partial Approval JAMES POWERS
Deputy Shotcrete 12/23/2016 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 12/23/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/27/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/27/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/27/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/28/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/28/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/28/2016 Partial Approval JAMES POWERS
Reinforced Concrete Frame 12/28/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/29/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/29/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/29/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/29/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/30/2016 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 12/30/2016 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/30/2016 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/30/2016 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/30/2016 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/3/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/3/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/3/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/4/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/4/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/4/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/4/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/4/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/4/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/5/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/5/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/5/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/6/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/6/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/9/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/9/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/10/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/10/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/10/2017 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 1/11/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/11/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/11/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/12/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/12/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/12/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/12/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/13/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/13/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/13/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/17/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/17/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/17/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/18/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/18/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/18/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/18/2017 Partial Approval JAMES POWERS
Reinforced Masonry Frame 1/18/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/19/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/19/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/19/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/20/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/20/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/20/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/23/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/23/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/23/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/24/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/24/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/24/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/24/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/25/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/25/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/25/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/26/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/26/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/26/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/26/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/27/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/27/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/27/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/27/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/30/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/30/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/31/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/31/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/31/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/1/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/1/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/1/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/2/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/2/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/3/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/3/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/6/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/6/2017 Partial Approval JAMES POWERS
Insulation 2/6/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/7/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/7/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/7/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/8/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/8/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/9/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/9/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/9/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/10/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/10/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/10/2017 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/13/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/13/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/14/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/14/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/15/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/15/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/15/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/17/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/21/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/21/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/22/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/22/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/22/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/23/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/23/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/23/2017 Partial Approval JAMES POWERS
Drywall Nailing 2/23/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/23/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/23/2017 Partial Approval JAMES POWERS
SWPPP-Const. Storm Water 2/23/2017 Completed JAMES POWERS
Deputy Drilled-In Anchors 2/24/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/24/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/24/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/27/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/27/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/27/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/28/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 2/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/28/2017 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 2/28/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 2/28/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/1/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/1/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/1/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/2/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/2/2017 Partial Approval JAMES POWERS
Insulation 3/2/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/2/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/3/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/3/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/3/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/3/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/6/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/6/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/6/2017 Partial Approval JAMES POWERS
Insulation 3/6/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/6/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 3/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 3/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/8/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/8/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/8/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/9/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/9/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/9/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/10/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/10/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/10/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/10/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/13/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/13/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/13/2017 Partial Approval JAMES POWERS
Insulation 3/13/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/13/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/14/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/14/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/14/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/15/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/15/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/15/2017 Partial Approval JAMES POWERS
Insulation 3/15/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/15/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/16/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/16/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/16/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/16/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/17/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/17/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/17/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/17/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/20/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/20/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/20/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/21/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/21/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/21/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/21/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/22/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/22/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/22/2017 Partial Approval JAMES POWERS
Drywall Nailing 3/22/2017 Not Ready for Inspection JAMES POWERS
Insulation 3/22/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/22/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/23/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/23/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/23/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/24/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/24/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/24/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/24/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/28/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/28/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/29/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/29/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/29/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/29/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/29/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/29/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/30/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/30/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/30/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/31/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/31/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/31/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/31/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/31/2017 Partial Approval JAMES POWERS
Drywall Nailing 3/31/2017 Not Ready for Inspection JAMES POWERS
Green Building Rough 3/31/2017 Not Ready for Inspection JOHN KLARIN
Insulation 3/31/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/31/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/3/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/3/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/3/2017 Partial Approval JAMES POWERS
Green Building Final 4/3/2017 Partial Inspection JOHN KLARIN
Reinforced Concrete Frame 4/3/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/4/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/4/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/4/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/4/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/4/2017 Partial Approval JAMES POWERS
Drywall Nailing 4/4/2017 Partial Approval JAMES POWERS
Insulation 4/4/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 4/4/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/4/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/5/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/5/2017 Partial Approval JAMES POWERS
Green Building Rough 4/5/2017 Partial Inspection JOHN KLARIN
Reinforced Concrete Frame 4/5/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/6/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/6/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/6/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/7/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/7/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 4/7/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/10/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/11/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/11/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/12/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/14/2017 Partial Approval JAMES POWERS
Drywall Nailing 4/14/2017 Partial Approval JAMES POWERS
Green Building Rough 4/14/2017 Not Ready for Inspection DONALD CRICHLOW
Insulation 4/14/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 4/14/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/14/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/17/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/17/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/17/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/18/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/18/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/18/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/19/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/19/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/19/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/19/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/20/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/20/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/20/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/21/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 4/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/21/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/21/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/24/2017 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 4/24/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/26/2017 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/26/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/27/2017 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 4/27/2017 Partial Approval LESLIE TRUJILLO
Light Gage Steel Frame 4/27/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/1/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/1/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/2/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/2/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/2/2017 Partial Approval JAMES POWERS
Drywall Nailing 5/2/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/2/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/3/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/3/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/3/2017 Partial Approval JAMES POWERS
Green Building Rough 5/3/2017 Partial Approval RICHARD DOCKUS
Insulation 5/3/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/3/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Pre-Stress Concrete 5/4/2017 Partial Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 5/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 5/4/2017 Conditional Approval LESLIE TRUJILLO
Floor/Roof Diaphrgm/Shear Wall 5/4/2017 Partial Approval LESLIE TRUJILLO
Green Building Rough 5/4/2017 Partial Approval RICHARD DOCKUS
Deputy Drilled-In Anchors 5/5/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/5/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/5/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/8/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/8/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/8/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/9/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/9/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/9/2017 Partial Approval JAMES POWERS
Drywall Nailing 5/9/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/9/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/10/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/10/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/10/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/11/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/11/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/11/2017 Partial Approval JAMES POWERS
Drywall Nailing 5/11/2017 Partial Approval JAMES POWERS
Insulation 5/11/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/11/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/12/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/12/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/12/2017 Partial Approval JAMES POWERS
Green Building Rough 5/12/2017 Not Ready for Inspection DONALD CRICHLOW
Insulation 5/12/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/15/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/15/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 5/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Seismic Resistance 5/16/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 5/17/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/17/2017 Partial Approval JAMES POWERS
Deputy Seismic Resistance 5/17/2017 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 5/17/2017 Not Ready for Inspection JAMES POWERS
Insulation 5/17/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/17/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/18/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/18/2017 Partial Approval JAMES POWERS
Deputy Seismic Resistance 5/18/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/19/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/19/2017 Partial Approval JAMES POWERS
Deputy Seismic Resistance 5/19/2017 Partial Approval JAMES POWERS
Insulation 5/19/2017 Partial Approval JAMES POWERS
Special/Order Compliance 5/19/2017 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 5/22/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/22/2017 Partial Approval JAMES POWERS
Deputy Seismic Resistance 5/22/2017 Partial Approval JAMES POWERS
Drywall Nailing 5/22/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/23/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/23/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/23/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/24/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/24/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/24/2017 Partial Approval JAMES POWERS
Drywall Nailing 5/24/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/25/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/25/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/25/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/26/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/26/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/26/2017 Partial Approval JAMES POWERS
Insulation 5/26/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/30/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/30/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 5/30/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/31/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 5/31/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/31/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/31/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/1/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/1/2017 Partial Approval JAMES POWERS
Drywall Nailing 6/1/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/1/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/2/2017 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/2/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/2/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/2/2017 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/5/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/5/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/6/2017 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/6/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/6/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/6/2017 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/6/2017 Conditional Approval ERNESTO CORRAL
Drywall Nailing 6/6/2017 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 6/7/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/7/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/7/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/8/2017 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/8/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/8/2017 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/8/2017 Conditional Approval ERNESTO CORRAL
Drywall Nailing 6/8/2017 Partial Inspection ERNESTO CORRAL
Footing/Foundation/Slab 6/8/2017 Partial Inspection ERNESTO CORRAL
Insulation 6/8/2017 Partial Inspection ERNESTO CORRAL
Light Gage Steel Frame 6/8/2017 Partial Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 6/9/2017 Conditional Approval ERNESTO CORRAL
Deputy Pre-Stress Concrete 6/9/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/9/2017 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/9/2017 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/9/2017 Conditional Approval ERNESTO CORRAL
Floor/Roof Diaphrgm/Shear Wall 6/9/2017 No Access for Inspection ERNESTO CORRAL
Deputy Drilled-In Anchors 6/12/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/12/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/12/2017 Partial Approval JAMES POWERS
Insulation 6/12/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/13/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/13/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/13/2017 Partial Approval JAMES POWERS
Drywall Nailing 6/13/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/13/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/14/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/14/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/14/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/15/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/15/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/15/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/16/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/16/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/16/2017 Partial Approval JAMES POWERS
Insulation 6/16/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/19/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 6/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/19/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/20/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/20/2017 Partial Approval JAMES POWERS
Drywall Nailing 6/20/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/21/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/21/2017 Partial Approval JAMES POWERS
Drywall Nailing 6/21/2017 Partial Approval JAMES POWERS
Green Building Rough 6/21/2017 Partial Approval RICHARD DOCKUS
Deputy Drilled-In Anchors 6/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/22/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/22/2017 Partial Approval JAMES POWERS
Green Building Final 6/22/2017 Partial Inspection RICHARD DOCKUS
Deputy Drilled-In Anchors 6/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/23/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/23/2017 Partial Approval JAMES POWERS
Drywall Nailing 6/23/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/26/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/26/2017 Partial Approval JAMES POWERS
Drywall Nailing 6/26/2017 Partial Approval JAMES POWERS
Green Building Rough 6/26/2017 Not Ready for Inspection RICHARD DOCKUS
Deputy Drilled-In Anchors 6/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/27/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/27/2017 Partial Approval JAMES POWERS
Insulation 6/27/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/28/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/28/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/29/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/29/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/29/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/30/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/30/2017 Partial Approval JAMES POWERS
Drywall Nailing 6/30/2017 Partial Approval JAMES POWERS
Reinforced Concrete Frame 6/30/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/3/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/3/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/5/2017 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 7/5/2017 Not Ready for Inspection JAMES POWERS
Insulation 7/5/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/6/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/6/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/7/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/7/2017 Partial Approval JAMES POWERS
Insulation 7/7/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/10/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/10/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/11/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/11/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/12/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/12/2017 Partial Approval JAMES POWERS
Green Building Rough 7/12/2017 Partial Approval RICHARD DOCKUS
Insulation 7/12/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/13/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/14/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/14/2017 Partial Approval JAMES POWERS
Drywall Nailing 7/14/2017 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 7/14/2017 Partial Approval JAMES POWERS
Green Building Rough 7/14/2017 Partial Approval RICHARD DOCKUS
Insulation 7/14/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/17/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/17/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/17/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/18/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/18/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/18/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/19/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/19/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/19/2017 Partial Approval JAMES POWERS
Drywall Nailing 7/19/2017 Partial Approval JAMES POWERS
Insulation 7/19/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/20/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/20/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/20/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/21/2017 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 7/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 7/21/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/21/2017 Partial Approval JAMES POWERS
Insulation 7/21/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/24/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/24/2017 Conditional Approval LESLIE TRUJILLO
Drywall Nailing 7/24/2017 No Access for Inspection LESLIE TRUJILLO
Green Building Rough 7/24/2017 Partial Approval RICHARD DOCKUS
Deputy Drilled-In Anchors 7/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/25/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/25/2017 Conditional Approval LESLIE TRUJILLO
Green Building Final 7/25/2017 Not Ready for Inspection RICHARD DOCKUS
Green Building Rough 7/25/2017 Partial Approval RICHARD DOCKUS
Insulation 7/25/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/26/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/26/2017 Conditional Approval LESLIE TRUJILLO
Insulation 7/26/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/27/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/28/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 7/28/2017 Conditional Approval LESLIE TRUJILLO
Insulation 7/28/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 7/31/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 7/31/2017 Conditional Approval LESLIE TRUJILLO
Insulation 7/31/2017 Partial Approval LESLIE TRUJILLO
Interior/Exterior Lathing 7/31/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/1/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/1/2017 Conditional Approval LESLIE TRUJILLO
Light Gage Steel Frame 8/1/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/2/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 8/2/2017 Conditional Approval LESLIE TRUJILLO
Insulation 8/2/2017 Partial Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/3/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 8/4/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 8/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/7/2017 Partial Approval JAMES POWERS
Drywall Nailing 8/7/2017 Partial Approval JAMES POWERS
Green Building Rough 8/7/2017 Not Ready for Inspection RICHARD DOCKUS
Insulation 8/7/2017 Partial Approval JAMES POWERS
Interior/Exterior Lathing 8/7/2017 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 8/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/8/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/8/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/8/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/9/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/9/2017 Partial Approval JAMES POWERS
Green Building Rough 8/9/2017 Partial Approval RICHARD DOCKUS
Interior/Exterior Lathing 8/9/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/10/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/10/2017 Partial Approval JAMES POWERS
Green Building Final 8/10/2017 Not Ready for Inspection RICHARD DOCKUS
Green Building Rough 8/10/2017 Not Ready for Inspection RICHARD DOCKUS
Deputy Drilled-In Anchors 8/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/11/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/11/2017 Partial Approval JAMES POWERS
Drywall Nailing 8/11/2017 Partial Approval JAMES POWERS
Insulation 8/11/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/11/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/14/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/14/2017 Partial Approval JAMES POWERS
Green Building Rough 8/14/2017 Partial Approval RICHARD DOCKUS
Insulation 8/14/2017 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 8/14/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/15/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/15/2017 Partial Approval JAMES POWERS
Insulation 8/15/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/15/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/16/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/16/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/17/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/17/2017 Partial Approval JAMES POWERS
Drywall Nailing 8/17/2017 Partial Approval JAMES POWERS
Insulation 8/17/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/18/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/18/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/21/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/21/2017 Partial Approval JAMES POWERS
Drywall Nailing 8/21/2017 Partial Approval JAMES POWERS
Green Building Rough 8/21/2017 Not Ready for Inspection RICHARD DOCKUS
Light Gage Steel Frame 8/21/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/22/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/22/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/22/2017 Partial Approval JAMES POWERS
Drywall Nailing 8/22/2017 Partial Approval JAMES POWERS
Insulation 8/22/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/22/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/23/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/23/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/23/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/24/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/24/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/24/2017 Partial Approval JAMES POWERS
Green Building Rough 8/24/2017 Partial Approval RICHARD DOCKUS
Insulation 8/24/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/24/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/25/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/25/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/25/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/28/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/28/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/28/2017 Partial Approval JAMES POWERS
Drywall Nailing 8/28/2017 Partial Approval JAMES POWERS
Insulation 8/28/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/29/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/29/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/29/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/29/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/29/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/30/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/30/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/30/2017 Partial Approval JAMES POWERS
Drywall Nailing 8/30/2017 Partial Approval JAMES POWERS
Insulation 8/30/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/30/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/31/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 8/31/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 8/31/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/31/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/1/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/1/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/1/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/5/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/5/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/5/2017 Partial Approval JAMES POWERS
Green Building Rough 9/5/2017 No Access for Inspection WILLIAM ROSE
Deputy Drilled-In Anchors 9/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/6/2017 Partial Approval JAMES POWERS
Drywall Nailing 9/6/2017 Partial Approval JAMES POWERS
Green Building Rough 9/6/2017 Partial Approval WILLIAM ROSE
Insulation 9/6/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/6/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 9/7/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 9/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/8/2017 Partial Approval JAMES POWERS
Insulation 9/8/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/8/2017 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 9/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/11/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/12/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/12/2017 Partial Approval JAMES POWERS
Drywall Nailing 9/12/2017 Partial Approval JAMES POWERS
Structural Steel Frame 9/12/2017 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 9/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/13/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/13/2017 Partial Approval JAMES POWERS
Insulation 9/13/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/14/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/14/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/15/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/15/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/18/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/18/2017 Partial Approval JAMES POWERS
Drywall Nailing 9/18/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/18/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/19/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/19/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/19/2017 Partial Approval JAMES POWERS
Green Building Rough 9/19/2017 Partial Approval RICHARD DOCKUS
Insulation 9/19/2017 Conditional Approval JAMES POWERS
Deputy Drilled-In Anchors 9/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/20/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/20/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/20/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/20/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/21/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/21/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/21/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/22/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/22/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/22/2017 Partial Approval JAMES POWERS
Drywall Nailing 9/22/2017 Partial Approval JAMES POWERS
Insulation 9/22/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/25/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/25/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/25/2017 Partial Approval JAMES POWERS
Drywall Nailing 9/25/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/26/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/26/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/27/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/27/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/27/2017 Partial Approval JAMES POWERS
Drywall Nailing 9/27/2017 Partial Approval JAMES POWERS
Interior/Exterior Lathing 9/27/2017 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 9/27/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/28/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/28/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/29/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 9/29/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 9/29/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/29/2017 Partial Approval JAMES POWERS
Drywall Nailing 9/29/2017 Partial Approval JAMES POWERS
Interior/Exterior Lathing 9/29/2017 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 10/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/2/2017 Partial Approval JAMES POWERS
Deputy Shotcrete 10/2/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/2/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/2/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/3/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/3/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/4/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/4/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/4/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/4/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/5/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/5/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/6/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/6/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/6/2017 Partial Approval JAMES POWERS
Interior/Exterior Lathing 10/6/2017 Partial Approval JAMES POWERS
SWPPP-Const. Storm Water 10/6/2017 Completed JAMES POWERS
Deputy Drilled-In Anchors 10/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/10/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/10/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/10/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/10/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/10/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/11/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/11/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/12/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/12/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/12/2017 Partial Approval JAMES POWERS
Interior/Exterior Lathing 10/12/2017 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 10/12/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/13/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/16/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/16/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/16/2017 Partial Approval JAMES POWERS
Green Building Rough 10/16/2017 Not Ready for Inspection RICHARD DOCKUS
Deputy Drilled-In Anchors 10/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/17/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/17/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/18/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/18/2017 Partial Approval JAMES POWERS
Insulation 10/18/2017 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 10/18/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/19/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/19/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/19/2017 Partial Approval JAMES POWERS
Insulation 10/19/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/19/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/20/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/20/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/23/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/23/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/23/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/23/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/24/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/24/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/24/2017 Partial Approval JAMES POWERS
Insulation 10/24/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/25/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/25/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/25/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/26/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/26/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/26/2017 Partial Approval JAMES POWERS
Green Building Rough 10/26/2017 Not Ready for Inspection DONALD CRICHLOW
Deputy Drilled-In Anchors 10/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/27/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/27/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/30/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/30/2017 Partial Approval JAMES POWERS
Drywall Nailing 10/30/2017 Partial Approval JAMES POWERS
Insulation 10/30/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/30/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/31/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/31/2017 Partial Approval JAMES POWERS
Insulation 10/31/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/31/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/1/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/2/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/2/2017 Partial Approval JAMES POWERS
Drywall Nailing 11/2/2017 Partial Approval JAMES POWERS
Green Building Rough 11/2/2017 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 11/2/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/3/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/3/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/6/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/6/2017 Partial Approval JAMES POWERS
Drywall Nailing 11/6/2017 Partial Approval JAMES POWERS
Green Building Rough 11/6/2017 Approved JAMES POWERS
Deputy Drilled-In Anchors 11/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/7/2017 Approved JAMES POWERS
Deputy Reinf. Masonry 11/7/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/7/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/7/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/8/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/8/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/9/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/9/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/9/2017 Partial Approval JAMES POWERS
Drywall Nailing 11/9/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/13/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/14/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/14/2017 Partial Approval JAMES POWERS
Drywall Nailing 11/14/2017 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 11/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/15/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/15/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/16/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/16/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/16/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/17/2017 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 11/17/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/17/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/17/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 11/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 11/20/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/21/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 11/22/2017 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 11/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/27/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/27/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/28/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/28/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/29/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/29/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/29/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 11/30/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/30/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 11/30/2017 Partial Approval JAMES POWERS
Drywall Nailing 11/30/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 11/30/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/1/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/1/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/1/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/4/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/4/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/4/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/4/2017 Partial Inspection JAMES POWERS
Deputy Drilled-In Anchors 12/5/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/5/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/5/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/6/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/6/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/6/2017 Partial Approval JAMES POWERS
Drywall Nailing 12/6/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/7/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/7/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/7/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/8/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/8/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/8/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/8/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/11/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/11/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/11/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/12/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/12/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/12/2017 Partial Approval JAMES POWERS
Insulation 12/12/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/13/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/13/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/13/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/14/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/14/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/14/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/14/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/15/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/15/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/15/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/15/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/18/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/18/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/18/2017 Partial Approval JAMES POWERS
Insulation 12/18/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/19/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/19/2017 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/19/2017 Partial Approval JAMES POWERS
Insulation 12/19/2017 Partial Approval JAMES POWERS
METHANE-Barrier 12/19/2017 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 12/19/2017 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 12/20/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/20/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/21/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/21/2017 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 12/21/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/21/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/22/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/22/2017 Partial Approval JAMES POWERS
Insulation 12/22/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/26/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/26/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/26/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/27/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/27/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/27/2017 Partial Approval JAMES POWERS
Footing/Foundation/Slab 12/27/2017 Partial Approval JAMES POWERS
Insulation 12/27/2017 Not Ready for Inspection JAMES POWERS
METHANE-Barrier 12/27/2017 Approved JAMES POWERS
METHANE-Subgrade 12/27/2017 Approved JAMES POWERS
Deputy Drilled-In Anchors 12/28/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/28/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/28/2017 Partial Approval JAMES POWERS
Insulation 12/28/2017 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/28/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/29/2017 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/29/2017 Partial Approval JAMES POWERS
Deputy Steel/Welding 12/29/2017 Partial Approval JAMES POWERS
Insulation 12/29/2017 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/2/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/2/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/2/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/3/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/3/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/3/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 1/3/2018 Partial Approval JAMES POWERS
Insulation 1/3/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/4/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/4/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/4/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/4/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/5/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/5/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/5/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/5/2018 Partial Approval JAMES POWERS
Insulation 1/5/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/8/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/8/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/8/2018 Partial Approval JAMES POWERS
Insulation 1/8/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/9/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/9/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/9/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/9/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/10/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/10/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/10/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/10/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/11/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/11/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/11/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/11/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/12/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/12/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/12/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/12/2018 Partial Approval JAMES POWERS
Drywall Nailing 1/12/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 1/12/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/12/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/16/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/16/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/16/2018 Partial Approval JAMES POWERS
Drywall Nailing 1/16/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/16/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/17/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/17/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/17/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/17/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 1/17/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 1/17/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/18/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/18/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/18/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/18/2018 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/18/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/19/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/19/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/19/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/19/2018 Partial Approval JAMES POWERS
Drywall Nailing 1/19/2018 Partial Approval JAMES POWERS
Insulation 1/19/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/22/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/22/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/22/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/22/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/23/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/23/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/23/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/23/2018 Partial Approval JAMES POWERS
Drywall Nailing 1/23/2018 Partial Approval JAMES POWERS
Insulation 1/23/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/24/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/24/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/24/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/24/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/25/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/25/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/25/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/25/2018 Partial Approval JAMES POWERS
Drywall Nailing 1/25/2018 Partial Approval JAMES POWERS
Insulation 1/25/2018 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/25/2018 Partial Approval JAMES POWERS
T-Bar Ceiling 1/25/2018 Partial Inspection JAMES POWERS
Deputy Drilled-In Anchors 1/26/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/26/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/26/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/26/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/29/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/29/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/29/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/29/2018 Partial Approval JAMES POWERS
Drywall Nailing 1/29/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/30/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/30/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/30/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/30/2018 Partial Approval JAMES POWERS
Drywall Nailing 1/30/2018 Partial Approval JAMES POWERS
Insulation 1/30/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/31/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/31/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/31/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 1/31/2018 Partial Approval JAMES POWERS
Insulation 1/31/2018 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/1/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 2/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 2/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 2/2/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 2/5/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/5/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/5/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/5/2018 Partial Approval JAMES POWERS
Drywall Nailing 2/5/2018 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 2/5/2018 Not Ready for Inspection JAMES POWERS
Insulation 2/5/2018 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/6/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/6/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/6/2018 Partial Approval JAMES POWERS
Drywall Nailing 2/6/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/6/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/7/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/7/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/7/2018 Partial Approval JAMES POWERS
Drywall Nailing 2/7/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 2/7/2018 Partial Approval JAMES POWERS
Insulation 2/7/2018 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/8/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/8/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/8/2018 Partial Approval JAMES POWERS
Drywall Nailing 2/8/2018 Partial Approval JAMES POWERS
Insulation 2/8/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/8/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/9/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/9/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/9/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/12/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/12/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/12/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/13/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/13/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/14/2018 No Access for Inspection JAMES POWERS
Deputy Reinf. Concrete 2/14/2018 No Access for Inspection JAMES POWERS
Deputy Steel/Welding 2/14/2018 No Access for Inspection JAMES POWERS
Footing/Foundation/Slab 2/14/2018 No Access for Inspection JAMES POWERS
Light Gage Steel Frame 2/14/2018 No Access for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/15/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/15/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/15/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/16/2018 No Access for Inspection JAMES POWERS
Deputy Reinf. Concrete 2/16/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/16/2018 No Access for Inspection JAMES POWERS
Deputy Drilled-In Anchors 2/20/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/20/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/20/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/21/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/21/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/21/2018 Partial Approval JAMES POWERS
Footing/Foundation/Slab 2/21/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/22/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 2/22/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 2/22/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 2/23/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/23/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/23/2018 Partial Approval JAMES POWERS
Insulation 2/23/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 2/23/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/26/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/26/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/26/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/27/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/27/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 2/27/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 2/28/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 2/28/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/1/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/1/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/1/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/2/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/2/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/2/2018 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/2/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/5/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/5/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/5/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/6/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/6/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/6/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/7/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/7/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/7/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/8/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/8/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/8/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/9/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/9/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/9/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/12/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/12/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/12/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/13/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/13/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 3/14/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/15/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 3/16/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 3/19/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/19/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/20/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/20/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/21/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/21/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/21/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/22/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/22/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/22/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/23/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/23/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/23/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/27/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/27/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/27/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/28/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/28/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 3/28/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/29/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/29/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/30/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/30/2018 Partial Approval JAMES POWERS
Drywall Nailing 3/30/2018 Partial Approval JAMES POWERS
Final 3/30/2018 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 3/30/2018 Approved JAMES POWERS
Green Building Final 3/30/2018 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 3/30/2018 Partial Approval JAMES POWERS
METHANE-Final 3/30/2018 Approved JAMES POWERS
METHANE-Rough 3/30/2018 Approved JAMES POWERS
Reinforced Concrete Frame 3/30/2018 Not Ready for Inspection JAMES POWERS
SGSOV-Seismic Gas S/O Valve 3/30/2018 SGSOV Not Ready JAMES POWERS
SUSMP-Std. Urban Storm Water 3/30/2018 Approved JAMES POWERS
Smoke Detectors 3/30/2018 Approved JAMES POWERS
Verify Sprinkler Sign Off 3/30/2018 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 4/2/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/2/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/3/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/4/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/4/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/4/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/5/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/5/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/5/2018 Partial Approval JAMES POWERS
Drywall Nailing 4/5/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/6/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/6/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/6/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/9/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/9/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/9/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/10/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/10/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/10/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/11/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/11/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/11/2018 Partial Approval JAMES POWERS
Drywall Nailing 4/11/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/12/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/12/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/12/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/13/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/13/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/16/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/16/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/16/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/17/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/17/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/18/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/18/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/18/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/19/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/19/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/19/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/20/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/20/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/20/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 4/23/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 4/23/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 4/23/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 4/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/24/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/25/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/26/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Concrete 4/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Reinf. Masonry 4/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Steel/Welding 4/27/2018 Conditional Approval LESLIE TRUJILLO
Deputy Drilled-In Anchors 4/30/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/30/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/30/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/30/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/1/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/1/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/1/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/2/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/2/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/2/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/3/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/3/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/4/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/4/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/7/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/7/2018 Partial Approval JAMES POWERS
Drywall Nailing 5/7/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/8/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/8/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/8/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/9/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/9/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/9/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/10/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/10/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/10/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/11/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/11/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/11/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/14/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 5/14/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/14/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/15/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/15/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/15/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/16/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/16/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/16/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/17/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/17/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/17/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/18/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/18/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/18/2018 Partial Approval JAMES POWERS
Drywall Nailing 5/18/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/21/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/21/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/21/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/22/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/22/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/23/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/23/2018 Partial Approval JAMES POWERS
Drywall Nailing 5/23/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/23/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/24/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/24/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/25/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/25/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/25/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/29/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/29/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/29/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/30/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/30/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 5/31/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/31/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 5/31/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/1/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/1/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/1/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/4/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/4/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/5/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/5/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/5/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 6/5/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 6/6/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/6/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/6/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/6/2018 Partial Approval JAMES POWERS
Drywall Nailing 6/6/2018 Partial Approval JAMES POWERS
Final 6/6/2018 Not Ready for Inspection JAMES POWERS
Green Building Final 6/6/2018 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 6/6/2018 Not Ready for Inspection JAMES POWERS
SGSOV-Seismic Gas S/O Valve 6/6/2018 SGSOV Not Ready JAMES POWERS
Verify Sprinkler Sign Off 6/6/2018 Not Ready for Inspection JAMES POWERS
Deputy Drilled-In Anchors 6/7/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 6/7/2018 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Masonry 6/7/2018 Conditional Approval ERNESTO CORRAL
Deputy Steel/Welding 6/7/2018 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 6/8/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/8/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/8/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/8/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/11/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/11/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/11/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/11/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/12/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Concrete 6/12/2018 Approved JEFF BYTHEWAY
Deputy Reinf. Masonry 6/12/2018 Approved JEFF BYTHEWAY
Deputy Steel/Welding 6/12/2018 Approved JEFF BYTHEWAY
Deputy Drilled-In Anchors 6/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/13/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/13/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/14/2018 Conditional Approval NICK DANERI
Deputy Reinf. Concrete 6/14/2018 Conditional Approval NICK DANERI
Deputy Reinf. Masonry 6/14/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 6/14/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 6/15/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/15/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/15/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/15/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/18/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/18/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/18/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/18/2018 Order to Comply Issued JAMES POWERS
Deputy Drilled-In Anchors 6/19/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/19/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/19/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/20/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/20/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/20/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/21/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/21/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/21/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/22/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/22/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/22/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/25/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/25/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 6/25/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/26/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/26/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/27/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/27/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/27/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/28/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/28/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 6/29/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/29/2018 Partial Approval JAMES POWERS
Interior/Exterior Lathing 6/29/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/3/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/3/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/5/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/6/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/6/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/9/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/9/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/10/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/10/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/10/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/11/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/11/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/12/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/12/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/12/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/13/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/13/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/13/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/16/2018 Order to Comply Issued JAMES POWERS
Deputy Drilled-In Anchors 7/16/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/16/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/16/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/17/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/17/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/17/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/18/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/18/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/18/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/18/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/19/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/19/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/20/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/20/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/23/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/23/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/24/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/24/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/24/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/25/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/25/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/25/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/26/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/26/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/26/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/27/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/27/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/27/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/30/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/30/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 7/31/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/31/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 7/31/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/1/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/1/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/1/2018 Partial Approval JAMES POWERS
Drywall Nailing 8/1/2018 Approved JAMES POWERS
Final 8/1/2018 Not Ready for Inspection JAMES POWERS
Green Building Final 8/1/2018 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 8/1/2018 Approved JAMES POWERS
SGSOV-Seismic Gas S/O Valve 8/1/2018 SGSOV Approved JAMES POWERS
Verify Sprinkler Sign Off 8/1/2018 Approved JAMES POWERS
Deputy Drilled-In Anchors 8/2/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/2/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/2/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/3/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/3/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/3/2018 Partial Approval JAMES POWERS
Pre-Inspection 8/3/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/6/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/6/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/6/2018 Partial Approval JAMES POWERS
Pre-Inspection 8/6/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/7/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/7/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/7/2018 Partial Approval JAMES POWERS
Pre-Inspection 8/7/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/8/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/8/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/8/2018 Partial Approval JAMES POWERS
Pre-Inspection 8/8/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/9/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/9/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/9/2018 Partial Approval JAMES POWERS
Pre-Inspection 8/9/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/10/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/10/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/10/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/13/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/13/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/13/2018 Approved JAMES POWERS
Pre-Inspection 8/13/2018 Partial Inspection JAMES POWERS
Deputy Drilled-In Anchors 8/14/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/14/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/14/2018 Partial Approval JAMES POWERS
Pre-Inspection 8/14/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/15/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/15/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/16/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/16/2018 Partial Approval JAMES POWERS
Pre-Inspection 8/16/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/17/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/17/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/21/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/21/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/22/2018 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/22/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/22/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/23/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/23/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/24/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/24/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/27/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/27/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/28/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/28/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/29/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/29/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/30/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/30/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 8/31/2018 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 8/31/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 8/31/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/4/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/4/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/5/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/5/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/6/2018 Conditional Approval NICK DANERI
Deputy Steel/Welding 9/6/2018 Conditional Approval NICK DANERI
Deputy Drilled-In Anchors 9/7/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/7/2018 Partial Approval JAMES POWERS
Pre-Inspection 9/7/2018 Not Ready for Inspection JAMES POWERS
Wood Frame 9/7/2018 Approved JAMES POWERS
Deputy Drilled-In Anchors 9/10/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/10/2018 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 9/10/2018 Approved JAMES POWERS
Deputy Drilled-In Anchors 9/11/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/11/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/12/2018 Approved JAMES POWERS
Pre-Inspection 9/12/2018 Approved JAMES POWERS
Reinforced Masonry Frame 9/12/2018 Approved JAMES POWERS
Deputy Drilled-In Anchors 9/13/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/13/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/13/2018 Approved JAMES POWERS
Deputy Drilled-In Anchors 9/14/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/14/2018 Partial Approval JAMES POWERS
Final 9/14/2018 OK for TCO JAMES POWERS
Deputy Drilled-In Anchors 9/17/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/17/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 9/18/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 9/18/2018 Partial Approval JAMES POWERS
Final 9/25/2018 Not Ready for Inspection JAMES POWERS
Green Building Final 9/25/2018 Approved JAMES POWERS
Pre-Inspection 9/25/2018 Not Ready for Inspection JAMES POWERS
Pre-Inspection 9/26/2018 Partial Approval JAMES POWERS
Pre-Inspection 9/28/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/2/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/2/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/3/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/3/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/4/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/4/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/5/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/5/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 10/9/2018 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/9/2018 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 10/18/2018 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/25/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 12/28/2018 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 1/22/2019 Partial Approval JAMES POWERS
Special/Order Compliance 3/8/2019 Approved JAMES POWERS
Special/Order Compliance 3/14/2019 Approved JAMES POWERS
Special/Order Compliance 5/21/2019 Approved JAMES POWERS
Special/Order Compliance 8/26/2019 Approved JAMES POWERS
Deputy Drilled-In Anchors 10/23/2019 Partial Approval JAMES POWERS
Deputy Steel/Welding 10/23/2019 Partial Approval JAMES POWERS
Special/Order Compliance 2/14/2020 Approved JAMES POWERS
Final 3/4/2020 Not Ready for Inspection JAMES POWERS
SWPPP-Const. Storm Water 3/4/2020 Completed JAMES POWERS
Final 3/6/2020 OK to Issue CofO JAMES POWERS