Footing/Foundation/Slab
|
11/12/2014
|
Corrections Issued
|
MAURICE MARTINEZ
|
Deputy Reinf. Concrete
|
11/17/2014
|
No Access for Inspection
|
TERRY DRIBIN
|
Footing/Foundation/Slab
|
11/17/2014
|
Not Ready for Inspection
|
TERRY DRIBIN
|
Excavation/Setback/Form/Re-Bar
|
11/18/2014
|
Not Ready for Inspection
|
MAURICE MARTINEZ
|
Footing/Foundation/Slab
|
11/19/2014
|
Not Ready for Inspection
|
MAURICE MARTINEZ
|
Footing/Foundation/Slab
|
11/25/2014
|
Partial Approval
|
MAURICE MARTINEZ
|
Footing/Foundation/Slab
|
12/5/2014
|
Partial Approval
|
TERRY DRIBIN
|
Footing/Foundation/Slab
|
12/10/2014
|
Not Ready for Inspection
|
MAURICE MARTINEZ
|
Masonry Wall/Backfill
|
12/11/2014
|
Not Ready for Inspection
|
MAURICE MARTINEZ
|
Footing/Foundation/Slab
|
12/16/2014
|
Not Ready for Inspection
|
MAURICE MARTINEZ
|
Deputy Reinf. Masonry
|
12/17/2014
|
Conditional Approval
|
MAURICE MARTINEZ
|
Deputy Reinf. Masonry
|
12/18/2014
|
Conditional Approval
|
MAURICE MARTINEZ
|
Footing/Foundation/Slab
|
12/18/2014
|
Not Ready for Inspection
|
MAURICE MARTINEZ
|
Pre-Inspection
|
12/18/2014
|
Not Ready for Inspection
|
MAURICE MARTINEZ
|
Deputy Reinf. Masonry
|
12/19/2014
|
Conditional Approval
|
MAURICE MARTINEZ
|
Deputy Reinf. Masonry
|
12/22/2014
|
Conditional Approval
|
MAURICE MARTINEZ
|
Deputy Reinf. Masonry
|
12/23/2014
|
Conditional Approval
|
MAURICE MARTINEZ
|
Reinforced Concrete Frame
|
12/23/2014
|
Corrections Issued
|
MAURICE MARTINEZ
|
Verify Sprinkler Sign Off
|
12/23/2014
|
Not Ready for Inspection
|
MAURICE MARTINEZ
|
Deputy Reinf. Masonry
|
12/24/2014
|
Conditional Approval
|
MAURICE MARTINEZ
|
Deputy Reinf. Masonry
|
12/26/2014
|
Partial Approval
|
TERRY DRIBIN
|
Deputy Reinf. Masonry
|
12/29/2014
|
Approved
|
DANNY RODRIGUEZ
|
Footing/Foundation/Slab
|
12/29/2014
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
Masonry Wall/Backfill
|
12/29/2014
|
Not Ready for Inspection
|
DANNY RODRIGUEZ
|
Deputy Reinf. Masonry
|
12/30/2014
|
Conditional Approval
|
DANNY RODRIGUEZ
|
Deputy Reinf. Masonry
|
12/31/2014
|
Partial Approval
|
TERRY DRIBIN
|
Footing/Foundation/Slab
|
1/2/2015
|
No Access for Inspection
|
TERRY DRIBIN
|
Deputy Reinf. Concrete
|
1/6/2015
|
Partial Approval
|
TERRY DRIBIN
|
Footing/Foundation/Slab
|
1/6/2015
|
Not Ready for Inspection
|
TERRY DRIBIN
|
Footing/Foundation/Slab
|
1/8/2015
|
Partial Approval
|
DERRICK SPENCER
|
Reinforced Masonry Frame
|
1/20/2015
|
Partial Approval
|
MAURICE MARTINEZ
|
Excavation/Setback/Form/Re-Bar
|
1/21/2015
|
Conditional Approval
|
MAURICE MARTINEZ
|
Footing/Foundation/Slab
|
1/23/2015
|
Corrections Issued
|
MAURICE MARTINEZ
|
Excavation/Setback/Form/Re-Bar
|
1/26/2015
|
Partial Inspection
|
MAURICE MARTINEZ
|
Deputy Reinf. Concrete
|
2/10/2015
|
Conditional Approval
|
MAURICE MARTINEZ
|
Deputy Reinf. Concrete
|
2/18/2015
|
Conditional Approval
|
MAURICE MARTINEZ
|
Deputy Reinf. Concrete
|
2/19/2015
|
Conditional Approval
|
MAURICE MARTINEZ
|
Deputy Reinf. Concrete
|
2/20/2015
|
Conditional Approval
|
MAURICE MARTINEZ
|
Reinforced Concrete Frame
|
6/15/2015
|
Partial Inspection
|
DAVID TSAU
|
Deputy Wood Construction
|
8/12/2015
|
Conditional Approval
|
DAVID TSAU
|
Deputy Wood Construction
|
8/26/2015
|
Conditional Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
9/3/2015
|
Partial Approval
|
DAVID TSAU
|
Green Building Rough
|
9/3/2015
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
Verify Sprinkler Sign Off
|
9/3/2015
|
Not Ready for Inspection
|
DAVID TSAU
|
Wood Frame
|
9/3/2015
|
Not Ready for Inspection
|
DAVID TSAU
|
Drywall Nailing
|
9/4/2015
|
Not Ready for Inspection
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
9/4/2015
|
Partial Approval
|
DAVID TSAU
|
Deputy Wood Construction
|
9/10/2015
|
Conditional Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
9/10/2015
|
Partial Approval
|
DAVID TSAU
|
Green Building Rough
|
9/10/2015
|
Not Ready for Inspection
|
DONALD CRICHLOW
|
Verify Sprinkler Sign Off
|
9/10/2015
|
Not Ready for Inspection
|
DAVID TSAU
|
Wood Frame
|
9/10/2015
|
Not Ready for Inspection
|
DAVID TSAU
|
Deputy Reinf. Concrete
|
9/30/2015
|
Approved
|
JASON MARKOWSKI
|
Deputy Wood Construction
|
10/5/2015
|
Conditional Approval
|
DAVID TSAU
|
Wood Frame
|
10/5/2015
|
Partial Inspection
|
DAVID TSAU
|
Deputy Reinf. Concrete
|
10/14/2015
|
Conditional Approval
|
DAVID TSAU
|
Deputy Reinf. Concrete
|
10/15/2015
|
Conditional Approval
|
DAVID TSAU
|
Footing/Foundation/Slab
|
10/15/2015
|
Partial Approval
|
DAVID TSAU
|
Masonry Wall/Backfill
|
10/16/2015
|
Not Ready for Inspection
|
DAVID TSAU
|
Deputy Reinf. Masonry
|
10/20/2015
|
Conditional Approval
|
DAVID TSAU
|
Masonry Wall/Backfill
|
10/26/2015
|
Not Ready for Inspection
|
DAVID TSAU
|
Deputy Reinf. Masonry
|
10/28/2015
|
Conditional Approval
|
DAVID TSAU
|
Deputy Wood Construction
|
10/28/2015
|
Conditional Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
10/29/2015
|
Partial Approval
|
DAVID TSAU
|
Deputy Reinf. Concrete
|
11/3/2015
|
Conditional Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
11/3/2015
|
Not Ready for Inspection
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
11/5/2015
|
Partial Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
11/12/2015
|
Partial Inspection
|
DAVID TSAU
|
Deputy Wood Construction
|
11/23/2015
|
Conditional Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
11/23/2015
|
Partial Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
11/30/2015
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
12/4/2015
|
Partial Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
12/7/2015
|
Partial Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
12/8/2015
|
Partial Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
12/15/2015
|
Not Ready for Inspection
|
DAVID TSAU
|
Deputy Reinf. Concrete
|
12/28/2015
|
Conditional Approval
|
DAVID TSAU
|
Deputy Drilled-In Anchors
|
12/29/2015
|
Conditional Approval
|
DAVID TSAU
|
Deputy Reinf. Concrete
|
12/29/2015
|
Conditional Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
1/6/2016
|
Partial Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
1/7/2016
|
Partial Approval
|
DAVID TSAU
|
Deputy Drilled-In Anchors
|
1/8/2016
|
Conditional Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
1/8/2016
|
Partial Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
1/12/2016
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
1/13/2016
|
Partial Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
1/15/2016
|
Partial Approval
|
DAVID TSAU
|
Green Building Rough
|
1/15/2016
|
Partial Inspection
|
BRYAN MEYER
|
Green Building Rough
|
1/19/2016
|
Partial Inspection
|
BRYAN MEYER
|
Pre-Inspection
|
1/19/2016
|
Partial Approval
|
DAVID TSAU
|
Floor/Roof Diaphrgm/Shear Wall
|
1/22/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
1/22/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Wood Frame
|
1/22/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
1/25/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Insulation
|
1/26/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Wood Frame
|
1/26/2016
|
Partial Approval
|
DAVID TSAU
|
Green Building Rough
|
1/27/2016
|
Not Ready for Inspection
|
BRYAN MEYER
|
Verify Sprinkler Sign Off
|
1/27/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Wood Frame
|
1/27/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
1/28/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Drywall Nailing
|
1/29/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
2/1/2016
|
Partial Approval
|
DAVID TSAU
|
Green Building Rough
|
2/8/2016
|
Not Ready for Inspection
|
BRYAN MEYER
|
Verify Sprinkler Sign Off
|
2/8/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Wood Frame
|
2/8/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Green Building Rough
|
2/25/2016
|
Not Ready for Inspection
|
BRYAN MEYER
|
Verify Sprinkler Sign Off
|
2/25/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Wood Frame
|
2/25/2016
|
Partial Inspection
|
DAVID TSAU
|
Pre-Inspection
|
2/26/2016
|
Partial Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/1/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/2/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/3/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/4/2016
|
Partial Approval
|
DERRICK SPENCER
|
Green Building Rough
|
3/8/2016
|
Partial Inspection
|
BRYAN MEYER
|
Insulation
|
3/8/2016
|
Partial Approval
|
DERRICK SPENCER
|
Pre-Inspection
|
3/10/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/16/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/17/2016
|
Conditional Approval
|
DAVID TSAU
|
Pre-Inspection
|
3/21/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/21/2016
|
Partial Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/22/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/23/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
3/24/2016
|
Partial Inspection
|
DAVID TSAU
|
Insulation
|
3/25/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
3/25/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
3/29/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
3/30/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
3/31/2016
|
Partial Approval
|
DANIEL MC AULIFFE
|
Verify Sprinkler Sign Off
|
4/6/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Wood Frame
|
4/6/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
4/7/2016
|
Partial Approval
|
DAVID TSAU
|
Green Building Rough
|
4/8/2016
|
Partial Inspection
|
BRYAN MEYER
|
Insulation
|
4/8/2016
|
Partial Approval
|
DAVID TSAU
|
Verify Sprinkler Sign Off
|
4/8/2016
|
Partial Approval
|
DAVID TSAU
|
Wood Frame
|
4/8/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
4/11/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
4/12/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
4/14/2016
|
Partial Inspection
|
DAVID TSAU
|
Insulation
|
4/18/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
4/20/2016
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
4/22/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Green Building Rough
|
4/26/2016
|
Partial Inspection
|
BRYAN MEYER
|
Verify Sprinkler Sign Off
|
4/26/2016
|
Partial Approval
|
DAVID TSAU
|
Wood Frame
|
4/26/2016
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
4/28/2016
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
4/29/2016
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
5/4/2016
|
Partial Inspection
|
DAVID TSAU
|
Drywall Nailing
|
5/5/2016
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
5/5/2016
|
Partial Approval
|
DAVID TSAU
|
Drywall Nailing
|
5/10/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
5/10/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Drywall Nailing
|
5/12/2016
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
5/12/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
5/12/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Green Building Rough
|
5/13/2016
|
Partial Approval
|
BRYAN MEYER
|
Insulation
|
5/13/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
5/13/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Drywall Nailing
|
5/17/2016
|
Partial Approval
|
DAVID TSAU
|
Insulation
|
5/17/2016
|
Not Ready for Inspection
|
DAVID TSAU
|
Pre-Inspection
|
5/17/2016
|
Approved
|
DAVID TSAU
|
Wall Anchors
|
5/17/2016
|
Partial Approval
|
DAVID TSAU
|
Green Building Rough
|
5/18/2016
|
Partial Approval
|
BRYAN MEYER
|
Drywall Nailing
|
5/20/2016
|
Partial Approval
|
TONY HARTONO
|
Insulation
|
5/20/2016
|
Partial Approval
|
TONY HARTONO
|
Drywall Nailing
|
5/23/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
5/23/2016
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
5/25/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
5/25/2016
|
Partial Inspection
|
NICK LAROCCA
|
Drywall Nailing
|
5/26/2016
|
Not Ready for Inspection
|
TONY HARTONO
|
Insulation
|
5/26/2016
|
Not Ready for Inspection
|
TONY HARTONO
|
Drywall Nailing
|
5/27/2016
|
Partial Approval
|
NICK LAROCCA
|
Green Building Rough
|
5/27/2016
|
Partial Inspection
|
BRYAN MEYER
|
Wood Frame
|
5/27/2016
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
5/31/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
5/31/2016
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
6/2/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
6/2/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
6/2/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
6/3/2016
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
6/6/2016
|
Partial Inspection
|
NICK LAROCCA
|
Insulation
|
6/6/2016
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
6/7/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
6/7/2016
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
6/10/2016
|
Partial Approval
|
NICK LAROCCA
|
Interior/Exterior Lathing
|
6/10/2016
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
6/14/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
6/14/2016
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
6/16/2016
|
Partial Approval
|
NICK LAROCCA
|
Wood Frame
|
6/16/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
6/20/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
6/20/2016
|
Approved
|
NICK LAROCCA
|
Deputy Reinf. Concrete
|
6/22/2016
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
6/23/2016
|
Partial Approval
|
NICK LAROCCA
|
Green Building Rough
|
6/24/2016
|
Not Ready for Inspection
|
BRYAN MEYER
|
Insulation
|
6/24/2016
|
Partial Approval
|
NICK LAROCCA
|
Green Building Final
|
6/28/2016
|
Partial Approval
|
BRYAN MEYER
|
Insulation
|
6/28/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
6/28/2016
|
Approved
|
NICK LAROCCA
|
Insulation
|
6/29/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
6/30/2016
|
Not Ready for Inspection
|
NICK LAROCCA
|
Interior/Exterior Lathing
|
6/30/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
7/5/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
7/5/2016
|
Approved
|
NICK LAROCCA
|
Insulation
|
7/6/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
7/6/2016
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
7/8/2016
|
Partial Approval
|
NICK LAROCCA
|
Green Building Rough
|
7/8/2016
|
Partial Inspection
|
JOHN KLARIN
|
Interior/Exterior Lathing
|
7/8/2016
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
7/12/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
7/12/2016
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
7/13/2016
|
Partial Inspection
|
NICK LAROCCA
|
Insulation
|
7/13/2016
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
7/20/2016
|
Partial Approval
|
DAVID TSAU
|
Pre-Inspection
|
7/20/2016
|
Partial Approval
|
DAVID TSAU
|
Interior/Exterior Lathing
|
7/21/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
7/21/2016
|
Approved
|
NICK LAROCCA
|
Green Building Rough
|
7/27/2016
|
Partial Approval
|
RUSSELL KELLY
|
Insulation
|
7/27/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
7/27/2016
|
Approved
|
NICK LAROCCA
|
Wood Frame
|
7/28/2016
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
8/1/2016
|
Partial Approval
|
JASON BORUTA
|
Drywall Nailing
|
8/4/2016
|
Partial Approval
|
DERRICK SPENCER
|
Insulation
|
8/4/2016
|
Partial Approval
|
DERRICK SPENCER
|
Interior/Exterior Lathing
|
8/11/2016
|
Partial Approval
|
DERRICK SPENCER
|
Insulation
|
8/15/2016
|
Partial Approval
|
DERRICK SPENCER
|
Insulation
|
8/17/2016
|
Approved
|
DERRICK SPENCER
|
Pre-Inspection
|
8/17/2016
|
Approved
|
DERRICK SPENCER
|
Drywall Nailing
|
8/18/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
8/18/2016
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
8/25/2016
|
Partial Approval
|
NICK LAROCCA
|
Green Building Rough
|
8/25/2016
|
Partial Approval
|
BRYAN MEYER
|
Drywall Nailing
|
8/30/2016
|
Partial Inspection
|
NICK LAROCCA
|
Pre-Inspection
|
8/30/2016
|
Approved
|
NICK LAROCCA
|
Interior/Exterior Lathing
|
8/31/2016
|
Approved
|
NICK LAROCCA
|
Light Gage Steel Frame
|
8/31/2016
|
Partial Approval
|
NICK LAROCCA
|
Interior/Exterior Lathing
|
9/1/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
9/6/2016
|
Approved
|
NICK LAROCCA
|
Deputy Reinf. Concrete
|
9/8/2016
|
Approved
|
NICK LAROCCA
|
Deputy Reinf. Concrete
|
9/9/2016
|
Approved
|
NICK LAROCCA
|
Deputy Reinf. Concrete
|
9/13/2016
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
9/13/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
9/13/2016
|
Partial Approval
|
NICK LAROCCA
|
Drywall Nailing
|
9/15/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
9/20/2016
|
Partial Approval
|
NICK LAROCCA
|
Insulation
|
9/21/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
9/23/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
9/28/2016
|
Partial Inspection
|
NICK LAROCCA
|
Wood Frame
|
9/30/2016
|
Partial Approval
|
NICK LAROCCA
|
Pre-Inspection
|
10/17/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
10/21/2016
|
Approved
|
NICK LAROCCA
|
Deputy Steel/Welding
|
10/27/2016
|
Approved
|
NICK LAROCCA
|
Green Building Rough
|
10/28/2016
|
Not Ready for Inspection
|
BRYAN MEYER
|
Verify Sprinkler Sign Off
|
10/28/2016
|
Approved
|
NICK LAROCCA
|
Wood Frame
|
10/28/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
11/3/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
11/8/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
11/16/2016
|
Approved
|
NICK LAROCCA
|
Drywall Nailing
|
11/17/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
11/23/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
12/1/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
12/20/2016
|
Approved
|
NICK LAROCCA
|
Final
|
12/22/2016
|
Partial Inspection
|
NICK LAROCCA
|
Footing/Foundation/Slab
|
12/22/2016
|
Approved
|
NICK LAROCCA
|
Green Building Final
|
12/22/2016
|
Partial Inspection
|
BRYAN MEYER
|
Green Building Rough
|
12/22/2016
|
Approved
|
BRYAN MEYER
|
Reinforced Concrete Frame
|
12/22/2016
|
Approved
|
NICK LAROCCA
|
SGSOV-Seismic Gas S/O Valve
|
12/22/2016
|
SGSOV Approved
|
NICK LAROCCA
|
Smoke Detectors
|
12/22/2016
|
Approved
|
NICK LAROCCA
|
Wood Frame
|
12/22/2016
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
1/5/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
1/6/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
1/10/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
1/11/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
1/12/2017
|
Approved
|
DERRICK SPENCER
|
Pre-Inspection
|
1/13/2017
|
Partial Inspection
|
NICK LAROCCA
|
Final
|
1/24/2017
|
Not Ready for Inspection
|
NICK LAROCCA
|
Green Building Final
|
1/25/2017
|
No Access for Inspection
|
BRYAN MEYER
|
Green Building Final
|
1/27/2017
|
Partial Inspection
|
BRYAN MEYER
|
Pre-Inspection
|
2/1/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
2/10/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
2/15/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
2/17/2017
|
Approved
|
NICK LAROCCA
|
Green Building Final
|
2/22/2017
|
Partial Inspection
|
BRYAN MEYER
|
Pre-Inspection
|
2/22/2017
|
Approved
|
NICK LAROCCA
|
Green Building Final
|
2/23/2017
|
Partial Approval
|
BRYAN MEYER
|
Pre-Inspection
|
2/24/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
2/28/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
3/2/2017
|
Approved
|
NICK LAROCCA
|
Pre-Inspection
|
3/31/2017
|
Approved
|
NICK LAROCCA
|
Green Building Final
|
6/2/2017
|
Approved
|
BRYAN MEYER
|
Final
|
7/27/2017
|
OK to Issue CofO
|
DERRICK SPENCER
|
Special/Order Compliance
|
8/9/2017
|
Approved
|
NICK LAROCCA
|