2317 S GLYNDON AVE 90291

Certificate Information: 2317 S GLYNDON AVE 90291

Application / Permit
12010-20001-00668
Plan Check / Job No.
B15VN04282
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
SUPPLEMENTAL TO PERMIT # 12010-10000-00668: To revise foundation framing from slab on grade to raised wood floor construction; addition of 1'-6" x 13'-9" on the 1st floor and on the 2nd floor at rear of the dwelling to expand kitchen and master bathroom; addition of 5'-0" x 14'-0" balcony on the 2nd floor; revise window locations per engineering plans. All work per engineering plans. No change to max. building height. The proposed structure shall be fully sprinklered per NFPA-13D requirements.
Permit Issued
Issued on 6/12/2015
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 3/4/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/8/2015 APPLICANT
Assigned to Plan Check Engineer 5/7/2015 ARMEN SARKISIAN
Corrections Issued 5/19/2015 ARMEN SARKISIAN
Building Plans Picked Up 5/21/2015 APPLICANT
Quality Review Completed 5/22/2015 STEVEN KIM
Applicant returned to address corrections 6/3/2015 ARMEN SARKISIAN
Plan Check Approved 6/4/2015 ARMEN SARKISIAN
Issued 6/12/2015 LADBS
Permit Finaled-Status Void 8/31/2023 JESUS RODRIGUEZ
Re-Activate Permit 3/4/2024 JESUS RODRIGUEZ
Permit Finaled 3/4/2024 MICHAEL PELHAM

Permit Application Clearance Information

Green Code Cleared 5/19/2015 MICHAEL AYERS
"D" conditions Cleared 6/4/2015 NORMA GUZMAN

Contact Information

Architect Chu, Tien Hsi; Lic. No.: C15558 3354 E COLORADO BLVD      PASADENA, CA 91107
Contractor Tan Randy; Lic. No.: 816849-B 377 EL PASEO      MILLBRAE, CA 94030
Engineer Li, Dacheng David; Lic. No.: C58075 23240 RIDGELINE DR      DIAMOND BAR, CA 91765

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 4/20/2016 Partial Approval DAVID HEINE
Excavation/Setback/Form/Re-Bar 5/12/2016 Partial Approval DAVID HEINE
ELECTRICAL-Rough 7/7/2016 Approved CARLOS MATAMOROS
Footing/Foundation/Slab 7/7/2016 Approved CARLOS MATAMOROS
Pre-Inspection 5/18/2017 Not Ready for Inspection CARLOS MATAMOROS
Pre-Inspection 6/19/2017 Corrections Issued CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 7/28/2017 Approved CARLOS MATAMOROS
BUILDING-Rough-Frame 9/21/2017 Corrections Issued CARLOS MATAMOROS
Floor/Roof Diaphrgm/Shear Wall 9/21/2017 Approved CARLOS MATAMOROS
BUILDING-Rough-Frame 8/7/2018 Not Ready for Inspection CARLOS MATAMOROS
Green Building Rough 8/7/2018 Not Ready for Inspection CARLOS MATAMOROS
BUILDING-Rough-Frame 11/19/2021 Partial Approval DAVID FEILER
Green Building Rough 11/19/2021 Not Ready for Inspection DAVID FEILER
Interior/Exterior Lathing 12/9/2021 Partial Approval DAVID FEILER
Shower Pan 4/8/2022 Corrections Issued DAVID FEILER
Shower Pan 4/11/2022 Approved DAVID FEILER
Interior/Exterior Lathing 4/20/2022 Approved DAVID FEILER
BUILDING-Rough-Frame 4/25/2022 Approved DAVID FEILER
Green Building Rough 4/25/2022 Approved DAVID FEILER
Insulation 5/3/2022 Approved DAVID FEILER
Final 8/31/2023 Not Ready for Inspection JESUS RODRIGUEZ
Green Building Final 8/31/2023 Approved JESUS RODRIGUEZ
Smoke Detectors 8/31/2023 Approved JESUS RODRIGUEZ