8026 W WENTWORTH ST 91040

Certificate Information: 8026 W WENTWORTH ST 91040

Application / Permit
12014-20000-00429
Plan Check / Job No.
B12VN01444
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
9'0"X 11'6" MASTER BATHROOM ADDITION TO THE REAR. ENCLOSE THE BREEZEWAY AND FRONT PORCH TO ENLARGE THE LIVING ROOM AND KITCHEN (UNDER EXISTING ROOF). REMODEL KITCHEN (CABINET CHANGEOUT). CHANGEOUT ALL EXISITING WINDOWS (SAME SIZE,STYLE AND LOCATION). REAR BEDROOM WINDOW TO A NEW SLIDING DOOR. PER ENG CALCS.
Permit Issued
Issued on 2/15/2012
Issuing Office
Valley
Current Status
CofO Issued on 4/21/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/13/2012 APPLICANT
Assigned to Plan Check Engineer 2/13/2012 JOSE MENDOZA
Corrections Issued 2/13/2012 JOSE MENDOZA
Issued 2/15/2012 LADBS
CofO in Progress 3/5/2026 NICHOLAS TROWBRIDGE
CofO Issued 4/21/2026 RUBEN SALAS
Permit Finaled 4/21/2026 RUBEN SALAS

Permit Application Clearance Information

CPC Cleared 2/13/2012 RICK TORRES
CPC Cleared 2/13/2012 RICK TORRES
CPC Cleared 2/13/2012 RICK TORRES
Eng Process Fee Ord 176,300 Cleared 2/13/2012 LEE GUILBEAUX
Watercourse Cleared 2/13/2012 LEE GUILBEAUX
Grading Pre-Inspection Cleared 2/15/2012 JOSE MENDOZA

Contact Information

Contractor Owner-Builder       ,
Engineer Mejia, Fernando Finuliar; Lic. No.: C54382 8305 DUCOR AVE      WEST HILLS, CA 91304

Inspector Information

NICHOLAS TROWBRIDGE, (818) 374-1174 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

FLOOD-Elevation Certificate 3/30/2012 Not Ready for Inspection KEVIN BEAULIEU
Footing/Foundation/Slab 3/30/2012 Not Ready for Inspection KEVIN BEAULIEU
FLOOD-Elevation Certificate 4/6/2012 Not Ready for Inspection KEVIN BEAULIEU
Footing/Foundation/Slab 4/6/2012 Partial Approval KEVIN BEAULIEU
BUILDING-Rough-Frame 4/20/2012 Not Ready for Inspection BEAU COLLINS
FLOOD-Proofing Certificate 4/20/2012 Approved BEAU COLLINS
BUILDING-Rough-Frame 4/24/2012 Partial Approval BEAU COLLINS
Green Building Rough 4/24/2012 Not Ready for Inspection MICKEY YAMASHITA
BUILDING-Rough-Frame 4/26/2012 Partial Approval BEAU COLLINS
Drywall Nailing 5/3/2012 Partial Approval BEAU COLLINS
Green Building Rough 5/3/2012 Corrections Issued MICKEY YAMASHITA
BUILDING-Rough-Frame 6/19/2013 Partial Approval BEAU COLLINS
Green Building Rough 6/19/2013 Not Ready for Inspection PETER FOLLING
BUILDING-Rough-Frame 12/18/2013 Not Ready for Inspection COREY HUPP
Green Building Rough 12/18/2013 Not Ready for Inspection PETER FOLLING
Pre-Inspection 3/5/2014 Approved BEAU COLLINS
Interior/Exterior Lathing 7/2/2014 Conditional Approval BEAU COLLINS
BUILDING-Rough-Frame 8/18/2014 Conditional Approval BEAU COLLINS
Green Building Rough 8/18/2014 Not Ready for Inspection PETER FOLLING
ELECTRICAL-Rough 2/10/2015 Approved KEVIN BEAULIEU
PLUMBING-Rough 2/10/2015 Approved KEVIN BEAULIEU
Drywall Nailing 3/3/2015 Approved BEAU COLLINS
Green Building Rough 3/3/2015 Approved BEAU COLLINS
BUILDING-Rough-Frame 2/18/2016 Approved BEAU COLLINS
Final 2/18/2016 Conditional Approval BEAU COLLINS
Footing/Foundation/Slab 2/18/2016 Approved BEAU COLLINS
Green Building Final 2/18/2016 Approved BEAU COLLINS
SGSOV-Seismic Gas S/O Valve 2/18/2016 SGSOV Approved BEAU COLLINS
Smoke Detectors 2/18/2016 Approved BEAU COLLINS
Final 1/22/2026 Corrections Issued NICHOLAS TROWBRIDGE
Final 3/4/2026 OK to Issue CofO NICHOLAS TROWBRIDGE